Hulcher Services Inc. • 611 Kimberly Drive • Denton, TX 76208 800-637-5471 • www.Hulcher.com Hulcher Services Inc. • 611 Kimberly Drive • Denton, TX 76208 800-637-5471 • www.Hulcher.com S pecifically designed for use off-track, the Hulcher Services undercuer is a revoluonary system designed to undercut track without wasng valuable track me. It aachesto a Caterpillar ® excavator and undercuts from an off-track locaon, allowing trains to keep moving. There is no longer a need for a set- out track or having to travel miles to get to a siding, thereby improving producvity. The Hulcher Services undercuer scoops out contaminated gravel from beneath railroad track and can be used when the grade of the ground adjacent to the track is different from the grade of the track itself. It includes a control head (mounted on the Caterpillar ® excavator) capable of pivong the undercuer bar 180°. The Caterpillar ® excavator is designed to accept a e inserter or a e tamper aachment. The e inserter grabs es in any posion for extracon, inseron or placement, and the e tamper packs the track ballast under the railway tracks. Call Hulcher today at 800-637-5471 to learn more about our undercuers or to schedule them for your next project. UNDERCUTTER UNDERCUTTER Tie Inserter Tie Tamper
Transcript
Page 1: UndercUtter - irp-cdn.multiscreensite.com · undercuts from an off-track location, allowing trains to keep moving. There is no longer a need for a set- ... under the railway tracks.

Hulcher Services Inc. • 611 Kimberly Drive • Denton, TX 76208800-637-5471 • www.Hulcher.com

Hulcher Services Inc. • 611 Kimberly Drive • Denton, TX 76208800-637-5471 • www.Hulcher.com

Specifically designed for use off-track, the Hulcher Services undercutter is a revolutionary system

designed to undercut track without wasting valuable track time. It attachesto a Caterpillar® excavator and undercuts from an off-track location, allowing trains to keep moving. There is no longer a need for a set-out track or having to travel miles to get to a siding, thereby improving productivity.

The Hulcher Services undercutter scoops out contaminated gravel from beneath railroad track and can be used when the grade of the ground adjacent to the track is different from the grade of the track itself. It includes a control head (mounted on the Caterpillar® excavator) capable of pivoting the undercutter bar 180°.

The Caterpillar® excavator is designed to accept a tie inserter or a tie tamper attachment. The tie inserter grabs ties in any position for extraction, insertion or placement, and the tie tamper packs the track ballast under the railway tracks.

Call Hulcher today at 800-637-5471 to learn more about our undercutters or to schedule them for your next project.

UndercUtterUndercUtter

Tie Inserter Tie Tamper

Page 2: UndercUtter - irp-cdn.multiscreensite.com · undercuts from an off-track location, allowing trains to keep moving. There is no longer a need for a set- ... under the railway tracks.

PROJECT SNAPSHOT

Hulcher Services Inc. • 611 Kimberly Drive • Denton, TX 76208800-637-5471 • www.Hulcher.com

KEY FACTSPROJECT SUMMARY: Undercut large stretch of track during a tight holiday shut-down period.

UNDERCUTTERS: Two undercutters and two track hoes worked into the evenings to complete the work on schedule

STRETCH OF TRACK CLEANED: The Hulcher workers worked closely with railroad crews to clean the entire stretch of track in only six days, even as the railroad performed other mainteance-of-way work.

ScopeThe railroad scheduled a one-week maintenance shut down on their coal line’s main artery to coincide with a holiday closing period for the coal companies. The environment for this artery is particularly prone to mud fouling, and as a result a large segment of the stretch required undercut-ting.The railroad needed experienced, trained undercutter operators who could provide the high-quality work needed for this critical segment of their rail network and complete it during a tight shut-down period.

SolutionHulcher Services responded to this challenge with two excavator / under-cutters and two support track hoes. Hulcher operators cleaned out the mud and fouled ballast as the rail gangs followed to drop and tamp new ballast and perform other maintenance-of-way work. Because of the schedule, crews worked days and evenings to complete the undercutting.

OutcomeAfter six days Hulcher’s underutters had cleaned the entire stretch of track on this important artery, allowing the railroad to finish its project in the crucial one-week window. The railroad was extremely pleased that this stretch of track, which accounts for a significant portion of their business in the region, was clean, safe and ready for use when the coal companies returned to their operations following the holiday.

LARGE UNDERCUTTER PROJECT COMPLETED DURING TIGHT HOLIDAY SHUT DOWN