The Uni-Tower stores easily for
transportation to site. 1. Open base unit and ensure central knuckle joints lock 3. Fit a brace at the base of the tower above the lowest rung opposite the folding
frame. Join two 4 Rung frames together and fit on to the base frames on both sides. Fit
side brace frame with the upper hooks resting on the sixth rung as shown.
4. At this point site the tower and fit stabilisers 6. Fit the assembly assist frame on to the side of the tower and store two brace frames. Climb the tower through
the hatchdoor and from this position ( sitting ) fit the two side brace frames, with the top hooks resting on the
top of the twelfth rung and facing outward.
5. Fit platform on to the eighth
rung of the tower.
7. Fit the assembly assist frame on to the side of the
tower . Store two eight rung ( two fitted together ) .
frames Climb through the hatchdoor and fit the joined
frames on to the lower frames.
8. Fit the next platform whilst
standing on the lower platform.
Fit the assembly assist frame
and two brace frames. 9. Whilst sitting through the hatchdoor fit the two side brace frames . At this stage
store a toeboard . With the brace frames fitted climb through the hatchdoor and fit
the toeboard. ASSEMBLED TOWER
Manufactured under an ISO9001:2008 Quality System by:-
Interlink Alloy Systems Limited
Tel: 01992 716509 Fax: 01992 652500
E-mail: [email protected]
Web: www.interlinkalloy.co.uk
UNI-TOWER