Undulator Prototype Status and Plans. Marion M. White APS-ASD. Outline – Prototype Undulator Status. Design Challenges Mechanical Design Features Performance Improvements Canted Pole Undulator Measurements Plans Summary. Undulator Design Parameters. LCLS – Familiar Design Challenges. - PowerPoint PPT Presentation
42
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department of Energy Undulator Prototype Status and Plans Marion M. White APS-ASD
Transcript
Page 1: Undulator Prototype  Status and Plans

A U.S. Department of EnergyOffice of Science LaboratoryOperated by The University of Chicago

Argonne National Laboratory

Office of ScienceU.S. Department of Energy

Undulator Prototype

Status and Plans

Marion M. White APS-ASD

Page 2: Undulator Prototype  Status and Plans

2Pioneering Science andTechnology

Office of Science U.S. Department

of Energy

Outline – Prototype Undulator Status

• Design Challenges• Mechanical Design Features• Performance• Improvements• Canted Pole Undulator Measurements• Plans • Summary

Page 3: Undulator Prototype  Status and Plans

3Pioneering Science andTechnology

Office of Science U.S. Department

of Energy

Undulator Design Parameters

Parameter Specified ValueUndulator Type Planar HybridMagnet Material NdFeBPole Material Vanadium PermendurPole Gap (Min. Allowance) 6 mmPeriod Length 30 mmEffective Magnetic Field 1.296 TeslaEffective K Value 3.63Undulator Segment Length 3.40 mNr. of Undulator Segments 33

Page 4: Undulator Prototype  Status and Plans

4Pioneering Science andTechnology

Office of Science U.S. Department

of Energy

LCLS – Familiar Design Challenges

• High-quality undulator magnetic fields• Magnetic tuning for phase errors and trajectory

straightness• Variable and fixed gaps• Phasing undulator ends• Magnetic design

- NdFeB magnets- Vanadium permendur poles- 30-mm period - K=3.63 so Beff=1.296 T

Between APS insertion devices and the LEUTL FEL, the APS team has a lot of undulator experience with:

Page 5: Undulator Prototype  Status and Plans

5Pioneering Science andTechnology

Office of Science U.S. Department

of Energy

Magnetic Design

Standard undulator design considerations:

• Maximize the field• Don’t demagnetize the magnets• Don’t oversaturate the poles

Page 6: Undulator Prototype  Status and Plans

6Pioneering Science andTechnology

Office of Science U.S. Department

of Energy

Magnetic Design (2)

- Chose a new grade of magnet with higher coercivity (N39SH) for the prototype

- Attention to minimizing the demagnetizing field

- Design goal to be as restrictive as usual on the demagnetizing field, maybe even at the cost of higher pole saturation, then use the high Hc magnets

Prevent Radiation Damage

Page 7: Undulator Prototype  Status and Plans

7Pioneering Science andTechnology

Office of Science U.S. Department

of Energy

New Challenges – Uniformity and Stability

Achieving a field-strength uniformity of 1.5 x 10-4 along the undulator line is a challenge

- Gap change of 1.4 microns- Vertical shift ~ 50 microns- Temperature coefficient of the magnet is 0.1%/°C- Thermal expansion

And there may be a desire to taper in the future

Page 8: Undulator Prototype  Status and Plans

8Pioneering Science andTechnology

Office of Science U.S. Department

of Energy

Outline – Prototype Undulator Status

• Design Challenges

• Mechanical Design Features• Performance• Design Improvements• Canted Pole Measurements• Plans • Summary

Page 9: Undulator Prototype  Status and Plans

9Pioneering Science andTechnology

Office of Science U.S. Department

of Energy

Complete Undulator Module

Magnet Assembly BPMQuadrupole

Rails CAM Movers Cradle

Page 10: Undulator Prototype  Status and Plans

10Pioneering Science andTechnology

Office of Science U.S. Department

of Energy

Mechanical Design

Page 11: Undulator Prototype  Status and Plans

11Pioneering Science andTechnology

Office of Science U.S. Department

of Energy

Mechanical Design Features1. Housing is made from a forged Ti bar

2. Ti was preferred over other materials because:

• Nonmagnetic

• Low thermal expansion

• Long-term stability

• Rigidity to density ratio for minimal deflection

3. Al baseplate provides partial thermal compensation

4. Open on one side for magnetic measurement access and shimming

Page 12: Undulator Prototype  Status and Plans

12Pioneering Science andTechnology

Office of Science U.S. Department

of Energy

Titanium Strongback

Page 13: Undulator Prototype  Status and Plans

13Pioneering Science andTechnology

Office of Science U.S. Department

of Energy

Mechanical design features, cont.

Shims and push-pull screws adjust the gap.

Magnets are clamped from only one side.

Magnetic side shims. Steel bars approach side of pole. Correction up to ~3% in field.

Page 14: Undulator Prototype  Status and Plans

14Pioneering Science andTechnology

Office of Science U.S. Department

of Energy

Pole clamping

Poles have titanium wings, and are clamped on both sides

Page 15: Undulator Prototype  Status and Plans

15Pioneering Science andTechnology

Office of Science U.S. Department

of Energy

Pole simplification now under consideration

Eliminate the wings and screw

the pole in from the bottom.

Still being refined; will be used in a segment of the prototype and

reviewed.

Page 16: Undulator Prototype  Status and Plans

16Pioneering Science andTechnology

Office of Science U.S. Department

of Energy

End-phase adjusters in the prototype•Piezo translators on end sections allowed gap & field strength adjustment

•Over the last seven periods only

•Adjusted phasing between undulators

•Can relax the requirement for constant Beff between undulators to 7x10-4

•Travel range 100 micron each jaw (200 microns in total gap). 100 microns corresponds to 29°.

Page 17: Undulator Prototype  Status and Plans

17Pioneering Science andTechnology

Office of Science U.S. Department

of Energy

Eccentric cam movers

Each cam is driven by a separate motor

Adjustable in both transverse directions & in roll, pitch, & yaw

Page 18: Undulator Prototype  Status and Plans

18Pioneering Science andTechnology

Office of Science U.S. Department

of Energy

Outline – Prototype Undulator Status

• Design Challenges• Mechanical Design Features

• Performance• Design Improvements• Canted Pole Measurements• Plans • Summary

Page 19: Undulator Prototype  Status and Plans

19Pioneering Science andTechnology

Office of Science U.S. Department

of Energy

Assembly - Magnet Sorting

Magnets were sorted by strength (Total Moment), then the strongest and the weakest were matched together.

Very important – saved lots of time since we found we could use this vendor’s measurements “as is” for sorting; not all vendors routinely make these measurements.

Single Magnets

Matched Pairs

Page 20: Undulator Prototype  Status and Plans

20Pioneering Science andTechnology

Office of Science U.S. Department

of Energy

Assembly - pole sortingAfter magnet sorting, the main contributor to field errors was pole height variation.

Tall and short poles were paired, and RMS deviation in gap was reduced from 6.3 to 2.4 microns

After sorting:But this pairing neglected the contribution of the Al base plate thickness, and variation due to the attachment to the Ti. Final gap variation was ±50 microns.

Note – Put tighter tolerances on the Al baseplate for production

Page 21: Undulator Prototype  Status and Plans

21Pioneering Science andTechnology

Office of Science U.S. Department

of Energy

Magnetic Tuning

Nonetheless, the device met the trajectory straightness requirement (±2 micron) without tuning.

After tuning, the wiggle-averaged trajectory was within a range of about 0.5 microns.

Page 22: Undulator Prototype  Status and Plans

22Pioneering Science andTechnology

Office of Science U.S. Department

of Energy

Phase Error TuningThe calculated spontaneous emission amplitude needed tuning to raise it from 93% to over 99% of ideal.

(The rms phase error decreased from 11.2° to 6.5°.)

Page 23: Undulator Prototype  Status and Plans

23Pioneering Science andTechnology

Office of Science U.S. Department

of Energy

Temperature Dependence

Care must be taken in the measurements to allow the undulator sufficient thermal equilibration time

Also need to correct for temperature dependence of the Hall probe: (Beff/Beff)/T = -5.5 x 10-4 /°C

Page 24: Undulator Prototype  Status and Plans

24Pioneering Science andTechnology

Office of Science U.S. Department

of Energy

Outline – Prototype Undulator Status

• Design Challenges• Mechanical Design Features• Performance

• Post-Prototype Design Improvements• Canted Pole Measurements• Plans • Summary

Page 25: Undulator Prototype  Status and Plans

25Pioneering Science andTechnology

Office of Science U.S. Department

of Energy

Post-prototype Considerations

• End phase adjustments- Piezos long-term stability for this application is untested

• Adjustment to final gap has not yet been done, but can do this with the cant anyway.

• Assume temperature dependence is handled by the conventional facilities specifications.

Page 26: Undulator Prototype  Status and Plans

26Pioneering Science andTechnology

Office of Science U.S. Department

of Energy

Radiation Damage – Post-prototype

• Had considered using SmCo magnets- Better radiation resistance- Smaller decrease in strength with temperature rise- But overall weaker strength and more brittle- Ruled out based on schedule – no time for R&D.

• Instead, take advantage of APS radiation exposure and damage experience at the APS.

• Provide dose limit guidance and information to SLAC to be used as input into the undulator protection system.

• Do not operate LCLS under conditions likely to result in damage to the undulators.

Page 27: Undulator Prototype  Status and Plans

27Pioneering Science andTechnology

Office of Science U.S. Department

of Energy

Post-prototype, cont.• A comb shunt for adjusting the field strength was proposed• Initial tests look promising, but added design complexity;

(remote capability - considerable added design complexity)• Also a possibility for end phase correction only

Page 28: Undulator Prototype  Status and Plans

28Pioneering Science andTechnology

Office of Science U.S. Department

of Energy

Outline – Prototype Undulator Status

• Design Challenges• Mechanical Design Features• Performance• Post-Prototype Design Improvements

• Canted Pole Measurements• Plans • Summary

Page 29: Undulator Prototype  Status and Plans

29Pioneering Science andTechnology

Office of Science U.S. Department

of Energy

Canting The Gap

• A scheme ( thanks to J. Pflueger) of canting the poles so that field strength varies with lateral (horizontal) position was very promising.

• A test section was “canted” and measured with excellent results. Canting was adopted into the baseline.

Page 30: Undulator Prototype  Status and Plans

30Pioneering Science andTechnology

Office of Science U.S. Department

of Energy

Canted Cross-section (exaggerated)

LCLS

Undulator

Cross-

Section with

Wedged

Shims

Page 31: Undulator Prototype  Status and Plans

31Pioneering Science andTechnology

Office of Science U.S. Department

of Energy

• Measured slope of 6.6 Gauss/mm agrees with calculations (~ 5.7 Gauss/mm for 3 mrad cant).

• Alignment accuracy needed for B/B ~ 1.5x10-4 ~ 2 Gauss -> 0.3 mm

Effective Magnetic Field

Page 32: Undulator Prototype  Status and Plans

32Pioneering Science andTechnology

Office of Science U.S. Department

of Energy

RMS Phase Error

• No significant dependency on X• An RMS phase error of ~ 6.5 degree is an upper limit for

near-perfect (~100%) performance.

Page 33: Undulator Prototype  Status and Plans

33Pioneering Science andTechnology

Office of Science U.S. Department

of Energy

Horizontal Trajectory (averaged over period length) at 14.1 GeV

• Trajectory vs. X well behaved and well within the tolerance requirement of 2 m maximum walk-off from a straight line.

• Operational range is ±1.2 mm for ±1.0°C temperature compensation.

Page 34: Undulator Prototype  Status and Plans

34Pioneering Science andTechnology

Office of Science U.S. Department

of Energy

Fringe Fields at X=65 and 100 mm

• Fringe fields with new shims are close to earth field for X=100 mm. (Earth field contribution to trajectory shift has to be corrected.)

Page 35: Undulator Prototype  Status and Plans

35Pioneering Science andTechnology

Office of Science U.S. Department

of Energy

Fine adjustment of effective magnetic field(Isaac’s field-tuning procedure )1. Select spacers with thickness step ~ 15 µm to set the

effective field in the range of ±30 Gauss (1 µm in gap corresponds to ~ 2 Gauss in field).

2. Set spacer horizontal position to adjust the effective field to ~ ±6 Gauss (spacers are wedged with 3 m/mm cant)

3. Set horizontal position of the undulator as a whole so the effective field is in the range ±2 Gauss (B/B ~ ±1.5x10-4) (This step saves time and provides better accuracy)

4. The undulator horizontal position could be remotely controlled during operation to compensate for in-tunnel temperature variations (motion of ±1.2 mm for ±1°C needed). Such option is available, if quadrupoles are separated from undulator sections.

Page 36: Undulator Prototype  Status and Plans

36Pioneering Science andTechnology

Office of Science U.S. Department

of Energy

Magnetic needles for alignment

• Only one needle is required for alignment in the X direction• One more needle has to be added at Y=0 for alignment in the Y

direction

Page 37: Undulator Prototype  Status and Plans

37Pioneering Science andTechnology

Office of Science U.S. Department

of Energy

Outline – Prototype Undulator Status

• Design Challenges• Mechanical Design Features• Performance• Post-Prototype Design Improvements• Canted Pole Measurements

• Plans• Summary

Page 38: Undulator Prototype  Status and Plans

38Pioneering Science andTechnology

Office of Science U.S. Department

of Energy

Scope and Plans – Undulator Systems

• 33 Precision magnetic arrays with canted poles• 33 Support/alignment systems including:

- Cradle that supports the undulator, BPM, and quadrupole magnet.

- Precision CAM movers and motors enabling positioning, alignment, and adjustment of the cradle.

- Rail system to move the undulator, facilitating manual retraction of an undulator out of the beamline and precision reproducible re-insertion.

• 7 Spare Undulator Modules • 1 Undulator Transport Device for Installation

Page 39: Undulator Prototype  Status and Plans

39Pioneering Science andTechnology

Office of Science U.S. Department

of Energy

Plan – Undulators (1)

• To meet schedule and funding profiles, and to ensure that the Undulator Systems are complete by July 2007, we plan to procure the following long-lead items as early as possible in FY05:

- Precision-machined titanium strongbacks- NdFeB Magnet blocks- Vanadium Permendur Magnet poles

• The same APS undulator experts, who were relied upon for design, construction, and assessment of the prototype, will finalize procurement packages for the LL items, in accordance with our Advance Procurement Plans [APP].

Page 40: Undulator Prototype  Status and Plans

40Pioneering Science andTechnology

Office of Science U.S. Department

of Energy

Scope – Quadrupole Magnet Systems

• 33 Quadrupole Magnet Systems - installed- Permanent Magnet Quadrupole- Support with Precision Translator [settable to 5 um;

readout to 1um]

• 5 Spare Magnet Systems

• Separate steering is not included

Page 41: Undulator Prototype  Status and Plans

41Pioneering Science andTechnology

Office of Science U.S. Department

of Energy

Summary• A full-scale prototype undulator was constructed and

tested at APS, and met LCLS performance goals. • A subsequent design improvement, that of introducing a 3-

mrad cant in the pole gap, was implemented using wedged spacers between the aluminum base plates and the titanium core. It was successfully tested and the concept was adopted in the baseline.

• A disadvantage of the canted-pole design is the necessity to provide a separate support for vacuum chamber

• Magnetic measurements show good agreement with calculated change of the effective magnetic field versus X (horizontal motion).

• No significant change of the RMS phase error versus X was measured.

Page 42: Undulator Prototype  Status and Plans

42Pioneering Science andTechnology

Office of Science U.S. Department

of Energy

Current Status • Significant effort has been devoted to planning, resulting in a detailed

undulator construction schedule that is integrated with the BPM, quadrupole and vacuum chamber construction and testing. The undulator schedule and the magnet measurement schedule are mostly integrated, and are consistent with completion of undulator systems in July 2007.

• A skeleton installation schedule exists; details are being added and integration with the rest of the schedule is ongoing.

• Schedule refinement is ongoing.• Costs were estimated by in-house experts with relevant experience and

were based on vendor quotes and previous experience. Cost scrubbing will continue.

• The greatest schedule risks come from:- Design changes - Delayed funding