The new proposed extension and refurbishment will provide the Business School with an addional 140-150 academic and professional services office space, as well as a number of high-quality meeng rooms and social spaces for staff, the majority of which are proposed as single person academic offices. This will allow the School to consolidate all of its non-teaching acvity on one site, thus maximising operaonal efficiencies in terms of how it uses its estate whilst placing and re-establishing University House as the heart and focus of the School. T3 were appointed to carry out the design and detailing of the mul-storey new teaching block comprising of tradionally reinforced slabs, beams, columns and walls together with very large spanning prestressed slabs. Hidden connectors and bare concrete finishes to all internal walls and columns were the choice of the Architect and presented their own difficules. By using BIM modelling soſtware Tekla, T3 were able to visualise all elements, connecons, clash free reinforcement with embedded items such as liſters and ulmately provide our client with a complete fully integrated BIM model. T3 produced over 500 No. manufacture drawings providing over 700 No. pieces of concrete to site. University House, Birmingham Reinforcement within concrete elements 3D Visual of Block 2 T: +44 (0)1777 861 865 | T: +44 (0) 1226 610 201 | E: [email protected] | W: www.t3-uk.com Detail 1 - Plan 1:15 3 - B - 267 Link - B - 270 Link 3 - B - 266 Link Section - - B 1:15 Section - - X 1:15 Detail 1 - Elevation 1:15 1 - B - Link 1 - B - Link 1 - B - 4 - B - 266 Link 1 - B - 108 Link Section - - A 1:15 Section - - Y 1:15 Elevation - Side 1:20 2 - B - 294 - U-Bar 1 - B - Detail 1 1 - B - Lifter 5 - B - - - 1 - B - Lifter 6 - B - 322 - 150 - Link 6 - B - 322 - 150 - Link 5 - B - - - Link 3 - B - 316 - Side 2 - B - - U-Bar 5 x 1 - B 20 - - Cplr Section - Z - Z 1:15 Plan 1:20 Detail 1 - B - - - B - 323 - Link 5 - B - 268 - 200 Link 5 - B - 268 - 200 Link - B - 270 - 200 Link Detail 1 - Plan 1:10 75 75 57 4 - B - - 75 75 342 3 - B - 90 - Link 75 75 75 582 3 - B - 89 - Link Section - - B 1:10 433 T1 49 Link 85 Link 433 T2 Section - - X 1:10 89 Link 110 Link 109 Link 108 Link Detail 1 - Elevation 1:10 1 - B - - X X Z Z Y Y 30 1 - B - - 50 1 - B - - Link 70 1 - B - - Link 398 1 - B - - Link Section - - A 1:10 410 Link 433 T1 Link 89 Link 433 T2 Section - - Y 1:10 94 Link 92 Link 90 Link 600 1 - B - - Cplr Detail 1 1 - B - 107 Lifter 1 - B - 107 Lifter 1350 2 x 1 - B - - Cplr 750 1105 Elevation - Side 1:20 Section - - Z 1:10 89 Link Plan 1:20 B B 2 - B - - 6 - B 10 - 49 - Link A A Detail 1 4 - B - 410 - 250 - Link 4 - B - 410 - 250 - Link 4 - B 16 - 433 - T1 6 - B 10 - 85 - 250 - Link = = r e * b * c * d * a * 49 51 1550 350 350 130 130 1.0 6 B 10 6 5.7 1 85 51 1775 650 165 130 130 1.1 6 B 10 6 6.6 1 89 51 1600 350 350 160 160 1.4 14 B 12 14 19.9 1 107 13 725 350 100 350 1.2 4 B 16 4 4.7 1 410 31 900 130 500 165 175 0.6 16 B 10 16 8.9 1 433 00 3150 3155 5.0 6 B 16 6 30.1 1 19 99 700 1 B 20 1 1.7 1.7 1 19 90 99 1500 6 B 12 6 1.3 8.0 1 90 92 99 1150 2 B 12 2 1.0 2.0 1 92 94 99 1000 2 B 12 2 0.9 1.8 1 94 108 99 2500 2 B 16 2 3.9 7.9 1 108 109 99 2375 2 B 16 2 3.8 7.5 1 109 110 99 2450 2 B 16 2 3.9 7.7 1 110 349 99 400 2 B 20 2 1.0 2.0 1 349 * Specified in multiples of 5mm # Specified in multiples of 25mm This Schedule complies with the requirements of BS 8666:2005 Total Rebar Weight (kg) Section Y - Y 1:20 69 69 69 ertical B16@200 Crs zontal B10@250 Crs Note: 69 Mesh_1 B 10/16-250/200- 3000x7044 Mesh_2 B 10/16-250/200- 3000x7044 69 69 Elevation - Front 1:20 1 - B 20 er 13 - B 10 - 69 - 200 - U-Bar 2 - B 20 - 301 - Trimmers 1 - B 10 er 1 - B 20 1 - B 20 2 - B 16 2 - B 16 1 - B 20 X X Y Y 13 - B 10 - 69 - 200 - U-Bar 10 - B 10 - 69 - 200 - U-Bar 3 - B 10 - 26 - 200 - U-Bar 4 - B 10 - 26 - 200 - U-Bar ar ar ar 10 - B 10 - 69 - 200 - U-Bar 35 - B 10 7 - B 10 - Concept to Completion
Transcript

The new proposed extension and refurbishment will provide the Business School with an additional 140-150 academic and professional services office space, as well as a number of high-quality meeting rooms and social spaces for staff, the majority of which are proposed as single person academic offices. This will allow the School to consolidate all of its non-teaching activity on one site, thus maximising operational efficiencies in terms of how it uses its estate whilst placing and re-establishing University House as the heart and focus of the School.

T3 were appointed to carry out the design and detailing of the multi-storey new teaching block comprising of traditionally reinforced slabs, beams, columns and walls together with very large spanning prestressed slabs. Hidden connectors and bare concrete finishes to all internal walls and columns were the choice of the Architect and presented their own difficulties. By using BIM modelling software Tekla, T3 were able to visualise all elements, connections, clash free reinforcement with embedded items such as lifters and ultimately provide our client with a complete fully integrated BIM model.

T3 produced over 500 No. manufacture drawings providing over 700 No. pieces of concrete to site.

University House, Birmingham

Reinforcement within concrete elements

3D Visual of Block 2

T: +44 (0)1777 861 865 | T: +44 (0) 1226 610 201 | E: [email protected] | W: www.t3-uk.com

Detail 1 - Plan1:15

753423-B12-267-Link 75

100626-B10-270-Link75755823-B12-266-Link

Section - B-B1:15

316 Side

269 Link

316 Side

323 Link

324 B1

316 Side

321 B2

321 T2

321 T1

270 Link

Section - X-X1:15

284 Additional

284 Additional

285 U-bar

285 U-bar

266 Link

Detail 1 - Elevation1:153971-B12-92-Link

130 3-B10-284-Additional

3621-B12-94-Link

130

110

2-B1

0-28

5-U-

bar

X

X

Y

Y

Z

Z

130

701-B16-109-Link

5237 130 3-B10-284-Additional

93

504-B12-266-Link301-B16-108-Link

Section - A-A1:15

316 Side

316 Side

324 B1

322 Link

321 B2

321 T2

321 T1

316 Side

268 Link

266 Link

Section - Y-Y1:15

267 Link

294 U-Bar

294 U-Bar

Elevation - Side1:20

1010

2-B1

6-32

1-T1

2-B1

2-29

4-U-

Bar

1-B1

6-10

7Lif

ter

Detail 1

4-B2

5-32

4-B1

1-B1

6-10

7Lif

ter

2-B1

6-32

1-B2 5-B10-268-200-Link

1-B1

6-10

7Lif

ter

2-B1

6-32

1-T2

6-B10-322-150-Link6-B10-322-150-Link5-B10-268-200-Link

3-B1

2-31

6-Si

de2-

B12-

294-

U-Ba

r

600 5 x 1-B20-19--Cplr874720720720720991600

Section - Z-Z1:15

266 Link

Plan1:20

B

B

A

A

Detail 1

centreline of beam.Detail 1 Symmetrical AboutNote:

26-B10-269-Link26-B10-323-Link

5-B10-268-200-Link5-B10-268-200-Link

= =26-B10-270-200-Link

C01 20-09-18 CONSTRUCTION GMNBJO

NOTES:Beam CType.

Mark. BM-0004

Quantity. 1Cover.

GA Drg. Ref. 03-GRA-0035-BM-0004-GA

25mm TOP, 35mm BTM Nominal

1cm

A2

This document shall not be reproduced in whole or in part or relied upon by third parties for any use whatsoever without the written authority of F. P. McCann Ltd.

1cm A2

DO NOT SCALE, IF IN DOUBT PLEASE ASK.

No. permember

re *b * c * d *Bar Mark Lgth ofCode

a * kg/bar kg/allShapeTotaleach barNo.

No. ofmembers

Type & Size

107 13 725 350 100 350 1.23B 16 3 3.61266 51 1900 500 350 160 160 1.714B 12 14 23.61268 31 1125 130 500 315 250 0.710B 10 10 6.91269 51 1775 500 315 130 130 1.126B 10 26 28.41270 51 1850 500 350 130 130 1.126B 10 26 29.61284 44 600 125 150 130 150 125 0.412B 10 12 4.41285 21 875 400 120 400 0.54B 10 4 2.21294 13 1025 500 120 500 1.04B 12 4 3.81316 00 6900 6905 6.16B 12 6 36.91321 00 6900 6905 10.96B 16 6 65.61322 31 2125 225 1010 150 800 1.312B 10 12 15.71323 51 2475 1010 150 130 130 1.526B 10 26 39.61324 00 6900 6905 26.74B 25 4 106.81

19 99 7008B 20 8 1.7 13.81 19-340

190

270

92 99 11502B 12 2 1.0 2.01 92-265

320

120

320

72°72°

dBR=200

dBR=76dBR=76

dBR=200

94 99 10002B 12 2 0.9 1.81 94- 265

250

115

250

71°71°

dBR=200

dBR=76dBR=76

dBR=200

108 99 25002B 16 2 3.9 7.91 108-

1000

315

105

dBR=300

dBR=70dBR=70

dBR=300

109 99 23752B 16 2 3.8 7.51 109-

1000

255

105

dBR=300

dBR=70dBR=70

dBR=300

110 99 24502B 16 2 3.9 7.71 110-

1000

270

100

270

70°

70°dBR=300

dBR=70

dBR=70

dBR=300

267 99 18006B 12 6 1.6 9.61 267-

160

135

500

350

* Specified in multiples of 5mm # Specified in multiples of 25mmThis Schedule complies with the requirements of BS 8666:2005

367.19Total Rebar Weight (kg)

Drawn:Drawing No :

03-GRA-0035-BM-0004-RCRev:

C01

Checked: Approved:

Status:Scale:

Date: 18-09-181:15

Issued for Manufacture - AJO NB GM

Title.

RC ofBeam C BM-0004

Project.

University House Birmingham-

Morgan SindallClient.

FP McCannBullhurst Lane,Weston Underwood,Derbyshire.DE6 4PHTel: +44 (0)1335 361 269

www.fpmccann.co.uk

Rev Date Revision Detail By Chk App

Detail 1 - Plan1:10

7575574-B12-89-Link

75 753423-B12-90-Link

7575

755823-B12-89-Link

Section - B-B1:10

433 T1

49 Link

85 Link433 T2

Section - X-X1:10

89 Link

110 Link109 Link108 Link

Detail 1 - Elevation1:10

3631-B12-94-Link

X

X

Z

Z

Y

Y

301-B16-108-Link501-B16-110-Link701-B16-109-Link

3981-B12-92-Link

Section - A-A1:10

410 Link

433 T1

410 Link

89 Link

433 T2

Section - Y-Y1:10

94 Link

92 Link

90 Link

600 1-B20-19-Cplr

Detail 1

2x1-

B16-

107

Lifter

2x1-

B16-

107

Lifter

1350 2 x 1-B20-349-Cplr7501105

Elevation - Side1:20

Section - Z-Z1:10

89 Link

Plan1:20

B

B

2-B1

6-43

3 -T2

6-B10-49-Link

A

A

Detail 1

4-B10-410-250-Link4-B10-410-250-Link

4-B1

6-43

3-T1

6-B10-85-250-Link ==

NOTES:Beam BType.

Mark. BM-0014

Quantity. 1Cover.

GA Drg. Ref. 03-GRA-0035-BM-0014-GA

25mm TOP, 35mm BTM Nominal

Drawn:Drawing No :

03-GRA-0035-BM-0014-RCRev:

C01

Checked: Approved:

Status:Scale:

Date: 18-10-181:10

Issued for Manufacture - AAM NB GM

Title.

RC ofBeam B BM-0014

Project.

University House Birmingham-

Morgan SindallClient.

FP McCannBullhurst Lane,Weston Underwood,Derbyshire.DE6 4PHTel: +44 (0)1335 361 269

www.fpmccann.co.uk

Rev Date Revision Detail By Chk App

1cm

A2

This document shall not be reproduced in whole or in part or relied upon by third parties for any use whatsoever without the written authority of F. P. McCann Ltd.

1cm A2

DO NOT SCALE, IF IN DOUBT PLEASE ASK.

No. permember

re *b * c * d *Bar Mark Lgth ofCode

a * kg/bar kg/allShapeTotaleach barNo.

No. ofmembers

Type & Size

49 51 1550 350 350 130 130 1.06B 10 6 5.7185 51 1775 650 165 130 130 1.16B 10 6 6.6189 51 1600 350 350 160 160 1.414B 12 14 19.91107 13 725 350 100 350 1.24B 16 4 4.71410 31 900 130 500 165 175 0.616B 10 16 8.91433 00 3150 3155 5.06B 16 6 30.1119 99 7001B 20 1 1.7 1.71 19-

340

190

270

90 99 15006B 12 6 1.3 8.01 90-

160

135

350

350

135

92 99 11502B 12 2 1.0 2.01 92- 265

320

120

320

72° 72°

dBR=200

dBR=76 dBR=76

dBR=200

94 99 10002B 12 2 0.9 1.81 94- 265

250

115

250

71° 71°

dBR=200

dBR=76 dBR=76

dBR=200

108 99 25002B 16 2 3.9 7.91 108-

1000

315

105

dBR=300

dBR=70 dBR=70

dBR=300

109 99 23752B 16 2 3.8 7.51 109-

1000

255

105

dBR=300

dBR=70 dBR=70

dBR=300

110 99 24502B 16 2 3.9 7.71 110-

1000

270

100

270

70°

70°

dBR=300

dBR=70 dBR=70

dBR=300

349 99 4002B 20 2 1.0 2.01 349-

380

* Specified in multiples of 5mm # Specified in multiples of 25mmThis Schedule complies with the requirements of BS 8666:2005

75.86Total Rebar Weight (kg)

C01 26-10-18 CONSTRUCTION GMNBAM

10-B

10-6

9-25

0-U-

Bar

Elevation - Front1:20

1-B20-363-Temporary

1-B20-16-Lifter

2-B2

0-30

1-Tr

imme

rs

1-B20-16-Lifter

1-B20-16-Lifter

2-B16-302-Trimmers

COG

2-B16-302-Trimmers

1-B20-16-Lifter

1-B20-363-Temporary

X

X

YY

10-B

10-6

9-25

0-U-

Bar

13-B

10-6

9-25

0-U-

Bar

3-B10-26-200-U-Bar

3-B10-26-200-U-Bar

4-B10-26-200-U-Bar

4-B10-26-200-U-Bar

13-B

10-6

9-25

0-U-

Bar

3-B10-26-200-U-Bar

35-B10-26-200-U-Bar

7-B10-26-200-U-Bar

Section Y - Y1:20

69 69

69

Vertical B16@200 CrsHorizontal B10@250 Crs

Note:

69

Mesh_1B10/16-250/200-3000x7044

Mesh_2B10/16-250/200-3000x7044

69

69

Elevation - Front1:20

1-B20-363-Temporary

1-B20-16-Lifter

13-B

10-6

9-20

0-U-

Bar

2-B2

0-30

1-Tr

imme

rs

1-B10-26-U-Bar

1-B20-16-Lifter

1-B20-16-Lifter

1-B20-16-Lifter

2-B16-302-Trimmers

2-B16-302-Trimmers

1-B20-363-Temporary

X

X

YY

13-B

10-6

9-20

0-U-

Bar

10-B

10-6

9-20

0-U-

Bar

3-B10-26-200-U-Bar

4-B10-26-200-U-Bar3-B10-26-200-U-Bar

4-B10-26-200-U-Bar

3-B10-26-200-U-Bar

10-B

10-6

9-20

0-U-

Bar

35-B10-26-200-U-Bar

7-B10-26-200-U-Bar

26

Section X - X1:20

26

Mesh_2B10/16-250/200-3000x7044

26 26

Mesh_3B10/16-250/200725x7015

Mesh_1B10/16-250/200-3000x7044

Mesh_4B10/16-250/200725x7015

No. permember

re *b * c * d *Bar Mark Lgth ofCode

a * kg/bar kg/allShapeTotaleach barNo.

No. ofmembers

Type & Size

16 13 2650 1285 185 1285 6.54B 20 4 26.1126 21 975 450 125 450 0.660B 10 60 37.0169 21 1000 450 150 450 0.646B 10 46 29.01301 11 3025 290 2810 70 7.52B 20 2 15.01302 00 2925 2940 4.74B 16 4 18.61363 21 2525 390 1860 390 6.32B 20 2 12.61Mesh_1 Custom1 1 1 3000x7044 172.7 172.7

Mesh_2 Custom1 1 1 3000x7044 169.3 169.3

Mesh_3 Custom1 1 1 1210x6994 80.98 80.98

Mesh_4 Custom1 1 1 1210x6994 81.95 81.95

* Specified in multiples of 5mm # Specified in multiples of 25mmThis Schedule complies with the requirements of BS 8666:2005

643.41Total Rebar Weight (kg)

NOTES:Staircase01-200Type.

Mark. IW-0010

Quantity. 1Cover.

GA Drg. Ref. 03-GRA-0035-IW-0010-GA

25mm TOP, 35mm BTM Nominal

1cm

A2

This document shall not be reproduced in whole or in part or relied upon by third parties for any use whatsoever without the written authority of F. P. McCann Ltd.

1cm A2

DO NOT SCALE, IF IN DOUBT PLEASE ASK.

Drawn:Drawing No :

03-GRA-0035-IW-0010-RCRev:

C01

Checked: Approved:

Status:Scale:

Date: 09-10-181:20

Issued for Manufacture - APH NB GM

Title.

RC ofStaircase01-200 IW-0010

Project.

University House Birmingham-

Morgan SindallClient.

FP McCannBullhurst Lane,Weston Underwood,Derbyshire.DE6 4PHTel: +44 (0)1335 361 269

www.fpmccann.co.uk

Rev Date Revision Detail By Chk AppC01 19-10-18 ISSUED FOR CONSTRUCTION GMNBPH

Concept to Completion

Recommended