+ All Categories
Home > Documents > [email protected] ATS ULTra Status Report Steve Raney, ATS Inc. (U.S.)

[email protected] ATS ULTra Status Report Steve Raney, ATS Inc. (U.S.)

Date post: 13-Jan-2016
Category:
Upload: doreen-allen
View: 216 times
Download: 1 times
Share this document with a friend
15
[email protected] ATS ULTra Status Report Steve Raney, ATS Inc. (U.S.)
Transcript
Page 1: Ultraprt@ultraprt.com ATS ULTra Status Report Steve Raney, ATS Inc. (U.S.)

[email protected]

ATS ULTra Status ReportSteve Raney, ATS Inc. (U.S.)

Page 2: Ultraprt@ultraprt.com ATS ULTra Status Report Steve Raney, ATS Inc. (U.S.)

[email protected]

ATS ULTra Status Report• PPT will NOT be posted on the web, not for

distribution• Agenda

– Some discussion items. What will the future hold?– Heathrow Terminal 5 status. Schedule– Version 1.0, 1.5, 2.0– VisiCalc, Lotus 123, MS Excel– “Road based” PRT– Market forecast– Swedish IST/GTS– Safety certification.

Page 3: Ultraprt@ultraprt.com ATS ULTra Status Report Steve Raney, ATS Inc. (U.S.)

[email protected]

LHR Terminal 5 Opens March ’08N

Car Park to T5

3.8 km of track18 vehicles300,000 pax paULTra Opens April 2008

T5: 3rd largest “airport”

?Morgantown complexity?Full Heathrow Build: bigger system, in phases

Page 4: Ultraprt@ultraprt.com ATS ULTra Status Report Steve Raney, ATS Inc. (U.S.)

[email protected]

Heathrow (LHR) Terminal 5 Status• BAA: privatized, owns LHR + 6 airports

– Contracts: Baltimore, Logan, Pittsburg, Indianapolis, Naples

• 100% private sector funding!• Happy customer (per Mar/Apr TransitPulse ’08 Article by BAA)

– “on time and on budget”– 2 year Heathrow study: low emissions, high LOS, space

efficient, value. Bus & APM lost. “PRT: only practical soln, 60% travel time svngs, 40% operating cost savings”

– Held open procurement: ULTra won– Phased Heathrow implementation

• Happy customer: new animation– BAA PR machine, not ATS PR.

Page 5: Ultraprt@ultraprt.com ATS ULTra Status Report Steve Raney, ATS Inc. (U.S.)

[email protected]

Schedule slip: Fall ’08 Spring ’09• Not: engineering underestimate or parts issue

• ATS has met all schedule milestones for Cardiff test track and Heathrow T5

• The schedule slip:– Was an administrative slip – Ferrovial’s $20BB acquisition of BAA had some

schedule impact.

Page 6: Ultraprt@ultraprt.com ATS ULTra Status Report Steve Raney, ATS Inc. (U.S.)

[email protected]

Schedule (some wiggle)• Column footings complete Jan ‘08• Infrastructure complete May ’08

– Columns, spans, concrete running surfaces– Calibration (“learn the guideway”) starts May ‘08

• Stations with glass doors & touch screens, May ’08– Also for 2008: Cardiff track copies LHR stations

• Guideway “fitted out” Oct ’08 (AVP, etc)– AVP – automatic vehicle protection

• Commissioning starts Oct ’08 – empty vehicles first, then with passengers

• 18th vehicle arrives Dec ’08• Guideway really does build fast

– 4 person, evening crew. 1 column or 1 span per night

• Cost: $10 to $15 MM per mile, depending …– For ULTra systems #2 through #5.

Page 8: Ultraprt@ultraprt.com ATS ULTra Status Report Steve Raney, ATS Inc. (U.S.)

[email protected]

VisiCalc, Lotus 123, Excel• Is ATS VisiCalc? Is Vectus Lotus 123? Who

will be Microsoft? Genteel?

Page 9: Ultraprt@ultraprt.com ATS ULTra Status Report Steve Raney, ATS Inc. (U.S.)

[email protected]

VisiCalc, Lotus 123, Excel• ATS first mover advantage?

• How much does having the best design matter?

• Version 1.0, 1.5, 2.0, Excel 98, Excel XP, ….

• Is ULTra V1.0 “road-based” PRT too simple? – Ingmar’s study: Skyweb chosen as best– Attendees: rate ULTra design vs. competition

• What will ULTra V1.5 include? V2.0? What version did BAA invest $15MM in?

Page 10: Ultraprt@ultraprt.com ATS ULTra Status Report Steve Raney, ATS Inc. (U.S.)

[email protected]

Batteries add weight, limit speed/range?

• For BAA’s long term Heathrow vision, is ULTra range an issue? If so, why would BAA invest?

• How much do ATS batteries weigh? – Vs. Tesla motors

• Road-based PRT: AHS + electric cars– Drive-by-wire versus traditional PRT mechanical switching– Advances in batteries (etc) & auto sensor technologies

benefit road-based PRT, and reduce cost.

Page 11: Ultraprt@ultraprt.com ATS ULTra Status Report Steve Raney, ATS Inc. (U.S.)

[email protected]

ULTra: Is guideway too bulky?• Attendees: rate ULTra guideway visual impact

• What about Megarail guideway? What if ULTra V1.5 was similar?

Page 12: Ultraprt@ultraprt.com ATS ULTra Status Report Steve Raney, ATS Inc. (U.S.)

[email protected]

When is the PRT Tipping Point?

• How many system contracts in 2008?– Versus “announcements”– What’s the deal with Dubai & Masdar?

• When will customers ask for PRT (like BAA?) – Customer studies feature PRT (like BAA)?

• When do sales go exponential?

• Will Fortune 1,000 companies enter? – Will they be genteel?

Page 13: Ultraprt@ultraprt.com ATS ULTra Status Report Steve Raney, ATS Inc. (U.S.)

[email protected]

Socialism/Capitalism & PRT

• Did Bill Gates cooperate with competition? Should ATS cooperate?

• Will ATS’s value as a company increase from cooperation? Or do investors look for a sustainable technological advantage?

• IST/GTS standardized (suspended) PRT scheme– Vendors relegated to being vehicle suppliers

• What would Bill Gates say? Linux O/S running Excel.

Page 14: Ultraprt@ultraprt.com ATS ULTra Status Report Steve Raney, ATS Inc. (U.S.)

[email protected]

Safety Certification• ASCE APM Standards

– ULTra meets the current standard– ATS and BAA are committee members

• UK Rail Inspectorate: similar to U.S. plus “safety designed in.” – Independent safety team meets with ULTra design team

regularly. Team adds new features to address safety cases.

– Inspectorate: “better than traditional systems”

• 361 hazard cases– Earthquake, truck crashes into column, falling debris, fire,

bad people, extreme weather, vehicle fails on guideway, slipping on stairs, etc.

Page 15: Ultraprt@ultraprt.com ATS ULTra Status Report Steve Raney, ATS Inc. (U.S.)

[email protected]

THE END


Recommended