Date post: | 31-Dec-2015 |
Category: |
Documents |
Upload: | ariel-moss |
View: | 32 times |
Download: | 1 times |
HAMWORTHY GATE SITE LOOKING BACK TO MAIN REGENERATION ZONEThe access road is completed but site is closed and there is no access.
CURRENT BRIDGE
Currently only access point to ferry/ catamaran port and Hamworthy. Traffic along this route can be very heavily congested especially during the summer tourist season. The quay is a very popular destination. Congestion made worse when bridge is raised for boats.