ideal grid for all
Unareti Demo Site
Alessio Dedè
Unareti SpA,
Smart Grid Department,
Italy
IDE4L Symposium, Brescia18th May 2016
ideal grid for all 18/05/2016 WWW.IDE4L.EU – IDE4L Symposium, BresciaSLIDE 2
• Demo Site General Description
• Demo Site Overall Architecture
• LV Network Demonstrator: architecture, use-cases and results
• MV Network Demonstrator: architecture, use-cases and results
ideal grid for all
Demo Site General Description
18/05/2016 WWW.IDE4L.EU – IDE4L Symposium, BresciaSLIDE 3
• Eco-compatible life-style area:high percentage of customerswith PV panels and districtheating system
• It covers the MVand LV networks,up to the finalconnection pointsof customers’ Violino
BresciaDowntown
• Unareti field demonstrator is located in the city of Brescia,in a district called “Il Violino”
ideal grid for all
Demo Site Overall Architecture
18/05/2016 WWW.IDE4L.EU – IDE4L Symposium, BresciaSLIDE 4
BRESCIACONTROL CENTER
PRIMARY SUBSTATION AUTOMATION UNIT
PROTECION SYSTEMS
PRIMARY SUBSATION SCADA SYSTEMS
SMART METER
PRIMARY SUBSTATION
LEVEL
SECONDARY SUBSTATION
LEVEL
LOW VOLTAGE NETWORK LEVEL
STORAGE
SECONDARY SUBSTATION AUTOMATION UNIT
PROTECTION SYSTEMS
BREAKERS
PHOTOVOLTAIC PANEL
ideal grid for all
Demo Site Overall Architecture
18/05/2016 WWW.IDE4L.EU – IDE4L Symposium, BresciaSLIDE 5
BRESCIACONTROL CENTER
PRIMARY SUBSTATION AUTOMATION UNIT
PROTECION SYSTEMS
PRIMARY SUBSATION SCADA SYSTEMS
SMART METER
PRIMARY SUBSTATION
LEVEL
SECONDARY SUBSTATION
LEVEL
LOW VOLTAGE NETWORK LEVEL
PHOTOVOLTAIC PANEL
STORAGE
MV Demonstrator
LV Demonstrator
SECONDARY SUBSTATION AUTOMATION UNIT
PROTECTION SYSTEMS
BREAKERS
ideal grid for all
LV Network Demonstrator
18/05/2016 WWW.IDE4L.EU – IDE4L Symposium, BresciaSLIDE 6
MV/LV
substation
Feeder 1
Feeder 2
Feeder 3Feeder 6
Feeder 7
Feeder 8 Feeder 3
Via
Bie
mm
i
Via
Fra
u
Via Rossa
Via Ansa
Via Adelchi
46
32
27
37
9
13
28
34
31
33
45
1
2330
14
4
12
4
5
23
1112
14
22
19
32
7230
33
2
3 6
4
Via Desiderio
7
Meter on the PV
Meter on the connection
node
Customer with PV
Customer
Street cabinet
STATCOM/DVR
Secondary substation involved in the LV demonstrator
• 1 Secondary substation
ideal grid for all
LV Network Demonstrator
18/05/2016 WWW.IDE4L.EU – IDE4L Symposium, BresciaSLIDE 7
MV/LV
substation
Feeder 1
Feeder 2
Feeder 3Feeder 6
Feeder 7
Feeder 8 Feeder 3
Via
Bie
mm
i
Via
Fra
u
Via Rossa
Via Ansa
Via Adelchi
46
32
27
37
9
13
28
34
31
33
45
1
2330
14
4
12
4
5
23
1112
14
22
19
32
7230
33
2
3 6
4
Via Desiderio
7
Meter on the PV
Meter on the connection
node
Customer with PV
Customer
Street cabinet
STATCOM/DVR
• 1 Secondary substation
• 10 LV feeders with monitor and control
LV Controllable breakers used in the LV demonstrator
ideal grid for all
LV Network Demonstrator
18/05/2016 WWW.IDE4L.EU – IDE4L Symposium, BresciaSLIDE 8
MV/LV
substation
Feeder 1
Feeder 2
Feeder 3Feeder 6
Feeder 7
Feeder 8 Feeder 3
Via
Bie
mm
i
Via
Fra
u
Via Rossa
Via Ansa
Via Adelchi
46
32
27
37
9
13
28
34
31
33
45
1
2330
14
4
12
4
5
23
1112
14
22
19
32
7230
33
2
3 6
4
Via Desiderio
7
Meter on the PV
Meter on the connection
node
Customer with PV
Customer
Street cabinet
STATCOM/DVR
• 1 Secondary substation
• 10 LV feeders with monitor and control
• 1 Dynamic Voltage Restorer (DVR)
DVR used in the LV demonstrator
ideal grid for all
LV Network Demonstrator
18/05/2016 WWW.IDE4L.EU – IDE4L Symposium, BresciaSLIDE 9
MV/LV
substation
Feeder 1
Feeder 2
Feeder 3Feeder 6
Feeder 7
Feeder 8 Feeder 3
Via
Bie
mm
i
Via
Fra
u
Via Rossa
Via Ansa
Via Adelchi
46
32
27
37
9
13
28
34
31
33
45
1
2330
14
4
12
4
5
23
1112
14
22
19
32
7230
33
2
3 6
4
Via Desiderio
7
Meter on the PV
Meter on the connection
node
Customer with PV
Customer
Street cabinet
STATCOM/DVR
• 1 Secondary substation
• 10 LV feeders with monitor and control
• 1 Dynamic Voltage Restorer (DVR)
• 1 Substation Automation Unit (SAU)
Substation Automation Unit used in the LV demonstrator
ideal grid for all
LV Network Demonstrator
18/05/2016 WWW.IDE4L.EU – IDE4L Symposium, BresciaSLIDE 10
MV/LV
substation
Feeder 1
Feeder 2
Feeder 3Feeder 6
Feeder 7
Feeder 8 Feeder 3
Via
Bie
mm
i
Via
Fra
u
Via Rossa
Via Ansa
Via Adelchi
46
32
27
37
9
13
28
34
31
33
45
1
2330
14
4
12
4
5
23
1112
14
22
19
32
7230
33
2
3 6
4
Via Desiderio
7
Meter on the PV
Meter on the connection
node
Customer with PV
Customer
Street cabinet
STATCOM/DVR
• 45 consumers involved in the project
LV customer in Via Biemmi involved in the LV demonstrator
ideal grid for all
LV Network Demonstrator
18/05/2016 WWW.IDE4L.EU – IDE4L Symposium, BresciaSLIDE 11
MV/LV
substation
Feeder 1
Feeder 2
Feeder 3Feeder 6
Feeder 7
Feeder 8 Feeder 3
Via
Bie
mm
i
Via
Fra
u
Via Rossa
Via Ansa
Via Adelchi
46
32
27
37
9
13
28
34
31
33
45
1
2330
14
4
12
4
5
23
1112
14
22
19
32
7230
33
2
3 6
4
Via Desiderio
7
Meter on the PV
Meter on the connection
node
Customer with PV
Customer
Street cabinet
STATCOM/DVR
• 45 consumers involved in the project
• 60 smart meters installed: 45 for load monitoring, 15 for PV monitoring
Smart meters used in the LV demonstrator
LV – BPL modem
SM PV
SM Load
ideal grid for all
LV Network Demonstrator
18/05/2016 WWW.IDE4L.EU – IDE4L Symposium, BresciaSLIDE 12
MV/LV
substation
Feeder 1
Feeder 2
Feeder 3Feeder 6
Feeder 7
Feeder 8 Feeder 3
Via
Bie
mm
i
Via
Fra
u
Via Rossa
Via Ansa
Via Adelchi
46
32
27
37
9
13
28
34
31
33
45
1
2330
14
4
12
4
5
23
1112
14
22
19
32
7230
33
2
3 6
4
Via Desiderio
7
Meter on the PV
Meter on the connection
node
Customer with PV
Customer
Street cabinet
STATCOM/DVR
• 45 consumers involved in the project
• 60 smart meters installed: 45 for load monitoring, 15 for PV monitoring
• Controllable resources: 4 PV inverters and 5 Static Synchronous Compensators (STATCOM)
STATCOMPV inverter
ideal grid for all
LV Network Demonstrator
18/05/2016 WWW.IDE4L.EU – IDE4L Symposium, BresciaSLIDE 13
REAL-TIME MONITORING
LOAD AND PRODUCTION FORECAST
STATE ESTIMATION
POWER CONTROL
USE
CA
SES
Monitoring
Power Control
Power Control
SMART METER
SECONDARY SUBSTATION
LEVEL
LOW VOLTAGE NETWORK LEVEL
PV (WITH INVERTER)
STORAGE (STATCOM)
SECONDARY SUBSTATION AUTOMATION UNIT
BREAKERS
DVR
Power Control
Monitoring
ideal grid for all
LV Network Demonstrator
18/05/2016 WWW.IDE4L.EU – IDE4L Symposium, BresciaSLIDE 14
• Data collected during the solar eclipse of March 20th
2015 (partially cloudy)
• KPIs:• +17% monitored nodes
• +8 kBytes/hour of data storage
REAL-TIME MONITORING
LOAD AND PRODUCTION FORECAST
STATE ESTIMATION
POWER CONTROL
ideal grid for all
LV Network Demonstrator
18/05/2016 WWW.IDE4L.EU – IDE4L Symposium, BresciaSLIDE 15
REAL-TIME MONITORING
LOAD AND PRODUCTION FORECAST
STATE ESTIMATION
POWER CONTROL
• Production forecast of a PV panel (1.29 kWp),September 12th – 19th 2015
• KPIs:• Load forecast→ Root Mean Square Error (RMSE)=214.23 Wh, Normalized RMSE
(NRMSE)=13.73%• Production forecast→ RMSE=103.96 Wh, NRMSE=11.07%
ideal grid for all
MV Network Demonstrator
18/05/2016 WWW.IDE4L.EU – IDE4L Symposium, BresciaSLIDE 16
1023
1024
0338
0145
0468
0827
1217
1464
1073
1341
1006
0545
1354 0605
0378
1512
1438011706031340
to another PS
Primary Substation«Violino» – 23
Line 2Line 1 Line 3
to another PS
Line 4 Line 5
Line 5 Line 523 kV
15 kV
1056
0732
1462
0297
1190
1180
1070
0585
0870114306040060118709871136
0952
0937
0749
2236
2137
2093
to another PS
normally open
Circuit breaker
On-load switch disconnector
Switch disconnector
Automation device
Control device
normally open
• 1 Primary substation
Primary Substation involved in the MV demonstrator
ideal grid for all
MV Network Demonstrator
18/05/2016 WWW.IDE4L.EU – IDE4L Symposium, BresciaSLIDE 17
• 1 Primary substation
• 1 Substation Automation Unit
Substation Automation Unit used in the MV demonstrator
1023
1024
0338
0145
0468
0827
1217
1464
1073
1341
1006
0545
1354 0605
0378
1512
1438011706031340
to another PS
Primary Substation«Violino» – 23
Line 2Line 1 Line 3
to another PS
Line 4 Line 5
Line 5 Line 523 kV
15 kV
1056
0732
1462
0297
1190
1180
1070
0585
0870114306040060118709871136
0952
0937
0749
2236
2137
2093
to another PS
normally open
Circuit breaker
On-load switch disconnector
Switch disconnector
Automation device
Control device
normally open
ideal grid for all
MV Network Demonstrator
18/05/2016 WWW.IDE4L.EU – IDE4L Symposium, BresciaSLIDE 18
• 1 Primary substation
• 1 Substation Automation Unit
• 1 Primary substation SCADA system
SCADA used in the MV demonstrator
1023
1024
0338
0145
0468
0827
1217
1464
1073
1341
1006
0545
1354 0605
0378
1512
1438011706031340
to another PS
Primary Substation«Violino» – 23
Line 2Line 1 Line 3
to another PS
Line 4 Line 5
Line 5 Line 523 kV
15 kV
1056
0732
1462
0297
1190
1180
1070
0585
0870114306040060118709871136
0952
0937
0749
2236
2137
2093
to another PS
normally open
Circuit breaker
On-load switch disconnector
Switch disconnector
Automation device
Control device
normally open
ideal grid for all
MV Network Demonstrator
18/05/2016 WWW.IDE4L.EU – IDE4L Symposium, BresciaSLIDE 19
• 1 Primary substation
• 1 Substation Automation Unit
• 1 Primary substation SCADA system
• 2 Protection Systems
Protection system used in the MV demonstrator
1023
1024
0338
0145
0468
0827
1217
1464
1073
1341
1006
0545
1354 0605
0378
1512
1438011706031340
to another PS
Primary Substation«Violino» – 23
Line 2Line 1 Line 3
to another PS
Line 4 Line 5
Line 5 Line 523 kV
15 kV
1056
0732
1462
0297
1190
1180
1070
0585
0870114306040060118709871136
0952
0937
0749
2236
2137
2093
to another PS
normally open
Circuit breaker
On-load switch disconnector
Switch disconnector
Automation device
Control device
normally open
ideal grid for all
MV Network Demonstrator
18/05/2016 WWW.IDE4L.EU – IDE4L Symposium, BresciaSLIDE 20
• 1 Primary substation
• 1 Substation Automation Unit
• 1 Primary substation SCADA system
• 2 Protection Systems
• 3 MV feeders (2 fully automated)
Feeders involved in the MV demonstrator
1023
1024
0338
0145
0468
0827
1217
1464
1073
1341
1006
0545
1354 0605
0378
1512
1438011706031340
to another PS
Primary Substation«Violino» – 23
Line 2Line 1 Line 3
to another PS
Line 4 Line 5
Line 5 Line 523 kV
15 kV
1056
0732
1462
0297
1190
1180
1070
0585
0870114306040060118709871136
0952
0937
0749
2236
2137
2093
to another PS
normally open
Circuit breaker
On-load switch disconnector
Switch disconnector
Automation device
Control device
normally open
ideal grid for all
MV Network Demonstrator
18/05/2016 WWW.IDE4L.EU – IDE4L Symposium, BresciaSLIDE 21
• 3 Secondary substations
1023
1024
0338
0145
0468
0827
1217
1464
1073
1341
1006
0545
1354 0605
0378
1512
1438011706031340
to another PS
Primary Substation«Violino» – 23
Line 2Line 1 Line 3
to another PS
Line 4 Line 5
Line 5 Line 523 kV
15 kV
1056
0732
1462
0297
1190
1180
1070
0585
0870114306040060118709871136
0952
0937
0749
2236
2137
2093
to another PS
normally open
Circuit breaker
On-load switch disconnector
Switch disconnector
Automation device
Control device
normally open
Secondary Substation involved in MV demonstrator
ideal grid for all
MV Network Demonstrator
18/05/2016 WWW.IDE4L.EU – IDE4L Symposium, BresciaSLIDE 22
• 3 Secondary substations
• 8 MV circuit breakers
Circuit breakers used in the MV demonstrator
1023
1024
0338
0145
0468
0827
1217
1464
1073
1341
1006
0545
1354 0605
0378
1512
1438011706031340
to another PS
Primary Substation«Violino» – 23
Line 2Line 1 Line 3
to another PS
Line 4 Line 5
Line 5 Line 523 kV
15 kV
1056
0732
1462
0297
1190
1180
1070
0585
0870114306040060118709871136
0952
0937
0749
2236
2137
2093
to another PS
normally open
Circuit breaker
On-load switch disconnector
Switch disconnector
Automation device
Control device
normally open
ideal grid for all
MV Network Demonstrator
18/05/2016 WWW.IDE4L.EU – IDE4L Symposium, BresciaSLIDE 23
• 3 Secondary substations
• 8 MV circuit breakers
• 3 protection systems
Protection systems used in the MV demonstrator
1023
1024
0338
0145
0468
0827
1217
1464
1073
1341
1006
0545
1354 0605
0378
1512
1438011706031340
to another PS
Primary Substation«Violino» – 23
Line 2Line 1 Line 3
to another PS
Line 4 Line 5
Line 5 Line 523 kV
15 kV
1056
0732
1462
0297
1190
1180
1070
0585
0870114306040060118709871136
0952
0937
0749
2236
2137
2093
to another PS
normally open
Circuit breaker
On-load switch disconnector
Switch disconnector
Automation device
Control device
normally open
ideal grid for all
MV Network Demonstrator
18/05/2016 WWW.IDE4L.EU – IDE4L Symposium, BresciaSLIDE 24
REAL-TIME MONITORING
STATE ESTIMATION
PROTECTIONS UPDATE
FLISR
USE
CA
SES
FLISR
ProtectionsUpdate
PRIMARY SUBSTATION AUTOMATION UNIT
PROTECION SYSTEMS
PRIMARY SUBSATION SCADA SYSTEMS
PRIMARY SUBSTATION
LEVEL
SECONDARY SUBSTATION
LEVEL
PROTECTION SYSTEMS
ideal grid for all
MV Network Demonstrator
18/05/2016 WWW.IDE4L.EU – IDE4L Symposium, BresciaSLIDE 25
• Active power of the primary substation lines on May 10th
2016
• KPIs:• +21% monitored nodes
• +13 kBytes/hour of data storage
REAL-TIME MONITORING
STATE ESTIMATION
PROTECTIONS UPDATE
FLISR
0
0,2
0,4
0,6
0,8
1
1,2
1,4
1,6
Act
ive
Po
wer
[M
W]
Active Power - PS023 Line 1 and Line 2
Line 1
Line 2
ideal grid for all
MV Network Demonstrator
18/05/2016 WWW.IDE4L.EU – IDE4L Symposium, BresciaSLIDE 26
• FLISR – Protection Functions Performances• 50/51 Overcurrent Time Range
• 67N Time Range and Angle Range
REAL-TIME MONITORING
STATE ESTIMATION
PROTECTIONS UPDATE
FLISR
ideal grid for all
MV Network Demonstrator
18/05/2016 WWW.IDE4L.EU – IDE4L Symposium, BresciaSLIDE 27
REAL-TIME MONITORING
STATE ESTIMATION
PROTECTIONS UPDATE
FLISR
OvercurrentTrip time range(100 Fault Tests)
• FLISR – Protection Functions Performances• 50/51 Overcurrent Time Range
• 67N Time Range and Angle Range
10°170°Ground DirectionalTrip time range
(10° to 170° Fault Tests)
ideal grid for all
MV Network Demonstrator
18/05/2016 WWW.IDE4L.EU – IDE4L Symposium, BresciaSLIDE 28
REAL-TIME MONITORING
STATE ESTIMATION
PROTECTIONS UPDATE
FLISR
• FLISR – Auto-Reclosure• 79 Logics
• Fast reclosure with success (500 msec from trip)
CLOSE
ideal grid for all
MV Network Demonstrator
18/05/2016 WWW.IDE4L.EU – IDE4L Symposium, BresciaSLIDE 29
REAL-TIME MONITORING
STATE ESTIMATION
PROTECTIONS UPDATE
FLISR
• FLISR – Auto-Reclosure• 79 Logics
• Fast reclosure with success (500 msec from trip)
Overcurrent
Fault!
CLOSE
ideal grid for all
MV Network Demonstrator
18/05/2016 WWW.IDE4L.EU – IDE4L Symposium, BresciaSLIDE 30
REAL-TIME MONITORING
STATE ESTIMATION
PROTECTIONS UPDATE
FLISR
• FLISR – Auto-Reclosure• 79 Logics
• Fast reclosure with success (500 msec from trip)
OPEN
Trip
ideal grid for all
MV Network Demonstrator
18/05/2016 WWW.IDE4L.EU – IDE4L Symposium, BresciaSLIDE 31
REAL-TIME MONITORING
STATE ESTIMATION
PROTECTIONS UPDATE
FLISR
• FLISR – Auto-Reclosure• 79 Logics
• Fast reclosure with success (500 msec from trip)
OPEN
Waiting
fast reclosure…
ideal grid for all
MV Network Demonstrator
18/05/2016 WWW.IDE4L.EU – IDE4L Symposium, BresciaSLIDE 32
REAL-TIME MONITORING
STATE ESTIMATION
PROTECTIONS UPDATE
FLISR
• FLISR – Auto-Reclosure• 79 Logics
• Fast reclosure with success (500 msec from trip)
CLOSE
ideal grid for all
MV Network Demonstrator
18/05/2016 WWW.IDE4L.EU – IDE4L Symposium, BresciaSLIDE 33
REAL-TIME MONITORING
STATE ESTIMATION
PROTECTIONS UPDATE
FLISR
• FLISR – Logic Selectivity• GOOSE and Logics
• Integration with Third Parties Devices
ideal grid for all
MV Network Demonstrator
18/05/2016 WWW.IDE4L.EU – IDE4L Symposium, BresciaSLIDE 34
REAL-TIME MONITORING
STATE ESTIMATION
PROTECTIONS UPDATE
FLISR
• FLISR – Logic Selectivity• GOOSE and Logics
• Integration with Third Parties Devices
Fault in MV feeder
After the first SS with
Protection Devices
ideal grid for all
MV Network Demonstrator
18/05/2016 WWW.IDE4L.EU – IDE4L Symposium, BresciaSLIDE 35
REAL-TIME MONITORING
STATE ESTIMATION
PROTECTIONS UPDATE
FLISR
• FLISR – Logic Selectivity• GOOSE and Logics
• Integration with Third Parties Devices
FAULT!
FAULT!
ideal grid for all
MV Network Demonstrator
18/05/2016 WWW.IDE4L.EU – IDE4L Symposium, BresciaSLIDE 36
REAL-TIME MONITORING
STATE ESTIMATION
PROTECTIONS UPDATE
FLISR
• FLISR – Logic Selectivity• GOOSE and Logics
• Integration with Third Parties Devices
FAULT!
FAULT!
GOOSE
ideal grid for all
MV Network Demonstrator
18/05/2016 WWW.IDE4L.EU – IDE4L Symposium, BresciaSLIDE 37
REAL-TIME MONITORING
STATE ESTIMATION
PROTECTIONS UPDATE
FLISR
• FLISR – Logic Selectivity• GOOSE and Logics
• Integration with Third Parties Devices
FAULT!
FAULT!
GOOSE
Waiting for
GOOSEs
ideal grid for all
MV Network Demonstrator
18/05/2016 WWW.IDE4L.EU – IDE4L Symposium, BresciaSLIDE 38
REAL-TIME MONITORING
STATE ESTIMATION
PROTECTIONS UPDATE
FLISR
• FLISR – Logic Selectivity• GOOSE and Logics
• Integration with Third Parties Devices
FAULT!
FAULT!
GOOSE
TRIP!!!