UNION ELECTRIQUI DU VANUATU LIMITED mPUBLIC OF VANUATU COrnCT FOR TBE MANAGEMENT -ADID OPERATION OF THE WATER SIJTPLY SERVICE IN PORT VILA
Transcript
Page 1: UNION ELECTRIQUI DU VANUATU LIMITED mPUBLIC OF …€¦ · Tht'purnping station is equipped with two Ajax E 65-26 pumps with a duty point of 100 m3/h et 70 rn head. The power of each

UNION ELECTRIQUI DU VANUATU LIMITED

mPUBLIC OF VANUATU

C O r n C T FOR TBE MANAGEMENT -ADID OPERATION

OF THE WATER SIJTPLY SERVICE IN PORT VILA

Page 2: UNION ELECTRIQUI DU VANUATU LIMITED mPUBLIC OF …€¦ · Tht'purnping station is equipped with two Ajax E 65-26 pumps with a duty point of 100 m3/h et 70 rn head. The power of each

UNION ELECTRIQUE DU VANUATU LIMITED

REPUBLIC OF VANUATU

C O r n C T . FOR THE MANAGEMENT AND OPERATIOK . - OF TEE WATER SUPPLY SERVICE

m PORT VILA

TRANSITORY PROVISIONS

Page 3: UNION ELECTRIQUI DU VANUATU LIMITED mPUBLIC OF …€¦ · Tht'purnping station is equipped with two Ajax E 65-26 pumps with a duty point of 100 m3/h et 70 rn head. The power of each

PAGE No

ARTICLE 1 STOCK OF PARTS, VEHICLES, L M A C ~ T R Y Ahi FIIR,?\n:SmGS.

ARTICLE 3 WATER C O ~ E C T I O N S

ARTICLE 4 SECURITY DEPOSITS P . D BEFORE CObfiENCEbEhT OF TBIS CONTRACT

ARTICLE 6 IRkYSITORY PERIOD TO RETURN THE 3XDVORX TO X NORMAL STATE OF OPERATION

Page 4: UNION ELECTRIQUI DU VANUATU LIMITED mPUBLIC OF …€¦ · Tht'purnping station is equipped with two Ajax E 65-26 pumps with a duty point of 100 m3/h et 70 rn head. The power of each

Furnishings and vehicier, propew of the present water rewise of theDepartment d P u b l k Works, shalI not be purchased by the OPERATOR

Page 5: UNION ELECTRIQUI DU VANUATU LIMITED mPUBLIC OF …€¦ · Tht'purnping station is equipped with two Ajax E 65-26 pumps with a duty point of 100 m3/h et 70 rn head. The power of each

Froa the implemeni~iion of h i s Contrac:, the OPE24TOR undertdces to employ all of the personnel pre.;iously assi$ed to the Water Service of the Department of Public Works zt the month of December 1992, ie., thirteen persons..

Wirhin a period of one month, the OPEKATOR wilI advise the GRANTOR of the salzries of the personnel employed by rhe Water service a well as the conditions of employment.

During rhe fist three months o f employment with the OPERATOR the personnel will receive 2 salary at least equal to that previously received as an employee of the water supply section of the Department of Public'Wotks.

M e r this period of three months has dapsed the penomel will be able to choose one of tile follotvhg options:

- Accept permanent employment wirh the OPER4TOR. The personnel will be employed under conditions comparable to other U E L C O sxfi'with respect to career oppomnities, conditions of pay, social benefi~s, at no Iess than the previous salary.

The personnel s h d retain senioriy zcquired rhrough lenph of senice for Cie calculation of any severance dIowmce.

- DecIine pemanent emplo,vment with the OPER4TOR md be reinstated to employment within the public service, Ln this case, the Government of Vhhi.4TU will underta!,te retraining of the personnel.

The OPEIL4TOR will contribute a lump s u m of 100,000 Vatu per person to be rerrzined by the Goveniient of V.hWATU. This offer will be Iimited to onecLhird *

of the personnel involved.

The OPERATOR will provide t r w g for the personnel remaining at UiNELCO V.X?iiATU,

U3XLCO shall pay the sum o f 2,000,000 Vatu to the GO=-T for the resealernent of casual employees.

Page 6: UNION ELECTRIQUI DU VANUATU LIMITED mPUBLIC OF …€¦ · Tht'purnping station is equipped with two Ajax E 65-26 pumps with a duty point of 100 m3/h et 70 rn head. The power of each

ARTICLE 3 - WATER COX3XCTIONS

- 3 - lms utick concerns vizier C ~ M ~ C T ~ O ~ S not equipped wit;? a w2iCf meter at the axt or' the Contract. If ,durins the t e r n between nvo billings, the meitr is installed by ~ i e OPERATOR before the cgd o f ~ h e lzst nonth of the quGer In considerziion, the cor.sumption t&en as 2 h i s for the application of the bat rat? de5ned in the ScheduIe of Conditions is the vdce meuured 2nd extrzpolated over the quuier. h the other case, a lump sum is zpplied c!epending on the size ofthe connection w'nic:?

1 includes the subscription fee.

T'ne cost of i n d i n g the meter is k e d zt two percent ofthe l ~ m p s u m of the water connection for lengths not exceedins ten meters a id for the corres?ondhg imer dimetzr 2s d e h d in ihe Schedule of Conditions.

A subscriber whose coimection is not fitted with a meter m2y not oppose the installation of a meter by the OPERATOR

Page 7: UNION ELECTRIQUI DU VANUATU LIMITED mPUBLIC OF …€¦ · Tht'purnping station is equipped with two Ajax E 65-26 pumps with a duty point of 100 m3/h et 70 rn head. The power of each

r ' - ARTICLE 4. - SECURlTY DEPOSIT P . - B E F ~ R E COMMENCEiVNT OF TEUS

Security deposits paid to the GUVERWm prior to the commencement of the Cont- act remain to the credit of the subscribers concerned in the books of the OPERATOR.

The arnount of the security deposit shall be transfered &om the GOVERNrMXT to h e OPERATOR by deducting the amont from the revenue fiom the sale of water for the period preceding the commencement of the Contract and which the OPERATOR shall collect on behalf of the GOVE-.

If the revenue for the b i h g period concerned is superior to the amount of the security deposits, h e difference shdI be p ~ d to the GOVERi . iNT.

Ifthe revenue for the billing period is less than the amount of the security deposits, the 5.d amomt of the revenue shall be transfered to a specific account in the books of the O P E L U O R

lhis amount shall be credited to the subscribers concerned in an equitable manner.

Page 8: UNION ELECTRIQUI DU VANUATU LIMITED mPUBLIC OF …€¦ · Tht'purnping station is equipped with two Ajax E 65-26 pumps with a duty point of 100 m3/h et 70 rn head. The power of each

. <

ARTICLE 5. - AGREEMENTS CONCLUDED WIIH TElW PARTIES

b" From the dateof commencement of the Contract, the OPERATOR s h d assume responsability for d obligations of the GOVERNMEST to third parties for the mwgernent and opera&n of the w r e r P supply. The GOVERNMENT shall advise the OPERATOR of these obligations within a period of one month from the commencement of the Contract.

The previous subscribers s h d Contract a new subscription policy.

Page 9: UNION ELECTRIQUI DU VANUATU LIMITED mPUBLIC OF …€¦ · Tht'purnping station is equipped with two Ajax E 65-26 pumps with a duty point of 100 m3/h et 70 rn head. The power of each

ARTICLE 6. - TRANSITORY PERIOD TO BXTTURN TEE NETWORX TO .A NOELMXL STATE OF OPERATION

I

. Considering the state of the netwbrk the penalities provided for in this Contract s h d only be appficoble aRer a transitory period of ten months to allow the OPERATOR to return the network to a normal state of operation. -

Page 10: UNION ELECTRIQUI DU VANUATU LIMITED mPUBLIC OF …€¦ · Tht'purnping station is equipped with two Ajax E 65-26 pumps with a duty point of 100 m3/h et 70 rn head. The power of each

UNION ELECTRIQUE DU VANUATU LIMITED

REPUBLIC OF VANUATU

Page 11: UNION ELECTRIQUI DU VANUATU LIMITED mPUBLIC OF …€¦ · Tht'purnping station is equipped with two Ajax E 65-26 pumps with a duty point of 100 m3/h et 70 rn head. The power of each

UNION ELECTRTQUE DU VANUATU

REPUBLIC OF VANUATU

APPErnrX

PROGRAMME OF WORKS

1993 - 2002

Page 12: UNION ELECTRIQUI DU VANUATU LIMITED mPUBLIC OF …€¦ · Tht'purnping station is equipped with two Ajax E 65-26 pumps with a duty point of 100 m3/h et 70 rn head. The power of each

COXTRACT FOR THE M~XAGEIME~VT AND OPERATTOi\;

OF THE WATER SUPPLY SERVICE EV' PORT VILA

1. PRESENTATION

In accordance with Ankle 5 of the Contract, the OPERATOR undertakes to carry out p r o g r w e s of works on the wzter supply network, over the full duration of *is Contract.

Thhe mount of investments to be made over the 40 year period of the Contrac is esihzted ar 800 Million Vztu.

E x h programme of works is esihbshed for a period of ten years. There will kt ;bur such programmes of works over the duraion of the Contract. Each p r o g m x of work is established by :he OPERATOR md submitted to the GOVERiilE3T for approvd.

The technical content of the ten ye= progamme of works is updated each yes and remains at the initial moun t p r o g m e d .

Tine 5rst programme is submitted for information only and ir's technical conten shall be conhned or modified by the OPERATOR once it has established the water supply mater pi=.

This programme concerns all or part of the foUowing fields :

1). Repairs to the IeveI controls to the reservoirs and the automatic control of pumps.

2). Meters

5)- Replacement and upgrading of pumps at the pump station

4) Upgrading of supply and pressure mains

5 ) . Exiensions of reservoirs

6): Renewal and upgrading of the existing network as at the date of commencement of the Contract.

7). Extension to the distniution network

. ..

Page 13: UNION ELECTRIQUI DU VANUATU LIMITED mPUBLIC OF …€¦ · Tht'purnping station is equipped with two Ajax E 65-26 pumps with a duty point of 100 m3/h et 70 rn head. The power of each

2 - PLAXSED OPERATIONS

The progrzrnme of works for the first ten yeus of the Contract concerns ir, pmicuIx :

1). FACIO and PERCHOLR hi& lift pumps

The &iiiilg pumps will be replaced md upgaded in order to transit a greatzr flow

2). Emergency diesel generator at the pump station

In order to incrwe the reliability of t he service, r second dieseI generaror will be installed.

3)- Supply rnaiil to PERCHOIX

In order to improve the supply to the PERCHOR reservoir and at the same time delete the tribunal pumping station, a new supply main will be constructed.

For this purpose the PERCHOR reservoir will be connected to the 400 mm main supplying water from the pumpins station to the QUM reservoir.

If the detailed studies reved thzt it would be preferable to construct a new rising main h m the ptlmp station to the PERCHOIR reservoir this solution nilI be adopted.

4). MALAPOA Reservoir

A 1200 d reservoir wiu be constructed to supply the sector of rM%MOX

This investment includes the coostmaion of the supply main to this reservoir and the various connections.

The construction of this reservoir will allow to defer the extension to the FACIO reservoir.

5). Level Controls Repairs to the level control of reservoirs and the automatic control of pumps.

In order to control the levels in the reservoirs and the automatic start up and stopping of pumps, the automatic control system shad be repaired.

6) Renewal and Upgradins of the existing nenvork

At the start of the Conritct the network comprises approximately 63.5 kilometers of galvanised pipework and 8.4 kilometers of PVC pipes.

Page 14: UNION ELECTRIQUI DU VANUATU LIMITED mPUBLIC OF …€¦ · Tht'purnping station is equipped with two Ajax E 65-26 pumps with a duty point of 100 m3/h et 70 rn head. The power of each

The present day cost for the consrruction of this distribution network is estimated at

Gdvanised Pipes . . . . . . . . . . . . .420 million Vatu PVC Pipes . . . . . . . . . . . . . . . . . . .55 rniiIion Vatu

TOTAL . . . . . . . . . . . . . . . . . . . , 4 7 5 Million Vatu

The programme of works shall include, for the first ten years, the renew4 of appro.&ately 30% of this pipework, ie. 142 milIion Vatu

7). Extensions

The contents of this progarnme 2nd details ofthe renewals and upgrading shall be confirmed and detded after the master plan has been esrablished.

3. - ESTTMATION OF COSTS A37) 'ITVIE FOR CO3ELETION

Tbc p r o r z m c of works hes becn fixed zt ~00,000,000 Vatu and it's implementztion should be es follows :

Automatic Conuols

Watx Meters

Pumps and. Generators

SuppIy blains and Rising Mains

Renewal and Uppiing of the Distributiaa Nework

Extensicas to the Distribution Network

-I

I ile exact iiining for iha works s k i be detzmktd i? coi?xen accord :vi;h the GOVE-T and updated each yea,

Page 15: UNION ELECTRIQUI DU VANUATU LIMITED mPUBLIC OF …€¦ · Tht'purnping station is equipped with two Ajax E 65-26 pumps with a duty point of 100 m3/h et 70 rn head. The power of each

UNION ELECTRIQUE DU VANUATU LIMITED

REPUBLIC OF VANUATU

b

APPEbiD3X

PROFIT ANI) LOSS STATEMENT

Page 16: UNION ELECTRIQUI DU VANUATU LIMITED mPUBLIC OF …€¦ · Tht'purnping station is equipped with two Ajax E 65-26 pumps with a duty point of 100 m3/h et 70 rn head. The power of each

1.. I, l e v i e s acd s l t f l b - EL-ges

Page 17: UNION ELECTRIQUI DU VANUATU LIMITED mPUBLIC OF …€¦ · Tht'purnping station is equipped with two Ajax E 65-26 pumps with a duty point of 100 m3/h et 70 rn head. The power of each

UNION ELECTRTQUE DU VANUATU LIMITED

REPUBLIC OF VANL'ATU

INSTALLATIONS T ~ ~ N OVER BY THE OPEIUTOR

AT THE COMMENCErMENT OF THE CONTRACT

Page 18: UNION ELECTRIQUI DU VANUATU LIMITED mPUBLIC OF …€¦ · Tht'purnping station is equipped with two Ajax E 65-26 pumps with a duty point of 100 m3/h et 70 rn head. The power of each

The water supply n e t w o r k put at the d i s p c s a l of t h e opera to r a t t h e start o f t h s c o n t r a c t includes the f o l l o w i n g facilities :

The pumping stetion is situated on government owned land, in t h e _ ~ r o x i n i t y of the TAGABE . r iver , the land is approxirnctely 100 rn x 30 m ( 3 . 0 0 0 m2).

The pumping s t e t i o n is fed by five sources.

- A spring with a basin immediately adjacent to the o l d pumping ststion.

- Four cased 5ores of 7 6 0 mm dia.

The depth of thsse Sorss varies between 15 rn and 26 m.

S t a t i c water level varies between + 4 m and - il m. Each bore is equipped with a SULZER submersible pumg model K 8 7 / 1 with 2 duty point o f 125 m3/h at 13.5 m htad and a power of 8 . 5 KW.

The submersible pumps discharge i n t o a con tac t / c h l o r i n a t i o n tank o f 650 m3, the tenk is circular and of metallic construction.

The old rectangular contact / chlorination tank is in very poor condition.

The floor l e v ~ I . of t h e tank is at 13.7 m and the overflow is at 1 7 . 4 5 rn.

Chlorination is achieved w i t h chlorine& gas. Chlorination equipment 1s of t h e vacuum / s u c t i o n type.

Water is then pumped to :

- FACIO reservoir by 4 high l i f t pumps. The 4 pumps are SULZER HZ S 126/3 w i t h a duty point of 120 rn3/h, at 7 6 , 4 m head and a power of 37 XW.

- PERCHOIR reservoir by 3 h igh lift pumps. The pumps are SULZER HZ S 126/5 with a duty point of 120 m3/h, at 1 1 4 , 2 m head and a power of 7 5 KW-

Page 19: UNION ELECTRIQUI DU VANUATU LIMITED mPUBLIC OF …€¦ · Tht'purnping station is equipped with two Ajax E 65-26 pumps with a duty point of 100 m3/h et 70 rn head. The power of each

The h i g h l i f t pumps, switch boards, a workshop, o f f i c e , chlorination equigmant and sanitary facilities are housed in s. masonry building.

A n o t h e r building houses a generator.

The g e n e r a t o r is driven by s. POYAUD Diesel w i t h a power or' 207 H . P . at 1 500 r.p.m. (170 KW).

2 ) TRIBUNAL PUMPING STATION

The pumping station allows to feed the PERCHOIR rsservoir by pumping f r o m the T~IBUNM., reservoir.

Tht'purnping s t a t i o n is equipped with t w o Ajax E 6 5 - 2 6 pumps with a d u t y point of 100 m3/h et 70 rn head.

The power of each gump is 3 7 KW.

The u r n p i n g mzin between t h e TAGA3E pumping station end t h e F A C I O reservoir is in ductile iron of diametre' 400 mm. It's length is 825 m.

The pumping main between the TAGABE pumping s t a t i o n and the PERCHOIR reservoir is in galvanised steel of 200 mm diameter. It's length is 3113 m.

The pumping main between t h e TRIBUNAL pumping s t a t i o n and the PERCHOIR reservoir is in galvanised steel of 100 mm diameter. it's l e n g t h is 600 rn.

The QUAI reservoir is fed from the FACIO reserv'oir by a d u c t i l e iron gravity main of 400 rnrn diameter. St's l ength is 8270 m.

A gravity feed in galvanised steel of 150 mrn diameter branches from this main to feed the PERCROIR reservoir. It's length is 450 m.

5 ) RESERVOIRS

The network includes 6 cylindrical steel reservoirs situated on fenced land approximately 5 0 m x 45 rn ( 2250 m2) f o r FACIO and 3 5 x 20 m ( 7 0 0 mP) f o r the.qthers.

Volumes and floor levels are set o u t in t h e table e l o

& ~Q!!-A

Page 20: UNION ELECTRIQUI DU VANUATU LIMITED mPUBLIC OF …€¦ · Tht'purnping station is equipped with two Ajax E 65-26 pumps with a duty point of 100 m3/h et 70 rn head. The power of each

RESERVOIR 1 . VOLUME I FLOOR LEVEL

EACIO

PE RCHO I R

I 1 QUAI I 1 x 1300 m3 I 74.81 rn

I I

Supply from the QUAI reservoir is limited to s h i p s . '

6 ) DXSSRTBUTION NETWORK

The distribution network consist of galvanised steel pipes of 3 / 4 " to 8 " diameter and of P . V . C . of 25 mm to 150 mm diarnetsr.

The total length of the distribution network is 71865 m of which 63475 m is galvanised steel , (i.e. 8 8 % ) and 8390 rn P . V . C .

The pump swiihboards axe equipped recorders.

with displays of t o t a l flow

The reservoirs are equipped with meters and rate of flow recorders w i t h grephic displ'ay . House connection are equipped with KENT water meters.

Page 21: UNION ELECTRIQUI DU VANUATU LIMITED mPUBLIC OF …€¦ · Tht'purnping station is equipped with two Ajax E 65-26 pumps with a duty point of 100 m3/h et 70 rn head. The power of each

--

Flow 1 123 n?/h

Eeod I 13.3 m

power ( 8 , j j kg !

Number 4

m e I SubnezsiSle 3

Diameter 1 9 0 173 Q C o l m n p i p e 7 " 3 / 8

Electricity SUPP~Y

I

-.-- -- Makz I zu-Z;n

390 v / 20 XZ / 3 Phcse

Page 22: UNION ELECTRIQUI DU VANUATU LIMITED mPUBLIC OF …€¦ · Tht'purnping station is equipped with two Ajax E 65-26 pumps with a duty point of 100 m3/h et 70 rn head. The power of each

. . . . . . - .

N u m b e r 1 4

-- -- -

Head r o . 4 m I - *

Tower :

Page 23: UNION ELECTRIQUI DU VANUATU LIMITED mPUBLIC OF …€¦ · Tht'purnping station is equipped with two Ajax E 65-26 pumps with a duty point of 100 m3/h et 70 rn head. The power of each

PERCHOIR HIGH LIFT PUMPS

Number b M ~ k e Model

Flow

Electricity Supply

GENERATOR

Number f 1

we 1 6 221

P o w e r 1 207 E.?. e t 1 500 r.g.rn.

Make I POVAUD

output 1 1i0 XVA

Alternator AUBRY - SZMONIN Condition Good: general s t a t e

Page 24: UNION ELECTRIQUI DU VANUATU LIMITED mPUBLIC OF …€¦ · Tht'purnping station is equipped with two Ajax E 65-26 pumps with a duty point of 100 m3/h et 70 rn head. The power of each

Number 1 2

Elsctricity Supply 380 v / 50 XZ / 3 ?hese

Page 25: UNION ELECTRIQUI DU VANUATU LIMITED mPUBLIC OF …€¦ · Tht'purnping station is equipped with two Ajax E 65-26 pumps with a duty point of 100 m3/h et 70 rn head. The power of each

EX3:STI:NG CONTACT CHLORXNAT'IOP? TANK

I Number I 1 - -

R"Y Rectangular, prefcbriccted ne=el panals egpzax, l m x l n ..

~ o l u m e ::om3

Contec t t i m e I 2 4 - 30 minuees Genra!, Condition

3rd c ~ n d l t i o n , n u r ~ e r e c u Leeks

Page 26: UNION ELECTRIQUI DU VANUATU LIMITED mPUBLIC OF …€¦ · Tht'purnping station is equipped with two Ajax E 65-26 pumps with a duty point of 100 m3/h et 70 rn head. The power of each

CONTACT CHLORINATION TANK UNDER CONSTRUCTION

Number I 1

Ripe I Tzefabricateb metzlFc, circular

Volume 1 550 rn3.

Contact A 1 L L ~ S 7 L - 3 0 m l z c t e s I - - G e n e r d I Kew, under ccnstructicn I n Condition nny 1392

b

Page 27: UNION ELECTRIQUI DU VANUATU LIMITED mPUBLIC OF …€¦ · Tht'purnping station is equipped with two Ajax E 65-26 pumps with a duty point of 100 m3/h et 70 rn head. The power of each

- - . -- -. . -

Langth I 82: rn

Page 28: UNION ELECTRIQUI DU VANUATU LIMITED mPUBLIC OF …€¦ · Tht'purnping station is equipped with two Ajax E 65-26 pumps with a duty point of 100 m3/h et 70 rn head. The power of each

RESERVOIRS

I 11 SITE ( TPPE I CAPACITY

I I I STEEL 1 x 1500 m3 STEEL 1 x 2 0 0 0 m3

[I TRIBUNAL STEEL

QUAI STEZL

Good cond i t i on Good cond i t i on , cons t r u c t e c 19 5 0

Good condition f o r ccs a .few leeks f o r ths a t h s r e v t r q s c o n d i t i o n

Avsraga c o n b i t i o n , a fex l a a k s t o r epa i r

Good c o n d i t i o n

Page 29: UNION ELECTRIQUI DU VANUATU LIMITED mPUBLIC OF …€¦ · Tht'purnping station is equipped with two Ajax E 65-26 pumps with a duty point of 100 m3/h et 70 rn head. The power of each

SECTION P a c i o - Quai TY32 i Ductile I ron i Steel

DIAYZTER ( 400 m! 1 150 mi7

LENGEi . 1 8 2 7 0 n 1 430 rn

GZY:=& C O r n I T I O N

Gocc c 3 x i i t i s z 1 ~ a c d con&.=tcz

Page 30: UNION ELECTRIQUI DU VANUATU LIMITED mPUBLIC OF …€¦ · Tht'purnping station is equipped with two Ajax E 65-26 pumps with a duty point of 100 m3/h et 70 rn head. The power of each

WZ'e I Gelvanised s t e e l

diameter 1 200 mm

Length 1 3113 m

Prtssure head S 8 . 1 n

pp- - -

Gensral CondltLon Good generzl c o n d i t i o n

Page 31: UNION ELECTRIQUI DU VANUATU LIMITED mPUBLIC OF …€¦ · Tht'purnping station is equipped with two Ajax E 65-26 pumps with a duty point of 100 m3/h et 70 rn head. The power of each

TRIBUNAL PUMPING MAIN

I w e 1 Galvanised s t e e l

d imstar 1 LO0 m?

Langth 1 6 0 0 m

PressQra h d d

Gensrel Condition

. . 70 iii

Gcod ~ o ~ e r c i condition

Page 32: UNION ELECTRIQUI DU VANUATU LIMITED mPUBLIC OF …€¦ · Tht'purnping station is equipped with two Ajax E 65-26 pumps with a duty point of 100 m3/h et 70 rn head. The power of each

- DSSTRIE3UTION NETWORK

. . . . . . - . -

E!?E D I M T E R LENGW ( inches) I n

3 / 4 " 1 1340

TOTAL

Page 33: UNION ELECTRIQUI DU VANUATU LIMITED mPUBLIC OF …€¦ · Tht'purnping station is equipped with two Ajax E 65-26 pumps with a duty point of 100 m3/h et 70 rn head. The power of each

LOCATION

. . -. . . - -.

Fieservo F r s

W ~ s t e wcter m e t e r s

X o u a ccnnection meters instolled

Icstzntcneous flow recozders

Page 34: UNION ELECTRIQUI DU VANUATU LIMITED mPUBLIC OF …€¦ · Tht'purnping station is equipped with two Ajax E 65-26 pumps with a duty point of 100 m3/h et 70 rn head. The power of each

- -.

BUILDINGS

SITE TlTE I SUlZWLCIE

TAGASZ p m g i n g S t ~ t i o n steel s t r u c t u r e enccssed Fn concre te 3 3 0 3:


Recommended