29
PRE FEASIBILITY REPORT FOR PAZHAVOOR PART-1 EARTH QUARRY J.RAJKUMAR Under EIA Notification 2006 Pre-Feasibility Report of Pazhavoor Part-1 Earth Quarry (Under the Guidelines of Ministry of Environment and Forest in terms of the provisions of EIA notification 20051, 52 & 127 and specifically in circular No J-11013/41/20051, 52 & 127 -IA.II (I) dated 30 th December, 2010) S.F.No. 1004/2 (P) Pazhavoor Part-1 Village, Radhapuram Taluk, Tirunelveli District, Extent: 1.47.25Ha (less than 5Ha) Category: B2 Project Applicant J.Rajkumar, S/o. Jeyakumar, 7-2-7, Peruratchi office street, Pudupatti, Theni District - 625556
Transcript

PRE FEASIBILITY REPORT FOR PAZHAVOOR PART-1 EARTH QUARRY J.RAJKUMAR

Under EIA Notification 2006

Pre-Feasibility Report of

Pazhavoor Part-1 Earth Quarry (Under the Guidelines of Ministry of Environment and Forest

in terms of the provisions of EIA notification 20051, 52 & 127 and specifically in circular

No J-11013/41/20051, 52 & 127 -IA.II (I) dated 30th

December, 2010)

S.F.No. 1004/2 (P)

Pazhavoor Part-1 Village,

Radhapuram Taluk, Tirunelveli District,

Extent: 1.47.25Ha (less than 5Ha)

Category: B2 Project

Applicant

J.Rajkumar,

S/o. Jeyakumar,

7-2-7, Peruratchi office street,

Pudupatti,

Theni District - 625556

PRE FEASIBILITY REPORT FOR PAZHAVOOR PART-1 EARTH QUARRY J.RAJKUMAR

Under EIA Notification 2006

1. EXECUTIVE SUMMERY

Mr. J.Rajkumar has been obtained permission from District collector Tirunelveli to quarry

Earth for over an extent of 1.47.25Ha in Survey No: 1004/2 (P) at Pazhavoor Part-1 Village,

Radhapuram Taluk and Tirunelveli District, Tamilnadu state by District Collector Tirunelveli,

Rc. No. M2/27088/2016 Dated: 06.09.2016, for a period of Three years only subjected to

submission of Environmental clearance from MoEF / SEIAA, consent for Establishment and

Consent for operation from TNPCB.

SALIENT FEATURES OF THE PROJECT

S.NO PARTICULAR DETAILS

1. Name of the Proponent J.Rajkumar

2. Type of Project Earth quarry

3. Location Survey No.1004/2 (P)

Pazhavoor Part-1 Village,

Radhapuram Taluk,

Tirunelveli District,

Tamilnadu State.

4. Mining lease area 1.47.25Ha

5. Type of land

Patta/forest/PWD

Patta Land – Non forest

6. Life of period Three years only

7. Production capacity The proposed quantity of reserves is 29505m3

(or)

5213 Lorry Loads of Earth up to a depth 3m below

the ground level for a period of Three years only.

Description Earth in m3

Geological Resources 44994

Available Mineable reserves 29505

Three years plan period

As in the approved mining plan

29505

8. Method of Mining Open cast method of shallow mining is proposed,

Machineries like excavators are proposed for

quarrying Earth 3m below the ground level.

No drilling or blasting is proposed for this type of

Earth Quarrying, it is a conventional eco friendly

quarrying operation.

PRE FEASIBILITY REPORT FOR PAZHAVOOR PART-1 EARTH QUARRY J.RAJKUMAR

Under EIA Notification 2006

9. Ultimate depth of Mining The quarry operation is Proposed up to depth 3m

below the ground level during this period.

10. Latitude 08°12’28.88’’N to 08°12’23.78’’N

11. Longitude 77°33’55.62’’E to 77°33’49.79’’E

12. Top sheet No. 58- H/12

13. Topography of MSL area 64m from MSL

14. Land use classification It is a fresh quarry lease

15. Ground water level The Ground water is about 30mt depth from below

ground level.

16. Climatic condition Rainfall 800mm– 900mm/annum

Temperature - 42ºC – 30ºC

17. Land use pattern Roads – 10%

Agricultural land – 35%

Trees – 25%

Odai/Stream – 10%

Barren land – 10%

Habitation – 10%

18. Nearest habitation Palavoor – 1km – E

19. Nearest Town Radhapuram - 15km - NE

20. Nearest Railway station Panagudi Railway station - 12km – N

21. Nearest Airport Thoothukudi Airport - 76km- NE

22. Nearest National Highways &

State Highways

NH 7 - Salem – Kanniyakumari – 750m –E

SH 46 – Nagercoil - Aralvaimozhi – 7km –NW

23. Nearest Hospital Palavoor – 1km – Eastern side

24. Aerial distance to the nearest

Eco sensitive areas, CRZ,

forest, wild life sanctuary,

Interstate boundary, critically

polluted area if the quarry site

is within 500m of these areas.

More than 500m from Eco sensitive areas, CRZ,

forest, wild life sanctuary, Interstate boundary,

critically polluted area.

25. Details of other quarries for a

radius of 500m around the

quarry site

There is no quarry within the radius of 500mt

26. Man power About 7 employees

PRE FEASIBILITY REPORT FOR PAZHAVOOR PART-1 EARTH QUARRY J.RAJKUMAR

Under EIA Notification 2006

27. Water requirement & source Total water requirement for 1.0KLD from water

vendors & nearby bore well.

28. Overburden/Waste There is no overburden anticipated in this area

29. Cost of the project The Project cost:

A. Fixed asset cost = Rs. 4,44,500/-

B. Operational cost = Rs. 7,38,000/-

C. EMP cost = Rs. 1,30,000/-

CSR Cost = Rs. 50,000/-

Total cost = Rs.13,62,500/-

The Prefeasibility report preparing for following condition of Government of India Ministry of

Environment and Forests (No.L-11011/47/2011 –IA-II (M) Dated: 24th June, 2013)

� Therkumalai Reserve forest is located on the west side of the area.

� Odai is located North and Eastern side of the area.

� Canal is situated 1km away from the South eastern side.

� The Western Ghats is situated 3km away from the Western side.

� There is no CRZ within the radius of 15km.

� The project area does not fall in ‘HACA’ region.

� There is no interstate boundary within the radius of 15km.

� There are no Bird sanctuaries, wild life sanctuaries and National park as Act 1972, within the

radius of 15kms.

PRE FEASIBILITY REPORT FOR PAZHAVOOR PART-1 EARTH QUARRY J.RAJKUMAR

Under EIA Notification 2006

The following information provided by the applicant

I have applied for getting Environmental clearance to SEIAA, Tamilnadu for quarry lease for

quarrying of Earth quarry in the S.F.No:1004/2 (P) over an extent of 1.47.25Ha, Patta land in

Pazhavoor Part-1 Village, Radhapuram Taluk and Tirunelveli District.

I will not deploy any child labors below 18 years for any type of quarrying operation. All labours

engaged for quarrying operation will be insured till the end of life of quarry period.

All type of safety / protective equipment’s will be provided to all the labourers working in my quarry

site.

I will sincerely follow and execute the Afforestation and Green belt as proposed during the course of

quarrying operation and maintain Afforestation after the expiry of quarrying lease.

I ensure to involve and participate in the corporate social responsibilities of the local community as

declared in the proposal.

I solemnly declare & affirm that there are no operating quarry within 500m radius from the periphery

of the quarry.

Besides I wish to state that the approach road belongs to me only and no other patta roads are

encountered.

There is no Habitation within the radius of 300meters radius from the periphery of my quarry.

No permanent structures, temples etc. are located within 500m radius from the periphery of my

quarry.

The quarrying operation will not cause any hindrance to the nearby public and also it will not cause

any hindrance to nearby villagers and human settlements during transportation of mineral.

PRE FEASIBILITY REPORT FOR PAZHAVOOR PART-1 EARTH QUARRY J.RAJKUMAR

Under EIA Notification 2006

2.0 INTRODUCTION OF THE PROJECT OR BACKGROUND INFORMATION

(i) Identification of project and project proponent: In case of mining project, a copy of mining

lease/letter of intent should be given

Identification of Project

Project Proponent Name with Address

J.Rajkumar,

S/o. Jeyakumar,

7-2-7, Peruratchi office street,

Pudupatti,

Theni District - 625556

Mobile No. 77084 11558

Email: [email protected]

In case of mining project, a copy of mining lease/letter of intent should be given

I. The Precise area communication letter was issued by the District collector Tirunelveli vide

Rc.No.M2/27088/2016 Dated: 06.09.2016.

II. The Mining plan was approved by the Assistant Director, Department of Geology and Mining

Tirunelveli vide Rc. No. M2/27088/2016 Dated: 14.09.2016.

Name of the Project Pazhavoor Part-1 Earth quarry

Lease area 1.47.25Ha Patta Land-Non forest

Location Survey No.1004/2 (P)

Pazhavoor Part-1 Village, Radhapuram Taluk,

Tirunelveli District and Tamilnadu State.

Topo sheet No. 58- H/12

PRE FEASIBILITY REPORT FOR PAZHAVOOR PART-1 EARTH QUARRY J.RAJKUMAR

Under EIA Notification 2006

(ii) Brief description of nature of the project

The lease area is exhibits almost plain topography. The Earth quarrying by opencast method

of shallow mining is proposed. Machineries like excavator are proposed for quarrying of Earth. No

drilling and blasting is proposed. There is no formation of bench; the quarrying is a restricted to a

depth of 3m in the entire area.

The applicant intends to use for leveling and filling of low lying areas for public and private

sector projects in and around the district.

There is no top soil. The waste material is not anticipated during the quarry operation, the

entire Earth is excavated and utilized. There is no top soil. It is proposed to exploit Earth of about

29505m3

for a period of Three years only.

(iii) Need for the project and its importance to the country and or region

The Earth quarrying project falls in the area of Tirunelveli District, Tamilnadu where scanty

agricultural activities are been carried out and the new industries are springing up in the district.

Earth is an important commercial product, with a number of applications. The applicant intends to

use for leveling and filling of low lying areas for public and private sector projects.

This project will give employment opportunities to 7 members directly. Mineral Industries of

the state of Tamilnadu provides employment opportunities for the people of the state as well as in the

specific project area. Mining and Quarrying is one among the major core sector industries which

plays a vital process of country’s economic development.

(iv) Demand and supply gap

There is a huge demand of Earth in Tirunelveli District for this a huge quantity of Earth is

required for filling and leveling of low lying areas of road construction projects and other

infrastructure development work. Besides there is also huge demand of Earth for public and private

sector projects also.

(v) Imports vs indigenous production

There is no import of Earth at present in India. India especially the peninsular India (southern

India) has good resource of Earth.

(vi)Export Possibility

There is no possibility for export of this Earth.

PRE FEASIBILITY REPORT FOR PAZHAVOOR PART-1 EARTH QUARRY J.RAJKUMAR

Under EIA Notification 2006

(vii) Domestic/Export Markets

The Earth is specifically used for leveling and filling of low lying areas for public and private

sector projects.

(viii) Employment Generation (Direct and Indirect) due to the project

About 7 employees labors directly and engaged in this proposed quarry project and the

tentative man power required for the proposed Earth quarry shall be as follows.

Designation No’s

Skilled

Mines foreman 1

Supervisor 1

Semi skilled

Excavators Operators 1

Co opeerator 1

Un-Skilled

Watchman 1

Unskilled helper 2

Total 7

The above man power is adequate to meet out the production schedule and the machinery

strength envisaged in the mining plan and also to comply with the stationary provisions of mine

safety regulation.

It is been ensured that the labors will not be deployed less than 18 years, No Child labors

will engaged or entertained for any kind of quarrying operations. All the labors engaged for

quarrying operations will be insured till the end of life of quarry.

PRE FEASIBILITY REPORT FOR PAZHAVOOR PART-1 EARTH QUARRY J.RAJKUMAR

Under EIA Notification 2006

3.0 PROJECT DESCRIPTION

(i) Type of project including interlinked and interdependent projects, if any

The Pazhavoor Part-1 Earth quarry, it is an opencast method of shallow mining is proposed.

There is no interlinked & Interdependent Project.

(ii) Location (map showing general location, specific location, and project boundary & project

site layout) with coordinates

� The area is located in S.F.No. 1004/2 (P), Pazhavoor Part-1 Village, Radhapuram

Taluk and Tirunelveli District.

� It’s a Patta Land; the lease applied area is Plain topography.

� The altitude of the area is 64m (Maximum) from MSL

� The area is falls in GSI Topo sheet No. 58- H/12

� The Latitude between of 08°12’28.88’’N to 08°12’23.78’’N

� The Longitude between of 77°33’55.62’’E to 77°33’49.79’’E on WGS 1984 datum.

PRE FEASIBILITY REPORT FOR PAZHAVOOR PART-1 EARTH QUARRY J.RAJKUMAR

Under EIA Notification 2006

LOCATION MAP OF THE PROJECT AREA WITH CO ORDINATES

LEASE AREA:

Village : Pazhavoor Part -1

Taluk : Radhapuram

District : Tirunelveli

Latitude : 08°12’28.88’’N to 08°12’23.78’’N

Longitude : 77°33’55.62’’E to 77°33’49.79’’E

PRE FEASIBILITY REPORT FOR PAZHAVOOR PART-1 EARTH QUARRY J.RAJKUMAR

Under EIA Notification 2006

DRAWING SHOW THE SURFACE PLAN WITH CO ORDINATES & 1KM RADIUS PLAN

PRE FEASIBILITY REPORT FOR PAZHAVOOR PART-1 EARTH QUARRY J.RAJKUMAR

Under EIA Notification 2006

(iii) Details of alternate sites considered and the basis of selecting the proposed site,

particularly the environmental considerations gone into should be highlighted

The quarrying operation is proposed in the Patta Land and there is no any alternative site for

this project is not considered, the project is site specific.

(iv) Size or magnitude of operation

The total area of the project is about 1.47.25Ha. It is proposed to exploit Earth about

29505m3 by open cast method of shallow mining is proposed for quarry by deploying excavate

directly for a period of Three years only.

(v) Project description with process details (a schematic diagram/flow chart showing the

project layout, components of the project etc. should be given)

General Geology

The area is plain topography, Earth is composed of consolidated of silica and fine feldspar, the

Earth is formed by weathering and transportation of rock particles.

The applicant intends to use this Earth especially for leveling and filling of low lying areas for

public and private sector projects in and around the district.

OPEN CAST WORKING

Open cast method of shallow mining is proposed, Machineries like excavators are proposed

for quarrying Earth 3m depth. No drilling or blasting is proposed for this type of Earth quarrying, it is

a conventional eco friendly quarrying operation.

The Earth will be loaded directly to the trucks / Lorries for transportation to the needy

customers.

Details of Exploration

No exploration is carried out. The Earth is found clearly right from the surface in the lease

applied area.

Proposed Study to be carried out

As the quarrying operation is proposed to be carried out for a period of Three years only to a

depth of 3m further exploration or proposed study is redundant.

PRE FEASIBILITY REPORT FOR PAZHAVOOR PART-1 EARTH QUARRY J.RAJKUMAR

Under EIA Notification 2006

Method of Estimation of Reserves

The Geological plans demarcating the commercially viable Earth body has been prepared in

1: 1000 scales (Plate No: III). Totally three sections have been drawn, one section along the Length

wise as (X-Y) another two section drawn the width wise as (A-B), (C-D), to chosen the maximum

area cover under the lease in the Horizontal 1:1000 & vertical 1: 100 (Plate No: III).

The cross sectional area for the proved depth persistence of 3m has been worked out for the

section. The cross sectional area multiplied by its length of influence of the longer axis gives the

volume (insitu) in the cross sectional area. The sum total of the insitu reserves available within the

individual cross sectional area gives the geological reserves of the lease applied are.

As the mineable of Earth in the terms of cubic meter. The Geological resource, Mineable reserves are

given only in terms of cubic meter. The Details of estimation of Geological resource and mineable

reserves with reference to topography, Geological plan and section shown in (Plate No: III).

Mineable reserves

Total Recoverable Reserves of Earth up to 3m depth = 29505 m3

Total Mineable reserves proposed to excavate 29505m3 for a period of Three years only.

Section Bench L (m)

W (m) D (m)

(Avg)

Volume

( Cbm)

Earth in

m3

XY-AB I 70 80 1 5520 5600

II 68 77 1 5236 5236

III 66 74 1 4884 4884

Total 15720

XY-CD I 97 51 1 4947 4947

II 96 48 1 4608 4608

III 94 45 1 4230 4230

Total 13785

GRAND TOTAL 29505

PRE FEASIBILITY REPORT FOR PAZHAVOOR PART-1 EARTH QUARRY J.RAJKUMAR

Under EIA Notification 2006

Process details:

Overburden:

No overburden in the area, Earth Clearly visible right from the surface.

(vi) Raw material required along with estimated quantity, likely source, marketing area of final

products, Mode of transport of raw Material and Finished Products

This is a quarrying project for excavating Earth hence there is no requirement for raw

material.

Uses:

The Excavated Earth especially for leveling and filling of low lying areas for public and

private sector projects in and around the district.

(vii) Resource optimization/recycling and reuse envisaged in the project, if any, should be

briefly outlined

No optimization/ Recycling and Reuse envisaged in the proposed Earth quarry project.

(viii) Availability of water its source, Energy/power requirement and source should be given

This Earth quarry project does not require huge water for the project. The total water

requirement in the quarry will be around 1KLD.

Purpose Quantity Sources

Drinking &

Domestic

purpose

0.3 KLD Water Purchase from Approved water

vendors

Dust

suppression

0.3 KLD From Existing Borehole on nearby the

quarry area.

Green belt 0.4 KLD From Existing Borehole on nearby the

quarry area.

Total 1.0KLD

Excavating the Earth by excavators

Loading the Earth into tippers by excavator

to the needy Road construction sites

PRE FEASIBILITY REPORT FOR PAZHAVOOR PART-1 EARTH QUARRY J.RAJKUMAR

Under EIA Notification 2006

Energy

No electricity is required for quarry operation; the quarry working is restricted on day time

only (between 9Am to 5Pm).

Diesel (HSD) will be used for quarrying machineries around 4920 liters of HSD will be used for the

entire projects. Diesel will be brought from nearby diesel pumps.

No power is required for the project. Lightings on the Night will be taken from nearby electric poles

after obtaining permission from concerned authorities.

Per hour Excavator will consume = 10 liters / hour

Per hour Excavator will excavate = 60m3

Per 29505m3 = 29505m

3/60m

3

= 492 hours

Diesel consume 492 working hours = 492 hours x 10 liters

= 4920 liters of HSD for entire project life

(ix) Quantity of wastes to be generated (liquid and solid) and scheme for their

management/disposal

There is no wastage is encountered during the quarrying operation the entire Earth is utilized

for public and private sector projects for filling and leveling the low lying areas.

There is no toxic effluent expected to generate in the form of solid liquid and gases and the no

requirement of treatment of waste. There is no top soil available in the lease applied area.

(x) Schematic representations of the feasibility drawing which give information of EIA purpose

To Submit SEIAA

Final Presentation

FORM-I

ALONG WITH PREFEASIBILITY REPORT

& APPROVED MINING PLAN

PRE FEASIBILITY REPORT FOR PAZHAVOOR PART-1 EARTH QUARRY J.RAJKUMAR

Under EIA Notification 2006

4.0 SITE ANALYSIS

(i) Connectivity

Mode Description

Road

connectivity

1. There is a metal road on the East side of the area, this road

connecting in the Palavoor village at a distance of 1km.

2. The Nearest National Highway (NH-7) Salem -

Kanniyakumari – 750m –Eastern side of the area.

3. The Nearest SH 46 – Nagarcoil – Aralvaimozhi – 7km –

Northwest side of the area.

Railway station

& Railway line

1. The Nearest Railway station is Panagudi – 12km –Northern

side.

2. The Nearest Railway line is Tirunelveli – Nagarcoil – 6km

–Northwestern side of the area.

Air port 1. The Nearest Airport is Thoothukudi – 76km- North eastern

side.

(ii) Land Form, Land use and Land ownership

The quarry lease applied area is 1.47.25Ha. The area falls in GSI top sheet No: 58- H/12. It is

a Patta Land, the applicant has obtained consent from the pattadhar. (Refer Annexure No.VI).

(iii) Topography (along with map)

The lease applied area exhibits almost plain topography, the area is fully covered by the Earth

formation, the nature of the earth deposit is residual deposit. The Earth was formed by the erosion and

transportation of rock particles from the hillock located on the western side. The altitude of the area is

64m (Maximum) from MSL.

Topographical view of the Pazhavoor Part-1 Earth quarry lease applied area

PRE FEASIBILITY REPORT FOR PAZHAVOOR PART-1 EARTH QUARRY J.RAJKUMAR

Under EIA Notification 2006

GOOGLE IMAGE SHOWING THE LEASE BOUNDARY AREA

For Pazhavoor Part-1 Earth Quarry

Lease Area:

Village: Pazhavoor Part-1

Taluk: Radhapuram

District: Tirunelveli

Topo sheet No: 58- H/12

Latitude : 08°12’28.88’’N to 08°12’23.78’’N

Longitude: 77°33’55.62’’E to 77°33’49.79’’E

Lease area

PRE FEASIBILITY REPORT FOR PAZHAVOOR PART-1 EARTH QUARRY J.RAJKUMAR

Under EIA Notification 2006

(iv) Existing land use pattern (agriculture, non-agriculture, forest, water bodies (including area

under CRZ)), shortest distances from the periphery of the project to periphery of the forests,

national park, wild life sanctuary, eco sensitive areas, water bodies (distance from the HFL of

the river), CRZ. In case of notified industrial area, a copy of the Gazette notification should be

given.

• Therkumalai Reserve forest is located on the west side of the area.

• Odai is located North and Eastern side of the area.

• Canal is situated 1km away from the South eastern side.

• The Western Ghats is situated 3km away from the Western side.

• There is no CRZ within the radius of 15km.

• The project area does not fall in ‘HACA’ region.

• There is no interstate boundary within the radius of 15km.

• There are no Bird sanctuaries, wild life sanctuaries and National park as Act 1972, within the

radius of 15kms.

• There is no quarry within the radius of 500m

(v) Existing Infrastructure

There is no existing infrastructure in the proposed quarry lease applied area.

(vi) Soil Classification

The area is mostly covered with Earth formation.

(vii) Climatic data form secondary sources

Both the North East and South West monsoon occurs here and the summer are hot and winter

is cool. During April and May the temperature may shoot up to 42°C and during winter the

temperature does not fall below 30°C. The average annual rainfall is around 800-900mm.

(viii) Social infrastructure available

There is no social infrastructures like Government Buildings, worship in the 1Km vicinity of

the quarry lease applied area.

PRE FEASIBILITY REPORT FOR PAZHAVOOR PART-1 EARTH QUARRY J.RAJKUMAR

Under EIA Notification 2006

5.0 PLANNING BRIEF

(i) Planning Concept (type of industries, facilities, transportation etc.) Town and Country

Planning/Development authority Classification.

The total area of the Project is about 1.47.25Ha. The Proposed production of Earth is about

29505m3

for a period of Three years only up to a depth of 3m from the existing profile. This

quarrying project is to excavate Earth by conventional Open cast method of shallow mining is

proposed. Hydraulic excavator is proposed for quarrying Earth. Transportation of Earth shall be done

by tippers on roads.

The Project land is devoid of Vegetation and lies in the backward town of Tirunelveli District.

There are no specific industries or factories in and around the project areas.

Transportation

Hired Tippers of 10/20Ts capacity will be utilized for Transportation of Earth from the quarry

to needy sites by Tarpaulin cover to prevent spillage. During the transportation the material along the

village roads and populated areas the vehicle should not exceed the 20Km speed limit.

Population project

There are few villages located in 5km radius from the lease applied area the details are given

below.

S.

No Name of the Village

Approximate distance

& Direction from lease

applied area

Approximate

population

1. Avaraikulam 4.0km - NE 550

2. Aralvaimozhi 6km - NW 600

3. Palavoor 1km - E 750

(iii) Land use planning (breakup along with green belt etc.,)

The Earth quarrying operation is proposed for a period of Three years only up to depth of

3m from the existing profile. The project area extent is 1.47.25Ha. The entire area is proposed to be

quarried.

Description Present

Area (Ha)

Area at the end of this

quarrying period (Ha)

Area under quarrying Nil 1.04.70

Road Nil 0.01.00

Green Belt Nil 0.05.00

Un utilized area 1.47.25 0.36.55

Grand Total 1.47.25 1.47.25

PRE FEASIBILITY REPORT FOR PAZHAVOOR PART-1 EARTH QUARRY J.RAJKUMAR

Under EIA Notification 2006

(iv) Assessment of Infrastructure Demand (Physical & Social)

The existing road facilities are already available which shall be used and maintained. Medical

facilities is available for the project sites, Government and private hospitals and other basic

infrastructure facilities like communication center, school supermarket, bus stand are also available

in Radhapuram which is at a distance of 15km on North eastern side of the area. This quarry project

will provide employment for about 7 persons directly.

(v) Amenities/Facilities

The simple methods adopted and the limited scale of activities involved in Earth quarrying

does not require High Tension Electric Power supply or huge worship facilities. The quarrying work

is restricted to one general shift during day time only. Major Machinery repair works are attended at

Tirunelveli. Packaged drinking water will be brought from approved water vendors. All the facilities

are available in Tirunelveli district which is at a distance about 59km on the North eastern side of the

area.

6.0PROPOSED INFRASTRUCTURE

(i) Industrial Area (Processing area)

There is no processing area proposed within the lease applied area.

(ii) Residential area (Non processing area)

There is no residential area within 300mts of the lease applied area.

(iii) Green Belt

After the completion of the quarrying operation, the quarried out land will be leveled and

used for agriculture purpose. The applicant ensures to carry out Afforestation by plant native species

like pungam, neem, causirina or nearby villages and along the village roads after consultation with

Panchyat Authorities. The budget for Afforestation will be around Rs. 15,000/-

(iv) Social infrastructure

This proposed Earth quarry will fetch employment for about 7 people directly and 5 persons

indirectly.

PRE FEASIBILITY REPORT FOR PAZHAVOOR PART-1 EARTH QUARRY J.RAJKUMAR

Under EIA Notification 2006

(v) Connectivity (traffic and transportation road/ Rail/ Metro/ Water ways etc.)

Mode Description

Road

connectivity

1. There is a metal road on the East side of the area, this road

connecting in the Palavoor village at a distance of 1km.

2. The Nearest National Highway (NH-7) Salem -

Kanniyakumari – 750m –Eastern side of the area.

3. The Nearest SH 46 – Nagarcoil – Aralvaimozhi – 7km –

Northwest side of the area.

Railway station

& Railway line

1. The Nearest Railway station is Panagudi – 12km –

Northern side.

2. The Nearest Railway line is Tirunelveli – Nagarcoil – 6km

–Northwestern side of the area.

Air port 1. The Nearest Airport is Thoothukudi – 76km- North

eastern side.

(vi) Drinking Water management (Source& Supply of water)

This proposed Earth quarry project does not require huge water either for beneficiation or

processing. Drinking water for this will be brought from approved water vendors in Palavoor which

is about 1Km on the Eastern side of the area.

(vii) Sewerage System

Toilets will be constructed on semi-permanent structure and sewage will be discharged once

in three months. The sewage waste will be collected in soak pit and discharged as manure.

(viii) Industrial Waste Management

No industrial waste will be generated from the project.

(ix) Solid Waste Management

The Earth quarrying does not produce any waste. The entire Earth is excavated and utilized.

This waste may not produce any toxic effluent in the form of solid liquid or gas.

(x) Power Requirement & Supply / source

The proposed Earth quarrying does not required any power supply the quarrying operation

which is proposed to operate in day time only for 7 Am to 5Pm with 1 Hour lunch interval between

1Pm to 2Pm.

PRE FEASIBILITY REPORT FOR PAZHAVOOR PART-1 EARTH QUARRY J.RAJKUMAR

Under EIA Notification 2006

7.0REHABILITATION AND RESETTLEMENT (R & R PLAN)

(i) Policy to be adopted (Central/State) in respect of the project affected persons including

home oustees, land oustees and landless laborers (a brief outline to be given)

The project area lies in Patta Land, Pazhavoor Part-1 Village, Radhapuram Taluk, Tirunelveli

district. There is no residential area within the radius of 300m; hence there is no rehabilitation and

resettlement involved in this Earth quarrying project.

8.0 PROJECT SCHEDULE & COST ESTIMATES

(i) Likely date of start of construction and likely date of completion (Time schedule for the

project to be given)

The Earth quarrying project is likely to get commenced after the execution of quarrying lease.

The total quantity of reserves is 29505m3 of Earth. The life of the quarry project is Three years only.

PRE FEASIBILITY REPORT FOR PAZHAVOOR PART-1 EARTH QUARRY J.RAJKUMAR

Under EIA Notification 2006

(ii) Estimated project cost along with analysis in terms of economic viability of the project

A. Fixed asset cost

Land cost = Rs. 2, 94,500/-

Temporary rest Shelter = Rs. 50,000/-

First aid room and accessories = Rs. 50,000/-

Sanitary facilities = Rs. 50,000/-

Total cost = Rs. 4, 44,500/-

B. Operational cost

For Excavation = Rs. 4, 92,000/-

Fencing Cost = Rs. 1, 00,000/-

Drinking Water = Rs. 36,000/-

Sanitary maintenance = Rs. 50,000/-

Safety kits = Rs. 10,000/-

Leveling after quarrying = Rs. 50,000/-

Total Operational Cost = Rs. 7, 38,000/-

C. EMP cost

Water Sprinkling = Rs. 1, 00,000/-

Afforestation cost = Rs. 30,000/-

Total EMP cost = Rs. 1, 30,000/-

The project cost:

A. Fixed asset cost = Rs. 4, 44,500/-

B. Operational cost = Rs. 7, 38,000/-

C. EMP cost = Rs. 1, 30,000/-

Total Cost = Rs. 13, 12,500/-

CSR Cost (2.5%) = Rs. 50,000/-

Total cost = Rs. 13, 62,500/-

� The total Project cost (A+B+C) and including CSR cost is about Rs.13,62,500/- (Rupees

Thirteen lakhs sixty two thousand five hundred only)

� The total EMP cost is around Rs. 50,000/- (Rupees Fifty thousand only)

Population Benefit

The applicant ensures to take social responsibilities like providing School Note books,

Uniforms to the Students below poverty level beside if the villages require any borehole for public

use the applicant ensure to do so. The applicant will also take part and contribute the native cultural

activities in the nearby villages. During summer seasons packaged drinking water will be kept in the

village for public and for tress pallers. The applicant will involve and contribute all the socio cultural

allocation in and around the area.

Government Revenue

The state Government will get revenue as Royalty, sale tax, surface rent, dead rent/ VAT/

income tax etc.

PRE FEASIBILITY REPORT FOR PAZHAVOOR PART-1 EARTH QUARRY J.RAJKUMAR

Under EIA Notification 2006

9.0ANALYSIS OF PROPOSAL (FINAL RECOMMENDATIONS)

(i) Financial and social benefits with special emphasis on the benefit to the local people

including tribal population, if any, in the area

The Excavated Earth is utilized for public and private sector projects for filling and leveling

the low lying areas, Besides the Earth also used for domestic housing and infrastructure projects of

the district. Due to this project many of the infrastructure development will be carried out in and

around the district on time, nearly 7 employees directly and 5 employees indirectly get employment

opportunity through this project. The detail furnished in this mining plan is based on information

provided by the state Government and lessee. By considering the merit of the project the permission

may be granted.

Place: Tirunelveli

Date: 19.09.2016

1. Signature of the Applicant

J.Rajkumar

2. Signature of the Recognized qualified person

Dr. P. Thangaraju, M.Sc., Ph.D.,

RQP/MAS/206/2007/A

BASE LINE STUDIES OF PAZHAVOOR PART -1 EARTH QUARRY J.RAJKUMAR

Base Line Studies is Prepared for

Pazhavoor Part-1 Earth Quarry

BASE LINE STUDIES OF PAZHAVOOR PART -1 EARTH QUARRY J.RAJKUMAR

BASE LINE STUDIES

The base line study is prepared for Pazhavoor Part -1 Earth Quarry project. Base line

studies provide a base data for regular Environmental Monitoring and Environmental Impact

Assessment (EIA).

The baseline study is provides bench mark for carrying out environmental Impact

assessment due to the course of quarrying and mining activities. The purpose of these studies is

to evaluate the benefited and adverse effect of developing activities on the neighborhood

environment and the area where the quarrying is proposed to carry out.

Mr. J.Rajkumar applied for Earth Quarry project lease for over an extent of 1.47.25Ha

in S.F.No:1004/2 (P) at Pazhavoor Part-1 Village of Radhapuram Taluk, Tirunelveli

District, Tamilnadu.

General approach to Environment

The Environmental besides data comprise of the features present of the site area its

includes environmental features such as forest area, conservation area, water bodies, industries,

wild life and fauna place of historic and importance etc.,

The data collected to cover the following.

1. Air environment

2. Noise Environment

3. Water environment

Air Environment

Ambient Air quality has been assessed through a net – Work of 3 ambient air quality

stations. Standard monitoring and analysis procedures were adopted for adopted for determining

the Air quality parameters. The PM10, PM2.5, SO2, NO2 are monitored as per prescribed

guidelines/methods. The AAQ monitored data for all locations for above parameters are shown

in Table No: 1

S.No Test Parameters Unit Protocol Results CPCB

Standards

1 Particulate matter less

than 10 micron size

(PM10)

µg/m3

IS 5182 Part 23-2006 41.6 100

2 Particulate matter less

than 2.5 micro size

(PM2.5)

µg/m3 IS 5182 part 4-1999

(Reaff 2010)

20.4 80

3 Sulphur dioxide SO2 µg/m3

IS 5182 part 2-2001

(Reaff 2006)

4.1 80

4 Nitrogen Dioxide NO2 µg/m3 IS 5182 Part 6-2006 5.3 80

BASE LINE STUDIES OF PAZHAVOOR PART -1 EARTH QUARRY J.RAJKUMAR

Noise Environment:

Sound can be defined as atmospheric or air vibration perceptible to ear. Noise is usually

unwanted or undesired sound. Consequently, particular sound can be noise to one person and not

to others or noise at one time and not at other time. Hence sound loud enough to be harmful is

called noise without regard to its characteristics. Noise is a form of pollution because it can cause

hearing impairment and psychological stresses.

The noise level measurement in the core zone and nearby buffer zone area was carried

out to evaluate the future impact on noise environment due to the proposed mining operation.

Noise measurements were carried out using Lutron SL 4001 sound level meter. The result of

hourly background noise levels for all locations are given in Table No: 2

S.No Location Results

dB (A)

CPCB Standard

Limit

1 Project site – Centre area 39.1 70*

2 Project Site SW corner 41.3 70*

3 Project site SE Corner 43.1 70*

4 Project site NE Corner 42.5 70*

Water environment

Assessment of baseline data on water environment includes identification of water

resources, collection of water samples, Analyzing water samples collected for Physico –

Chemical parameters as per standards. 1 bore well and 2 well water samples were collected and

the water quality results are given Table No: 3

Test Protocol Results Limits as per IS 10500 : 2012

Acceptable

Limit

Permissible limit in the

absence of alternate

source

Colour IS : 3025 part : 4-1983

(Reaff : 2006)

9.2Hazen 6 15

Odour IS : 3025 part : 5-1983

(Reaff : 2006)

Agreeable Agreeable Agreeable

pH at 250C IS : 3025 part : 11-

1983 (Reaff : 2006)

6.1 7.5 – 8.5 No relaxation

Total Dissolved

solids

IS : 3025 part : 16-

1984 (Reaff : 2006)

1415mg/l 600 mg/l 2000mg/l

Aluminiumas Al IS : 3025 part 2:2004

(Reaff : 2009)

BDL (DL:0.005

mg/l)

0.04 mg/l

0.2 mg/l

Barium as Ba IS : 3025 Part 2:2004

(Reaff : 2009)

0.20mg/l 0.7mg /l No relaxation

Boran as B IS : 3025 Part 2:2004

(Reaff : 2009)

BDL (DL: 0.1

mg/l)

0.5mg /l 1.0mg/l

Calcium as Ca IS: 3025 Part 2: 2004

(Reaff : 2009)

149.2mg/l 75mg/l 200mg/l

Chloride as Cl IS : 3025 Part 32-1988

(Reaff . 2009)

463mg/l 245mg/l 1000mg/l

Copper as Cu IS: 3025 part 2: 2004

(Reaff : 2009)

BDL (DL:0.01

mg/l)

0.05mg/l 1.5mg/l

Fluoride as F IS : 3025 Part 60: 2008 0.71mg/l 1.0mg/l 1.5mg/l

BASE LINE STUDIES OF PAZHAVOOR PART -1 EARTH QUARRY J.RAJKUMAR

Flora and fauna in and around the area

A detail study related to flora and fauna was carefully observed physically by

environmental engineers, Botanist and zoologist. The following table shows the flora and Fauna

available at the region.

S.No Common Name Botanical name Pictures

1. Neem Azadirachata indica

2. Korai Cyperus Pangorei

3. Oomathai Daturametel

4. Sappathikalli Opuntiadillenii

5. Pirandi Cissusquadrangularis

6. Karuvelam Tree Acsia nilotica

7. Palm tree Borassus falabellifer

8. Velikathan Prosopis juliflora

9. chotthukatali Aloe Vera

10. Mookuthichedi Tridax procumbens

List of Faunas

S.No Common Name Scientific name 1. Frog Rana aurora

2. Dog Canius familairis

3. Goat Capra hircus

4. Crow Corvus splenders

5. Squirrel Rodentia scrurus,

6. Ant Hymenopterous formicida,

7. Cat Felsis catus

BASE LINE STUDIES OF PAZHAVOOR PART -1 EARTH QUARRY J.RAJKUMAR

Conclusion

The base line studies relents no hazardous levels of dust and noise and prevailing at the

project area. A well implemented environmental Management plan as discussed in the mining

plan will help in mitigation the adverse effects due to quarrying activities.

The movement of vehicles is very minimal. The entire vehicle used will be periodically

maintained by well experienced mechanic and kept under TNPCB standards, emission testing

will be carried out periodically and water will be sprinkled periodically to prevent dust into air.

The small quantity of non-humus rich surface soil will be removed and preserved in the

boundary barrier to facilitate the Afforestation.

Environmental care and attitude of preventing environment is inducted to the proponent

and advice to carry out and mitigate the minor impacts due to quarrying. Appropriate persons are

advice to get employed to protect the Environment and Ecology of the area.

Date : 19.09.2016

Place : Tirunelveli

1. Signature of the applicant

J.Rajkumar

2. Signature of the Recognized qualified person

Dr. P. Thangaraju, M.Sc., Ph.D.,

RQP/MAS/206/2007/A


Recommended