+ All Categories
Home > Documents > UNILEVER END 2 END SUPPLY CHAIN LULEÅ OKTOBER 2013 KHALIL EL-ACHKAR NORDIC QUALITY ASSURANCE...

UNILEVER END 2 END SUPPLY CHAIN LULEÅ OKTOBER 2013 KHALIL EL-ACHKAR NORDIC QUALITY ASSURANCE...

Date post: 01-Apr-2015
Category:
Upload: walter-hollifield
View: 219 times
Download: 1 times
Share this document with a friend
Popular Tags:
9
UNILEVER END 2 END SUPPLY CHAIN LULEÅ OKTOBER 2013 KHALIL EL-ACHKAR NORDIC QUALITY ASSURANCE MANAGER
Transcript
Page 3: UNILEVER END 2 END SUPPLY CHAIN LULEÅ OKTOBER 2013 KHALIL EL-ACHKAR NORDIC QUALITY ASSURANCE MANAGER.

FAST FACTS - 2012

190COUNTRIES IN WHICH OUR PRODUCTSARE SOLD

TURNOVER OF

€51 BILLION AT END OF 2012

EMPLOYEES AT THE END OF THE YEAR

173,000

252 FACTORIES (4 IN

NORDICS)

€1 BILLION

INVESTED IN R&D WORLDWIDE

Page 4: UNILEVER END 2 END SUPPLY CHAIN LULEÅ OKTOBER 2013 KHALIL EL-ACHKAR NORDIC QUALITY ASSURANCE MANAGER.

SCALE AND GEOGRAPHICAL REACH

EUROPE

€20.4 billion turnover5.7% underlying volume growth40% of group turnover

ASIA, AFRICA, CENTRAL & EASTERN EUROPE

EUROPE

€13.9 billion turnover 0.9% underlying volume growth27% of group turnover

EUROPE

EUROPE

€17.1 billion turnover3.1% underlying volume growth 33% of group turnover

THE AMERICAS

Page 5: UNILEVER END 2 END SUPPLY CHAIN LULEÅ OKTOBER 2013 KHALIL EL-ACHKAR NORDIC QUALITY ASSURANCE MANAGER.

CATEGORY HIGHLIGHTS IN 2012

Turnover: €9.1 billion

Turnover: €14.4 billion Turnover: €18.1 billion

Turnover: €9.7 billion

PERSONAL CAREFOODS

REFRESHMENTHOMECARE

Page 6: UNILEVER END 2 END SUPPLY CHAIN LULEÅ OKTOBER 2013 KHALIL EL-ACHKAR NORDIC QUALITY ASSURANCE MANAGER.

LET’S START WITH A SHOP VISIT

What is End 2 End Supply chain?

More than delivering on time in full…

Page 8: UNILEVER END 2 END SUPPLY CHAIN LULEÅ OKTOBER 2013 KHALIL EL-ACHKAR NORDIC QUALITY ASSURANCE MANAGER.

MAKE

252 factories

Waste management – Delivery and changeover

Stocks – Balance between service and DOH

OEE – (Overall Equipment Efficiency)

CCFOT – (Customer Case Fill On Time)

TPM - (Total Productive Maintenance)

Flen

CopenhagenOdense

Sipoo

Office

Manufacturing

Storage


Recommended