+ All Categories
Home > Documents > UniSA New Building at Mt Gambier & High Speed Fibre Projects Design Presentation.

UniSA New Building at Mt Gambier & High Speed Fibre Projects Design Presentation.

Date post: 31-Mar-2015
Category:
Upload: norman-naylor
View: 215 times
Download: 0 times
Share this document with a friend
Popular Tags:
16
UniSA New Building at Mt Gambier & High Speed Fibre Projects Design Presentation
Transcript
Page 1: UniSA New Building at Mt Gambier & High Speed Fibre Projects Design Presentation.

UniSA New Building at Mt Gambier

& High Speed Fibre Projects

Design Presentation

Page 2: UniSA New Building at Mt Gambier & High Speed Fibre Projects Design Presentation.

Welcome and IntroductionsProf Judy Nagy

Page 3: UniSA New Building at Mt Gambier & High Speed Fibre Projects Design Presentation.

OverviewChristina Coleiro

Page 4: UniSA New Building at Mt Gambier & High Speed Fibre Projects Design Presentation.

Project Components

New Building Project for UniSA $12.5M

New High Speed Fibre Project $7.5M

Page 5: UniSA New Building at Mt Gambier & High Speed Fibre Projects Design Presentation.

Project Vision

To create a world class tertiary education facility underpinned by new high speed fibre optic infrastructure which will revolutionise the student learning experience and access for regional and rural students in the state and will enable UniSA to expand its course offerings in Mt Gambier and Whyalla.

Page 6: UniSA New Building at Mt Gambier & High Speed Fibre Projects Design Presentation.

Project Benefits

• revolutionise the student learning experience for regional students • triple UniSA’s facilities in the region• enable up to four times as many students to participate in UniSA

programs• improve integration • internet speeds 100 times their current rate • enable students to access the same UniSA curriculum, resources

and academics as those in the city• access to new fibre infrastructure will be available indirectly to

broader Mount Gambier community through 3rd party commercial arrangements

• employment opportunities for local community• focus on local materials

Page 7: UniSA New Building at Mt Gambier & High Speed Fibre Projects Design Presentation.

Education Opportunities

Building Project as a learning tool

Page 8: UniSA New Building at Mt Gambier & High Speed Fibre Projects Design Presentation.

Project Scope

Page 9: UniSA New Building at Mt Gambier & High Speed Fibre Projects Design Presentation.

Project Scope

New Building

Civic Lecture Gallery 120 seats

Piazza Student Hub

5 General Teaching Rooms 30 seats

2 Active Teaching Rooms 30 seats

Specialist Teaching Facilities Nursing + Midwifery, Social Work and Education

Meeting Rooms

Administration

Total Gross Floor Area 2600m²

Integration link to TAFESA

External Elements

Car parking 50 additional

Landscaping

Page 10: UniSA New Building at Mt Gambier & High Speed Fibre Projects Design Presentation.

Project Program

Page 11: UniSA New Building at Mt Gambier & High Speed Fibre Projects Design Presentation.

Program

Key Project Time lines

Consultant Team Appointed May 13

Project Start Up Workshop June 13

Concept (Schematic) Design Phase End Sept 13

Design Development Phase End Dec 13

Documentation Phase completed May 14

Tender May- June 14

Construction on Site Commences July/August 14

Construction Completed Early 2016

Occupation Early 2016

Page 12: UniSA New Building at Mt Gambier & High Speed Fibre Projects Design Presentation.

Building Project Presentation

Hal Guida

Page 13: UniSA New Building at Mt Gambier & High Speed Fibre Projects Design Presentation.

High Speed Fibre ProjectPaul Sherlock

Page 14: UniSA New Building at Mt Gambier & High Speed Fibre Projects Design Presentation.

Questions

Page 15: UniSA New Building at Mt Gambier & High Speed Fibre Projects Design Presentation.

Further Information

Page 16: UniSA New Building at Mt Gambier & High Speed Fibre Projects Design Presentation.

Information/ Communication

Key Channels:

UniSA Facilities Management Unit Website http://w3.unisa.edu.au/facilities/capital/projects_2012.asp

Senior Project Manager, UniSA- Christina Coleiro [email protected]

Manager Facilities, TAFESA- Karen Pillen [email protected]

A/ Dean Teaching and Learning UniSA– Judy Nagy [email protected]


Recommended