Unit Concept (M) Sdn Bhd
AUTOMATION SYSTEM INTEGRATIONS PROJECT REFERENCE LIST
Experience List Page 1 of 21
Oct, 2010
ITEM CLIENT PROJECT
RELEVANT DETAILS DELIVERY DATE
1
Chemtech Oiltek
Plant Process
Control System
Specialty Fats Plant, scope of supply includes:
• Design, installation, and commissioning of the process control system, instrumentation, transmitter, cabling, etc.
• Project management
• Programming for Siemens S7 PLC and FactoryLink MMI
• Site installation, testing and commissioning
• Site training
2001
2
Petronas Dagangan Berhad Bottling Plant Control System
Main Contractor: Protank Technologies S/B.
Additional LPG Storage tank and upgrading of Prai bottling plant. Scope of work:
• Design, installation, and commissioning of Process Control System (PCS), Tank Gauging System (TGS),
Emergency Shutdown System (ESD), Gas Detector System (GDS), Flame Detector, Pressure Transmitter,
Pressure Transmitter and etc,
• Installation and commissioning of the electrical system which include UPS System, MCC Panel, and
modification work on he existing sub-switch board, cabling work and etc.
• Commissioning of the fire-water system and etc
2001
Unit Concept (M) Sdn Bhd
AUTOMATION SYSTEM INTEGRATIONS PROJECT REFERENCE LIST
Experience List Page 2 of 21
Oct, 2010
ITEM CLIENT PROJECT
RELEVANT DETAILS DELIVERY DATE
3
Petronas Gas
Berhad
Metering
Control System
Main Contractor:
Mecomb
Telok Gong Extension Metering Station consists of Modicon PLC Systems, Factorylink MMI, 4 x Solartron Flow Computers, 4 x ABB Totalflow EFMs. Scope of supply includes:
• System Design: Produce system layout, system functional design specifications
• Design Control Panel: Panel sizing, Equipment Layout, Equipment Wiring
• Produce Factory Acceptance Test Procedure and Site Acceptance Test Procedure.
• Instrumentation hook-up, installation drawings
• Cable routing and loop drawings
• Programming: Programmed FactoryLink ECS 7.0 Man-Machine Interface, Programmed Modicon Compact
984-E265 PLC, Configured Solartron 7951 Flow Computer, Configured ABB TotalFlow EFMs, Programmed
Existing Modicon 984-E385 PLC to integrate the new system to the existing GC and to the Petronas Gas
Control Host at Segamat.
• Produce Power Consumption Calculation
• Testing: Conducted Factory Acceptance Test and Site Acceptance Test
• Commissioning: Commissioning of System, including testing of instrumentation.
• Site Training
2002
4
Petronas Carigali
Plant Control
System
Main
Contractor:
Rittal Metal
PM 5 Scope of supply includes:
• Site assessment
• Re developed of the existing Fisher ROC PLC and application development for Intellution iFix MMI
• Design, installation, and application development
• Site testing and commissioning for the upgrading of the existing control system
2002
Unit Concept (M) Sdn Bhd
AUTOMATION SYSTEM INTEGRATIONS PROJECT REFERENCE LIST
Experience List Page 3 of 21
Oct, 2010
ITEM CLIENT PROJECT
RELEVANT DETAILS DELIVERY DATE
5
Petronas Gas Berhad, Segamat Electronic Flow Measurement (EFM) Upgrade Contractor: Mecomb Engineering
Upgrading project at 16 PGB Gas Metering Stations located along the PGU II, which involved installation and hook-up of 54 x EFM complete with the required instrumentation, hook-up, and wiring works. Scope of Supply:
• Project Management to interface between customers, vendors, principals, consultants and team members
• Design/ produce instrumentation hook-up and installation drawings
• Design/ Produce cable routing and loop drawings.
• Manage Installation and commissioning team
2003
6
Esso Production Malaysia Inc. Remote Terminal
Unit Main contractor: Siemens Malaysia
Satellite field Development Project for 5 offshore satellite platforms for EPMI.
• Design, installation, and commissioning of the process control system, remote communication link, interface
with Safety/Fire & Gas System, Zone 1 certified control panel etc.
• Project management to interface between customer (EPMI), EPMI’s vendor for Safety/Fire & Gas System,
vendors, principle, etc.
• Programming for FactoryLink MMI
2003
7
MLNG Tiga Liquid Metering System
Contractor: Mecomb Engineering
To fabricate and install of 4 liquid metering skids which consist of Gasoline, Propane, Butane, Bunker Fuel Oil. The project also involved the installation and hook-up of a Metering Control Panel consisting of 4 x Modicon PLC, 2 x FactoryLink MMI and 13 x Solartron Flow Computer Scope of supply:
• System Design: to produce System Layout, functional design specifications
• Design Control Panels: Panel sizing, and Equipment wiring
• Applications development
• FAT procedure, testing and certifications
• Site installation, testing and commissioning: Loop test, calibration and validation of Pressure, temperature & DP Transmitter, testing of Turbine meter, PD Meter, MOV and Welker Sampling System, Flow rate calculation and validations, third parties interface communication test.
• Site training
2003
Unit Concept (M) Sdn Bhd
AUTOMATION SYSTEM INTEGRATIONS PROJECT REFERENCE LIST
Experience List Page 4 of 21
Oct, 2010
ITEM CLIENT PROJECT
RELEVANT DETAILS DELIVERY DATE
8
Asean Bintulu Fertiliser Bulk Urea Storage Control System Contractor: Siemens Malaysia
Installation and hook-up of the Control System consisting of two redundant PLCs c/w a SCADA system. Scope of supply:
• Project management to interface between the customers, vendors, Principal, contractor and team members’
• System Design: Produce system layout, system Functional Design Specifications
• Design Control Panel: Equipment Layout, Equipment Wiring
• Application development: PLC & SCADA
• Produce FAT procedures and conduct FAT
• Testing and commissioning of the control system, which included: Loop test, Functional logic test and mimic
• Site training
2003
9
Sarawak Shell
Berhad
Condensate
Metering
Control Station
Main Contractor:
HL Engineering
Serai Condensate Metering Station, scope of supply includes:
• To design the Electrical & Instrumentation package: Design drawings, cable sizing, routing, tubing works, bill
of materials, specification of instrumentation
• Design and produce instrumentation hook-up, installation drawings
• Design in cable routing and loop drawings
2003
10
Serudong Power
Plant
Plant Control
System
Main Contractor:
Mecomb
Engineering
Scope of supply to upgrade the existing plant control system includes:
• Plan/study, design, installation, and commissioning for the upgrading of the control system.
• Programming for FactoryLink MMI Upgrade to latest revision
• Factory acceptance test
• Site Installation, and commissioning
• Site training
2003
Unit Concept (M) Sdn Bhd
AUTOMATION SYSTEM INTEGRATIONS PROJECT REFERENCE LIST
Experience List Page 5 of 21
Oct, 2010
ITEM CLIENT PROJECT
RELEVANT DETAILS DELIVERY DATE
11
Sarawak Shell Berhad Condensate Metering Control System Main Contractor: Mecomb Malaysia
Scope of supply includes:
• Design, fabrication, installation, testing and commissioning of the complete metering skid, metering control
system, sampling system, instrumentation, turbine meter, PD meter, PT/PDT transmitter, temperature element,
thermowell, strainer, flow control valve, MOV, pressure/temperature gauge, densitometer, watercut meter etc.
• Project management to interface between the customer (MLNG), main contractor (JGC), vendors, principle,
fabricator and team members (mechanical, E&I, process, etc)
2003
12
ExxonMobil Exploration & Production Malaysia Inc. Gas & Liquid Hydrocarbon Metering System Contractor: HL Engineering
Scope of supply:
• Project Management to interface between the customers, vendors, principal, contractor and team members
• Preparation of instruments procurement list
• Design of instrument hook-up and installation drawing
• Preparation of cable schedule
• Design cable routing and loop drawing
• Design single line cable block diagram
• Determine cable type and cable sizing
• Produce Power Consumption calculation
2004
13
Petronas Carigali
Master Terminal
Unit & Remote
Terminal Units
Main Contractor:
Mecomb Malaysia
Master Terminal Unit located at Bunga Kertas FPSO, with two class 1 Division 2 control panel with Modicon Quantum
located at North Lukut and Penara Satellite platforms.
• Design, installation, and commissioning of the process control system, remote communication link,
interface with Safety/Fire & Gas System, Zone 1 certified control panel etc.
• Project management to interface between PCSB’s vendor MSE, vendors, principle, etc.
• Factory Acceptance Test and Onshore commissioning.
2004
Unit Concept (M) Sdn Bhd
AUTOMATION SYSTEM INTEGRATIONS PROJECT REFERENCE LIST
Experience List Page 6 of 21
Oct, 2010
ITEM CLIENT PROJECT
RELEVANT DETAILS DELIVERY DATE
14
Yetagun Offshore Platforms Glycol Dehydration Control System Contactor: Petronas Carigali Myanmar
Fabrication and Installation of a glycol dehydration skid which involved installation, hooked up of a PLC Control Panel consisting a Redundant PLC systems. Scope of supply:
• Preparation of Site Acceptance Test procedure
• Testing and site commissioning: Loop test, Calibration of Pressure Transmitter, DP Transmitter, Temperature and Level Transmitters
• Communication test with DCS
• PLC Logic functional test.
• Site training
2004
15 Sime Kansai Sdn
Bhd
Desolvency Plant
Control System
Scope of works includes:
• Design, installation, and commissioning of the process control system, instrumentation, transmitter, cabling, etc.
• Project management
• Programming for Siemens S7 PLC
• Programming of FactoryLink MMI
2005
16
Talisman Energy
Limited
Water Injection
System
Main Contractor:
Global Process
System
South Angsi-A Offshore platform’s Water Injection System, scope of supply includes:
• Design, installation, and commissioning of the process control system, instrumentation, transmitter, cabling, etc.
• Project management to interface between customer (Talisman), and vendors for Platform Process Control
System, vendors, principal, etc.
• Programming for Allen-Bradley SLC Series PLC with FlexLogix I/O, AB PanelView
2005
Unit Concept (M) Sdn Bhd
AUTOMATION SYSTEM INTEGRATIONS PROJECT REFERENCE LIST
Experience List Page 7 of 21
Oct, 2010
ITEM CLIENT PROJECT
RELEVANT DETAILS DELIVERY DATE
17
Odoriser Package
Man Machine
Interface
Main Contractor:
Emerson Process
Management Ptd
Ltd
Scope of supply includes:
• Preparation of Functional Design Specification
• Design, and program the MMI.
• Integration & Factory Acceptance Testing
2005
18
Kertih Terminal Control and Monitoring System (CMS) Main Contractor: Sime Darby Offshore
To upgrade the existing FacotryLink Redundant Server to FactoryLink 7.5, scope of supplies:
• To configure the Windows 2003 Servers
• To upgrade the existing application to FactoryLink 7.5 version
• To re-develop the Server Redundancy and client access
• To upgrade the network to Modbus TCP
• Site installation, testing and commissioning
2006
19
Petronas Gas Berhad Metering Control System Upgrade
Main Contractor: Sime Darby Offshore
To upgrade Six (6) Metering station, scope of supply:
• To design the new layout with Modicon Quantum PLC
• To migrate the application to Concept IEC61131
• Site installation, testing, and commissioning
2006
20
Petronas Gas Berhad Energy Flow Meter Main Contractor: Sime Darby Offshore
To install 26 units of ABB Totalflow EFM in various PGB metering station
• To design the system layout for each station after site assessment
• Factory Acceptance test
• Site installation, testing and commissioning
2006
Unit Concept (M) Sdn Bhd
AUTOMATION SYSTEM INTEGRATIONS PROJECT REFERENCE LIST
Experience List Page 8 of 21
Oct, 2010
ITEM CLIENT PROJECT
RELEVANT DETAILS DELIVERY DATE
21
Petronas Gas Berhad EPIC MCS, E&I & Mechanical Work Batang Berjuntai City Gate Main Contractor: Unit Concept
To rectify existing Metering Control System, Electrical & Instrumentation and Mechanical Works
• To rectify existing metering control system consisting of EFM, PLC, PT and SCADA
• To rectify exiting E&I Works, inclusive of cable laying, junction box termination, grounding and the supply of equipment within Control Building
• Site Acceptance test & Commissioning
2006
22
Petronas Gas Berhad EPIC of Measurement and control system for Bintulu Office Main Contractor: Unit Concept
To upgrade Auto Dialer/MMI System
• Engineering, Design, Installation and Commissioning of MMI System
2006
23
TNB Pasir Gudang Supply, Install & Commission for Signal from TNB Pasir Gudang to
PGB Station
Main Contractor: Takdir Teguh
To tie-in Gas Metering Data signal from PGB Pasir Gudang Station to TNB Pasir Gudang
• Engineering, Design, Installation and Commissioning of Gas Metering Data from PGB to TNB Station
• Supply, Design and Development Factorylink MMI System for TNB Station
2007
Unit Concept (M) Sdn Bhd
AUTOMATION SYSTEM INTEGRATIONS PROJECT REFERENCE LIST
Experience List Page 9 of 21
Oct, 2010
ITEM CLIENT PROJECT
RELEVANT DETAILS DELIVERY DATE
24
Petronas Carigali SUJTC&SUPGB Heaters
Main Contractor: MSET Engineering Corporation
To supply the Electric Powered Heaters to MSET for Fuel Gas Heater Packages
• Engineering, Design, Supply and Commissioning of Electric Powered Heater
2007
25
Petronas Carigali PCC for Puteri
Wellhead Platform for PCSB Puteri Field Development Project – Modification for
Master Terminal Unit (MTU)
Main Contractor: Kencana HL
• Design, installation, and commissioning of the process control system, remote communication link, interface with Safety/Fire & Gas System, Zone 1 certified control panel etc.
• Project management to interface between PCSB’s vendor MSE, vendors, principle, etc.
• Factory Acceptance Test and Onshore commissioning.
2007
26
Petronas Carigali Allocation Transfer Crude Oil Metering (Puteri Platform)
Main Contractor: Kencana HL
Crude Metering Station, scope of supply includes:
• To design the Electrical & Instrumentation package: Design drawings, cable sizing, routing, tubing works, bill of materials, specification of instrumentation
• Design and produce instrumentation hook-up, installation drawings
• Design in cable routing and loop drawings
2007
27
Serudong Power MMI Upgrade and System Tie-In to SESB, KK
Main Contractor: Unit Concept
Design, develop, test and commissioning of the following:
• Tie-In communication between Serudong, Tawau and SESB Kota Kinabalu via Leased Line.
• Upgrade Serudong Power Monitoring System (MMI)
• Install Protocol Conversion unit – IEC 60870-5-101 to Modbus RTU
2007
Unit Concept (M) Sdn Bhd
AUTOMATION SYSTEM INTEGRATIONS PROJECT REFERENCE LIST
Experience List Page 10 of 21
Oct, 2010
ITEM CLIENT PROJECT
RELEVANT DETAILS DELIVERY DATE
28
Petronas Gas Service & Maintenance
Contract (ABB, Modicon, Solartron)
Main Contractor: Unit Concept
• Service and Maintenance Contract with PGB
2007
29
Petronas Gas GC Maintenance
Contract
Main Contractor: Unit Concept
• Routine Quarterly Maintenance and Servicing for PGB’s ABB Totalflow GC.
2007
30
PT Sempec Supply of Process Control System (PCS) and Emergency Shutdown System (SDS) for Heera Redevelopment Project Main Contractor: Schneider Electric
Supply of Process Control System (PCS) and Emergency Shutdown System (SDS) for Heera Redevelopment Project
• Install, Test & Commissioning on the HIMA Shutdown Panel
• Install, Test & Commissioning on the Process Control Panel
• Design & Engineering
2007
Unit Concept (M) Sdn Bhd
AUTOMATION SYSTEM INTEGRATIONS PROJECT REFERENCE LIST
Experience List Page 11 of 21
Oct, 2010
ITEM CLIENT PROJECT
RELEVANT DETAILS DELIVERY DATE
31
Lion Group / Petronas Gas EPCC of Natural Gas Pipeline and Metering & Regulating System to LION Group, Banting Operation, Selangor Main Contractor: MMC Engineering Services
Gas Metering Station, scope of supply includes:
• To design the Electrical & Instrumentation package: Design drawings, cable sizing, routing, tubing works, bill of materials, specification of instrumentation
• Design and produce instrumentation hook-up, installation drawings
• Design in cable routing and loop drawings
2007
32
Petronas Gas Kuantan and Segamat Kompressor Station (EFM Upgrade) Main Contractor: Tractors Malaysia
Install, test and commissioning 20units of ABB Totalflow EFM. This project also includes some electrical and instrumentation works.
2008
33
Exxon Mobil EPC1A-Load shedding system Main Contractor: Hyundai Heavy Industries
Tie-In between two (2) sub systems.
2008
Unit Concept (M) Sdn Bhd
AUTOMATION SYSTEM INTEGRATIONS PROJECT REFERENCE LIST
Experience List Page 12 of 21
Oct, 2010
ITEM CLIENT PROJECT
RELEVANT DETAILS DELIVERY DATE
34
Petronas Gas GC Zoning at PGB Shah Alam, Regional Office Main Contractor: Unit Concept
Modify existing PLC system to transfer gas analysis data from SCADA, Segamat to 7 PGB Stations.
• PLC logic modifications and flow computer configurations
2008
35
Petronas Gas MCS & EFM Upgrade for USM Main Contractor: BNF S/B
Modify existing PLC, MMI & supply of FC, EFM system to interface with Sick Maihak Ultrasonic Meters.
• PLC & MMI logic modifications
• Flow computer & EFM Installation, testing and configurations
2008
36
Petronas Dagangan Pasir Gudang Depot Re-Development Work (E&I) Main Contractor: MMC Eng. & Services
Supply, Install, Test and Commissioning of Tank Farm Monitoring System
• Design & Engineering for PLC, MMI, Level, Flow, MCC, PDB
• Site Installation of Cabling & Tubing works
2009
37
Petronas Gas Seremban RO MMI Upgrade for 5 Stations Main Contractor: Unit Concept
Supply, Install, Test and Commission of 5 MMI Systems for PGB Seremban RO
• Design & Programming
• Re-develop Factorylink MMI System
• Perform necessary Panel / Wiring Modification
2007
Unit Concept (M) Sdn Bhd
AUTOMATION SYSTEM INTEGRATIONS PROJECT REFERENCE LIST
Experience List Page 13 of 21
Oct, 2010
ITEM CLIENT PROJECT
RELEVANT DETAILS DELIVERY DATE
38
Schaefer Kalk Upgrade of GC Monitoring System Main Contractor: Unit Concept
Supply, Install and testing of Modbus to Profibus Converter
• To design and manufacture Control Panel
• Perform interfacing between Modbus & Profibus Systems
2008
39
Petronas Gas Optimal Ethane Metering Upgrade Main Contractor: Sidenco
Gas Metering Station (Ultrasonic Meter), scope of supply includes:
• To design the Electrical & Instrumentation package: Design drawings, cable sizing, routing, tubing works, bill of materials, specification of instrumentation
• Design and produce instrumentation hook-up, installation drawings
• Design in cable routing and loop drawings
2010
40
Gas Malaysia Install GC at Tambun Tulang, Perlis Main Contractor: Unit Concept
Install GC with ABB Totalflow NGC8206, workscope includes:
• Install, Test and commission new GC
• Tie-in with existing GMSB Control Center via Dial-Up Modem
• E&I Works
2008
41 Siemens Malaysia HMI Upgrade for Siemens Main Contractor: Siemens
Engineering, Procurement, Installation and Commissioning of the following equipment:
• Factorylink MMI Software for PCS (Exxon Mobil Satellite Irong Barat, Raya, Rawang, Seligi Platform)
2008
Unit Concept (M) Sdn Bhd
AUTOMATION SYSTEM INTEGRATIONS PROJECT REFERENCE LIST
Experience List Page 14 of 21
Oct, 2010
ITEM CLIENT PROJECT
RELEVANT DETAILS DELIVERY DATE
42 Petronas Gas Prai City Gate Upgrade Main Contractor: Diversified Engineering
Engineering, Procurement, Installation and Commissioning of the following equipment:
• Schneider Modicon Quantum PLC
• ABB Totalflow EFM
• Metering Control Panel
• MMI System
2009
43 ExxonMobil Supply of MMI for ANOC Well Test Main Contractor: Emerson Process Management
Engineering, Procurement, Testing and Commissioning of the following equipment:
• Vijeo Citect MMI System with Emerson Micro Motion Coriolis Meter
2008
44 Petronas Carigali Duyong Load Shedding System Main Contractor: Local Engineering
Engineering, Procurement, Testing and Commissioning of the following equipment:
• Vijeo Citect MMI System
2008
45 Sarawak Shell Bhd. Supply of Report Database Server for LCOT Main Contractor: Petra Resources Sdn Bhd
Supply, Install, Test and Commission of MMI System
• Design & Programming
• Re-develop Factorylink MMI System
• Perform necessary Panel / Wiring Modification
2008
46 Petronas Gas Panglima PLC Upgrade Main Contractor: Unit Concept
Engineering, Procurement, Installation and Commissioning of the following equipment:
• Schneider Modicon Quantum PLC
• Tie-In to SCADA Segamat
2008
Unit Concept (M) Sdn Bhd
AUTOMATION SYSTEM INTEGRATIONS PROJECT REFERENCE LIST
Experience List Page 15 of 21
Oct, 2010
ITEM CLIENT PROJECT
RELEVANT DETAILS DELIVERY DATE
47 Petronas Gas SCADA System at EMSB MS, Tioxide MS, PDH MS, Polyplastic MS, Tronoh MS and PNGV MS Main Contractor: Rira Metal
Engineering, Procurement, Installation and Commissioning of the following equipment:
• ABB Totalflow RTU
• E&I Scope
• Tie-In to SCADA Segamat
2008
48 Professional Engineers of India Pte Ltd. OGIP-Supply of Remote Monitoring and Control System for OGIP (Power to ESP) Main Contractor: Schneider Malaysia
Engineering, Procurement, Installation and Commissioning of the following equipment:
• Schneider Quantum Hot-standby PLC
• Schneider Magelis Touchscreen
• Vijeo Citect MMI
• Control Panel
On-Going
49 Catalyst Recovery Singapore MMI Upgrade for Catalyst Recovery Singapore Pte Ltd. Main Contractor: Unit Concept
Engineering, Procurement, Installation and Commissioning of the following equipment:
• Wonderware MMI Software
2008
Unit Concept (M) Sdn Bhd
AUTOMATION SYSTEM INTEGRATIONS PROJECT REFERENCE LIST
Experience List Page 16 of 21
Oct, 2010
ITEM CLIENT PROJECT
RELEVANT DETAILS DELIVERY DATE
50 Sarawak Shell Bhd Cili Padi Fuel Gas Skid (E&I) Main Contractor: MSET
E&I Engineering, Procurement, Installation and Commissioning of the following equipment:
• Control Valves
• Level, Pressure, Temperature, Flowmeter, Pressure Differential Transmitters
• Level, Pressure, Temperature Gauge
• Cabling, Cable Glands, Cable Tray Works
• Tubing & Fittings
2008
51 Petronas Gas EFM Multistream upgrade for YTL Paka Main Contractor: Unit Concept
Engineering, Procurement, Installation and Commissioning of the following equipment:
• ABB Totalflow IMVT for Multistream Application – Two (2) Runs
2009
52
OYO FPSO Unit Control Panel for Water Injection System package for OYO FPSO Project Main Contractor: VME Process
Engineering, Procurement, Installation and Commissioning of the following equipment:
• Schneider Quantum SIL2 PLC
• Schneider Magelis Touchscreen
• Vijeo Citect MMI
• Control Panel
2009
53 Petronas Gas EPCC Kapar, Serdang, Connaught Bridge, Meru Factorycast HMI Main Contractor: Sime Darby Offshore Engineering
Engineering, Procurement, Installation and Commissioning of the following equipment:
• FactoryCast PLC based Web Server
• Tie-Into existing PLCs and SCADA
• Auto-Correction Billing
2009
Unit Concept (M) Sdn Bhd
AUTOMATION SYSTEM INTEGRATIONS PROJECT REFERENCE LIST
Experience List Page 17 of 21
Oct, 2010
ITEM CLIENT PROJECT
RELEVANT DETAILS DELIVERY DATE
54 Petronas Penapisan Terengganu Solartron FC Modification Main Contractor: Emerson Process Management
Engineering, Testing and Commissioning of the following equipment:
• Solartron FC Source-Code reprogramming
• Schneider Electric PLC Logic Modification
2009
55
Natural Analysis Service Modification at PGB Data connectivity to Foxboro DCS Main Contractor: Unit Concept
Engineering, Testing and Commissioning of the following equipment:
• Schneider Electric Momentum PLC Logic Modification
2009
56 VME Process Supply of manpower for OYO (E&I Works) Main Contractor: VME Process
E&I Engineering, Procurement, Installation and Commissioning of the following equipment:
• Control Valves
• Level, Pressure, Temperature, Flowmeter, Pressure Differential Transmitters
• Level, Pressure, Temperature Gauge
• Cabling, Cable Glands, Cable Tray Works
• Tubing & Fittings
2009
57 Petronas Gas To replace new FC for run #3 for GSMS. Main Contractor: Unit Concept
Engineering, Procurement, Installation and Commissioning of the following equipment:
• Solartron FC
• PLC Logic Modification
• Tie-In to SCADA Segamat
2009
Unit Concept (M) Sdn Bhd
AUTOMATION SYSTEM INTEGRATIONS PROJECT REFERENCE LIST
Experience List Page 18 of 21
Oct, 2010
ITEM CLIENT PROJECT
RELEVANT DETAILS DELIVERY DATE
58 Petronas Gas EPIC of obsolete GC replacement at 4 meter stn. For TOD, PGB Main Contractor: Unit Concept
Install GC with ABB Totalflow NGC8201 with H2Smeasurement, workscope includes:
• Install, Test and commission new GC
• Tie-in with existing PGB PLC and MMI System
• E&I Works – Cabling & Tubing
2009
59 Petronas Gas To replace, supply, deliver, install and commission (1) Quantum PLC & Solartron FC (3) at YTL PG Main Contractor: Unit Concept
Engineering, Procurement, Installation and Commissioning of the following equipment:
• Solartron Flow Computers
• Schneider Electric PLC
• Tie-In to SCADA Segamat
2009
60 Petronas Gas EPIC of MCS for Bintulu Take-Off Station 2 Upgrading Project Main Contractor: Unit Concept
Engineering, Procurement, Installation and Commissioning of the following equipment:
• Valve Positioners
• Transmitters
• Modify MMI & PLC System
2009
61 Bumi Armada OYO Flash Compressor Package (E&I) Main Contractor: VME Process
E&I Engineering, Procurement, Installation and Commissioning of the following equipment:
• Control Valves
• Level, Pressure, Temperature, Flowmeter, Pressure Differential Transmitters
• Level, Pressure, Temperature Gauge
• Cabling, Cable Glands, Cable Tray Works
• Tubing & Fittings
2009
Unit Concept (M) Sdn Bhd
AUTOMATION SYSTEM INTEGRATIONS PROJECT REFERENCE LIST
Experience List Page 19 of 21
Oct, 2010
ITEM CLIENT PROJECT
RELEVANT DETAILS DELIVERY DATE
62 Bumi Armada Supply of SEA Water Injection Pump PLC Main Contractor: VME Process
Engineering, Procurement, Installation and Commissioning of the following equipment:
• Schneider Quantum PLC
• Schneider Magelis Touchscreen
• Vijeo Citect MMI
• Control Panel
2009
63 Nippon Carbon Dioxide (M) S/B Installation of Webclient for iFix Main Contractor: Unit Concept
Supply, Test & Commission Web-Clients for iFix.
2009
64 Petronas Gas Bhd EPIC Replacement of 6 obsolete MMI and 1 GC MMI Main Contractor: Unit Concept
Engineering, Procurement, Installation and Commissioning of the following equipment:
• FactoryCast HMI that is able to perform Auto-correction based upon AGA Standard depending on failure matrix
• Integration with existing Metering Control Systems
• UPS for Auto-Correction System
2010
65 Petronas Penapisan Melaka Supply of Control Panel & Control System Main Contractor: UOP Malaysia
Engineering, Procurement, Installation and Commissioning of the following equipment:
• Schneider Quantum PLC
• Schneider Magelis Touchscreen
• Vijeo Citect MMI
• Control Panel
2009
Unit Concept (M) Sdn Bhd
AUTOMATION SYSTEM INTEGRATIONS PROJECT REFERENCE LIST
Experience List Page 20 of 21
Oct, 2010
ITEM CLIENT PROJECT
RELEVANT DETAILS DELIVERY DATE
66 Petronas Carigali Well test Control System Main Contractor: TT Technik
Engineering, Procurement, Installation and Commissioning of the following equipment:
• Schneider PLC
• Vijeo Citect MMI
• Control Panel
2010
67 Petronas Gas Bhd. EPCC for NUR MS MCS System (Matlab Configuration) Main Contractor: Unit Concept
Engineering, Procurement, Installation and Commissioning of the following equipment:
• Interface Matlab with existing FactoryCast Auto-correction software
2010
68
ExxonMobil Control System OPC Connectivity for the Plant Information Project Main Contractor: Unit Concept
Engineering, Procurement, Installation and Commissioning of the following equipment:
• Modification of Existing Factorylink HMI Software to provide data for PI System interfacing
• Supply, Install & Test Tunneller Software for OPC
On-Going
69 Petronas Carigali S/B Remote Analyzer HMI System – Phase 1 (4 nos. of Onshore Analyzer System) Main Contractor: TT Technik S/B
Engineering, Procurement, Installation and Commissioning of the following equipment:
• Schneider PLC
• Schneider Magelis Touchscreen
• Control Panel
2010
Unit Concept (M) Sdn Bhd
AUTOMATION SYSTEM INTEGRATIONS PROJECT REFERENCE LIST
Experience List Page 21 of 21
Oct, 2010
ITEM CLIENT PROJECT
RELEVANT DETAILS DELIVERY DATE
70 Petronas Gas Bhd. EPCC of GC Sharing Concept with Automated GC Data Entry to FC & EFM at PGRO, Segamat & Shah Alam Main Contractor: Unit Concept
Engineering, Procurement, Installation and Commissioning of the following equipment:
• GC Sharing Concept for PGB using Web Concept Software
• Customize GC Sharing failure matrix
• Customize GC Sharing Interface Screens
• Generation of customized reports
2011
71 Petronas Gas Bhd. Citect Historian (Enhancement of Alarm Management) Main Contractor: Unit Concept
Engineering, Procurement, Installation and Commissioning of the following equipment:
• Development & Customize Alarm Management Software
• Interface with existing PGB Citect SCADAs
2010
72 Petronas Gas Bhd. EPIC replacement of obsolete GC and GC redundancy project (11units) Main Contractor: Unit Concept
Engineering, Procurement, Installation and Commissioning of the following equipment:
• ABB Totalflow NGC8206 and 8201 (with H2S)
• E&I Instrumentation Works
• GC Redundancy via Web Concept
• Design, Construct and Install new GC Shelters
• Tie-In GCs with existing Metering Control Systems
2011
73 Petronas Gas Bhd. EPIC upgrading of EFM to G4 (63units) Main Contractor: Unit Concept
Engineering, Procurement, Installation and Commissioning of the following equipment:
• ABB Totalflow EFM G4 Board with Ethernet Capability
• Ethernet Cable from EFMs to Control Room
• Junction Box
2011