i UNIVERSITY OF NAIROBI MSc Research Project TITLE: ELECTRICAL POWER SUBSTATION ENERGY AUDIT AND THE COST- BENEFIT ANALYSIS OF AUTOMATING SWITCHING OPERATIONS DURING OUTAGES AT THE KENYA POWER COMPANY LIMITED. . A project report submitted in partial fulfillment of the requirement for the award of the degree of Master of Science in Energy Management of the University of Nairobi Department of Mechanical and Manufacturing Engineering School of Engineering Student: Mr. Wambua Festus Muema Supervisors: Dr. Nicodemus Abungu Odero and Dr. Cyrus Wekesa Date: April, 2012
Transcript
Page 1: UNIVERSITY OF NAIROBIcae.uonbi.ac.ke/sites/default/files/cae/cae/FESTUS MUEMA WAMBUA … · UNIVERSITY OF NAIROBI ... 2.5 Gas-Insulated Substations 12 2.6 Superconductors 13 2.7 ...

i

UNIVERSITY OF NAIROBI

MSc Research Project

TITLE: ELECTRICAL POWER SUBSTATION ENERGY AUDIT AND

THE COST- BENEFIT ANALYSIS OF AUTOMATING SWITCHING

OPERATIONS DURING OUTAGES AT THE KENYA POWER

COMPANY LIMITED.

.

A project report submitted in partial fulfillment of the requirement for the award of the

degree of Master of Science in Energy Management of the University of Nairobi

Department of Mechanical and Manufacturing Engineering

School of Engineering

Student: Mr. Wambua Festus Muema

Supervisors: Dr. Nicodemus Abungu Odero and Dr. Cyrus Wekesa

Date: April, 2012

Page 2: UNIVERSITY OF NAIROBIcae.uonbi.ac.ke/sites/default/files/cae/cae/FESTUS MUEMA WAMBUA … · UNIVERSITY OF NAIROBI ... 2.5 Gas-Insulated Substations 12 2.6 Superconductors 13 2.7 ...

ii

I DECLARATION

A. Student’s Declaration

This MSc research project Report is my original work and has not been

presented for a degree award in this or any other university.

Wambua Festus Muema

Reg. No. F56/76714/2009

Sign………………………………………………………

Date……………………………………………………...

B. Supervisors’ Declaration

This MSc research project report has been submitted to the School of

Engineering, University of Nairobi with our approval as supervisors:

Dr. N.O. Abungu Dr. C. Wekesa

Sign: ……………………… Sign: …………………………

Date: ……………………… Date: ………………………….

Page 3: UNIVERSITY OF NAIROBIcae.uonbi.ac.ke/sites/default/files/cae/cae/FESTUS MUEMA WAMBUA … · UNIVERSITY OF NAIROBI ... 2.5 Gas-Insulated Substations 12 2.6 Superconductors 13 2.7 ...

iii

II DEDICATION

To my loving wife Christine and children, for their support during the entire

project period. They demonstrated great patience and I salute them all.

Page 4: UNIVERSITY OF NAIROBIcae.uonbi.ac.ke/sites/default/files/cae/cae/FESTUS MUEMA WAMBUA … · UNIVERSITY OF NAIROBI ... 2.5 Gas-Insulated Substations 12 2.6 Superconductors 13 2.7 ...

iv

III ACKNOWLEDGEMENT

I would like to express my gratitude to my supervisors, Dr. Nicodemus

Abungu Odero and Dr. Cyrus Wekesa for their guidance and support that

enabled me to complete this work.

In the process of data collection and analysis, I was fortunate to receive the

assistance of many members of staff of the Kenya Power who were extremely

generous with their time. In that regard I express my deep appreciation to:

Dr. Nicodemus Abungu Odero for his introductory letter written to Kenya

Power to allow me carry out the research in the utility company.

Eng. Henry Odede the chief engineer, National Control Centre for allowing

me do the research under a very considered friendly environment.

Mr Charles Maloba, the senior engineer in charge of system planning and

operations in Kenya Power. He was so resourceful in the field of planning and

operation of the system.

All system control staff for their unreserved ideas and assistance during the

entire period of the project.

Well it is not possible to thank everybody in person especially all the system

control staff for their unreserved ideas and assistance during the entire period

of the project. So I am indeed grateful to all those who gave a word or

participated in one way or another to make the entire project a success.

Page 5: UNIVERSITY OF NAIROBIcae.uonbi.ac.ke/sites/default/files/cae/cae/FESTUS MUEMA WAMBUA … · UNIVERSITY OF NAIROBI ... 2.5 Gas-Insulated Substations 12 2.6 Superconductors 13 2.7 ...

v

IV TABLE OF CONTENTS

Page

I DECLARATION ii

II DEDICATION iii

III ACKOWLDGEMENT iv

IV TABLE OF CONTENTS v

V ABSTRACT vii

1 CHAPTER ONE 1

1.0 INTRODUCTION 1

1.1 PROBLEM STATEMENT 3

1.2 RESEARCH OBJECTIVES 4

1.3 RELEVANCE/JUSTIFICATION OF STUDY 5

2 CHAPTER TWO 6

2.0 LITERATURE REVIEW 6

2.1. Introduction 6

2.2 Improving Efficiency in the T&D System 9

2.3 Energy Auditing of Substation Electrical Power flows 10

2.4 Flexible AC Transmission Systems (FACTS) Devices 12

2.5 Gas-Insulated Substations 12

2.6 Superconductors 13

2.7 Wide Area Monitoring Systems 14

2.8 System Automation 15

2.9 Modeling the substation switching operations 16

2.10 Removal of Power 19

2.11 Simulation 21

2.12 Benefits of improved efficiency through automation auditing 22

3 CHAPTER THREE 24

3.0 METHODOLOGY 24

3.1 Research design and method 24

3.1.1 Energy audit methodology 24

3.1.2 Steps to goals and objectives of the audit 25

Page 6: UNIVERSITY OF NAIROBIcae.uonbi.ac.ke/sites/default/files/cae/cae/FESTUS MUEMA WAMBUA … · UNIVERSITY OF NAIROBI ... 2.5 Gas-Insulated Substations 12 2.6 Superconductors 13 2.7 ...

vi

3.2 Study of time taken during outage switching operations 27

3.2.1 The power transmission network system in the Juja Rd substation 27

3.2.2 Plant, Switchgear, Instruments and tools inspection 27

3.3 Data collection 28

4 CHAPTER FOUR 29

4.0 FINDINGS, RESULTS AND DISCUSSION 29

4.1 Energy audit findings 29

4.1.0 Energy management of KPLC transmission substations 30

4.1.1 Utility substation infrastructure 30

4.1.2 Energy monitoring system 31

4.1.3 Benchmarking 32

4.1.4 Management of change 32

4.1.5 Training 33

4.1.6 Energy audit instruments 34

4.2 Notable Energy Saving Opportunities 34

4.2 1 No cost measures 34

4.2.2 Low cost measures 35

4.2.3 Retrofit of the Substation Lighting System 35

4.2.4 Financial impacts 35

4.3 Switching Automation Simulation 44

4.3.1 Test Program of a blinking output 44

4.3.2 How the Simulation process was realized. 46

4.3.3 Zilog Z-80 Microprocessor Final Project Program 48

4.3.4 Simulation Results 49

5 CHAPTER FIVE 52

5.0 RECOMMENDATIONS 52

6 CHAPTER SIX 54

6.0 CONCLUSION 54

7.0 PROJECT BUDGET 55

7.1 PROJECT COST 55

8.0 APPENDICES 56

9.0 REFERENCES 61

Page 7: UNIVERSITY OF NAIROBIcae.uonbi.ac.ke/sites/default/files/cae/cae/FESTUS MUEMA WAMBUA … · UNIVERSITY OF NAIROBI ... 2.5 Gas-Insulated Substations 12 2.6 Superconductors 13 2.7 ...

vii

V ABSTRACT

Substation automation has, its prime objective, the need to satisfy the increasingly

demanding requirements of the power systems concerned. The most important requirement

is to ensure that the power system, as a whole, is operated and controlled in the most

effective, secure and economic manner possible. In High Voltage (HV) and Extra HV

substations, decisions must be taken quickly and safely to achieve rapid restoration of

supply and speedy return to normal operating conditions following a substation equipment

fault or other substation abnormality [50]. The project intended to explore interactive

techniques for substation automation by describing models and computational techniques

that have been developed to model substation configuration and detect the available

restoration operations following a fault in a substation equipment. These techniques should

recognize the existing, at the time of fault, operational configuration of the substation by

inputting the operating states of the breakers and isolators.

Simulation and especially computer simulation is a basic tool since it enables engineers to

understand how systems work without actually needing to see them. They can learn how

they work in different circumstances and optimize their design with considerably less cost

in terms of time and money than if they had to carry out tests on a physical system. There is

a wide range of commercial brands on the market offering products for electrical

simulation. These are powerful tools, but require the engineer to have a perfect knowledge

of the electrical field.

Energy efficiency brings health, productivity, safety, comfort and savings to consumers and

beneficiaries, as well as local and global environmental benefits.

This project intended to study and explore the modelling of Intelligent Electronic Device

(IED). These configurable IED models allow to easily build Substation Automation System

(SAS) network model with different topologies for all kinds of substations so that the

dynamic performance issues could be studied during the planning stage and network

performance problem could be caught ahead of the deployment stage [50]. An example of

using models to construct Substation Automation System network as well as the network

performance simulation results was considered in this project.

Page 8: UNIVERSITY OF NAIROBIcae.uonbi.ac.ke/sites/default/files/cae/cae/FESTUS MUEMA WAMBUA … · UNIVERSITY OF NAIROBI ... 2.5 Gas-Insulated Substations 12 2.6 Superconductors 13 2.7 ...

1

CHAPTER ONE

1. INTRODUCTION

This report presents the results of an energy audit and computer simulation study performed

on the 132000V to 66000V Juja road Substation, an Electrical Power Transmission facility

located in the City of Nairobi, Kenya. This project study was completed as part of my

masters degree program in energy management of the University of Nairobi.

Energy auditing is an excellent way to obtain energy savings through low cost

improvements that optimize building systems so that they operate efficiently and

effectively. In addition, an energy management system can improve occupant comfort,

reduce indoor air quality problems and reduce operations and maintenance costs.

In developing countries, about 40 per cent of operational expenditure is estimated to be

incurred in human settlements, and costs for supplying energy accounts for a significant

portion of this expenditure. These costs place a severe strain on the national economy of

almost all developing countries: hence, there is an urgent need for initiating sound energy

management [1]. This calls for innovative approaches to management aimed at energy

conservation. Energy users need to be convinced of the financial benefits they can derive

through energy management: it is often not realized that resources spent on conserving

energy and on reducing energy waste are sound investments and that there are several

measures which can be undertaken at minimal costs.

Efficient functioning of any business organization would enable it to provide goods and

services at a lower price. In the process of managing organizations, the managers at

different levels should take appropriate economic decisions which will help in minimizing

investment, operating and maintenance expenditures besides increasing the revenue, savings

and such other gains of the organization. These can be achieved through Engineering

Economics which deals with the methods that enable one to make economic decisions

towards minimizing costs and maximizing benefits to business organizations [2].

Examples of possible savings that can be made by changing operating and maintenance

procedures and, in many cases, by installing energy efficient equipment has been indicated

in this project. Implementing the ideas and suggestions presented in this report will provide

Page 9: UNIVERSITY OF NAIROBIcae.uonbi.ac.ke/sites/default/files/cae/cae/FESTUS MUEMA WAMBUA … · UNIVERSITY OF NAIROBI ... 2.5 Gas-Insulated Substations 12 2.6 Superconductors 13 2.7 ...

2

energy savings for most substations, although the savings might not be the same as those

cited in the examples.

After doing an energy audit, this project report proposes no-cost and low-cost methods for

reducing energy consumption. Procedures and techniques to eliminate energy waste and to

reduce energy use are also proposed.

The first part of the report − the Energy Audit report − is, as the name implies, devoted to

the energy audit or survey of one of the Kenya Power substations, the Juja Rd substation.

Energy auditing is an integral part of any energy-management programme and an essential

step in the process of energy-conservation, since it facilitates the optimum use of available

energy resources [2]. It can be a valuable tool in developing countries like Kenya where

emphasis is being placed on reducing consumption of commercial and non-commercial

energy through energy-conservation measures. Some governments of developing countries

have already adopted energy-conservation measures but not always in accordance with a

systematic national policy on energy conservation which would bring benefits through

(i) A reduction of the load on overall energy-supply systems;

(ii) An increase in time available to develop new indigenous energy sources;

(iii) A reduction of foreign-exchange demand; and

(iv) A reduction in overall costs of operating human settlements.

A first step in undertaking an energy-management programme is to identify energy-

consumption patterns, to determine:

(a) Where energy is used;

(b) How energy is used;

(c) What forms of energy is used;

(d) How much energy is used; and

(e) When energy is used.

―Energy audit‖ therefore means the verification, monitoring and analysis of use of energy

including submission of technical report containing recommendation for improving energy

efficiency with cost benefit analysis and an action plan to reduce energy consumption [3].

The energy audit will present a picture of the substation‘s energy profile.

The second part of the report − the automation of the switching operations in substations −

provides a suggestion and an example of possible savings as compared to manual operations

in switching.

Page 10: UNIVERSITY OF NAIROBIcae.uonbi.ac.ke/sites/default/files/cae/cae/FESTUS MUEMA WAMBUA … · UNIVERSITY OF NAIROBI ... 2.5 Gas-Insulated Substations 12 2.6 Superconductors 13 2.7 ...

3

A necessary input into the performance of any task is energy, hence the importance of the

study of its automatic transformation. Substation automation therefore has, as its prime

objective, the need to satisfy the increasingly demanding requirements of the power systems

concerned. The most important requirement is to ensure that the power system, as a whole,

is operated and controlled in the most effective, secure and economic manner possible. In

High Voltage and Extra High Voltage substations, decisions must be taken quickly and

safely to achieve rapid restoration of supply and speedy return to normal operating

conditions following a substation equipment fault or other substation abnormality.

1.1 PROBLEM STATEMENT

Energy exists in different forms in nature but the most important form is the electrical

energy. The modern society is so much dependent upon the use of electrical energy that it

has become a part and parcel of our life. Energy is the basic necessity for the economic

development of a country. Many functions necessary to present day living grind to a halt

when supply of energy stop. It is practically impossible to estimate the actual magnitude of

the past that energy has played in the building up of present-day civilization. As a matter of

fact, there is a close relationship between the energy used per person and his/her standard of

living. The greater the per capita consumption of energy in a country, the higher is the

standard of living of its people.

Electrical Power is a critical infrastructure for the growth of the Kenyan Economy.

Acceleration in the economic growth will depend upon a financially and commercially

viable power sector that is able to attract fresh investments. However, the financial health of

the state owned utility company- The Kenya Power, has become a matter of grave concern

considering the rate at which electricity tariffs are sky rocketing time and again.

The challenges facing the energy sector in Kenya today include among others a weak power

transmission and distribution infrastructure due to limited investments in power system

upgrading. As a consequence, the economy has been experiencing high electrical power

system losses, extreme voltage fluctuations and intermittent power outages which cause

equipment and material damage including losses in production.

With the foregoing in focus, the Kenyan electrical power transmission and distribution

system has more than one occasion let down its customers in power failures. Blackouts and

unexpected power interruptions have been and are a common punctuation phenomenon in

the entire customer base of Kenya Power. These power system weaknesses coupled with the

Page 11: UNIVERSITY OF NAIROBIcae.uonbi.ac.ke/sites/default/files/cae/cae/FESTUS MUEMA WAMBUA … · UNIVERSITY OF NAIROBI ... 2.5 Gas-Insulated Substations 12 2.6 Superconductors 13 2.7 ...

4

high cost of power from independent power producer contribute to the high cost of power in

Kenya.

In Kenya, for humanity‘s continued survival and improvement of quality of life, and just as

developing countries become industrialized and their populations grow, the need for

increasing amounts of energy is placing a heavy burden on energy-supply systems. Hence,

there is an urgent need for maximum conservation of existing energy supplies and

maximum efficiency in their use. The Kenya Power has to continue to improve its capacity

to exploit opportunities to transmit and distribute a reliable and improved electrical power

and avoid prolonged power outages if not blackouts to its customers as the case stands now.

Unless this trend is halted with corrective steps, then the Kenya power as a utility Company

in a developing nation would therefore have no option, but to improve its services for its

continued survival in the market. If not, it would definitely loose to new upcoming utility

companies given the current world trends of an increasing free competitive market in

electrical power supply. This is because modern civilization being science and technology

driven, a time will come when it would be suicidal to ignore even the smallest of energy

saving opportunities and failure to embrace automation in switching operations.

1.2 RESEARCH OBJECTIVES

Most of the switching operations in most of the transmission and distribution substations in

the Kenya Power Company are manual in nature. The principal goal of this research project

was to analyze the cost-benefit of automating all the switching programmes during all

manner and forms of operations be it load transfers, outages and breakdowns within the

Kenya Power and Lighting Company as well as conducting an energy audit in one of the

major transmission substations to check whether power is transmitted and distributed most

efficiently and economically.

Thus:

1. To design a computer simulation method to model sequence switching in high

voltage substations as a faster switching means and thus reducing the switching time

and hence the overall outage time during both planned and unplanned outages in

Kenya Power Company.

2. Conduct an energy audit as far as is practically possible to check whether there are

any opportunities to save energy loss.

When met, these two objectives would indirectly to some extend reduce legal tussles

between Kenya Power and its customers as entrenched in the new constitution as a result of

Page 12: UNIVERSITY OF NAIROBIcae.uonbi.ac.ke/sites/default/files/cae/cae/FESTUS MUEMA WAMBUA … · UNIVERSITY OF NAIROBI ... 2.5 Gas-Insulated Substations 12 2.6 Superconductors 13 2.7 ...

5

a more stable and reliable power system because the automatic switching would be faster

and less prone to transients, a cause of equipment failure.

1.3 RELEVANCE/JUSTIFICATION OF STUDY

Most of the switching operations in the Kenya Power and Lighting Company are manual in

nature. This in itself makes it a very lengthy exercise when the need arises to isolate and

work upon a section of the interconnected transmission and distribution system. A process

which would take less than a few minutes when automatically operated end up taking much

time than it is necessary when manually operated. Therefore it is prudent to quantify the

input cost and associated benefits in changing from a manually operated system to an

automatically operated one.

Secondly, transmission and distribution substation systems are built up with electrical

apparatus and equipment. These then become potential sources of electrical energy loss

during the energy conveyance from one point to another. So carrying out an energy audit in

one of the major substations within Kenya Power and Lighting Company would assist in

establishing areas of energy saving opportunities which over time could turn out as great

revenue savers for the utility company. Besides that, being the only monopoly in the area of

transmission and distribution of electrical power, the company would more often than not

tent to loose focus of the opportunities available to save on energy losses. A necessary input

into the performance of any task is energy, hence the importance of the study of its

transformation

Page 13: UNIVERSITY OF NAIROBIcae.uonbi.ac.ke/sites/default/files/cae/cae/FESTUS MUEMA WAMBUA … · UNIVERSITY OF NAIROBI ... 2.5 Gas-Insulated Substations 12 2.6 Superconductors 13 2.7 ...

6

CHAPTER TWO

2. LITERATURE REVIEW

2.1 Introduction

Energy is the basic necessity for the economic development of a country. Many functions

necessary to present day living grind to a halt when supply of energy stops. It is practically

impossible to estimate the actual magnitude of the past that energy has played in the

building up of present-day civilization. The availability of huge amount of energy in the

modern times has resulted in a shorter working day, higher agricultural and industrial

production, a healthier and more balanced diet and better transportation facilities. As a

matter of fact, in their book, V.K Mehta And Rohit Mehta of the Principles of Power

Systems, [4], there is a close relationship between the energy used per person and his/her

standard of living. The greater the per capita consumption of energy in a country, the

higher is the standard of living of its people [4].

The power sector has existed for over 100 years. Throughout this time, it has experienced

waves of change in structure and regulatory approach driven by technical and economic

developments. Power engineering being the oldest and most traditional of the various areas

within electrical engineering, no other facet of modern technology is currently undergoing a

more dramatic revolution in technology or business structure as it is. Perhaps the most

fundamental change taking place in the electric utility industry is the move toward a

quantitative basis for the management of service reliability. Traditionally, electric utilities

achieved satisfactory customer service quality through the use of more or less ―one size fits

all situations‖ standards and criteria that experience had shown would lead to no more than

an acceptable level of trouble on their system. Tried and true, these methods succeeded in

achieving acceptable service quality[5].

But evolving industry requirements changed the relevance of these methods in two ways.

First, the needs of modern electric energy consumers changed. Even into the early 1980s,

very short (less than 10 second) interruptions of power had minimal impact on most

consumers. Then, utilities routinely performed field switching of feeders in the early

morning hours, creating 10-second interruptions of power flow that most consumers would

not even notice. But where the synchronous-motor alarm clocks of the 1960s and 1970s

Page 14: UNIVERSITY OF NAIROBIcae.uonbi.ac.ke/sites/default/files/cae/cae/FESTUS MUEMA WAMBUA … · UNIVERSITY OF NAIROBI ... 2.5 Gas-Insulated Substations 12 2.6 Superconductors 13 2.7 ...

7

would just fall a few seconds behind during such interruptions, modern digital clocks,

microelectronic equipment and computers cease working altogether The key evolutionary

stages are outlined below.

1870s - 1920s: Private ownership. Fragmentation. No universal grid.

1920s - World War II: Governments recognition of electric power as a "necessity". Public

investment but industry remains fragmented.

World War II - 1960s: Sector viewed as a natural monopoly. Some governments

consolidate and nationalise the power sector; others apply economic regulation; some

exempt the sector from the application of competition law.

1970s: Oil shocks. Changes in fuel inputs to power generation and shift toward nuclear.

Experience with independent power producers on the public grid and discovery that

minimum efficient scale of generation may be smaller. Identification of economies of

vertical integration between generation and transmission.

1980s - 1990s: Combined Cycle Gas Turbine development reduces minimum efficient scale

in generation; coordination eased by falling information technology costs. Power sector

reform in some countries involved the development of competition in generation and

supply.[5]

According to R. E. Brown, G. Frimpong and H. L. Willis, Electricity, produced and

delivered to customers through generation, transmission and distribution systems,

constitutes one of the largest consumer markets in the world[6]. Engineers design

transmission networks to transport the energy as efficiently as feasible, while at the same

time taking into account economic factors, network safety and redundancy. These networks

use components such as power lines, cables, circuit breakers, switches and transformers.

Electric power transmission or "high-voltage electric transmission" is the bulk transfer of

electrical energy, from generating power plants to substations located near population

centers. This is distinct from the local wiring between high-voltage substations and

customers, which is typically referred to as electric power distribution. Transmission lines,

when interconnected with each other, become high-voltage transmission networks. In the

US, these are typically referred to as "power grids" or just "the grid", while in the UK the

network is known as the "national grid." Historically, transmission and distribution lines

were owned by the same company, but over the last few decades or so many countries have

liberalized the electricity market in ways that have led to the separation of the electricity

transmission business from the distribution business[7].

Page 15: UNIVERSITY OF NAIROBIcae.uonbi.ac.ke/sites/default/files/cae/cae/FESTUS MUEMA WAMBUA … · UNIVERSITY OF NAIROBI ... 2.5 Gas-Insulated Substations 12 2.6 Superconductors 13 2.7 ...

8

Electricity is transmitted at high voltages (110 kV or above) to reduce the energy lost in

long distance transmission. Power is usually transmitted through overhead power lines to

transmission or sub-transmission substations.

Despite the undisputed success of electrical power generation, transmission and distribution

all over the world, many important fundamental problems and questions remain unanswered

in many utilities dealing with electrical power. Without doubt, one of the most widely

discussed of these in the present day is how to achieve both efficiency and reliability of

electrical power. Like most fundamental issues in physics, this question leads to challenges

at several levels of thought. At the philosophical level this issue poses questions about

whether it is true or false that energy is lost or not. At the physical level we are forced to

examine what equipment and apparatus in a system cause or cause not energy losses and at

the mathematical level many questions are raised about the completeness and logical depth

to which losses can be quantified. A key limitation in the distribution of electricity is that,

with minor exceptions, electrical energy cannot be stored, and therefore must be generated

as needed. A sophisticated system of control is therefore required to ensure electric

generation very closely matches the demand. If supply and demand are not in balance,

generation plants and transmission equipment can shut down which, in the worst cases, can

lead to a major regional blackout, such as occurred in California and the US Northwest in

1996 and in the US Northeast in 1965, 1977 and 2003[8].

To reduce the risk of such failures, electric transmission networks are interconnected into

regional, national or continental wide networks thereby providing multiple redundant

alternate routes for power to flow should (weather or equipment) failures occur therefore as

the reliable supply of energy, especially electric energy, continues to grow in importance,

the potential impact of energy efficiency cannot be overstated. With the array of

technologies and methodologies now available, efficiency stands ready to play a much

larger role in the energy equation.

In the U.S, Department of Energy estimates that increasing energy efficiency could reduce

national energy use by as much as 20% in 2020, with net economic benefits for consumers

and businesses as a result.

The concept of energy efficiency has moved in and out of favor with the public over the

years, but recently has gained renewed broad-based support. The confluence of economic,

environmental and geopolitical concerns around reducing America‘s exposure to

disruptions in the supply of energy has moved efficiency to the fore. As a result, a number

Page 16: UNIVERSITY OF NAIROBIcae.uonbi.ac.ke/sites/default/files/cae/cae/FESTUS MUEMA WAMBUA … · UNIVERSITY OF NAIROBI ... 2.5 Gas-Insulated Substations 12 2.6 Superconductors 13 2.7 ...

9

of initiatives are now underway to improve efficiency in a variety of areas, but much more

can and should be done.

The US is not alone in these efforts. China presently has ten efficiency programs aimed at

bringing the country‘s energy intensity—the amount of energy used per unit of GDP—in

line with rivals such as the US and the European Union. The European Union likewise has

taken steps to improve energy efficiency in its member countries by 20% over the next

fifteen years.

Efficiency is a simple concept which can perhaps best be summed up with the cliché,

―doing more with less.‖ Perhaps the best-known efficiency program among American

consumers is the Energy Star program that helps them to identify appliances like

dishwashers and refrigerators that use less energy than other similar models. Indeed, the

term ―efficiency‖ is typically associated with how energy is consumed at the point of end

use, but the concept of efficiency can also be applied to how energy is produced and

distributed.

Once electric energy is generated, it must be moved to areas where it will be used. This is

known as transmission—moving large amounts of power over sometimes very long

distances—and is separate from distribution, which refers to the process of delivering

electric energy from the high voltage transmission grid to specific locations such as a

residential street or commercial park.

The transmission and distribution or ―T&D‖ system, then, includes everything between a

generation plant and an end-use site. Along the way, some of the energy supplied by the

generator is lost due to the resistance of the wires and equipment that the electricity passes

through. Most of this energy is converted to heat. Just how much energy is taken up as

losses in the T&D system depends greatly on the physical characteristics of the system in

question as well as how it is operated. Generally speaking, T&D losses between 6% and 8%

are considered normal.

2.2 Improving Efficiency in the T&D System

There are other initiatives at the distribution level, but if we focus our attention on the

measures that have the greatest potential for improving efficiency, we inevitably must look

to transmission. There are numerous technologies that are already being applied to boost

efficiency in transmission, and still more that have yet to reach full commercial

implementation. In the following sections, some of these technologies have been explored.

Page 17: UNIVERSITY OF NAIROBIcae.uonbi.ac.ke/sites/default/files/cae/cae/FESTUS MUEMA WAMBUA … · UNIVERSITY OF NAIROBI ... 2.5 Gas-Insulated Substations 12 2.6 Superconductors 13 2.7 ...

10

2.3 Energy Auditing of Substation Electrical Power flows

Energy auditing has been used as an integral part of any energy-management programme

and an essential step in the process of energy-conservation, since it facilitates the optimum

use of available energy resources. It can be a valuable tool in developing countries where

emphasis is being placed on reducing consumption of commercial and non-commercial

energy through energy-conservation measures[1].

An energy audit, sometimes referred to as an energy survey or an energy inventory, is an

examination of the total energy used in a particular property. The analysis is designed to

provide a relatively quick and simple method of determining not only how much energy is

being consumed but where and when. The energy audit will identify deficiencies in

operating procedures and in physical facilities. Once these deficiencies have been identified,

it will be apparent where to concentrate efforts in order to save energy. The energy audit is

the beginning of and the basis for an effective energy-management programme [9].

For example human settlements encompass a variety of buildings. Regardless of the

building involved, the audit procedure is basically the same. If more than one facility is

involved (as is the case of apartment buildings) an audit of each will be necessary.

―An energy audit may be considered similar to the monthly closing statement of an

accounting system. One series of entries would consist of amounts of energy which are

consumed during a month in the form of electricity, gas, fuel, oil, steam, and the second

series would list how the energy was used: how much for lighting, in air-conditioning, in

heating, in process, etc. The energy audit process must be carried out accurately enough to

identify and qualify the energy and cost savings that are likely to be realized through

investment in an energy saving measure.‖[9]

With the purpose of examining the various aspects of energy conservation and energy

management, the United Nations Centre for Human Settlements (Habitat) and the Regional

Centre for Energy, Heat and Mass Transfer for Asia and the Pacific convened a Workshop

on Energy Auditing in Human Settlements in Madras, India, in 1987. The Workshop noted

that, in developing countries, per capita energy consumption is on the increase and that

energy consumption in residential, commercial and public buildings constitutes a significant

portion of total energy consumption in urban areas, thus justifying the implementation of

energy-conservation measures. It concluded that there was scope for initiating energy-

auditing procedures which would lead to energy conservation in these sectors and

recommended, inter alia, the development of national and local-level energy-audit manuals,

Page 18: UNIVERSITY OF NAIROBIcae.uonbi.ac.ke/sites/default/files/cae/cae/FESTUS MUEMA WAMBUA … · UNIVERSITY OF NAIROBI ... 2.5 Gas-Insulated Substations 12 2.6 Superconductors 13 2.7 ...

11

both for the user and the auditor, applying, with suitable modifications where necessary, the

experience already gained by developed countries in the field [1].

Elsewhere in the U.S, due to the recent economic downturn, which has hindered the

construction industry world wide, Arches etc, a San Diego business, which specializes in

the manufacture, distribution, and installation of custom designed doors, windows,

mouldings, and hardware believed that an analysis and optimization of their energy usage

would provide additional assistance towards their goal to lower overhead and maintain

current operations. This was in a Senior Project submitted in partial fulfilment of the

requirements for the degree of Bachelor of Science in Industrial Engineering entitled

Energy Audit and Optimization for ―Arches etc.‖ by Ross Dixon. To begin this task, a

comprehensive energy audit was conducted to establish an initial state from which to base

improvements [10].

With this energy audit as baseline to build upon, several aspects of their facility were

analyzed, including: Manufacturing Processes, Equipment Capacity, Equipment Runtime,

and Equipment Efficiency. After developing a collection of proposed improvements based

upon these areas, the economic justification of each improvement was evaluated. Free

energy saving improvements, or those that did not require an initial investment resulted in

an estimated annual savings of $2,000.

Hamilton Zanze of San Francisco, the owners of the properties at 140/160 Franklin –

Oakland, Califonia, and the adjacent corner property at 384 Embarcadero, commissioned

15000 Inc.[11] to evaluate the buildings for potential savings in energy usage based upon

criteria ―ASHRAE‖ (American Society of Heating, Refrigeration and Air Conditioning

Engineers).

In short, the building was found to present multiple energy savings opportunities with

varying degrees of payback, return on investment and capital outlay. In general, it was

recommended to perform the high priority, low capital improvement projects first. Each

practical measure proposed was weighted for priority based upon capital expenditure versus

net energy effect and Energy Usage Index. (EUI.

Despite all this much work done in residential, commercial and industrial buildings, no

much attention seem ever been dedicated to electrical power transforming substations in the

field of energy auditing.

Page 19: UNIVERSITY OF NAIROBIcae.uonbi.ac.ke/sites/default/files/cae/cae/FESTUS MUEMA WAMBUA … · UNIVERSITY OF NAIROBI ... 2.5 Gas-Insulated Substations 12 2.6 Superconductors 13 2.7 ...

12

2.4 Flexible AC Transmission Systems (FACTS) Devices

A family of power electronics devices known as Flexible AC Transmission Systems, or

FACTS, provides a variety of benefits for increasing transmission efficiency. Perhaps the

most immediate is their ability to allow existing AC lines to be loaded more heavily without

increasing the risk of disturbances on the system. FACTS devices stabilize voltage, and in

so doing remove some of the operational safety constraints that prevent operators from

loading a given line more heavily. In addition to the efficiency gains, these devices also

deliver a clear reliability benefit.

2.5 Gas-Insulated Substations

Most substations occupy large areas of land to accommodate the design requirements of the

given facility. However, each time power flows through a substation to step down the

voltage, more energy is lost as the power flows through the transformers, switches and other

equipment. The efficiency of the lower-voltage lines coming out of the substation is also

markedly lower than their high-voltage counterparts. If power can be transmitted at higher

voltage to a substation that is closer to where the energy will be consumed, significant

efficiency improvements are possible.

Gas-insulated substations essentially take all of the equipment you would find in an outdoor

substation and encapsulate it inside of a metal housing. The air inside is replaced with a

special inert gas, which allows all of the components to be placed much closer together

without the risk of a flashover. The result is that it is now possible to locate a substation in

the basement of a building or other confined space so that the efficiency of high-voltage

transmission can be exploited to the fullest extent.

ABB is a pioneer in developing gas insulated substations. In the year 1967, ABB delivered

the first gas insulated substation in the world. Since that time, ABB has delivered more than

10.000 high voltage gas insulated switchgear bays[12].

GIS was first developed in various countries between 1968 and 1972. After about 5 years of

experience, the use rate increased to about 20% of new substations in countries where space

is limited. In other countries with space easily available, the higher cost of GIS relative to

Air Insulated System has limited use to special cases.

For example, in the U.S., only about 2% of new substations are GIS. International

experience with GIS is described in a series of CIGRE papers (CIGRE, 1992; 1994;

1982)[13]. The use of SF6 gas as an insulating medium in switchgear reduces the clearance

distance between active and non-active parts of a switchgear facilitating the following

advantages of gas insulated applications compared to air insulated applications:

Page 20: UNIVERSITY OF NAIROBIcae.uonbi.ac.ke/sites/default/files/cae/cae/FESTUS MUEMA WAMBUA … · UNIVERSITY OF NAIROBI ... 2.5 Gas-Insulated Substations 12 2.6 Superconductors 13 2.7 ...

13

Less space requirements - especially in congested city areas

Less sensitivity to pollution, as well as salt, sand or even large amounts of snow

Less operation & maintenance costs

More than 35 years experience in building turnkey gas insulated substations around the

world has given ABB the expertise to handle all kinds of challenges in the construction of

indoor and outdoor gas insulated substations without limitation due to site conditions or

voltage levels.[12]

In Kenya the technology has been adopted at the Kenya Electricity Generating company

Kipevu III station at the Coastal town of Mombasa.

2.6 Superconductors

Superconducting materials at or near liquid nitrogen temperatures have the ability to

conduct electricity with near-zero resistance. So-called high temperature superconducting

(HTS) cables now under development, which still require some refrigeration, can carry

three to five times the power of conventional cables. The losses in HTS cables are also

significantly lower than the losses in conventional lines, even when the refrigeration costs

are included. A major vendor of superconducting conductors claims that the HTS cable

losses are only half a percent (0.5%) of the transmitted power compared to 5-8% for

traditional power cables. Superconducting materials can also be used to replace the copper

windings of transformers to reduce losses by as much as 70% compared to current designs.

James Dewar initiated research into electrical resistance at low temperatures.

Zygmunt Florenty Wroblewski conducted research into electrical properties at low

temperatures, though his research ended early due to his accidental death. Around 1864,

Karol Olszewski and Wroblewski predicted the electrical phenomena of dropping resistance

levels at ultra-cold temperatures. Olszewski and Wroblewski documented evidence of this

in the 1880s. Dewar and John Ambrose Fleming predicted that at absolute zero, pure metals

would become perfect electromagnetic conductors (though, later, Dewar altered his opinion

on the disappearance of resistance, believing that there would always be some resistance).

Walther Hermann Nernst developed the third law of thermodynamics and stated that

absolute zero was unattainable. Carl von Linde and William Hampson, both commercial

researchers, nearly at the same time filed for patents on the Joule-Thomson effect for the

liquefaction of gases. Linde's patent was the climax of 20 years of systematic investigation

of established facts, using a regenerative counterflow method. Hampson's designs was also

Page 21: UNIVERSITY OF NAIROBIcae.uonbi.ac.ke/sites/default/files/cae/cae/FESTUS MUEMA WAMBUA … · UNIVERSITY OF NAIROBI ... 2.5 Gas-Insulated Substations 12 2.6 Superconductors 13 2.7 ...

14

of a regenerative method. The combined process became known as the Hampson-Linde

liquefaction process.

Onnes purchased a Linde machine for his research. On March 21, 1900, Nikola Tesla was

granted a US patent for the means for increasing the intensity of electrical oscillations by

lowering the temperature, which was caused by lowered resistance, a phenomenon

previously observed by Olszewski and Wroblewski. Within this patent it describes the

increased intensity and duration of electric oscillations of a low temperature resonating

circuit. It is believed that Tesla had intended that Linde's machine would be used to attain

the cooling agents.

A milestone was achieved on July 10, 1908 when Heike Kamerlingh Onnes at Leiden

University in the Netherlands produced, for the first time, liquified helium, which has a

boiling point of 4.2 kelvin at atmospheric pressure.

2.7 Wide Area Monitoring Systems

Much of the transmission system could feasibly be operated at a higher loading, were it not

for reliability concerns. However, if operators were given the ability to monitor grid

conditions more precisely and in real time, some of these constraints would be removed.

One example relates to the simple fact that when transmission lines heat up, the metal

becomes pliable and the lines sag, which can cause a short circuit if they come into contact

with a tree or other grounding object. Wide area monitoring systems (WAMS) have many

promising capabilities, one of which is line thermal monitoring. With this functionality,

transmission operators could conceivably change the loading of transmission lines more

freely by virtue of having a very clear understanding of how close a given line really is to

its thermal limits.

The load on electricity supply systems has increased continuously over the past few years.

There are many reasons for this:

Increased cross-border power trading in Europe, for example, is placing new demands

on the tie lines between control areas. For example, power transmission on tie lines in

the European grid increased almost 6-fold from 1975 to 2008 .

Increased input of wind power and the planned shutdown of existing power plants will

extend the transmission distances between generation and consumers.

Severe weather and storms can put important lines out of operation, for a short time

exposing the remaining grid to increased load quickly.

Page 22: UNIVERSITY OF NAIROBIcae.uonbi.ac.ke/sites/default/files/cae/cae/FESTUS MUEMA WAMBUA … · UNIVERSITY OF NAIROBI ... 2.5 Gas-Insulated Substations 12 2.6 Superconductors 13 2.7 ...

15

This means that the power system is increasingly operated closer to its stability limit and

new load flows arise that are unfamiliar to network control center operators.

This is where SIGUARD PDP (Phasor Data Processor) comes in.

This system for network monitoring using synchrophasors helps with fast appraisal of the

current system situation. Power swings and transients are indicated without delay to help

the control center personnel find the causes and take countermeasures [14].

2.8 System Automation

In recent years, considerable interest has been shown in applying digital computers for

substation control and protection [15-21]. The development and application of new methods

and computational techniques in the field of substation automation have, as their prime

objective, the need to satisfy the increasingly demanding requirements of the power systems

concerned. These requirements are dictated by such factors as the growing size and

complexity of the power systems, the use of larger and more highly rated plant units and,

above all, the need to ensure that the power system as a whole is operated and controlled in

the most effective, secure and economic manner possible.

The last factor mentioned is given particular emphasis by the present trend towards the

control of substations from digital computer centres. As a High Voltage (HV) or Extra High

Voltage (EHV) substation increases in complexity, decisions must be taken quickly and

safely. It is extremely important to achieve rapid restoration of supply and speedy return to

normal operating conditions following a substation equipment fault or other substation

abnormality.

Computational methods have been published [22] to model substation interlocking and

sequence switching in high-voltage substations. These methods use dynamic programming

[22] or a heuristic approach [21] to detect the optimal sequence of on-line switching

operations. However, relatively little has been done in the area of automatic restoration and

rearrangement of the substation following a substation abnormality and making maximum

utilisation of equipment. One of the purposes of this project is to present interactive

technique for substation automation by studying models and techniques that have been

previously developed to model the substation configuration and detect the available

restoration operations following a fault in a substation equipment. These techniques

recognise the existing, at the time of fault, operational configuration of the substation by

Page 23: UNIVERSITY OF NAIROBIcae.uonbi.ac.ke/sites/default/files/cae/cae/FESTUS MUEMA WAMBUA … · UNIVERSITY OF NAIROBI ... 2.5 Gas-Insulated Substations 12 2.6 Superconductors 13 2.7 ...

16

inputting the source and load points and the operating states (closed or open) of the breakers

and isolators.

2.9 Modelling the substation switching operations

Modelling refers to the process of generating a model as a conceptual representation of

some phenomenon. Typically a model will refer only to some aspects of the phenomenon in

question, and two models of the same phenomenon may be essentially different, that is in

which the difference is more than just a simple renaming. This may be due to differing

requirements of the model's end users or to conceptual or aesthetic differences by the

modellers and decisions made during the modelling process. [23]

Scientific modelling is the process of generating abstract, conceptual, graphical and/or

mathematical models. Science offers a growing collection of methods, techniques and

theory about all kinds of specialized scientific modelling. Also a way to read elements

easily which have been broken down to the simplest form. Modeling is an essential and

inseparable part of all scientific activity, and many scientific disciplines have their own

ideas about specific types of modelling. There is little general theory about scientific

modelling, offered by the philosophy of science, systems theory, and new fields like

knowledge visualization.A scientific model represents empirical objects, phenomena, and

physical processes in a logical way. Attempts to formalize the principles of the empirical

sciences, use an interpretation to model reality, in the same way logicians axiomatize the

principles of logic. The aim of these attempts is to construct a formal system for which

reality is the only interpretation. The world is an interpretation (or model) of these sciences,

only insofar as these sciences are true. [23]

For the scientist, a model is also a way in which the human thought processes can be

amplified [24]. Models that are rendered in software allow scientists to leverage

computational power to simulate, visualize, manipulate and gain intuition about the entity,

phenomenon or process being represented.

A model is a simplified representation used to explain the workings of a real world system

or event. A physical model (most commonly referred to simply as a model, however in this

sense it is distinguished from a conceptual model) is a smaller or larger physical copy of an

object. The object being modelled may be small (for example, an atom) or large (for

example, the Solar System). The geometry of the model and the object it represents are

often similar in the sense that one is a rescaling of the other; in such cases the scale is an

important characteristic. However, in many cases the similarity is only approximate or even

Page 24: UNIVERSITY OF NAIROBIcae.uonbi.ac.ke/sites/default/files/cae/cae/FESTUS MUEMA WAMBUA … · UNIVERSITY OF NAIROBI ... 2.5 Gas-Insulated Substations 12 2.6 Superconductors 13 2.7 ...

17

intentionally distorted. Sometimes the distortion is systematic with e.g. a fixed scale

horizontally and a larger fixed scale vertically when modelling topography of a large area

(as opposed to a model of a smaller mountain region, which may well use the same scale

horizontally and vertically, and show the true slopes). Physical models allow visualization,

from examining the model, of information about the thing the model represents. A model

can be a physical object such as an architectural model of a building. Uses of an

architectural model include visualization of internal relationships within the structure or

external relationships of the structure to the environment.

Instrumented physical models are the most effective way of investigating fluid flows such

as around hydraulic structures. These models are scaled in terms of both geometry and

important forces, for example using Froude number or Reynolds number scaling. A

physical model of something large is usually smaller, and of something very small is larger.

A physical model of something that can move, like a vehicle or machine, may be

completely static, or have parts that can be moved manually, or be powered. A physical

model may show inner parts that are normally not visible. The purpose of a physical model

on a smaller scale may be to have a better overview, for testing purposes, as hobby or toy.

The purpose of a physical model on a larger scale may be to see the structure of things that

are normally too small to see properly or to see at all, for example a model of an insect or of

a molecule. A physical model of an animal shows the animals physical composition without

it walking or flying away, and without danger, and if the real animal is not available. A soft

model of an animal is popular among children and some adults as cuddly toy. A model of a

person may for example be a doll, a statue, and in fiction a robotic humanoid. A model is a

3D alternative for a 2D representation such as a drawing or photograph, or in the case of a

globe, a 3D, undistorted alternative for a flat world map.

During the last decade considerable attention has been devoted by power utilities to the

evaluation of the effectiveness of their transmission and distribution systems from a

reliability viewpoint. One of the main concerns of the published computational methods

[25-27] has been the development of accurate and consistent models to represent true

component and system behaviour. Furthermore, several papers [28-30] have specifically

considered techniques that are suitable for evaluating the reliability of power-system

substations. These techniques consider the concepts of open and short circuits, their impact

on the operation of circuit breakers and the consequential effect on the reliability of load

Page 25: UNIVERSITY OF NAIROBIcae.uonbi.ac.ke/sites/default/files/cae/cae/FESTUS MUEMA WAMBUA … · UNIVERSITY OF NAIROBI ... 2.5 Gas-Insulated Substations 12 2.6 Superconductors 13 2.7 ...

18

points. The only reason for concentrating on substations is that these systems are quite

complicated in their own right and comprise switching arrangements that are generally

more complex than the corresponding ones in power-system networks.

In real-time environments, however, substation configuration is dynamic. This is because

breakers and isolators may operate at any time producing the following effects:

(a) incoming or outgoing circuits may or may not be disconnected

(b) substation busbar sections may or may not separate, possibly forming new nodes in the

system.

Automation systems are evolving towards ubiquitous, diverse, broad, agile, autonomous

and integrated large-scale real-time information systems [31]. Information handling has

become a crucial issue, given the need for cost-effective integration of multiple application

domains such as monitoring, supervision, control, protection, asset management,

maintenance, condition monitoring, incident management, power quality monitoring,

configuration management or security management. With the purpose of optimizing

information handling, object orientation is being widely introduced at the

platform level.

In their paper at the C I R E D 18th International Conference on Electricity Distribution‖

entitled ―towards model-driven design of substation automation systems‖ [32] Rogério

Paulo and Adriano Carvalho concluded that illustration of a modelling approach, applied to

the design process, shows that the adoption of object oriented modelling and the model-

driven design approach leads to both cost-reduced and quality-enhanced system

development.

It is therefore evident that provisions must be made to automatically incorporate, in real

time, the effects of breaker operation on system topology and decisions for switching

actions must be taken quickly and safely to maintain the continuity and quality of supply to

consumers.

Electrical power is removed (switched off) and restored (switched on) for various reasons

including:

• Operational requirements, and

• Electrical safety

According to the Department of Primary Industries, in the New South Wales Government

of the United Kingdom with the mining industry as an example, [33] procedures for the

Page 26: UNIVERSITY OF NAIROBIcae.uonbi.ac.ke/sites/default/files/cae/cae/FESTUS MUEMA WAMBUA … · UNIVERSITY OF NAIROBI ... 2.5 Gas-Insulated Substations 12 2.6 Superconductors 13 2.7 ...

19

removal and restoration of power are intended to provide information in the safe removal of

power at the mine, such as:

• Removal of power at the completion of the work day (shut site generator down).

• Safe access to plant for mechanical maintenance / repair in accordance with the site

isolation procedures, and

• Removal of electrical power source under electrical fault conditions, that is, the operation

of electrical protection devices.

Similarly the procedures for the restoration of power are intended to provide information for

the safe application of power to electrical circuits, following the removal of power, as a

controlled process, such as:

• Starting process for the generator at the start of the work day (start up procedures)

• Procedure for removing isolation to re-power the plant following mechanical maintenance

/ repair, and

• Reset procedures to restore power after an electrical protection device has tripped.

There are increased risks to operators and maintenance personnel if the process of switching

off and switching on is not carried out in a systematic and rigorous manner. Any process

developed for the removal and restoration of power at the operation should form part of the

Mine Safety Management Plan as a control for the safe use of electricity.

2.10 Removal of Power

There are three methods for the removal of power, Manual – Whole Current, Manual –

Remote Switching, and Automatic:

1. Manual - Whole Current – this is where switch devices are physically operated to switch

the power supply off (the phase conductors have a physical gap).

2. Manual - Remote Switching – this is where control switches (stop switches, emergency

stop switches, conveyor lanyards) are operated to stop the plant. Note: The use of remote

switching must not be relied on for isolation purposes when doing mechanical maintenance

and repair work.

3. Automatic – this is where switching devices (generally, these are circuit breakers) are

operated and tripped by electrical protection systems (overload, short circuit and earth fault

protection).

In electrical engineering, a switch is an electrical component that can break an electrical

circuit, interrupting the current or diverting it from one conductor to another.[34][35]

The most familiar form of switch is a manually operated electromechanical device with one

or more sets of electrical contacts, which are connected to external circuits. Each set of

Page 27: UNIVERSITY OF NAIROBIcae.uonbi.ac.ke/sites/default/files/cae/cae/FESTUS MUEMA WAMBUA … · UNIVERSITY OF NAIROBI ... 2.5 Gas-Insulated Substations 12 2.6 Superconductors 13 2.7 ...

20

contacts can be in one of two states: either "closed" meaning the contacts are touching and

electricity can flow between them, or "open", meaning the contacts are separated and the

switch is non-conducting. The mechanism actuating the transition between these two states

(open or closed) can be either a "toggle" (flip switch for continuous "on" or "off") or

"momentary" (push-for "on" or push-for "off") type.

A switch may be directly manipulated by a human as a control signal to a system, such as a

computer keyboard button, or to control power flow in a circuit, such as a light switch.

Automatically operated switches can be used to control the motions of machines, for

example, to indicate that a garage door has reached its full open position or that a machine

tool is in a position to accept another workpiece. Switches may be operated by process

variables such as pressure, temperature, flow, current, voltage, and force, acting as sensors

in a process and used to automatically control a system. For example, a thermostat is a

temperature-operated switch used to control a heating process. A switch that is operated by

another electrical circuit is called a relay. Large switches may be remotely operated by a

motor drive mechanism. Some switches are used to isolate electric power from a system,

providing a visible point of isolation that can be pad-locked if necessary to prevent

accidental operation of a machine during maintenance, or to prevent electric shock.

A high-voltage disconnect switch used in an electrical substation. Such switches are

used mostly to isolate circuits, and usually cannot break load current. High-voltage

switches are available for the highest transmission voltages, up to 1 million volts. This

switch is gang-operated so that all three phases are interrupted at the same time

Page 28: UNIVERSITY OF NAIROBIcae.uonbi.ac.ke/sites/default/files/cae/cae/FESTUS MUEMA WAMBUA … · UNIVERSITY OF NAIROBI ... 2.5 Gas-Insulated Substations 12 2.6 Superconductors 13 2.7 ...

21

2.11 Simulation

Simulation is the imitation of some real thing, state of affairs, or process. The act of

simulating something generally entails representing certain key characteristics or

behaviours of a selected physical or abstract system.

Simulation is used in many contexts, including the modeling of natural systems or human

systems in order to gain insight into their functioning. Other contexts include simulation of

technology for performance optimization, safety engineering, testing, training and

education. Simulation can be used to show the eventual real effects of alternative conditions

and courses of action. Simulation is also used when the real system cannot be engaged. The

real system may not be engaged because it may not be accessible, it may be dangerous or

unacceptable to engage, or it may simply not exist.[36]

Key issues in simulation include acquisition of valid source information about the relevant

selection of key characteristics and behaviours, the use of simplifying approximations and

assumptions within the simulation, and fidelity and validity of the simulation outcomes.

A computer simulation (or "sim") is an attempt to model a real-life or hypothetical situation

on a computer so that it can be studied to see how the system works. By changing variables,

predictions may be made about the behaviour of the system[37]

Computer simulation has become a useful part of modeling many natural systems in

physics, chemistry and biology[37], and human systems in economics and social science

(the computational sociology) as well as in engineering to gain insight into the operation of

those systems. A good example of the usefulness of using computers to simulate can be

found in the field of network traffic simulation. In such simulations, the model behaviour

will change each simulation according to the set of initial parameters assumed for the

environment.

Traditionally, the formal modeling of systems has been via a mathematical model, which

attempts to find analytical solutions enabling the prediction of the behaviour of the system

from a set of parameters and initial conditions. Computer simulation is often used as an

adjunct to, or substitution for, modeling systems for which simple closed form analytic

solutions are not possible. There are many different types of computer simulation, the

common feature they all share is the attempt to generate a sample of representative

scenarios for a model in which a complete enumeration of all possible states would be

prohibitive or impossible. Several software packages exist for running computer-based

Page 29: UNIVERSITY OF NAIROBIcae.uonbi.ac.ke/sites/default/files/cae/cae/FESTUS MUEMA WAMBUA … · UNIVERSITY OF NAIROBI ... 2.5 Gas-Insulated Substations 12 2.6 Superconductors 13 2.7 ...

22

simulation modeling (e.g. Monte Carlo simulation, stochastic modeling, multimethod

modeling) that makes the modeling almost effortless.

Simulation and especially computer simulation is a basic tool since it enables engineers to

understand how systems work without actually needing to see them. They can learn how

they work in different circumstances and optimize their design with considerably less cost

in terms of time and money than if they had to carry out tests on a physical system.

A system is a set of interacting or interdependent entities, real or abstract, forming an

integrated whole. In general, a system is a construct or collection of different elements that

together produce results not obtainable by the elements alone[38]

There is a wide range of commercial brands on the market offering products for electrical

simulation. These are powerful tools, but require the engineer to have a perfect knowledge

of the electrical field. Substation Automation System (SAS), established using

multifunctional Intelligent Electronic Devices (IEDs) and advanced network

communication technologies, could provide us with the effective substation monitoring,

local and remote control, protection, primary equipment condition monitoring and many

other functions.

The key objectives for designing substation automation architecture are interoperability

between IEDs, satisfaction of communication performance, and extensibility of the

architecture. For instance, the International Electro-technical Commission (IEC) 61850, the

global communication standard for Substation Automation System, defines the

communication between IEDs and not only solves the interoperation problem but also

specifies other system requirements like message performance, information security in SAS

network. According to the IEC 61850-5, the message transmission time requirements for

SAS network must be ensured under any operating conditions and contingencies inside the

substation [39]. Dynamic performance of the SAS network must be studied during the

planning stage in order to catch network performance problem ahead of the deployment

stage.

2.12 Benefits of improved efficiency through automation auditing.

The ―business case‖ for energy efficiency is fairly straightforward: using less energy means

paying less for energy. But a simple cost-benefit analysis might overlook some very

important benefits that efficiency brings.

Within the context of the power system, it is important to recognize how interrelated energy

efficiency is with grid reliability. In many areas of the US, transmission constraints have

Page 30: UNIVERSITY OF NAIROBIcae.uonbi.ac.ke/sites/default/files/cae/cae/FESTUS MUEMA WAMBUA … · UNIVERSITY OF NAIROBI ... 2.5 Gas-Insulated Substations 12 2.6 Superconductors 13 2.7 ...

23

reached the point where they not only cost consumers billions of dollars in congestion

charges, they threaten the integrity of the power system itself. Over the past twenty years,

the situation has continued to deteriorate to the point where now the question of installing a

new line is nearly moot in some locations. By the time it was completed, demand would

long since have outstripped the ability of the local grid to meet it, so a short-term solution

must be implemented in the interim.

FACTS devices offer a good example of how efficiency and reliability improvements often

go hand in hand. Unlike siting and building a new transmission line, FACTS devices can be

implemented quickly (less than a year from purchase to completion in some cases). They

immediately boost the transmission capacity of the given line while also providing voltage

support and bolstering the local grid‘s ability to withstand disturbances.

Page 31: UNIVERSITY OF NAIROBIcae.uonbi.ac.ke/sites/default/files/cae/cae/FESTUS MUEMA WAMBUA … · UNIVERSITY OF NAIROBI ... 2.5 Gas-Insulated Substations 12 2.6 Superconductors 13 2.7 ...

24

CHAPTER THREE

3. METHODOLOGY

The principal goal of this research project was to analyze the cost-benefit of automating all

the switching programs during outages and breakdowns within the Kenya Power as well as

conducting an energy audit in one of the major transmission substations- Juja Rd 132/66Kv

substation, to check whether power is transmitted and distributed most efficiently and

economically.

3.1 Research Design and Method

The research design was divided into two areas of study namely the energy audit in one part

and secondly, study of the switching operations with a view to reducing time taken during

outage/or breakdown and therefore subsequent restoration of power.

The method used towards this end was (i) to conduct an energy audit using and following

the general well established audit steps and (ii) doing a cost-benefit analysis of automating

the switching operations thereafter. The study utilized both qualitative and quantitative

methods. Qualitative methods included collection of standard commercial spares/ or fittings

data from manufacturers‘ manuals, web sites and personal interaction with staff working in

the selected substation. Quantitative methods included collection of recorded past switching

data, system operation data and personal involvement in switching operations during system

outages and breakdowns.

This particular bit involved a lot of travelling to visit and compare different substations in

different geographical areas in the country. The visits included:

1. Juja Rd 132/66KV , Dandora 220/132KV and Embakasi 220/66KV substations all in

Nairobi.

2. Kamburu 11/132KV, Kamburu 132/220KV substations in the Hydros or seven folks area

along the Tana River

3. Rabai 220/132KV, New Bamburi 132/66KV and 132/33KV Galu substations all in

Mombasa

3.1.1 Energy Audit Methodology

The big energy audit picture was done on three major Kenya Power transmission

substations namely the 132/66KV Juja Rd, the 220/132KV Dandora and the 220/66KV

Page 32: UNIVERSITY OF NAIROBIcae.uonbi.ac.ke/sites/default/files/cae/cae/FESTUS MUEMA WAMBUA … · UNIVERSITY OF NAIROBI ... 2.5 Gas-Insulated Substations 12 2.6 Superconductors 13 2.7 ...

25

Embakasi substations all located within the capital city-Nairobi. However due to safety

reasons, operational procedures, code of practice and project time limitation, the detailed

energy audit study was narrowed down and carried in only one of the three, and thus Juja

Rd 132/66KV substation was selected as a representative of the others.

3.1.2 Steps to goals and objectives of the audit

Qualitatively the audit research methodology consisted of the following steps:

i) Step 1- Interview with Key Facility Personnel

The Kenya Power is a limited company registered in the Nairobi Stock Exchange.

Therefore this makes it a profit making facility/entity in its quest to transmit and distribute

electrical power in the country. In order to get an insight of the whole transmission function,

an initial meeting with the chief engineer, national control centre was conducted and

permission granted to under take the energy audit study in the facility.

The meeting agenda focused on: audit objectives and scope of work, facility rules and

regulations due to the high voltages involved- a live wire is a dead man/woman [40]. In

addition to these administrative issues, the discussion during this meeting sought to

establish the operating characteristics of the facility, energy system specifications, operating

and maintenance procedures, preliminary areas of investigation and the survey operating

constraints.

ii) Step 2- Facility Tour

After the initial meeting, a tour in each of the three substations was carried out (in different

days) to observe the various switchgears first hand, and focusing on the major energy

consuming systems and time taken to do and accomplish any particular switching operation,

be it an outage or a breakdown. The architectural design and substation equipment layout,

lighting and power monitoring in and out of the substations formed the basis of study.

iii) Step 3- Document Review

During the initial visit and subsequent kick-off meeting, available substations

documentation were reviewed with the control engineers. This documentation included all

available architectural and engineering diagrams, operation & maintenance procedures and

logs of both incoming and out going power flows in the substation.

Page 33: UNIVERSITY OF NAIROBIcae.uonbi.ac.ke/sites/default/files/cae/cae/FESTUS MUEMA WAMBUA … · UNIVERSITY OF NAIROBI ... 2.5 Gas-Insulated Substations 12 2.6 Superconductors 13 2.7 ...

26

iv) Step 4- Facility Inspection

After studying and thorough reviewing of the construction and operating documentation,

the major energy wasting processes in the substation chosen were further investigated.

Where appropriate, field measurements were collected to substantiate operating parameters

like temperature.

v) Step 5- Staff Interviews

Subsequent to the switchyard inspection, it was necessary to meet again with the operation

staff to review preliminary findings and the recommendations being considered. This was in

line with the audit objective of identifying hot spots that have high value impact to the

customers in terms of temporary or major breakdowns and therefore uncalled for outages.

Management input at this juncture was felt necessary to establish the foundation of a strong

minimum electrical power interruption to customers. This in effect would improve the

company‘s revenue collection by a constant non-interruptible supply.

vii) Step 6- Utility Analysis

The utility analysis was a detailed review of energy consumption from areas like substation

yard flood lighting, all disconnecting switches, all conductor joints and other control

equipment. The purchased or in-coming electrical energy as brought in by the transmission

lines and taken out by distribution feeders was compared to evaluate the magnitude of

energy loss in the substations by way of analysing the difference in power flow (in and out).

It was prudent to do that especially with the advent of deregulation era where energy is, and

can be purchased on contract from a number of third party marketers and therefore

necessary to embrace efficiency to survive in the market. It is a world of high cost of energy

purchase and it may be cost-effective to transmit it with minimum loss possible

viii) Step 7- Economic Analysis

Data collected during the audit was processed and analysed. Simulation with software was

built to reproduce the field/or substation outage switching observations and developed as a

base line against which to measure and quantify the energy savings potential. Calculation of

the implementation cost in energy savings, time savings and simple payback periods were

also evaluated.

Page 34: UNIVERSITY OF NAIROBIcae.uonbi.ac.ke/sites/default/files/cae/cae/FESTUS MUEMA WAMBUA … · UNIVERSITY OF NAIROBI ... 2.5 Gas-Insulated Substations 12 2.6 Superconductors 13 2.7 ...

27

ix) Step 8- Audit Findings and Recommendations

The results of findings and recommendations formed the final element of the audit project

report. The report included a description of the substation installation and its operation, a

discussion of major energy consuming areas, a description of recommended Energy

Conservation Measures (ECMs) with their specific energy impact, implementation costs,

benefits and payback. The report incorporated a summary of all the activities and effort

performed throughout the project with specific conclusions and recommendations.

3.2 Study of Time Taken During Outage Switching Operations

After going round and visiting the major power transmission substations within the Kenya

Power as indicated in section 3.1 above, the study of automation was narrowed down to the

Juja Rd 132/66KV substation. Switching is one of the most important activities in power

transmission and distribution systems. It arises whenever load transfer is needed, during

planned outages and breakdowns to isolate, repair and restore a faulty system.

In order to gather enough information regarding this area of study, the method employed

was reviewing of electrical power flow and utilization systems, examination of the system

network line diagrams, inspection of the electrical plants, switchgears, instruments and tools

used for works and collection of past data on switching procedures.

3.2.1 The power transmission network system in the Juja Rd substation

The system network was important studying in order to fully understand its layout for

power flow examination. The incoming 132KV transmission power lines as well as the out

going 66 KV feeders were checked and confirmed on line diagrams. The general layout of

plant and equipment in the substation yard was also ascertained and proved. The actual

equipment placement distances and areas were observed and noted

3.2.2 Plant, Switchgear, Instruments and tools inspection

For switching operations to move smoothly, there is need for use of sound and reliable

plant, switchgear, instruments and tools. Inspection exercise was conducted on them to

enhance accuracy, safety to health and equipment, create understanding and ensure

confidence of the same during the study. The areas of inspection included

i) 51- 132KV and 29- 66KV line isolators or disconnectors

ii) Eight 132KV and Twenty six 66KV circuit breakers

iii) 132KV Mesh/Ring Bus-Bar and 66KV Main and Reserve bus-bars

Page 35: UNIVERSITY OF NAIROBIcae.uonbi.ac.ke/sites/default/files/cae/cae/FESTUS MUEMA WAMBUA … · UNIVERSITY OF NAIROBI ... 2.5 Gas-Insulated Substations 12 2.6 Superconductors 13 2.7 ...

28

iv) Seven 132/66KV step down power transformers

v) One 66KV Main and Reserve bus-bar coupler

vi) All the incoming and outgoing conductors, jointing clamps and the associated

jumpers.

vii) 46 Halogen Floodlights with High Pressure Sodium (HPS) Lamps

viii) 521 Compact Fluorescent Lamps (CFLs) for Control rooms, Battery rooms,

Washrooms, Staff quarters, Behind building blocks, Entrance gate, Corridors

and Walkways.

3.3 Data collection

Empirical data collection is well achieved using quantitative data collection tools or

instruments. These tools include questionnaires, tests, examinations, exercises, activity

interviews, observations and instrumentation [41]. In this study the major tools used were:

a) Survey of previous switching data to ascertain time taken between start of any

switching process and the start of the work itself.

b) Field tests during outages

c) Self administered Observations during peak loads using an infra-red camera to

monitor temperatures.

d) Operational staff interviews

Empirical data collection procedure characterized the major part of data collection in this

study. Data collected was either in secondary or primary data categories. Secondary data

was collected through survey of historical switching records kept for purposes of

monitoring and provision of numerical data on running of the substation. Primary data was

collected using study tools (b) to (d). For purposes of this research, data of two particular

past outages was noted, involving the 132KV bay and the 66KV bay as well. Each of the

two was undertaken on different days and dates for purposes of system maintenance.

Page 36: UNIVERSITY OF NAIROBIcae.uonbi.ac.ke/sites/default/files/cae/cae/FESTUS MUEMA WAMBUA … · UNIVERSITY OF NAIROBI ... 2.5 Gas-Insulated Substations 12 2.6 Superconductors 13 2.7 ...

29

CHAPTER FOUR

4. FINDINGS, RESULTS AND DISCUSSION

The Kenya Power, not to be confused with the associated Kenya Electricity Generating

Company (KenGen) is a limited liability Company which transmits, distributes and retails

electricity to customers throughout Kenya. Kenya Power is a public company listed in the

Nairobi Stock Exchange (NSE). The Company is a national electric utility company,

managing electrical power transmission, distribution, electric metering, licensing, billing,

emergency electricity service and customer relations. The company was recently in 2008

awarded the ISO 9001:2008 certificate for standardization, which ensures that the highest

possible quality of service is provided at any given time. Kenya Power headquarters are at

Stima Plaza, Kolobot Road in Parklands, Nairobi; it operates many offices throughout

Kenya.

4.1 Energy Audit Findings

The following observations and findings were made during the energy audit:

� The major electrical loads of the substation include indoor and outside lighting;

� There are several local air conditioning systems, which some are switched on and off by

the personnel when needed and others for batteries run throughout;

� Fluorescent lamps are used in most of the general areas of the control rooms. However,

there are still over 45 incandescent lamps used in the substation;

� The substation is being installed with shunt reactors for power factor improvement on the

66KV bay.

Detailed areas of study included but not limited to the following observations and probable

findings as was made during the energy audit:

There is no formal energy policy statement and energy manager in the whole company. The

Chief Manager, Energy Transmission under whom the Juja Rd 132/66KV substation lies

operation-wise together with the divisional technical staff address the energy issues,

organizing regular maintenance of energy transmission equipment, replacing failed

electrical plant equipment, providing for reliable operation of the transmission network, and

planning future energy improvements.

Page 37: UNIVERSITY OF NAIROBIcae.uonbi.ac.ke/sites/default/files/cae/cae/FESTUS MUEMA WAMBUA … · UNIVERSITY OF NAIROBI ... 2.5 Gas-Insulated Substations 12 2.6 Superconductors 13 2.7 ...

30

No records to indicate any energy survey ever conducted at any of the company‘s

substations or transmission lines by any auditor.

Therefore this audit is based strictly upon observations made at the time of the site visits

where potential energy conservation and efficiency improvements, based on the physical

operation of the facility at the time of the site visits is suggested .

4.1.0 Energy Management at the KPLC Transmission Substations

Subsequent to the series of meetings, facility tours and witnessing of quite a number of

switching operations and procedures, the following findings were established and

categorised as hereunder listed:

1. ULTILITY INFRASTRUCTURE

2. ENERGY MANAGEMENT POLICY

3. ENERGY MONITORING SYSTEM

4. BENCHMARKING

5. MANAGEMENT OF CHANGE

6. TRAINING

7. ENERGY AUDIT INSTRUMENTS

8. SWITCHING TIME REDUCTION AND SIMULATION PROCEDURE

4.1.1 Utility Substation Infrastructure

The substation‘s sources of power are a number of six overhead 132KV transmission lines

that enter and terminate on gantry (dead-end) structures as seen in appendix. The inlet lines

are the Juja-Lessos lines 1 and 2, the Dandora-Juja lines 1 and 2, the Kindaruma-Juja line

and the Juja-Rabai line. The lines are connected through disconnect switches with integral

earth switches mounted on same structure, capable of visibly isolating the substation from

the transmission lines and grounding when necessary. Electricity is routed from these

switches across voltage transformers, through current transformers to circuit breakers.

These breakers protect the seven power transformers that step voltage down to 66KV

distribution levels. High voltage components are said to be located on the ―high side‖ or

―primary side‖ or 132KV bay of the substation. The low voltage sides of the transformers

are connected to secondary breakers or transformer breakers.

If a transformer fault occurs, both the primary and secondary breakers will open to isolate

the transformer from the rest of the system through the protection scheme. The secondary

Page 38: UNIVERSITY OF NAIROBIcae.uonbi.ac.ke/sites/default/files/cae/cae/FESTUS MUEMA WAMBUA … · UNIVERSITY OF NAIROBI ... 2.5 Gas-Insulated Substations 12 2.6 Superconductors 13 2.7 ...

31

breakers are connected to secondary buses that provide power to seven feeder breakers.

These breakers are connected to two bus-bars dubbed ‗‘main and reserve‘‘ respectively.

Medium voltage components are said to be located on the ―low side‖ or ―secondary side‖ of

the substation.

The 66KV bay is approximately the source of half the load supplied to the City of Nairobi

through the following 66KV feeders:

1. Ruaraka 1& 2 feeders towards Ruaraka in Nairobi North zone.

2. Parklands 1&2 feeders towards Westlands zone

3. Jevanjee 1&2 feeders towards the Central Business District

4. EMCO or Steel Billets feeder towards the Eastern side of the City and environs

5. Nairobi South 1, 2&3 feeders towards the Southern zone of the City.

6. Athi feeder towards AthiRiver township where there is a cluster of industries also.

The diversity of the feeder‘s services offered to the City of Nairobi makes the Juja Rd

substation one of the leading and most relied electrical power facility in Kenya.

The substation has been so arranged since its time of construction in the early 70s and so

has no means of increasing reliability by having additional transmission lines, energized

spare power transformers, motor-operated switches, apart from primary ring-bus protection

and a secondary transfer bus which are not adequate to automate switching. Worse still is

that both the Kindaruma and Rabai 132KV lines fly right over the Dandora-Juja

interconnector and this is a serious threat should any cut and fall down. Such a situation will

plunge the whole substation into darkness and the entire customer base will be affected.

There is need for power loss reduction via full automation by way of changing to new

efficient and reliable equipment.

4.1.2 Energy Monitoring System

Supervisory Control and Data Acquisition (SCADA) system has been utilized to play a vital

role by providing the Kenya Power with valuable knowledge and capabilities that are key to

a primary business function- delivering power in a reliable and safe manner. A quality

SCADA solution is central to effective operation of a utility's most critical and costly

distribution, transmission, and generation assets [42]

The Kenya Power management has set up and are even in the process of updating a

comprehensive set of real-time or data logging monitoring SCADA system for all

parameters required to complete the transmission efficiency to enable staff to identify

Page 39: UNIVERSITY OF NAIROBIcae.uonbi.ac.ke/sites/default/files/cae/cae/FESTUS MUEMA WAMBUA … · UNIVERSITY OF NAIROBI ... 2.5 Gas-Insulated Substations 12 2.6 Superconductors 13 2.7 ...

32

abnormal energy loss and areas of improvement. To this end, in the year 2010, the Kenya

Power commissioned its 450 km Nairobi-Mombasa fibre optic line; implemented under a

USD 32 million. In this item of auditing, Kenya Power has not fully utilized the SCADA

system to automate its switching operations.

4.1.3 Benchmarking

Benchmarking both internally and externally are two powerful tools for energy efficiency

performance assessment and logical evolution of avenues for improvement. Trend analysis

of energy loss against cost of purchase and regular review of energy performance against

the latest benchmarks is a tool used to monitor capacity utilization on energy transmission

efficiency.

The European Investment Bank has facilitated the replacement of the old system which was

installed in 1990, and which was no longer suitable for the fast growing electricity network

in the country

4.1.4 Management of Change

It was established that Kenya Power is ISO certified- ISO 9001:2008 by Bureau Veritas

certification body. The company has developed and instituted a system including use of

proper written procedures to ensure that any system work procedure changes must take into

consideration and include energy efficiency possibilities. Indeed at the level of

transmission, it was established that there are at least two noted network outage

management systems. These are ENERGY TRANSMISSION INCIDENCE

MANAGEMENT SYSTEM (ETIMS) and DISTRIBUTION AND TRANSMISSION

MAINTENANCE MANAGEMENT SYSTEM (DTMMS). The ETIMS number appears in

all transmission maintenance switching programs as seen in appendix 2.

These systems have provided the capabilities to efficiently identify and resolve outages and

to generate and report valuable historical information. This is in line with today‘s increasing

requirements of utilities to track and report outage incidences accurately to their consumers

of supplied power. The ETIMS support accurate time stamping of outages and power

restoration to customers on top of generating reports for management and regulatory

reasons. The operations and maintenance works are performed in-house in the company by

members of staff.

Page 40: UNIVERSITY OF NAIROBIcae.uonbi.ac.ke/sites/default/files/cae/cae/FESTUS MUEMA WAMBUA … · UNIVERSITY OF NAIROBI ... 2.5 Gas-Insulated Substations 12 2.6 Superconductors 13 2.7 ...

33

Internal ISO audits were confirmed taking place every year as evidenced in the very recent

ISO audit schedule released in the month of April, 2011 and attached as appendix 1.

Kenya Power has in the last one year appointed a consortium of consultants to spearhead a

planned re- branding and organizational culture change programme [38]. The consortium‘s

mandate is to develop and roll out a strategy and implementation programme for the

organizational culture change and corporate re-branding (Project dubbed Mwangaza).

Kenya Power Managing Director and CEO, Eng Joseph Njoroge has since indicated that the

appointment of the consortium marks a major milestone in the history of the Company and

signals the beginning of a new chapter that will see Kenya Power aggressively re-evaluate

its existing corporate identity, prevailing corporate culture and vision, among key

stakeholders [43].

4.1.5 Training

A key ingredient to success of any energy management programme is maintaining a high

level of awareness among staff. This could be in form of both formal and informal training,

newsletters, posters, publications and by incorporating energy management into existing

training programmes [44]. Training provided to staff responsible for the operation and

associated processes are effective and that such training adequately covers the retrieval,

management and analysis of predefined parameters captured from the SCADA monitoring

system. The training ensures that staff are kept up to date on changes to the work

procedures pertaining to improved energy transmission efficiency. The figure 4.1 is a table

of the staff trained in various system network courses in the last seven years as obtained

from Human Resources and Administration record files.

Table 4.1 Trained personnel in different courses in the last two years.

Course No. Course Name No. of staff trained

1 Energy auditing 4

2 Energy management 8

3 Energy purchase and costing 20

5 Renewable energy technologies 3

6 Plant commissioning 50

7 Energy efficiency designs 8

8 Other pertinent courses A big number

Page 41: UNIVERSITY OF NAIROBIcae.uonbi.ac.ke/sites/default/files/cae/cae/FESTUS MUEMA WAMBUA … · UNIVERSITY OF NAIROBI ... 2.5 Gas-Insulated Substations 12 2.6 Superconductors 13 2.7 ...

34

Training is expensive by nature. That was a commendable number of trained personnel and

move towards the right direction. By the time of this audit, training on the functioning of

the new installed SCADA system was in progress at the national control centre at Juja Road

station. So, as far as training was concerned, the Company highly values that.

4.1.6 Energy Audit Instruments

For an energy audit to succeed, availability of portable, durable easy to operate and

relatively inexpensive instruments is of utmost importance.

The following were the instruments used in making the audit project a success. Because of

the expense in the cost of buying, all the instruments used were the property of Kenya

Power.

1. Electrical power measuring instruments like voltmeters, ammeters, power

factor meter, frequency meters and energy meters to collect data in appendix

10.

2. Contact thermometer for temperature measurement

3. Infra Red camera as a non-contact thermometer

4. Lux meter for illumination level measurement

5. Gas leak detectors for compressed circuit breaker gas detection

So at least the company greatly conforms generally to the requirements pertaining to

identification and quantification of energy transmission measurements and they have

adequate instruments for that work.

4.2 Notable Energy Saving Opportunities

During the audit, several no cost and low-cost short-term energy saving opportunities were

identified, which if implemented will lead to substantial energy savings. This energy report

comprises recommendations for implementation of these energy saving measures,

supported with the corresponding savings calculations.

4.2.1 No cost measures:

1) The substation control room lights to the battery rooms, control panel rooms and

corridors can be switched when and where it is necessary other than running on throughout

as the case stands now.

2) The control rooms personnel should be encouraged to utilise the services of natural

lighting by opening the windows wide open and stop using lights during day time.

Page 42: UNIVERSITY OF NAIROBIcae.uonbi.ac.ke/sites/default/files/cae/cae/FESTUS MUEMA WAMBUA … · UNIVERSITY OF NAIROBI ... 2.5 Gas-Insulated Substations 12 2.6 Superconductors 13 2.7 ...

35

4.2.2 Low cost measures:

For a few of the identified measures, the current situation and the proposed measure were

described for each, including the financial impacts – if the measure was to be implemented.

4.2.3 Retrofit of the Substation Lighting System

Description

Several areas of the substation are currently illuminated by 60W tungsten filament and

500W quartz halogen incandescent lamps. These areas include the entrance gate, control

rooms, washrooms, battery rooms, corridors and walkways, staff quarters and general area

lighting behind building blocks. The halogen flood lights are used for security lighting at

night. These lamps are being used during the night through out the year, but the usage time

is different for particular areas. The light output of the 60W incandescent lamps is about

600 Lumens, while the light output of the 500W quartz halogen lamp is about 11,000

lumens. It is recommended to replace the 60W incandescent lamps with 11W compact

fluorescent lamps (CFLs) with the same light output of about 600 Lumens and the 500W

halogen floodlights with 100W high pressure sodium lamps with a similar light output.

Furthermore, the CFLs and HPS lamps offer 10 times more service life than the

incandescent lamps according to manufactures‘ data sheets.

This measure will result in the same level of illumination at lower energy consumption and

cost, and much longer service life, further reducing maintenance costs. For the CFL lamps,

the existing lamp fixture (batten/pendant lamp holders) can be re-used. Only the lamps need

to be changed. To replace the halogen floodlights, complete HPS fixtures need to be

installed. HPS lamps produce a yellowish light colour, but these are only being

recommended for outdoor area lighting, where colour is not a major concern.

4.2.4 Financial impacts

Implementation of this measure will result in the following savings:

Energy Savings (kWh) = (No. of Lamps • Operating Hours • Power Difference) / 1,000

Demand Savings (kVA) = (No. of Lamps•Power Difference•12•Diversity Factor)/1,000

a) Security Lighting - Retrofit of Halogen Floodlights with HPS Lamps

All areas of the substations switch yards are currently illuminated by 500W quartz halogen

incandescent lamps. The halogen flood lights are used for security lighting at night. These

Page 43: UNIVERSITY OF NAIROBIcae.uonbi.ac.ke/sites/default/files/cae/cae/FESTUS MUEMA WAMBUA … · UNIVERSITY OF NAIROBI ... 2.5 Gas-Insulated Substations 12 2.6 Superconductors 13 2.7 ...

36

lamps are being used during the night through out the year, but the usage time is about 12

hours daily. The light output of the 500W quartz halogen lamp is about 11,000 lumens.

The implementation of the measure will result in the following annual savings:

Estimated annual electrical energy savings – 68797.6 kWh/year.

Estimated monthly demand reduction – 17.02kVA

Total Annual Cost Savings = 1338832.29KSh/year

Estimated implementation cost – 506,000 KSh.

Payback period = 0.38 year.

Calculations of expected savings realization

Number of lamps to be replaced = 46.

Operating hours = 12 hours per day.

Replacement lamps: 100w HPS, with integral 30 watt ballast (130 watts total)

Annual energy savings: 46 • 12hrs/day • 365 days/yr • (500-130)W/1,000 = 68797.6

kWh/year

Annual energy cost savings: 68797.6kWh/yr •18.57KSh/kWh=1277560.29KSh/yr[45]

Demand reduction = 46 • 370 /1,000 = 17.02 kVA

Annual demand cost savings: 17.02 kVA • 300 KSh/kVA • 12 months = 61272 KSh/yr

Total annual cost savings = 1277560.29+ 61272 = 1338832.29KSh/yr

Implementation cost:

Cost of procurement and installation of 46, 100 W HPS Flood Lights, wall or structure

mounted assembly (fixture complete with ballast and control gear) at 10,000.00 KSh each:

Materials = 46 x 100W HPS Fixtures at 10,000 KSh = 460,000 KSh

Labour & Misc. (estimated 10% of materials) = 46,000 KSH

Total Implementation Cost = 506,000 KSh

The simple payback period = 506,000 / 1338832.29= 0.38 year.

Page 44: UNIVERSITY OF NAIROBIcae.uonbi.ac.ke/sites/default/files/cae/cae/FESTUS MUEMA WAMBUA … · UNIVERSITY OF NAIROBI ... 2.5 Gas-Insulated Substations 12 2.6 Superconductors 13 2.7 ...

37

b) General Area Lighting – entrance/gate, walkways, corridors and behind building

blocks.

The implementation of the measure will result in the following annual savings:

Estimated annual electrical energy savings – 8,865 kWh/year.

Estimated demand reduction – 2.04 kVA

Total Annual Cost Savings – 171909.45 KSh/year

Estimated implementation cost - 85,250 KSh.

Payback period = 0.496 year.

Calculations of expected savings

Number of lamps to be replaced = 55

Operating hours = 12 hours per day, with an 80% assumed diversity factor.

Annual energy savings = 55• 80% • 12hrs/day • 365 days/yr• (60-14)W/1,000 = 8,865

kWh/year, 3W is added to the CFL lamp rating for the ballast power consumption)

Annual energy cost savings = 8,865 kWh/yr • 18.57 KSh/kWh = 164623.05KSh/yr

Demand reduction = 55 • 46 W • 80% /1,000 = 2.04 kVA/month

Annual Demand cost savings = 2.04 kVA/year •12 • 300 KSh/kVA = 7,286 KSh/yr

Total annual cost savings = 164,623.05 + 7,286.40 = 171909.45 KSh/yr

Implementation cost:

Cost of procurement and installation of 55 CFL lamps rated at 11W, using existing lighting

fixtures:

Materials = 55 • 1550 KSh = 85,250 KSh

Internal resources can be used for replacing lamps. Therefore no labor cost is included.

Total Implementation Cost = 85,250 KSh

The simple payback period = 85,250/ 171909.45 = 0.496 year.

c) Staff Quarters.

The implementation of the measure will result in the following annual savings:

Estimated annual electrical energy savings – 24,177.60kWh/year

Estimated monthly demand reduction – 9.94 kVA.

Total Annual Cost Savings – 484,762.03 KSh/year

Estimated implementation cost – 558,000 KSh.

Payback period = 1.15 year.

Page 45: UNIVERSITY OF NAIROBIcae.uonbi.ac.ke/sites/default/files/cae/cae/FESTUS MUEMA WAMBUA … · UNIVERSITY OF NAIROBI ... 2.5 Gas-Insulated Substations 12 2.6 Superconductors 13 2.7 ...

38

Calculations of expected savings

Number of lamps to be replaced = 360.

Average operating hours = 4 hours per day.

Annual energy savings: 360 • 4 hrs/day • 365 days/yr • (60 – 14)W/1,000 =

24,177.60kWh/year, 3W is added to the CFL lamp rating for the ballast power

consumption)

Annual energy cost savings: 24177.60 kWh/yr • 18.57KSh/kWh = 448,978.03 KSh/yr

Monthly demand savings: 360 • 46W • 60% /1,000 = 9.94 kVA/month

Annual demand cost savings: 9.94kVA/year •12 • 300 KSh/kVA = 35784 KSh/yr

Total annual cost savings = 448,978.03 + 35,784 = 484,762.03 KSh/yr

Implementation cost:

Cost of procurement and installation of 360 CFL lamps rated at 11W, using existing

lighting fixtures:

Materials = 360 No. 11W CFL lamps at 1550 KSh = 558,000 KSh

Internal resources can be used for replacing lamps. Therefore no labour cost is included.

Total Implementation Cost = 558,000 KSh

The simple payback period = 558,000 / 484,762.030 = 1.15 year.

d) Control rooms, Battery rooms and Washrooms

The implementation of the measure will result in the following annual savings:

Estimated annual electrical energy savings – 21,356.9 kWh/year

Estimated monthly demand reduction – 2.93 kVA

Total Annual Cost Savings = 407145.63 KSh/yr

Estimated implementation cost – 164,300 KSh.

Payback period = 0.4year.

Calculations of expected savings

Energy Savings (kWh) = (No. of Lamps • Operating Hours • Power Difference) / 1,000

Demand Savings (kVA) = (No. of Lamps•Power Difference•12•Diversity Factor)/1,000

Number of lamps to be replaced = 106

Operating time = 12 hours per day.

Annual energy savings = 106 • 12hrs/day • 365 days/yr • (60-14) W/1,000 = 21,356.9

kWh/year, 3W is added to the CFL lamp rating for the ballast power consumption).

Page 46: UNIVERSITY OF NAIROBIcae.uonbi.ac.ke/sites/default/files/cae/cae/FESTUS MUEMA WAMBUA … · UNIVERSITY OF NAIROBI ... 2.5 Gas-Insulated Substations 12 2.6 Superconductors 13 2.7 ...

39

Annual energy cost savings = 21356.9 kWh/yr • 18.57 KSh/kWh = 396597.63KSh/yr

Monthly demand reduction = 106 • 46W• 60% • /1,000 = 2.93kVA/month

Annual demand cost savings = 2.93kVA/month • 12 • 300 KSh/kVA = 10,548 KSh/yr

Total annual cost savings = 396597.63 + 10,548 = 407145.63 KSh/yr

Implementation cost:

Cost of procurement and installation of 106 CFL lamps rated at 11W, using existing

lighting fixtures:

Materials = 106 • 1550 KSh/lamp = 164,300 KSh.

Internal resources can be used for replacing lamps. Therefore no labor cost is included.

Total Implementation Cost = 164,300 KSh

The simple payback period = 164,300 KSh / 407145.63 KSh/yr = 0.4 year.

e) Reduction of outage switching time, hotspot correction and simulation of switching

operations.

Apart from the energy audit i.e. checking whether there were areas of energy saving

opportunities, the other major aim of this project research was to investigate whether

automating and thus reducing the outage switching time would have had any considerable

significant economic value to Kenya Power as a commercial entity.

To achieve this goal, attendance of several switching operations was done, witnessed and

participated. Figure 4.1 is of the Juja Rd 132/66 and shows the substation layout.

Both in-coming and out-going feeders, transformers, conductors, bus-bars and all other

auxiliary plant were visually inspected from within the substation, 20 metres from the

entrance and exit gantries of the substation on foot. Doing so intended to identify advanced

stages of probable causes of damage to cross-arms, hardware, and conductors.

The 132KV bay of the substation is connected in a closed ring/mesh circuit. All the

incoming transmission lines terminate in this bay via line isolators with mechanical integral

earth switches. On the 132KV bus, each line terminates in between two isolators and circuit

breakers. Apart from the breakers which are automated, all the isolators are manually

operated save for a few motorised ones which have faulty motors. If reversed and changed

to motorised operation, then a big percentage of the objective of this project would be

realised and achieved. Then we have the substation seven step-down power transformers

connected to the 132KV bay through transformer isolators. Similarly, the 66KV bay has

Page 47: UNIVERSITY OF NAIROBIcae.uonbi.ac.ke/sites/default/files/cae/cae/FESTUS MUEMA WAMBUA … · UNIVERSITY OF NAIROBI ... 2.5 Gas-Insulated Substations 12 2.6 Superconductors 13 2.7 ...

40

quite a large number of manually operated no-load disconnect switches/isolators which

compounds the problem of the whole substation outage switching.

CB 120 CB220

CB320CB420CB520CB620CB720CB820

TX1D TX1A TX1B TX1C TX2A TX2B TX2C

Isol

124

Isol

128

Isol

224 Isol

228

Isol 324

Isol 328

Isol 424Isol 428Isol 524Isol 528Isol 624Isol 628

Isol 724

Isol 728Isol824

Isol 828

Dandora-Juja line 2

Dandora-Juja line 1

Juja-Rabai line Kindaruma-Juja

UEB 1

UEB 2

271

272

171

172

371

372

471

472

671

672

572

571

113D 113A 113B 113C 213A213B

213C

CB210CCB210B

CB210ACB110CCB110BCB110ACB110D

VT

VT

CB 105

CB 205CB305

CB405CB505CB605

CB705CB805CB905

CB1105

CB1305

Ruaraka1Ruaraka2Parklands1

Parklands

2

EmcoJeevanjee1Jevanjee2N/South1N/South2N/South3Ex Athi

1204

1206

11041106

906904 804

806

704

706

604

606

504

506

404

406 304

306 204 206

104

106

101

103

201

203

301

303

401

403

501

503

601

603

701

703

801

803

901

903

1101

1103

1301

1303

Tana 1

Tana 2

CB130

134

136

266 269

169166

114D

116D

114A

116A

114B 116B

114C 116C 214A 216A214B 216B

214C

216C

246

146

1201

1203

CB1205

1003

1001

CB1005

10061004

1401

CB14051403

Reserve1

Main1 Main2

Reserve2

By Festus W am bua

Figure 4.1 Juja Rd 132 to 66KV Substation

Financial impacts

There are two notable measures to take advantage of from the foregoing, namely:

e)(a) Fitting of motors on the isolators to achieve remote control and operation and thus

achieving automation.

e)(b) Work toward reducing the many areas prone to hot spots - a source of great thermal

energy loss..

e)(a) (i) Motorisation of isolators

Implementation of this measure will result in the following savings:

Page 48: UNIVERSITY OF NAIROBIcae.uonbi.ac.ke/sites/default/files/cae/cae/FESTUS MUEMA WAMBUA … · UNIVERSITY OF NAIROBI ... 2.5 Gas-Insulated Substations 12 2.6 Superconductors 13 2.7 ...

41

Energy Savings (kWh) = (No. of feeders involved in an outage • Difference in switching

Operation Hours • Average Power in a feeder . No. of outages in a year ) / 1,000

Assumptions

1) The total switching operation time is the sum of a minimum of two switching

hours during start of outage and a minimum of two hours of power

restoration.

2) The average number of feeders affected during outage is 2 and average

feeder power is 20000kWh

3) Out of 12 months in a year, at least one outage takes place every month.

Calculations of expected savings

Number of motors to be fitted = 65.

Switching Operation hours after motorisation = 1 hour per day.

Energy Savings (kWh) = (No. of feeders involved in an outage • New switching Operation

Hours • Average Power in a feeder . No. of outages in a year ).

= 2 x 1 x 20000 x 12 = 480,000

Annual energy cost savings: 480,000 kWh/yr • 18.57KSh/kWh = 8,913,600KSh/yr

Implementation cost:

Cost of procurement and installation of 65 motors isolator structure mounted

assembly (fixture complete control gear) at 25,000.00 KSh each:

Cost of motors = 65 x kSh. 25000 = kSh. 1,625,000

Labour & Misc. (estimated 30% of materials) = 487,500 KSH

Total Implementation Cost = 2,112,500 KSh

The simple payback period = 2,112,500 / 8,913,600= 0.24 year.

e)(a)(ii) Control of thermal energy loss on the hot spots

Infrared Inspection results — knowing that nonferrous line hardware in good condition

will operate cooler than the conductor [46]. Unreliable or loose connections tend to operate

hotter and were identified by infrared inspection camera/equipment.

Page 49: UNIVERSITY OF NAIROBIcae.uonbi.ac.ke/sites/default/files/cae/cae/FESTUS MUEMA WAMBUA … · UNIVERSITY OF NAIROBI ... 2.5 Gas-Insulated Substations 12 2.6 Superconductors 13 2.7 ...

42

The following figure is a table of one of the infrared scanning report (Table 4.2) done on the

19th April, 2011 and used to undertake the outage of the 24

th April, 2011 whose switching

program is herein attached as appendix 2. From the switching program, the switching

operation to full isolation and presentation of the system ready for repair work took slightly

more than two hours. This is evidenced by the time of start of isolation and time of issuance

of the safety document (electrical permit to work) by the day‘s supervisor in charge with the

consent of the system control engineer. The document of the electrical permit to work is

attached as appendix 3. Similarly, the restoration of supply after the repair works took

almost the same duration of time. This is shown by the difference between the permit‘s

clearance time and that of cancellation.

From the report, all the areas with temperature marked in red required immediate outage

planning to avert a system reliability crisis.

Implementation of this measure will result in the following savings:

Energy Savings (kWh) = (Average No. of hot spots detected in one scan x No of scans per

month x Average Power dissipated per hot spot x No. of months per year x cost of power/

kWh x No. of hrs /day)

Calculations of expected savings

Average No. of hotspots per infrared scan = 10

Average power per hotspot = 3kWh

Average No. of scans per month = 10

Annual Energy Savings (kWh) = 10 x 10 x 3 x 12 x 18.57 x 24 = 1,604,448 KSH

Implementation cost:Approximate Cost of hotspot control per year = kSh. 1,200,000

Labour & Misc. (estimated 30% of hotspot control) = 360,000 KSH

Total Implementation Cost = 1,560,500 KSh

The simple payback period = 1,560,000 / 1,604,448 = 0.97 year.

Page 50: UNIVERSITY OF NAIROBIcae.uonbi.ac.ke/sites/default/files/cae/cae/FESTUS MUEMA WAMBUA … · UNIVERSITY OF NAIROBI ... 2.5 Gas-Insulated Substations 12 2.6 Superconductors 13 2.7 ...

43

Table No. 4.2 of the Infrared report of the 19th

May, 2011

The Kenya Power & Lighting Co. Ltd

ISO 9001:2000 QMS

Infra Red Inspection Report Sheet

LOCATION: Transmission Central

Office

Doc. No. KPLC1/7A/QMS/R-02

Issue No. 1

Revision No. 0

Date of Issue 2006-03-27

SUBJECT: Infra Red Inspection Page 43 of 70

WORK ORDER NO.

4.1 SUBSTATION NAME: Juja Rd s/s INSPECTED BY: Eric

AREAS INSPECTED:66 KV Side DATE OF INSPECTION:19/ 04/ 11

Equipment Name & No.

Description of Hotspot Position

Temperature 0C

Priority Level

Remarks

Isol 1206 Flex lug conn side of male

contact Y ф

1210c

High

Normal 26.3

Btw isol 506&116c Short flex conn clamp to

busbar B ф

1010c

Isol 404 Flex lug conn side of male

contact Y ф

1040c

Isol 503 Flex lug conn bolt Y ф

Side of male contact

Flex lug side of male contact

B ф

1500c

89.50c

CB505 Jumper conn btw CT &CB

B ф

R ф

1100c

77.70c

CB 405 Dropper Y ф 65.50c Needs to be

changed

Isol216B Male female contact

Y ф

Side of dropper

990c

CB210B Dropper conn.clamp

upperside Y ф

66.90c

Isol1003 Jumper conn clamp from the

wave trap to isol

Y ф

990c

Priority Level 1. High – Temperatures above 100

0C - Corrective action not to exceed 1 Week

2. Medium – Temperatures 50 0C to 100

0C - Corrective action not to exceed 2 Weeks

3. Low – Temperatures below 50 0C - Corrective action within a month.

Page 51: UNIVERSITY OF NAIROBIcae.uonbi.ac.ke/sites/default/files/cae/cae/FESTUS MUEMA WAMBUA … · UNIVERSITY OF NAIROBI ... 2.5 Gas-Insulated Substations 12 2.6 Superconductors 13 2.7 ...

44

4.3 Switching Automation Simulation

Computer simulation has become a useful part of modeling many natural systems in

physics, chemistry and biology[47], and human systems in economics and social science

(the computational sociology) as well as in engineering to gain insight into the operation of

those systems.

In order to simulate the switching process in this project i.e. show the automation of the

opening and closing of the circuit breakers and isolators, the Zilog Z-80 microcomputer

based software was selected to demonstrate how signals could be generated to close and

open a breaker or an isolator in circuit. Figure 4.2a is a circuit representation block diagram

while figure 4.2b is the circuit diagram of the basic structure of a Zilog microprocessor

based system.

The Zilog microcomputer contains the central processing unit (CPU), a pre-programmed

memory containing the operating system software, scratchpad memory for storing

temporary results, logic for communicating with a computer terminal, and three parallel

input/output ports for hardware control applications [48].

An example program written, assembled, compiled and tried in the simulation software for

a blinking system was as follows:

4.3.1 Test Program of a blinking output on the Z-80 microcomputer system flat-form.

LD SP, 1000H

BACK LD A,0FFH

OUT (00),A

CALL DELAY

LD A,00H

OUT (00),A

CALL DELAY

JP BACK

DELAY PUSH AF

LD DE,00FFH

LOOP DEC DE

LD A, E

OR D

JP NZ,LOOP

POP AF

RET

Page 52: UNIVERSITY OF NAIROBIcae.uonbi.ac.ke/sites/default/files/cae/cae/FESTUS MUEMA WAMBUA … · UNIVERSITY OF NAIROBI ... 2.5 Gas-Insulated Substations 12 2.6 Superconductors 13 2.7 ...

45

KEYBOARD BLOCK COMPUTER BLOCKSUBSTATION EXCUTION

BLOCKDECODER BLOCK

Figure 4.2a of the block diagram representation of the simulation process

Z80A

CPU 6116 RAM2716 EPROM 8255 PIO

RESET

CLOCK

The substation switch yard

Control Engineer

Communication cables

Substation switch yard

Perimeter fence

Figure 4.2b of the Zilog microprocessor based system used to simulate switching operations

Page 53: UNIVERSITY OF NAIROBIcae.uonbi.ac.ke/sites/default/files/cae/cae/FESTUS MUEMA WAMBUA … · UNIVERSITY OF NAIROBI ... 2.5 Gas-Insulated Substations 12 2.6 Superconductors 13 2.7 ...

46

The Zilog microcomputer contains the central processing unit (CPU), a pre-programmed

memory containing the operating system software, scratchpad memory for storing

temporary results, logic for communicating with a computer terminal, and three parallel

input/output ports for hardware control applications [48].

An example program written, assembled, compiled and tried in the simulation software for

a blinking system was as follows:

4.3.2 How the Simulation process was realized.

A representative network drawn from part of the Juja Rd substation on the 66KV bay was

here by used to demonstrate a real time network circuit. The various electrical plant

equipments were then noted and accorded unique numbers to identify and distinguish them

from one another. Figure 4.3 is the circuit used to show the process of simulation.

The network comprises of 4 power transformers, 8 circuit breakers, two bus-bars and 24

isolators or disconnect switches all interconnected to form the whole. For ease of

management of all switching operations, the circuit breakers were numbered CB1, CB2 all

through CB8. The transformers were numbered Tx1 through Tx4, the bus-bars BB1 and

BB2. Finally the isolators were assigned numbers S1 through S24. Table 4.3 indicates each

unit and its corresponding Hexadecimal code number pressed on the key board to give an

out put display number in binary form.

sW1

sW2

sW3

sW4

Tx1

Tx2

Tx3

Tx4

CB1

CB2

CB3

CB4

SW5

SW6

SW7

SW8

SW9

W

SW11

SW12

SW13

SW14

SW15

SW16

W

SW18

SW19

SW20

CB5

CB6

CB7

CB8

SW21

SW22

SW23

SW24

BB2 BB1

Figure 4.3 of part of the 66KV network comprising transformers, circuit breakers, bus-bars and isolator

switches

Page 54: UNIVERSITY OF NAIROBIcae.uonbi.ac.ke/sites/default/files/cae/cae/FESTUS MUEMA WAMBUA … · UNIVERSITY OF NAIROBI ... 2.5 Gas-Insulated Substations 12 2.6 Superconductors 13 2.7 ...

47

With this kind of information, the mighty of microprocessors was invoked to input signals

from a keyboard to control the corresponding output signals to operate the addressed

component of the circuit. This was possible by writing down the Z-80 control program to

operate the microcomputer simulation software. By so doing, the operations time of

opening and closing individual units was tremendously reduced right from the comfort of

the system control engineer‘s desk. Section4.3.3 is the program written and used to run the

simulation process.

Table 4.3 of both the Hex and Obj codes of the units number assignment

Unit identifier Keyboard Hex-code input Output display Object- code/address

Tx 1 01H 00000001

Tx 2 02H 00000010

Tx 3 03H 00000011

Tx 4 04H 00000100

CB1 05H 00000101

CB2 06H 00000110

CB3 07H 00000111

CB4 08H 00001000

CB5 09H 00001001

CB6 0AH 00001010

CB7 0BH 00001011

CB8 0CH 00001100

BB1 0DH 00001101

BB2 0EH 00001110

SW1 0FH 00001111

SW2 10H 00010000

SW3 11H 00010001

SW4 12H 00010010

SW5 13H 00010011

SW6 14H 00010100

SW7 15H 00010101

SW8 16H 00010110

SW9 17H 00010111

SW10 18H 00011000

SW11 19H 00011001

SW12 1AH 00011010

SW13 1BH 00011011

SW14 1CH 00011100

SW15 1DH 00011101

SW16 1EH 00011110

SW17 1FH 00011111

SW18 20H 00100000

SW19 21H 00100001

SW20 22H 00100010

SW21 23H 00100011

SW22 24H 00100100

SW23 25H 00100101

SW24 26H 00100110

Page 55: UNIVERSITY OF NAIROBIcae.uonbi.ac.ke/sites/default/files/cae/cae/FESTUS MUEMA WAMBUA … · UNIVERSITY OF NAIROBI ... 2.5 Gas-Insulated Substations 12 2.6 Superconductors 13 2.7 ...

48

4.3.3 Zilog Z-80 Microprocessor Final Project Program

PROG EQU 0000H

STACK EQU 1000H

WORD EQU 82H

PORTA EQU 00H

PORTB EQU 01H

PORTC EQU 02H

PORT4 EQU 03H

ORG PROG

LD SP,STACK

LD A,WORD

OUT (PORT4),A

NEXT IN A,(01H)

CALL DELAY

OUT (00),A

CALL DELAY

JP NEXT

DELAY PUSH AF

LD BC,000FH

LOOP DEC BC

LD A,C

OR B

JP NZ, LOOP

POP AF

RET

When run in the assembler, it automatically generated the machine code necessary for

running the simulation as can be seen in the simulation screen shots of figure 4.4 (a and b).

A graphic user interface keyboard facilitates the pressing of component address code as the

operator wishes.

Page 56: UNIVERSITY OF NAIROBIcae.uonbi.ac.ke/sites/default/files/cae/cae/FESTUS MUEMA WAMBUA … · UNIVERSITY OF NAIROBI ... 2.5 Gas-Insulated Substations 12 2.6 Superconductors 13 2.7 ...

49

4.3.4 Simulation Results

Appendix4 contains the drawn circuit network of the entire Juja Rd substation switchyard

and the figure 4.4 shows a screen shot of the computer simulation results on running any

written and compiled program.

Simulation Results

Fig.4.4a of the screen shots of the simulation first stage.

Next Stage of Simulation

Figure 4.4b of the computer screen shot simulation results for the next stage.

Page 57: UNIVERSITY OF NAIROBIcae.uonbi.ac.ke/sites/default/files/cae/cae/FESTUS MUEMA WAMBUA … · UNIVERSITY OF NAIROBI ... 2.5 Gas-Insulated Substations 12 2.6 Superconductors 13 2.7 ...

50

Practically in real time, switching the circuit of figure 4.3 as at the Kenya Power Juja Road

substation takes at least 2 hours to isolate a circuit for maintenance. However, after

simulation, the same process would take less than 10 minutes. In real time operation

considering signal transmission delays, the process of isolation can take at most 1 hour.

This by itself is the beauty of automation because it reduces the switching time

tremendously.

Considering the circuit diagram of figure 4.3 say a fault did occur along bus-bar1. Then the

switching program would involve the following isolation points to completely present it for

maintenance: Switches SW5, SW7, SW9, SW11, SW13, SW15, SW17 and SW19.

The switching program would then be as follows:

1) Trip CB1 and open switches SW5 and SW13 and lock off with non standard

padlock to take approximately 15 minutes to cover distance involved.

2) Close back CB1.

3) Trip CB2 and open switches SW7 and SW15 and lock off with non standard

padlock to take approximately 15 minutes to cover distance involved.

4) Close back CB2 .

5) Trip CB3 and open switches SW9 and SW17 and lock off with non standard

padlock . Similarly it takes approximately 15 minutes.

6) Close back CB3.

7) Trip CB4 and open switches SW11 and SW19 and lock off with non standard

padlock. Another 15 minutes gone.

8) Close back CB4.

9) Test whether dead/not charged.

10) If not charged, apply a set of overhead circuit main earth at the point of work.

11) Sanction for electrical permit to work according to regulations.

Practically this process in real time would take more than one hour because the units are

spread over a distance from each other and would therefore require the operator to walk and

cover quite a distance to manually open the isolators. However, with the application of the

software program, it was demonstrated that it would definitely take less than 3 minutes from

the comfort of the control engineer‘s desk when all the switchgear involved are fully

Page 58: UNIVERSITY OF NAIROBIcae.uonbi.ac.ke/sites/default/files/cae/cae/FESTUS MUEMA WAMBUA … · UNIVERSITY OF NAIROBI ... 2.5 Gas-Insulated Substations 12 2.6 Superconductors 13 2.7 ...

51

automated. The successful demonstration of the working simulation results marked the end

of this project.

In cost terms, this two hours before and after maintenance can be quantified as follows:

1) Two plus two gives a total of four (4) hours in every outage.

2) Assuming an average of five (5) outages in a month, in a year will have 60 in

number.

3) Assuming the average power evacuation by each feeder as 2 megawatt giving a total

of 22MW for the eleven feeders as listed in section 4.1.1

4) The 4 hours per outage by 60 outages translates to 240 hours in a year or 22MW by

60 outages totalling to 14400MW in a year saved and sold towards the revenue base.

5) In revenue terms 14400MW x 1000 x 18.57Ksh/KWh gives Ksh.267408000. So

basically a total of Kenya shillings 267 millions will be saved in a year by the mere

fact of automating and switching from the control engineer‘s desk. If the cost to

implement this was assumed to be 7 millions using the new SCADA system

currently under installation, then the total savings would amount to Kenya shillings

260 millions in a year.

Page 59: UNIVERSITY OF NAIROBIcae.uonbi.ac.ke/sites/default/files/cae/cae/FESTUS MUEMA WAMBUA … · UNIVERSITY OF NAIROBI ... 2.5 Gas-Insulated Substations 12 2.6 Superconductors 13 2.7 ...

52

CHAPTER FIVE

5.0 RECOMMENDATIONS

1. All substations in Kenya Power occupy large areas of land to accommodate the design

requirements of the given facility. However, each time power flows through a substation to

step down the voltage, more energy is lost as the power flows through the transformers,

switches and other equipment. The efficiency of the lower-voltage lines coming out of the

substation is also markedly lower than their high-voltage counterparts. If power can be

transmitted at higher voltage to a substation that is closer to where the energy will be

consumed, significant efficiency improvements are possible - a feature with Gas Insulated

substations.

This is what is recommended for Kenya Power in the long run to improve on Transmission

and Distribution efficiency and reduce losses.

2. With the advent of a new type of High Voltage Direct Current, invented by ABB and

dubbed HVDC Light [45], the benefits of DC transmission and distribution are now being

realized on much shorter distances. This can be highly recommended in Kenya Power

substation feeders to reduce distribution feeder losses and therefore strike a near balance

between power input and that of output.

3. It is highly recommended exploration of the use of superconducting materials for

conductors within substations to curb the notable losses through infra-red hotspots.

Superconducting materials at or near liquid nitrogen temperatures have the ability to

conduct electricity with near-zero resistance and carry three to five times the power of

conventional cables. The losses in the High Temperature Superconductor cables are also

significantly lower than the losses in conventional lines. A major vendor [49] of

superconducting conductors claims that the HTS cable losses are only half a percent (0.5%)

of the transmitted power compared to 5-8% for traditional power cables. Superconducting

materials can also be used to replace the copper windings of transformers to reduce losses

by as much as 70% compared to current designs in the power transformers within Kenya

Power.

4. It is recommended to replace the 500W halogen floodlights with 100W high pressure

sodium lamps with a similar light output. Furthermore, HPS lamps offer 10 times more

Page 60: UNIVERSITY OF NAIROBIcae.uonbi.ac.ke/sites/default/files/cae/cae/FESTUS MUEMA WAMBUA … · UNIVERSITY OF NAIROBI ... 2.5 Gas-Insulated Substations 12 2.6 Superconductors 13 2.7 ...

53

service life than the incandescent lamps. This measure will result in the same level of

illumination at lower energy consumption and cost, and much longer service life, further

reducing maintenance costs. To replace the halogen floodlights, complete HPS fixtures need

to be installed. HPS lamps produce a yellowish light colour, but these are only being

recommended for outdoor area lighting, where colour is not a major concern. However the

Company management should be aware of the colour rendition from these fixtures before

deciding whether to implement recommendation.

5. Other notable paths to improved efficiency would be

• Voltage optimization through the reactive power compensation being undertaken

• Asset replacement schedule optimization to phase out old inefficient plant and equipments

• Distribution loss reduction via distribution automation

• Load management (e.g., smart metering or price-sensitive load control)

Page 61: UNIVERSITY OF NAIROBIcae.uonbi.ac.ke/sites/default/files/cae/cae/FESTUS MUEMA WAMBUA … · UNIVERSITY OF NAIROBI ... 2.5 Gas-Insulated Substations 12 2.6 Superconductors 13 2.7 ...

54

CHAPTER SIX

6.0 CONCLUSION

Power system reliability is the field of engineering devoted to assessing the adequacy and

security of power systems. Adequacy is defined as the ability to meet the aggregate

electrical demand and energy requirements of customers at all times, taking into account

scheduled and reasonably expected unscheduled outages of system elements.

It was evident that if provisions were made to automatically incorporate, in real time, the

effects of breaker operation on system topology and decisions for switching actions made

quickly and safely, then little cost would be used to maintain the continuity and quality of

supply to consumers. The function of a power system is to supply consumers with electric

energy economically, at any time and location, observing reliability and quality standards.

The practical economic impossibility to store significant amounts of electric energy implies

that a balance between generation and load, including network losses, must be maintained at

all points in time.

Today‘s fast moving and economy-driven business environment has dictated that

companies, both private and public, cannot be competitive without closely examining

traditional design practices and taking full advantage of the tools available to help them

overcome limitations. They must make conscious efforts to make paradigm shifts and

welcome new ideas, technologies, and practices. The computer is the major tool of the

corporate world, and this project did come up with a tool that would allow the transmission

line industry Kenya Power to make a major move within the re-engineering effort.

The interactive computational software model developed would be able to switch all the

alternative switching points which are available following the occurrence of a substation

abnormality, making maximum utilisation of substation equipment.

This energy audit project was therefore used to identify cost effective ways to improve the

reliability and efficiency of transmission substations in Kenya Power.

Page 62: UNIVERSITY OF NAIROBIcae.uonbi.ac.ke/sites/default/files/cae/cae/FESTUS MUEMA WAMBUA … · UNIVERSITY OF NAIROBI ... 2.5 Gas-Insulated Substations 12 2.6 Superconductors 13 2.7 ...

55

7. PROJECT BUDGET

The following 7.1 was the initial projected budget for the project expenditure.

The total project cost was estimated at about ninety to hundred thousand Kenya shillings.

Table 7.1 of projected budget

No. Items Cost(kshs) Remarks

1 Transport expenses 10,000

2 Stationery 10,000

3 Tools 5,500

4 Instruments 15,000

5 Photocopying 5,000

6 Printing 7,500

7 Project typing and binding 8,000

8 Equipment hiring 15,000

9 Contingencies 10,000

10 Total 86,000

However, due to availability of tools and equipment within the Kenya Power, the actual

project cost scaled down to about KShs. 43,000 as indicated in table 7.2.

7.1 PROJECT COST

Table 7.2 the actual cost of doing the project.

ITEM COST IN KSHS. REMARKS

Transport expenses 12,850.00 For movement

Stationary 5,000.00

Photocopying 5,000.00

Tools and Equipment 1,200.00

Instruments 750.00

Project typing 3,000.00

Printing and binding 10,000.00

Contingencies 5,000.00

Total 42,800.00

Page 63: UNIVERSITY OF NAIROBIcae.uonbi.ac.ke/sites/default/files/cae/cae/FESTUS MUEMA WAMBUA … · UNIVERSITY OF NAIROBI ... 2.5 Gas-Insulated Substations 12 2.6 Superconductors 13 2.7 ...

56

8. APPENDICES

APPENDIX 1:- May, 2011 Kenya Power internal ISO audits schedule

This appendix contains a mail addressed to all company employees in preparation of the

scheduled annual audits.

From: Catherine Ndungu

Sent: 19 April, 2011 15:51

To: Everyone in KPLC

Subject: IQA Audit Schedule - May 2011 final

Attached please find the schedule for the May 2011 Internal Quality Audits (IQAs),

summary of the QMS requirements and a copy of the ISO 9001:2008 standard

The audits will be conducted on the dates indicated below for the different regions

9th

- 13

th May 2011 Central Office & Nairobi Region

16th

- 20th

May 2011 Coast Region

23rd

- 27th May 2011 West Region

6th

– 10th June 2011 Mt. Kenya Region

DIVISION DEPARTMENT AUDIT NO AUDITORS/TEAM NO.

MD & CEO’S OFFICE

TOP MANAGEMENT MD, CM - Fin, CM - E/T, CM – Dist, CM-PR&PM, CM – IT & T, CM – HR & A, CM – SS

& T, CM - CS, CM – Corp Communications, Company Secretary IQA/1/1/11

Henry Gichungi* Joyce Ochieng/1

Quality Management System Management Representative IQA/2/1/11

Safety, Health & Environment Head of Department & Staff IQA/3/1/11

Corporate Communication Head of section & Staff IQA/4/1/11

Security Head of Department & Staff IQA/5/1/11

Internal Audit Head of Department IQA/6/1/11

Kimtai Bett* Erick Wekesa/2

General Audit Head of section & Staff IQA/7/1/11

Financial Audit Head of section & Staff IQA/8/1/11

Supplies Audit Head of section & Staff IQA/9/1/11

Investigation Head of section & Staff IQA/10/1/11

Information System Audit Head of section & Staff IQA/11/1/11

Technical Audit Head of section & Staff IQA/12/1/11

COMPANY

SECRETARY

Insurance Heads of Section & Staff IQA/13/1/11

Legal Office Heads of Section & Staff IQA/14/1/11

Record Management Heads of Section & Staff IQA/15/1/11

Property Office Heads of Section & Staff IQA/16/1/11

Shares Office Heads of Section & Staff IQA/17/1/11

ENERGY TRANSMISSION

Energy Purchase & System Control

Head of Department IQA/18/1/11

Geoffrey Muli* Elizabeth Wanyiri/3

Page 64: UNIVERSITY OF NAIROBIcae.uonbi.ac.ke/sites/default/files/cae/cae/FESTUS MUEMA WAMBUA … · UNIVERSITY OF NAIROBI ... 2.5 Gas-Insulated Substations 12 2.6 Superconductors 13 2.7 ...

57

System control Heads of Section & Staff IQA/19/1/11

Energy purchase Heads of Section & Staff IQA/20/1/11

Technical Services Head of Department IQA/21/1/11

Electrical Plant Workshop Heads of Section & Staff IQA/22/1/11

Electrical Plant Projects Heads of Section & Staff IQA/23/1/11

Protection Heads of Section & Staff IQA/24/1/11

Transmission Head of Department IQA/25/1/11

Transmission & Network Maintenance

Heads of Section & Staff IQA/26/1/11

Aviation Services Heads of Section & Staff IQA/27/1/11

DISTRIBUTION

Operations & Maintenance Head of Department IQA/28/1/11

Wanyoike Mwaura* Dalton Langat/4

*

Design & Construction Head of Department IQA/29/1/11

Way leaves Head of section & Staff IQA/30/1/11

Drawing Office Head of section & Staff IQA/31/1/11

Survey Head of section & staff IQA/32/1/11

Central Design Head of section & staff IQA/33/1/11

Construction Head of section & staff IQA/34/1/11

Business Development Head of section & staff IQA/35/1/11

APPENDIX 2:-Switching programme used to undertake the outage of the 24th April, 2011

at Juja Rd substation by the Kenya Power staff

ETIMS 2789

Outage of Reserve BB1 at Juja Rd. S/s for Hotspot Correction on Sunday 2011-04-24 -

0800-1600 hrs

- NRCC to transfer Athi load to Embakasi.

- In charge of work – Festus Muema.

Isolation – to be done even if Athi is not yet transeferred to Embakasi

1. Confirm BC 130 closed.

2. Close isols. 206 & 304 to make double parallel.

3. Close isol. 504, open isol. 506 L/O

4. Close isol. 1004, open isol. 1006 L/O

5. Close isol. 1104, open isol. 1106 L/O

6. Close isol. 1204, open isol. 1206 L/O

7. L/O in open position isols. 406,116C,116B,606,116A,116D,706,806,116R & 906

8. Open isol.266 live condition, no load to discharge Reserve BB1.

9. Test POW, prove dead, apply CMEs appropriately.

10. Sanction issue of EPTW.

Page 65: UNIVERSITY OF NAIROBIcae.uonbi.ac.ke/sites/default/files/cae/cae/FESTUS MUEMA WAMBUA … · UNIVERSITY OF NAIROBI ... 2.5 Gas-Insulated Substations 12 2.6 Superconductors 13 2.7 ...

58

Hotspot Correction on Isolator 1206 - to be done if Athi loads ex Juja have been

transferred to Embakasi

Isolation

1. Confirm with NRCC that all Athi loads is ex Embakasi.

2. At Juja, open CB 1305, open isol.1303 L/O.

3. At Thika , transfer TR2 load to Line1 thus:

a. At Thika, close BS, open Incomer 2 OCB.

b. At Juja, open CB 1205.

c. At Thika, close isol. W212, open isol. 2W3 L/O.

d. At Thika, close Incomer 2 OCB, open BS.

4. At Juja, with CB 1205 open, open isol.1203 & 1204 L/O.

5. Test POW, prove dead, apply 2 sets of O/H CMEs either side.

6. Sanction issue of EPTW.

Restoration

Assumption - Isol.1206 also isolated and repaired

1. Clear/ Cancel EPTW ,recover all CMEs

2. Close isol. 266 to charge Reserve BB1.

3. Close isol. 1106, open isol. 1104

4. Close isol. 1006, open isol. 1004

5. Close isol. 506, open isol. 504

6. Confirm BC 130 closed, open isols. 206 & 304 to break double parallel.

7. At Juja, with CBs 1205 & 1305 open, close isols. 1206 & 1303.

8. At Juja, close CB 1305.

9. At Thika, close BS, open Incomer 2 OCB.

10. With CB 1205 open, close isol.2W3, open isol. W212

11. At Juja, close CB 1205.

12. At Thika, close Incomer 2 OCB, open BS. Confirm all okay at Thika.

13. NRCC to normalize Athi load.

Prepared by: Cyril Bett -system control engineer on 2011-04-23

Checked by: Charles Maloba- Senior system control engineer

Page 66: UNIVERSITY OF NAIROBIcae.uonbi.ac.ke/sites/default/files/cae/cae/FESTUS MUEMA WAMBUA … · UNIVERSITY OF NAIROBI ... 2.5 Gas-Insulated Substations 12 2.6 Superconductors 13 2.7 ...

59

APPENDIX3

The scanned copy of the document of the Electrical Permit to Work on the 24th April,

2011 attached as appendix3

Page 67: UNIVERSITY OF NAIROBIcae.uonbi.ac.ke/sites/default/files/cae/cae/FESTUS MUEMA WAMBUA … · UNIVERSITY OF NAIROBI ... 2.5 Gas-Insulated Substations 12 2.6 Superconductors 13 2.7 ...

60

APPENDIX 4 Overall network circuit diagram for Juja Rd substation

CB 120 CB220

CB320CB420CB520CB620CB720CB820

TX1D TX1A TX1B TX1C TX2A TX2B TX2C

Isol

124

Isol

128

Isol

224 Isol

228

Isol 324

Isol 328

Isol 424Isol 428Isol 524Isol 528Isol 624Isol 628

Isol 724

Isol 728Isol824

Isol 828

Dandora-Juja line 2

Dandora-Juja line 1

Juja-Rabai line Kindaruma-Juja

UEB 1

UEB 2

271

272

171

172

371

372

471

472

671

672

572

571

113D 113A 113B 113C 213A213B

213C

CB210CCB210B

CB210ACB110CCB110BCB110ACB110D

VT

VT

CB 105

CB 205CB305

CB405CB505CB605

CB705CB805CB905

CB1105

CB1305

Ruaraka1Ruaraka2Parklands1

Parklands

2

EmcoJeevanjee1Jevanjee2N/South1N/South2N/South3Ex Athi

1204

1206

11041106

906904 804

806

704

706

604

606

504

506

404

406 304

306 204 206

104

106

101

103

201

203

301

303

401

403

501

503

601

603

701

703

801

803

901

903

1101

1103

1301

1303

Tana 1

Tana 2

CB130

134

136

266 269

169166

114D

116D

114A

116A

114B 116B

114C 116C 214A 216A214B 216B

214C

216C

246

146

1201

1203

CB1205

1003

1001

CB1005

10061004

1401

CB14051403

Reserve1

Main1 Main2

Reserve2

Drawn by Festus

Page 68: UNIVERSITY OF NAIROBIcae.uonbi.ac.ke/sites/default/files/cae/cae/FESTUS MUEMA WAMBUA … · UNIVERSITY OF NAIROBI ... 2.5 Gas-Insulated Substations 12 2.6 Superconductors 13 2.7 ...

61

9. REFERENCES

[1] UNITED NATIONS CENTRE FOR HUMAN SETTLEMENTS (Habitat), Energy

Audit Manual for Use in the Operation of Buildings, Nairobi, Kenya, 1988

[2] Panneerselvam R., Engineering Economics, New Delhi-110001, Prentice Hall of India,

2008

[3] Retrieved from The Energy Conservation Act, 2001

[4] Mehta V.K and Mehta R. Principles of Power Systems, New Delhi: S. Chand and

Company, 2000.

[5] Retrieved from, The International Energy Agency handbook ,9, rue de la Fédération,

75739 Paris Cedex 15, France

[6] Brown R. E, Frimpong G and Willis H. L, Failure Rate Modeling Using Equipment

Inspection Data, IEEE Transactions on Power Systems, Vol. 19, No. 2, pp.782-787 May

2004

[7]

A Primer on Electric Utilities, Deregulation, and Restructuring of U.S. Electricity Markets.

United States Department of Energy Federal Energy Management Program(FEMP). 2002-05.

http://www1.eere.energy.gov/femp/pdfs/primer.pdf. Retrieved December 27, 2008.

[8] Retrieved from: http://en.wikipedia.org/wiki// Buffalo Evening News. November 10

1965

[9] Thumann, A., Handbook of Energy Audits. Fairmont Press, NJ. (1998).

[10] Dixon R. Energy Audit and Optimization for ―Arches etc.‖ Project submitted in partial

fulfilment of the requirements for the degree of Bachelor of Science in Industrial

Engineering , California Polytechnic State University, San Luis Obispo

[11] 15000 Inc. Energy audit report, 613 4th

Street, Suite 203a Santa Rosa, CA 95404 Feb

2009

[12] Retrieved from www.abb.com/industries.

[13] Electrical-engineering-portal.com/gas-insulated-substations-gis 10 Nov 2010

[14] Retrieved from www.energy.siemens.com/fi/en/.../power.../wide-area-monitoring/

[15] Naylor, J.H.: 'Trends in automation in HV and EHV substations', Electra, 52, pp. 33-

52, 1977

[16] Righezza P, Abella R., Miroux J, and Pavard M. 'Substation telecontrolled and

automated by means of standard data processing equipment'. CIGRE paper 34.01, Paris,

1976

Page 69: UNIVERSITY OF NAIROBIcae.uonbi.ac.ke/sites/default/files/cae/cae/FESTUS MUEMA WAMBUA … · UNIVERSITY OF NAIROBI ... 2.5 Gas-Insulated Substations 12 2.6 Superconductors 13 2.7 ...

62

[17] Scherer F, and Eastaugh D.J 'Automatic control and protection philosophy and its

effect on substation design'. CIGRE paper 23-11, Paris, 1976

[18] IEEE Committee Report: 'Central computer control and protection functions', IEEE

Trans., PAS-97, pp. 166-182, 1978

[19] Sasson A.M., Ehrmann S.T, Lynch R., and Van Slyck L.S.: 'Automatic power system

network topology determination', ibid, PAS-92, pp. 610-618., 1973

[20] Deliyannides J.S., and Udren E.A. Design criteria for an integrated microprocessor-

based substation protection and control system, ibid, PAS-101, pp. 1664-1672., 1982

[21] Traca D.E and Almeida A. 'Substation interlocking and sequence switching using a

digital computer', ibid, PAS-100, pp. 3002- 3007., 1981

[23] Freudenthal H (1951), The Concept and the Role of the Model in Mathematics and

Natural and Social Sciences, p. 8-9

[24] West Churchman C, The Systems Approach, New York: Dell publishing, 1968

[25] IEEE Subcommittee Report: 'Bibliography on the application of probability methods in

power system reliability evaluation', IEEE Trans., PAS-97, pp. 2235-2242, 1978,

[26] Allan R.N, Billinton R, and Lee S.H 'Bibliography on the application of probability

methods in power system reliability evaluation', ibid, PAS-103, pp. 275-282, 1984

[27] Billinton R and Allan R.N. 'Reliability Evaluation of Power Systems' Pitman Books

Ltd, London, 1984

[28] Grover M.S., and Billinton R. 'A computerised approach to substation and switching

station reliability evaluation', IEEE Trans, PAS-93, pp. 1488-1497, 1974

[29] Albrecht P.F. 'Reliability evaluation of substation bus arrangements', Can. Electr.

Assoc. Trans, 13, Pt. Ill, Paper 74-SP-152, 1974

[30] Billinton R, Allan R.N, and De Oliveira M.F. 'Reliability evaluation of electrical

systems with switching actions', Proc. IEE, 123, pp. 325-330, 1976

[31] Paulo R, Carvalho A, "An Approach towards System-Oriented Utility Automation

Systems Integration ", Proceedings Mechatronics and Robotics, IEEE, vol. 1, 247-252, 2004

[32] Rogério P and Carvalho A ―towards model-driven design of substation automation

systems‖ C I R E D 18th International Conference on Electricity Distribution‖ Turin, 6-9

June 2005

[33] Retrieved from “www.facilities.yale.edu/publications/Electrical/Switching.pdf”

[34] "Switch".The Free Dictionary. Farlex. http://www.thefreedictionary.com/switch.

Retrieved 2008-12-27.

Page 70: UNIVERSITY OF NAIROBIcae.uonbi.ac.ke/sites/default/files/cae/cae/FESTUS MUEMA WAMBUA … · UNIVERSITY OF NAIROBI ... 2.5 Gas-Insulated Substations 12 2.6 Superconductors 13 2.7 ...

63

[35] "Switch". The American Heritage Dictionary, College Edition. Houghton Mifflin. pp.

1301, 1979.

[36] Sokolowski J.A and Banks C.M ‗Principles of Modeling and Simulation’. Hoboken,

NJ: John Wiley and Sons; p. 6., 2009.

[37] Retrieved from: http://en.wikipedia.org/wiki//

[38] Fishwick P.A. ‗Simulation Model Design and Execution’, Building Digital Worlds.

Upper Saddle River, NJ: Prentice Hall. 1995

[39] IEC 61850-5 Communication requirements for functions and device models First

Edition pp. 43-48. 2003.

[40] The Kenya Power and Lighting Company Training school- Mains Training Manual

[41] Ngechu M., Understanding the research process and methods, University of Nairobi,

First Edition, 2006

[42] Power system and substation design.

Retrieved from http://www.powersystem.org/substation-design

[43] Source KPLC STIMA News

[44] John Wiley and Sons, Wayne C. Turner, Energy management handbook,

[45] The Kenya Power and Lighting Company pre-paid power user guide

[46] G. J. Clark, ―Summary Report on the Effects of High Operating Temperatures on

Conductors and Hardware Behavior,‖ Ontario Hydro Research Division, Report No. 77-

177-H, April 25, 1977.

[47] Retrieved from: http://en.wikipedia.org/wiki//

[48] John Uffenbeck, The 8080, 8085, and Z-80 Programming, Interfacing, and

Troubleshooting, Second Edition, Prentice Hall, Inc

[49] ABB Inc. Corporate Communications 501 Merritt 7 Norwalk, Connecticut 06856

www.abb.us

[50] OPNET Modeler-- OPNET Technologies. Information Available at

http://www.opnet.com .


Recommended