L1 1. GENERAL CONTRACTOR AND SUB-CONTRACTOR(S) ARE TO BID THIS PROJECT AS DESIGNED. IT IS THE CONTRACTOR'S RESPONSIBILITY TO THOROUGHLY REVIEW THE CONTRACT DOCUMENTS DURING THE BIDDING PROCESS. IF DURING THE BIDDING PROCESS THE CONTRACTOR DETERMINES A DOCUMENT INTERPRETATION OR CLARIFICATION IS REQUIRED, THEY ARE TO SUBMIT IN WRITTEN A REQUEST FOR INTERPRETATION PRIOR TO THEIR SUBMISSION OF THEIR PROPOSAL. IN THE EVENT SAID INTERPRETATIONS AND/OR CLARIFICATIONS ARE NOT SUBMITTED FOR RESOLUTION BEFORE THE AWARD OF THE CONTRACT, THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL COSTS INCURRED TO CORRECT OR ADDRESS SAID INTERPRETATIONS/CLARIFICATIONS. 2. PLANS AND SPECIFICATIONS HAVE BEEN DEVELOPED WITH THE INTENT OF MEETING OR EXCEEDING THE MINIMUM REQUIRED AND INDUSTRY STANDARDS. IN THE CASE OF AN INCONSISTENCY WITHIN THE CONTRACT DOCUMENTS, THE BETTER QUALITY OR GREATER QUANTITY OF WORK SHALL BE BID AND PROVIDED. 3. THE CONTRACTOR(S) AND ALL TRADE SUBCONTRACTORS SHALL TOUR THE JOB SITE AND CAREFULLY EXAMINE AND VERIFY ALL CONDITIONS AND UTILITY SERVICES, BOTH NEW AND EXISTING TO VERIFY THAT SAID CONDITIONS ARE AS INDICATED ON THE CONTRACT DOCUMENTS. IF SUCH CONDITIONS VARY IN ANYWAY THE CONTRACTOR(S) SHALL NOTIFY THE ARCHITECT PRIOR TO SUBMITTING HIS PROPOSAL. ANY ITEMS THAT HAVE NOT BEEN RESOLVED BY ADDENDUM PRIOR TO BID DATE SHALL BE SPECIFICALLY NOTED IN WRITING AND INCLUDED IN THE BID. IF THE CONTRACTOR FAILS TO NOTIFY THE ARCHITECT, THEY ARE PROCEEDING AT THEIR OWN RISK AND SHALL BE RESPONSIBLE FOR ALL COSTS INCURRED TO RESOLVE THE CONDITION. 4. NOTICE TO SUBCONTRACTORS, IT IS YOUR RESPONSIBILITY TO BID YOUR SCOPE OF WORK USING THE COMPLETE SET OF PLANS AND SPECIFICATIONS. THE FACT THAT AN ITEM OR A SCOPE OF WORK WAS NOT INDICATED ON YOUR PORTION OF THE DRAWINGS WILL NOT BE ACCEPTABLE AS A REASON FOR AN EXTRA CHARGE IF IT CAN BE FOUND ELSEWHERE IN THE CONTRACT DOCUMENTS. 5. THE CONTACT DOCUMENTS ARE PROVIDED FOR THE PURPOSE OF INDICATING PROPOSED EQUIPMENT LOCATIONS, SIZES, UTILITY REQUIREMENTS AND RELATIVE POSITIONS TO ADJACENT EQUIPMENT AND BUILDING CONDITIONS FOR EITHER ALL NEW OR A COMBINATION OF NEW AND EXISTING EQUIPMENT AS INDICATED ON THE DRAWINGS. IT IS NOT THE INTENT OF THESE PLANS TO RELIEVE THE CONTRACTOR, SUBCONTRACTORS AND ALL OTHER TRADES INVOLVED OF THE RESPONSIBILITY OF VERIFYING AND COORDINATING ALL CONDITIONS, BUILDING ELEMENTS, AND EQUIPMENT, BOTH NEW AND EXISTING WITH THE CONTRACT DOCUMENTS AND ON-SITE CONDITIONS. 6. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO ENSURE THAT ALL TRADE SUBCONTRACTORS RECEIVE COPIES OF ALL ADDENDA OR CHANGES TO THE CONTRACT DOCUMENTS. 7. ALL PROPOSALS SHALL TAKE INTO CONSIDERATION ALL SITE AND CONSTRUCTION CONDITIONS AFFECTING WORK UNDER THIS CONTRACT. 8. CONTRACTOR(S) TO COORDINATE STAGING AREAS. 9. COORDINATE STRUCTURAL, MECHANICAL, PLUMBING, FIRE SPRINKLERS, KITCHEN, AND ELECTRICAL DIVISIONS WITH OTHER TRADES AFFECTING OR AFFECTED BY SAME. 10. CONTRACTOR SHALL BE RESPONSIBLE FOR CONSTRUCTING THE PROJECT IN ACCORDANCE WITH ALL PROVISIONS OF APPLICABLE CODES AND ORDINANCES. WORKMANSHIP AND MATERIALS TO BE OF THE HIGHEST INDUSTRY STANDARDS. 11. CHANGES IN MATERIALS, DETAILS, SPECIFICATIONS, GENERAL NOTES AND SCHEDULES, OR DELETION OF & REQUIREMENT SHOWN ON THESE PLANS WILL NOT BE ACCEPTABLE WITHOUT FIRST OBTAINING PERMISSION FROM THE ARCHITECT AND CLIENT. TO OBTAIN PERMISSION THE CONTRACTOR SHALL PROVIDE PRICING, RELEVANT DRAWINGS, AND DOCUMENTS. 12. CONTRACTOR SHALL REPLACE AND/OR RESTORE ALL MATERIALS STORED OR INSTALLED ON THE SITE LEFT SUBJECT TO DAMAGE OR THEFT. 13. PROVIDE FIRST AID AND FIRE PROTECTION AS REQUIRED BY OSHA. 14. UNLESS OTHERWISE INDICATED THE CONTRACTOR SHALL PROVIDE AND PAY FOR LABOR, MATERIALS, EQUIPMENT, TOOLS, CONSTRUCTION EQUIPMENT AND MACHINERY, TRANSPORTATION, EQUIPMENT TO ACCEPT DELIVERIES, AND OTHER FACILITIES AND SERVICES NECESSARY FOR PROPER EXECUTION AND COMPLETION OF THE WORK. 15. THE CONTRACTOR SHALL PROVIDE AND PAY FOR ALL COST FOR TEMPORARY PARTITIONS, FACILITIES, AND SERVICES REQUIRED FOR THE PROPER AND EXPEDITIOUS EXECUTION OF THE CONTRACT WORK. MAKE ALL TEMPORARY CONNECTIONS TO EXISTING UTILITIES IN LOCATIONS ACCEPTABLE TO THE OWNER AND LOCAL AUTHORITIES HAVING JURISDICTION THEREOF. PAY ALL COSTS FOR TEMPORARY ELECTRICAL POWER, WATER, SANITARY FACILITIES AND/OR HEATING. 16. THE CONTRACTOR, PROMPTLY AFTER BEING AWARDED THE CONTRACT, SHALL SUBMIT A CONTRACTOR'S CONSTRUCTION SCHEDULE FOR THE WORK. THE SCHEDULE SHALL NOT EXCEED TIME LIMITS INDICATED UNDER THE CONTACTOR DOCUMENTS. THE CONTRACTOR SHALL ADVISE VIA THE CONSTRUCTION SCHEDULE ANY MILESTONE OR CRITICAL DATES AND, IF APPLICABLE, CRITICAL DATES FOR RELATED WORK BY OWNER, BY OTHER CONTRACTORS, OR BY UTILITY COMPANIES OR OTHER AGENCIES. CONTRACTOR TO COORDINATE EQUIPMENT AND/OR FURNITURE INSTALLATION WITH CONSTRUCTION SEQUENCING AND ACCESS. 17. THE CONTRACTOR SHALL PROVIDE SUBMITTALS WHICH INCLUDE SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES FOR MATERIALS, EQUIPMENT, FINISHES, ETC. WHICH ARE INDICATED IN THE CONTRACT DOCUMENTS. PRIOR TO THE SUBMITTING TO THE ARCHITECT, THE CONTRACTOR SHALL REVIEW AND APPROVE ALL SUBMITTALS BY AFFIXING THEIR CONTRACTOR'S STAMP TO SAID SUBMITTALS. THE CONTACTOR SHALL PERFORM NO PORTION OF THE WORK UNTIL THE RESPECTIVE SUBMITTAL PROCESS IS COMPLETE. BY THE CONTRACTOR'S ISSUANCE OF THE SUBMITTALS, THE CONTRACTOR REPRESENTS THEY HAVE DETERMINED AND VERIFIED MATERIALS, FIELD MEASUREMENTS AND ANY RELATED FIELD CONSTRUCTION CRITERIA, OR WILL DO SO, AND HAS CHECKED THE INFORMATION CONTAINED WITHIN THE SUBMITTALS WITH THE REQUIREMENTS OF THE CONTRACT DOCUMENTS. THE ARCHITECT'S REVIEW OF THE SUBMITTAL IS ONLY FOR CONFORMANCE WITH THE DESIGN CONCEPT OF THE PROJECT AND COMPLIANCE WITH THE INFORMATION GIVEN IN THE CONTRACT DOCUMENTS. THE CONTRACTOR SHALL NOT BE RELIEVED OF RESPONSIBILITIES FOR DEVIATIONS, ERRORS, AND/OR OMISSIONS IN THE SUBMITTALS WHICH HAS BEEN REVIEWED AND RETURNED BY THE ARCHITECT. 18. SUBSTANTIAL COMPLETION IS THE STAGE IN THE WORK WHEN THE WORK OR DESIGNATED PORTION THEREOF IS SUFFICIENTLY COMPLETE SO THE OWNER CAN OCCUPY OR UTILIZE THE WORK FOR ITS INTENDED USE. WHEN THE CONTRACTOR CONSIDERS THE WORK, OR PORTION THEREOF WHICH THE OWNER AGREES TO ACCEPT SEPARATELY, IS SUBSTANTIALLY COMPLETE, THE CONTRACTOR SHALL OBTAIN A CERTIFICATE OF OCCUPANCY & CERTIFICATES OF INSPECTION AND OTHER INSPECTIONS AND OR DOCUMENTS REQUIRED BY AUTHORITIES HAVING JURISDICTION AND PREPARE/SUBMIT TO THE ARCHITECT A COMPREHENSIVE LIST OF ITEMS TO BE COMPLETED OR CORRECTED. 19. UPON ACCEPTANCE OF SUBSTANTIAL COMPLETION, THE CONTRACTOR SHALL PROVIDE THE FOLLOWING PROJECT CLOSEOUT DOCUMENTS: a. A COMPLETE SET OF AS-BUILT DRAWING THAT REFLECT ANY CHANGES TO THE ORIGINAL DRAWINGS AND FINISH/MATERIAL SPECIFICATIONS INCLUDING ADDENDA ITEMS AND CHANGE ORDER MODIFICATIONS. CONTRACTOR TO PROVIDE AN ELECTRONIC SCANNED COPY AND PAPER COPY OF THE AS-BUILTS. b. A HARDBACK BINDER WHICH IS INDEXED, LABELED, AND DIVIDERS FOR WHICH INCLUDES COPIES OF PERMITS, AGENCY OR INSPECTION APPROVALS, THE CERTIFICATE OF OCCUPANCY, A LIST OF SUB-CONTRACTOR AND THEIR PHONE NUMBERS, REVIEWED SHOP DRAWINGS, ALL WARRANTIES, AND OPERATING AND MAINTENANCE MANUALS. PROVIDE PAINT COLORS AND FORMULAS OF ALL PAINTS. c. RELEASE OF LIENS AND ENCUMBRANCES OR ALTERNATE EVIDENCES. d. FINAL STATEMENT OF ACCOUNTING WHICH REFLECTS ANY ADJUSTMENTS TO THE CONTRACT SUM. 20. THE CONTRACTOR WARRANTS FOR A PERIOD OF ONE YEAR AFTER THE DATE OF SUBSTANTIAL COMPLETION OR THE ISSUANCE OF THE CERTIFICATE OF OCCUPANCY THAT WORK, MATERIALS, AND EQUIPMENT PROVIDED UNDER THE CONTRACT WILL BE FREE FROM DEFECTS. WORK, MATERIALS, AND EQUIPMENT FOUND TO BE DEFECTIVE SHALL BE CORRECTED PROMPTLY BY THE CONTRACTOR. THE CONTRACTOR'S WARRANTY EXCLUDES REMEDY FOR DAMAGE OR DEFECT CAUSED BY ABUSE AND/OR MODIFICATIONS NOT EXECUTED BY THE CONTRACTOR, IMPROPER MAINTENANCE, IMPROPER OPERATION, OR NORMAL WEAR AND TEAR. THE CONTRACTOR SHALL, IN ADDITION, FURNISH AND FULFILL ALL SPECIAL/SPECIFIC WARRANTIES REQUIRED ELSEWHERE BY THE CONTRACT DRAWINGS AND SPECIFICATIONS. 21. THE CONTRACTOR SHALL PROVIDE OWNER TRAINING FOR ALL SPECIALIZED EQUIPMENT REVIEWING EMERGENCY PROVISIONS AND PROPER USE OF CONTROL SYSTEMS, OPERATIONS, AND REQUIRED MAINTENANCE. 22. PRIOR TO SUBSTANTIAL COMPLETION THE CONTRACTOR SHALL REMOVE ALL TEMPORARY PROTECTION, DISPOSE OF REMAINING DEBRIS AND HIRE A PROFESSIONAL CLEANING COMPANY TO FULLY SANITIZE AND CLEAN ALL SCOPE AREAS LEAVING THE PROJECT READY FOR OCCUPANCY. 23. AT CONCLUSION OF PROJECT PROVIDE 10% OF ALL FINISH MATERIALS AS ATTIC STOCK AND DELIVER TO THE OWNER. 24. IF CONTRACTOR WISHES TO MAKE A CLAIM FOR AN INCREASE IN COST AND/OR TIME, THE CONTACTOR SHALL SUBMIT A CHANGE ORDER REQUEST (COR). FOR ANY CONTACTOR CLAIM REQUESTING ADDITIONAL COST, THE COR SHALL BE ACCOMPANIED BY A COMPLETE ITEMIZATION OF COSTS INCLUDING LABOR, MATERIALS, EQUIPMENT AND/OR SUBCONTRACTS. THE ALLOWANCE FOR THE COMBINED OVERHEAD AND PROFIT (O&P) INCLUDED IN THE TOTAL COST FOR WORK PERFORMED BY THE CONTRACTOR'S OWN FORCES SHALL BE 15%. FOR WORK PERFORMED BY A SUBCONTRACTOR, THE SUBCONTRACTOR IS PERMITTED A COMBINED 15% O&P AND THE CONTRACTOR IS PERMITTED 5% OF THE AMOUNT DUE THE SUBCONTRACTOR. 25. BEFORE THE FIRST APPLICATION FOR PAYMENT, THE CONTRACTOR SHALL SUBMIT A SCHEDULE OF VALUES ALLOCATED TO VARIOUS PORTIONS OF THE WORK WITHIN TEN DAYS AFTER AWARD OF CONTRACT. LIST INSTALLED VALUE, MATERIAL AND LABOR, OF EACH MAJOR ITEM OF WORK AND EACH SUBCONTRACTED ITEM OF WORK AS A SEPARATE LINE ITEMS. THIS SCHEDULE, UNLESS OBJECTED BY THE ARCHITECT, SHALL BE USED AS A BASIS FOR REVIEWING THE CONTRACTOR'S APPLICATION FOR PAYMENT. GENERAL PROJECT NOTES: Drawing Index Cover Sheet Architectural Mechanical DATE Issued for - CVR Cover Sheet MD-1 Mechanical Demolition Plan Abbreviations COL. & AND ANGLE @ AT CENTERLINE DIAMETER # POUND OR NUMBER ACP. ACOUSTICAL CEILING PANEL ADJUSTABLE ADJ. A.F.F. ABOVE FINISH FLOOR ALUMINUM AL. ARCH. ARCHITECTURAL BD. BOARD BLDG. BUILDING BLK. BLOCK BLOCKING BLKG. BM. BEAM BOTTOM BOT. CAB. CABINET CERAMIC CER. CLG. CEILING CAULKING CLKG. CLR. CLEAR CONCRETE MASONRY UNIT CMU. COLUMN CONCRETE CONC. CONT. CONTINUOUS CARPET CPT. CERAMIC TILE CT DOUBLE DBL. DIA. DIAMETER DIMENSION DIM. DN. DOWN DOOR DR. DETAIL DTL. DWG. DRAWING EAST E EXIST. EXISTING ELECTRICAL PANELBOARD E.P. EA. ELECTRICAL CONTRACTOR E.C. ELEVATION EL. ELEC. ELECTRICAL EMERGENCY EMER. EQ. EQUAL F.E. FIRE EXTINGUISHER EACH PLASTIC LAMINATE P. LAM. OPNG. OPENING CONTRACTOR INSTALLED O.F.C.I. OWNER FURNISHED NOM. NOMINAL NUMBER NO. N.T.S. NOT TO SCALE NOT IN CONTRACT N.I.C. NORTH MTL. METAL GYPSUM WALLBOARD MOISTURE RESISTANT MRB MISC MISCELLANEOUS MINIMUM MIN. MFR. MANUFACTURER MECHANICAL MECH. MAX. MAXIMUM LIGHT LT. LAMINATE LAM JT. JOINT INSULATION INSUL. HEATING, VENTILATION, AND AIR CONDITIONING HVAC HR. HOUR HT. HEIGHT HORIZONTAL HORIZ. H.M. HOLLOW METAL GYPSUM WALL BOARD GWB GYP. GYPSUM GLASS GL. GENERAL CONTRACTOR G.C. GAUGE G.A. FRT. FIRE TREATED FL. FLOOR FINISH FIN. F.S. FLOOR SINK FACE OF FINISH F.O.F. F.O. FACE OF WT. WEIGHT WD. WOOD WATER RESISTANT WR W/O WITHOUT WALL COVERING WC WITH W/ WEST W. VERIFY IN FIELD V.I.F. VERT. VERTICAL VINYL WALL COVERING VWC VCT VINYL COMPOSITION TILE VCB VINYL COVE BASE UNLESS OTHERWISE NOTED U.O.N. TYPICAL TYP. THK. THICK TELEPHONE TEL. T.O. TOP OF TO BE DETERMINED TBD. SUSPENDED SUSP. STOR. STORAGE STEEL STL. STD. STANDARD SQ. SQUARE SPECIFICATION SPEC. SIM. SIMILAR SHEET SHT. SCT. SUSPENDED CEILING TILE SCHEDULE SCHED. STAINLESS STEEL S.S. SOUTH S. ROOM RM. REQUIRED REQ'D REGISTER RGTR. REF. REFERENCE RADIUS RAD. QUARRY TILE QT. PTD. PAINTED POINT, PAINT PT. PLYWD. PLYWOOD N. C L DIA. P.C. PLUMBING CONTRACTOR OPPOSITE HAND O.H. OPPOSITE OPP. FT. FEET / FOOT EXPANSION JOINT EJ. Xcelerated Concepts LLC 2019 Project Site: UNIVERSITY SOUTH CAROLINA UPSTATE HORACE C. SMITH SCIENCE BUILDING 160 GRAMLING DRIVE SPARTANBURG, SC 29303 Overall Building Plan: HORACE C. SMITH SCIENCE BUILDING UNIVERSITY OF SOUTH CAROLINA UPSTATE KITCHEN EXHAUST HOOD INSTALLATION AT THE HORACE C. SMITH SCIENCE BUILDING'S RETAIL FOOD COURT (WOW) 160 GRAMLING DRIVE, SPARTANBURG, SC 29303 AUGUST 9th, 2019 - ISSUED FOR BID LOCATION OF WORK AREA M-1 M-2 Mechanical Renovation Plan Hood General Notes, Schedules & Diagram Electrical Engineer: Land Engineering Associates, LLC 262 Sandhurst Road, Suite 101 Columbia, SC 29210 803-528-1437 Foodservice & Interior Design: Xcelerated Concepts 325 Mill Street, Suite 101 Danville, PA 17821 570-275-6130 Client: University of South Carolina Upstate 800 University Way Spartanburg, SC 29303 Project Management: Xcelerated Concepts 325 Mill Street, Suite 101 Danville, PA 17821 Phone: 570-275-6130 Mechanical Engineer: Swyegrt & Associates, LTD 1315 State Street Cayce, SC 29033 803-791-9300 KH-1 Architectural Plans and Elevation M-3 Exhaust Hood M-4 Exhaust Hood M-5 Exhaust Hood Electrical E-1 General Notes, Legend, Details, and Schedules E-2 Electrical Renovation Plan E-1 Lighting & Fire Alarm Renovation Plan
Transcript
Page 1: UNIVERSITY OF SOUTH CAROLINA UPSTATE KITCHEN EXHAUST …purchasing.sc.edu/solicitations/2019 0809 Bid Smith Hood.pdf · mechanical dateissued for - cvrcover sheet md-1mechanical demolition

L1

1. GENERAL CONTRACTOR AND SUB-CONTRACTOR(S) ARE TO BID THIS PROJECTAS DESIGNED. IT IS THE CONTRACTOR'S RESPONSIBILITY TO THOROUGHLYREVIEW THE CONTRACT DOCUMENTS DURING THE BIDDING PROCESS. IFDURING THE BIDDING PROCESS THE CONTRACTOR DETERMINES A DOCUMENTINTERPRETATION OR CLARIFICATION IS REQUIRED, THEY ARE TO SUBMIT INWRITTEN A REQUEST FOR INTERPRETATION PRIOR TO THEIR SUBMISSION OFTHEIR PROPOSAL. IN THE EVENT SAID INTERPRETATIONS AND/ORCLARIFICATIONS ARE NOT SUBMITTED FOR RESOLUTION BEFORE THE AWARDOF THE CONTRACT, THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL COSTSINCURRED TO CORRECT OR ADDRESS SAID INTERPRETATIONS/CLARIFICATIONS.

2. PLANS AND SPECIFICATIONS HAVE BEEN DEVELOPED WITH THE INTENT OFMEETING OR EXCEEDING THE MINIMUM REQUIRED AND INDUSTRY STANDARDS.IN THE CASE OF AN INCONSISTENCY WITHIN THE CONTRACT DOCUMENTS,THE BETTER QUALITY OR GREATER QUANTITY OF WORK SHALL BE BID ANDPROVIDED.

3. THE CONTRACTOR(S) AND ALL TRADE SUBCONTRACTORS SHALL TOUR THEJOB SITE AND CAREFULLY EXAMINE AND VERIFY ALL CONDITIONS AND UTILITYSERVICES, BOTH NEW AND EXISTING TO VERIFY THAT SAID CONDITIONS AREAS INDICATED ON THE CONTRACT DOCUMENTS. IF SUCH CONDITIONS VARYIN ANYWAY THE CONTRACTOR(S) SHALL NOTIFY THE ARCHITECT PRIOR TOSUBMITTING HIS PROPOSAL. ANY ITEMS THAT HAVE NOT BEEN RESOLVED BYADDENDUM PRIOR TO BID DATE SHALL BE SPECIFICALLY NOTED IN WRITINGAND INCLUDED IN THE BID. IF THE CONTRACTOR FAILS TO NOTIFY THEARCHITECT, THEY ARE PROCEEDING AT THEIR OWN RISK AND SHALL BERESPONSIBLE FOR ALL COSTS INCURRED TO RESOLVE THE CONDITION.

4. NOTICE TO SUBCONTRACTORS, IT IS YOUR RESPONSIBILITY TO BID YOURSCOPE OF WORK USING THE COMPLETE SET OF PLANS AND SPECIFICATIONS.THE FACT THAT AN ITEM OR A SCOPE OF WORK WAS NOT INDICATED ONYOUR PORTION OF THE DRAWINGS WILL NOT BE ACCEPTABLE AS A REASONFOR AN EXTRA CHARGE IF IT CAN BE FOUND ELSEWHERE IN THE CONTRACTDOCUMENTS.

5. THE CONTACT DOCUMENTS ARE PROVIDED FOR THE PURPOSE OF INDICATINGPROPOSED EQUIPMENT LOCATIONS, SIZES, UTILITY REQUIREMENTS ANDRELATIVE POSITIONS TO ADJACENT EQUIPMENT AND BUILDING CONDITIONSFOR EITHER ALL NEW OR A COMBINATION OF NEW AND EXISTING EQUIPMENTAS INDICATED ON THE DRAWINGS. IT IS NOT THE INTENT OF THESE PLANS TORELIEVE THE CONTRACTOR, SUBCONTRACTORS AND ALL OTHER TRADESINVOLVED OF THE RESPONSIBILITY OF VERIFYING AND COORDINATING ALLCONDITIONS, BUILDING ELEMENTS, AND EQUIPMENT, BOTH NEW ANDEXISTING WITH THE CONTRACT DOCUMENTS AND ON-SITE CONDITIONS.

6. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO ENSURE THAT ALLTRADE SUBCONTRACTORS RECEIVE COPIES OF ALL ADDENDA OR CHANGES TOTHE CONTRACT DOCUMENTS.

7. ALL PROPOSALS SHALL TAKE INTO CONSIDERATION ALL SITE ANDCONSTRUCTION CONDITIONS AFFECTING WORK UNDER THIS CONTRACT.

8. CONTRACTOR(S) TO COORDINATE STAGING AREAS.9. COORDINATE STRUCTURAL, MECHANICAL, PLUMBING, FIRE SPRINKLERS,

KITCHEN, AND ELECTRICAL DIVISIONS WITH OTHER TRADES AFFECTING ORAFFECTED BY SAME.

10. CONTRACTOR SHALL BE RESPONSIBLE FOR CONSTRUCTING THE PROJECT INACCORDANCE WITH ALL PROVISIONS OF APPLICABLE CODES ANDORDINANCES. WORKMANSHIP AND MATERIALS TO BE OF THE HIGHESTINDUSTRY STANDARDS.

11. CHANGES IN MATERIALS, DETAILS, SPECIFICATIONS, GENERAL NOTES ANDSCHEDULES, OR DELETION OF & REQUIREMENT SHOWN ON THESE PLANS WILLNOT BE ACCEPTABLE WITHOUT FIRST OBTAINING PERMISSION FROM THEARCHITECT AND CLIENT. TO OBTAIN PERMISSION THE CONTRACTOR SHALLPROVIDE PRICING, RELEVANT DRAWINGS, AND DOCUMENTS.

12. CONTRACTOR SHALL REPLACE AND/OR RESTORE ALL MATERIALS STORED ORINSTALLED ON THE SITE LEFT SUBJECT TO DAMAGE OR THEFT.

13. PROVIDE FIRST AID AND FIRE PROTECTION AS REQUIRED BY OSHA.14. UNLESS OTHERWISE INDICATED THE CONTRACTOR SHALL PROVIDE AND PAY

FOR LABOR, MATERIALS, EQUIPMENT, TOOLS, CONSTRUCTION EQUIPMENT ANDMACHINERY, TRANSPORTATION, EQUIPMENT TO ACCEPT DELIVERIES, ANDOTHER FACILITIES AND SERVICES NECESSARY FOR PROPER EXECUTION ANDCOMPLETION OF THE WORK.

15. THE CONTRACTOR SHALL PROVIDE AND PAY FOR ALL COST FOR TEMPORARYPARTITIONS, FACILITIES, AND SERVICES REQUIRED FOR THE PROPER ANDEXPEDITIOUS EXECUTION OF THE CONTRACT WORK. MAKE ALL TEMPORARYCONNECTIONS TO EXISTING UTILITIES IN LOCATIONS ACCEPTABLE TO THEOWNER AND LOCAL AUTHORITIES HAVING JURISDICTION THEREOF. PAY ALLCOSTS FOR TEMPORARY ELECTRICAL POWER, WATER, SANITARY FACILITIESAND/OR HEATING.

16. THE CONTRACTOR, PROMPTLY AFTER BEING AWARDED THE CONTRACT,SHALL SUBMIT A CONTRACTOR'S CONSTRUCTION SCHEDULE FOR THE WORK.THE SCHEDULE SHALL NOT EXCEED TIME LIMITS INDICATED UNDER THECONTACTOR DOCUMENTS. THE CONTRACTOR SHALL ADVISE VIA THECONSTRUCTION SCHEDULE ANY MILESTONE OR CRITICAL DATES AND, IFAPPLICABLE, CRITICAL DATES FOR RELATED WORK BY OWNER, BY OTHERCONTRACTORS, OR BY UTILITY COMPANIES OR OTHER AGENCIES.CONTRACTOR TO COORDINATE EQUIPMENT AND/OR FURNITUREINSTALLATION WITH CONSTRUCTION SEQUENCING AND ACCESS.

17. THE CONTRACTOR SHALL PROVIDE SUBMITTALS WHICH INCLUDE SHOPDRAWINGS, PRODUCT DATA, AND SAMPLES FOR MATERIALS, EQUIPMENT,FINISHES, ETC. WHICH ARE INDICATED IN THE CONTRACT DOCUMENTS. PRIORTO THE SUBMITTING TO THE ARCHITECT, THE CONTRACTOR SHALL REVIEWAND APPROVE ALL SUBMITTALS BY AFFIXING THEIR CONTRACTOR'S STAMP TOSAID SUBMITTALS. THE CONTACTOR SHALL PERFORM NO PORTION OF THEWORK UNTIL THE RESPECTIVE SUBMITTAL PROCESS IS COMPLETE. BY THECONTRACTOR'S ISSUANCE OF THE SUBMITTALS, THE CONTRACTORREPRESENTS THEY HAVE DETERMINED AND VERIFIED MATERIALS, FIELDMEASUREMENTS AND ANY RELATED FIELD CONSTRUCTION CRITERIA, OR WILLDO SO, AND HAS CHECKED THE INFORMATION CONTAINED WITHIN THESUBMITTALS WITH THE REQUIREMENTS OF THE CONTRACT DOCUMENTS. THEARCHITECT'S REVIEW OF THE SUBMITTAL IS ONLY FOR CONFORMANCE WITHTHE DESIGN CONCEPT OF THE PROJECT AND COMPLIANCE WITH THEINFORMATION GIVEN IN THE CONTRACT DOCUMENTS. THE CONTRACTORSHALL NOT BE RELIEVED OF RESPONSIBILITIES FOR DEVIATIONS, ERRORS,AND/OR OMISSIONS IN THE SUBMITTALS WHICH HAS BEEN REVIEWED ANDRETURNED BY THE ARCHITECT.

18. SUBSTANTIAL COMPLETION IS THE STAGE IN THE WORK WHEN THE WORK ORDESIGNATED PORTION THEREOF IS SUFFICIENTLY COMPLETE SO THE OWNERCAN OCCUPY OR UTILIZE THE WORK FOR ITS INTENDED USE. WHEN THECONTRACTOR CONSIDERS THE WORK, OR PORTION THEREOF WHICH THEOWNER AGREES TO ACCEPT SEPARATELY, IS SUBSTANTIALLY COMPLETE, THECONTRACTOR SHALL OBTAIN A CERTIFICATE OF OCCUPANCY & CERTIFICATESOF INSPECTION AND OTHER INSPECTIONS AND OR DOCUMENTS REQUIRED BYAUTHORITIES HAVING JURISDICTION AND PREPARE/SUBMIT TO THE ARCHITECTA COMPREHENSIVE LIST OF ITEMS TO BE COMPLETED OR CORRECTED.

19. UPON ACCEPTANCE OF SUBSTANTIAL COMPLETION, THE CONTRACTOR SHALLPROVIDE THE FOLLOWING PROJECT CLOSEOUT DOCUMENTS:a. A COMPLETE SET OF AS-BUILT DRAWING THAT REFLECT ANY CHANGES TO

THE ORIGINAL DRAWINGS AND FINISH/MATERIAL SPECIFICATIONSINCLUDING ADDENDA ITEMS AND CHANGE ORDER MODIFICATIONS.CONTRACTOR TO PROVIDE AN ELECTRONIC SCANNED COPY AND PAPERCOPY OF THE AS-BUILTS.

b. A HARDBACK BINDER WHICH IS INDEXED, LABELED, AND DIVIDERS FORWHICH INCLUDES COPIES OF PERMITS, AGENCY OR INSPECTION APPROVALS,THE CERTIFICATE OF OCCUPANCY, A LIST OF SUB-CONTRACTOR AND THEIRPHONE NUMBERS, REVIEWED SHOP DRAWINGS, ALL WARRANTIES, ANDOPERATING AND MAINTENANCE MANUALS. PROVIDE PAINT COLORS ANDFORMULAS OF ALL PAINTS.

c. RELEASE OF LIENS AND ENCUMBRANCES OR ALTERNATE EVIDENCES.d. FINAL STATEMENT OF ACCOUNTING WHICH REFLECTS ANY ADJUSTMENTS

TO THE CONTRACT SUM.20. THE CONTRACTOR WARRANTS FOR A PERIOD OF ONE YEAR AFTER THE DATE

OF SUBSTANTIAL COMPLETION OR THE ISSUANCE OF THE CERTIFICATE OFOCCUPANCY THAT WORK, MATERIALS, AND EQUIPMENT PROVIDED UNDERTHE CONTRACT WILL BE FREE FROM DEFECTS. WORK, MATERIALS, ANDEQUIPMENT FOUND TO BE DEFECTIVE SHALL BE CORRECTED PROMPTLY BY THECONTRACTOR. THE CONTRACTOR'S WARRANTY EXCLUDES REMEDY FORDAMAGE OR DEFECT CAUSED BY ABUSE AND/OR MODIFICATIONS NOTEXECUTED BY THE CONTRACTOR, IMPROPER MAINTENANCE, IMPROPEROPERATION, OR NORMAL WEAR AND TEAR. THE CONTRACTOR SHALL, INADDITION, FURNISH AND FULFILL ALL SPECIAL/SPECIFIC WARRANTIES REQUIREDELSEWHERE BY THE CONTRACT DRAWINGS AND SPECIFICATIONS.

21. THE CONTRACTOR SHALL PROVIDE OWNER TRAINING FOR ALL SPECIALIZEDEQUIPMENT REVIEWING EMERGENCY PROVISIONS AND PROPER USE OFCONTROL SYSTEMS, OPERATIONS, AND REQUIRED MAINTENANCE.

22.PRIOR TO SUBSTANTIAL COMPLETION THE CONTRACTOR SHALL REMOVE ALLTEMPORARY PROTECTION, DISPOSE OF REMAINING DEBRIS AND HIRE APROFESSIONAL CLEANING COMPANY TO FULLY SANITIZE AND CLEAN ALLSCOPE AREAS LEAVING THE PROJECT READY FOR OCCUPANCY.

23. AT CONCLUSION OF PROJECT PROVIDE 10% OF ALL FINISH MATERIALS AS ATTICSTOCK AND DELIVER TO THE OWNER.

24. IF CONTRACTOR WISHES TO MAKE A CLAIM FOR AN INCREASE IN COSTAND/OR TIME, THE CONTACTOR SHALL SUBMIT A CHANGE ORDER REQUEST(COR). FOR ANY CONTACTOR CLAIM REQUESTING ADDITIONAL COST, THECOR SHALL BE ACCOMPANIED BY A COMPLETE ITEMIZATION OF COSTSINCLUDING LABOR, MATERIALS, EQUIPMENT AND/OR SUBCONTRACTS. THEALLOWANCE FOR THE COMBINED OVERHEAD AND PROFIT (O&P) INCLUDED INTHE TOTAL COST FOR WORK PERFORMED BY THE CONTRACTOR'S OWNFORCES SHALL BE 15%. FOR WORK PERFORMED BY A SUBCONTRACTOR, THESUBCONTRACTOR IS PERMITTED A COMBINED 15% O&P AND THECONTRACTOR IS PERMITTED 5% OF THE AMOUNT DUE THE SUBCONTRACTOR.

25.BEFORE THE FIRST APPLICATION FOR PAYMENT, THE CONTRACTOR SHALLSUBMIT A SCHEDULE OF VALUES ALLOCATED TO VARIOUS PORTIONS OF THEWORK WITHIN TEN DAYS AFTER AWARD OF CONTRACT. LIST INSTALLEDVALUE, MATERIAL AND LABOR, OF EACH MAJOR ITEM OF WORK AND EACHSUBCONTRACTED ITEM OF WORK AS A SEPARATE LINE ITEMS. THIS SCHEDULE,UNLESS OBJECTED BY THE ARCHITECT, SHALL BE USED AS A BASIS FORREVIEWING THE CONTRACTOR'S APPLICATION FOR PAYMENT.

GENERAL PROJECT NOTES:

Drawing Index

Cover Sheet

Architectural

Mechanical

DATE Issued for -

CVR Cover Sheet

MD-1 Mechanical Demolition Plan

Abbreviations

COL.

∠& AND

ANGLE@ AT

CENTERLINE

DIAMETER# POUND OR NUMBERACP. ACOUSTICAL CEILING PANEL

ADJUSTABLEADJ.A.F.F. ABOVE FINISH FLOOR

ALUMINUMAL.ARCH. ARCHITECTURALBD. BOARDBLDG. BUILDINGBLK. BLOCK

BLOCKINGBLKG.BM. BEAM

BOTTOMBOT.CAB. CABINET

CERAMICCER.CLG. CEILING

CAULKINGCLKG.CLR. CLEAR

CONCRETE MASONRY UNITCMU.COLUMNCONCRETECONC.

CONT. CONTINUOUSCARPETCPT.CERAMIC TILECTDOUBLEDBL.

DIA. DIAMETERDIMENSIONDIM.

DN. DOWNDOORDR.DETAILDTL.

DWG. DRAWINGEASTE

EXIST. EXISTINGELECTRICAL PANELBOARDE.P.

EA.ELECTRICAL CONTRACTORE.C.

ELEVATIONEL.ELEC. ELECTRICAL

EMERGENCYEMER.EQ. EQUALF.E. FIRE EXTINGUISHER

EACH

PLASTIC LAMINATEP. LAM.

OPNG. OPENING

CONTRACTOR INSTALLEDO.F.C.I. OWNER FURNISHEDNOM. NOMINAL

NUMBERNO.N.T.S. NOT TO SCALE

NOT IN CONTRACTN.I.C.

NORTHMTL. METAL

GYPSUM WALLBOARDMOISTURE RESISTANTMRB

MISC MISCELLANEOUS

MINIMUMMIN.MFR. MANUFACTURER

MECHANICALMECH.MAX. MAXIMUM

LIGHTLT.LAMINATELAM

JT. JOINTINSULATIONINSUL.

HEATING, VENTILATION,

AND AIR CONDITIONING

HVAC

HR. HOURHT. HEIGHT

HORIZONTALHORIZ.H.M. HOLLOW METAL

GYPSUM WALL BOARDGWBGYP. GYPSUM

GLASSGL.GENERAL CONTRACTORG.C.GAUGEG.A.

FRT. FIRE TREATEDFL. FLOOR

FINISHFIN.F.S. FLOOR SINK

FACE OF FINISHF.O.F.F.O. FACE OF

WT. WEIGHTWD. WOOD

WATER RESISTANTWRW/O WITHOUT

WALL COVERINGWCWITHW/WESTW.VERIFY IN FIELDV.I.F.

VERT. VERTICALVINYL WALL COVERINGVWC

VCT VINYL COMPOSITION TILEVCB VINYL COVE BASE

UNLESS OTHERWISE NOTEDU.O.N.TYPICALTYP.

THK. THICKTELEPHONETEL.

T.O. TOP OFTO BE DETERMINEDTBD.SUSPENDEDSUSP.

STOR. STORAGESTEELSTL.

STD. STANDARDSQ. SQUARE

SPECIFICATIONSPEC.SIM. SIMILAR

SHEETSHT.SCT. SUSPENDED CEILING TILE

SCHEDULESCHED.STAINLESS STEELS.S.SOUTHS.ROOMRM.REQUIREDREQ'D

REGISTERRGTR.REF. REFERENCE

RADIUSRAD.QUARRY TILEQT.

PTD. PAINTEDPOINT, PAINTPT.

PLYWD. PLYWOOD

N.

CLDIA.

P.C. PLUMBING CONTRACTOR

OPPOSITE HANDO.H.

OPPOSITEOPP.

FT. FEET / FOOT

EXPANSION JOINTEJ.

Xcelerated Concepts LLC 2019

Project Site:UNIVERSITY SOUTH CAROLINA UPSTATE

HORACE C. SMITH SCIENCE BUILDING

160 GRAMLING DRIVE

SPARTANBURG, SC 29303

Overall Building Plan:HORACE C. SMITH SCIENCE BUILDING

UNIVERSITY OF SOUTH CAROLINA UPSTATE KITCHEN EXHAUSTHOOD INSTALLATION AT THE HORACE C. SMITH SCIENCE

BUILDING'S RETAIL FOOD COURT (WOW)160 GRAMLING DRIVE, SPARTANBURG, SC 29303

AUGUST 9th, 2019 - ISSUED FOR BID

LOCATION OFWORK AREA

M-1

M-2

Mechanical Renovation PlanHood General Notes, Schedules & Diagram

Electrical Engineer:

Land Engineering Associates, LLC

262 Sandhurst Road, Suite 101

Columbia, SC 29210

803-528-1437

Foodservice & Interior Design:

Xcelerated Concepts

325 Mill Street, Suite 101

Danville, PA 17821

570-275-6130

Client:

University of South Carolina Upstate

800 University Way

Spartanburg, SC 29303

Project Management:

Xcelerated Concepts

325 Mill Street, Suite 101

Danville, PA 17821

Phone: 570-275-6130

Mechanical Engineer:

Swyegrt & Associates, LTD

1315 State Street

Cayce, SC 29033

803-791-9300

KH-1 Architectural Plans and Elevation

M-3 Exhaust Hood

M-4 Exhaust Hood

M-5 Exhaust Hood

Electrical

E-1 General Notes, Legend, Details, and Schedules

E-2 Electrical Renovation Plan

E-1 Lighting & Fire Alarm Renovation Plan

Page 2: UNIVERSITY OF SOUTH CAROLINA UPSTATE KITCHEN EXHAUST …purchasing.sc.edu/solicitations/2019 0809 Bid Smith Hood.pdf · mechanical dateissued for - cvrcover sheet md-1mechanical demolition

C

H

H

RE

RL

RL

RL

RL

RL

EXHAUST HOOD EQUIPMENT SCHEDULE

ItemNo Qty Equipment Category

EquipmentRemarks V

olts

Phas

e

Am

ps

KW

HP

Dir

ect

Plu

g

NEM

A

Ele

ctri

cal

AFF (

in)

ElectricalRemarks

1 Exhaust Hood

1 Exhaust Hood ANSUL System

* * X CLGRefer to M-2 thru M-5 Drawings

HOOD1A

HOOD1

Refer to M-2 thru M-5 Drawings

* *Refer to M-2 thru M-5 Drawings

8'-0"

HOOD1A

HOOD1

C

H

RL

RL

RL

RL

RL

GENERAL DEMOLITION NOTES

DEMOLITION WORK LEGEND

EXISTING CONSTRUCTIONTO BE REMOVED

EXISTING CONSTRUCTIONTO REMAIN

CONTRACT LIMIT LINE

1. THE TERM "REMOVE" SHALL MEAN TO TAKE OFF-SITEAND DISPOSE OF PROPERLY AND LEGALLYACCORDING TO STATE AND FEDERAL REGULATIONS.CONTRACTOR TO SUBMIT PAPERWORK INDICATINGREMOVED OBJECTS WHERE PROPERLY AND LEGALLYDISPOSED OF ACCORDING TO STATE AND FEDERALREGULATIONS.

2. THE GENERAL CONTRACTOR TO VERIFY WITH THE OWNER'S/CLIENT'SREPRESENTATIVE REGARDING DISPOSITION OF EXISTING EQUIPMENT.ITEMS REMOVED WILL BE SALVAGED FOR REUSE AS NOTED OR LEGALLYDISPOSED OF, OFF SITE BY THE CONTRACTOR.

3. THE GENERAL CONTRACTOR SHALL PROVIDE TEMPORARY INSULATEDDUSTPROOF PARTITIONS WHERE REQUIRED TO SEPARATE AREASWHERE NOISY, DIRTY OR DUSTY OPERATIONS ARE PERFORMED.PROVIDE REQUIRED OPENINGS IN SUCH PARTITIONS WITH DUST-PROOFDOORS AND SECURITY LOCKS. SUBMIT PLAN FOR ARCHITECT ANDOWNER REVIEW & COMMENT.

4. DURING CONSTRUCTION, THE GENERAL CONTRACTOR IS RESPONSIBLEFOR PROTECTING THE EXISTING FACILITY AND EQUIPMENT.

5. CONTRACTOR(S) TO FIELD VERIFY ALL DIMENSIONS AND CONDITIONSAT THE JOB SITE. FIELD VERIFY EXACT COMPOSITION OF ALL WALLSBEING REMOVED. REPORT CONFLICTS TO A/E CONSULTANT PRIOR TOINITIATING WORK.

6. THE CONTRACTOR(S) IS RESPONSIBLE FOR MAINTAINING CONTINUOUSUTILITY SERVICES TO THE SPACES IN THE BUILDING NOT AFFECTED BYTHIS WORK. ANY DISRUPTION IN SERVICES REQUIRED TO PERFORM THEWORK OR MODIFY EXISTING PIPING, DUCTWORK OR ANY ASSOCIATEDEQUIPMENT SHALL BE COORDINATED WITH A/E CONSULTANT,CONSTRUCTION PROJECT MANAGER AND THE UNIVERSITY FACILITIESGROUP.

7. IF UTILITY SYSTEMS, INCLUDING MECHANICAL, PLUMBING/FIREPROTECTION OR ELECTRICAL SYSTEMS, ARE ENCOUNTERED, THAT ARENOT INDICATED TO REMAIN BUT GIVE EVIDENCE OF BEING IN USE,PROMPTLY ADVISE THE ARCHITECT FOR INSTRUCTIONS BEFOREPROCEEDING.

8. THE CONTRACTOR(S) SHALL PROVIDE ALL LABOR AND MATERIALSREQUIRED TO “CUT AND PATCH” ANY SECTION OF WALLS, FLOORSAND OR CEILINGS AFFECTED BY THE WORK SHOWN ON THECONTRACT DOCUMENTS. ALL MATERIALS AND FINISHES FOR PATCHESSHALL MATCH ADJACENT FINISHES AND MATERIALS IN THE AREA. INTHE EVENT THAT REPAIRS ARE REQUIRED FOR ERRORS, OMISSIONS ORDISCREPANCIES IN THE CONTRACT DOCUMENTS THAT HAVE NOT BEENSUBMITTED FOR RESOLUTION PRIOR TO THE WORK BEING INSTALLED,THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR ALL COSTSINCURRED TO CORRECT SAID CONDITIONS.

9. PROVIDE NECESSARY SHORING, BRACING, AND SUPPORT TO PREVENTMOVEMENT, SETTLEMENT, OR COLLAPSE OF STRUCTURE OR ELEMENTTO BE DEMOLISHED, AND ADJACENT FACILITIES TO REMAIN.

10. ALL CONDUIT AND OR PIPING EXPOSED DURING DEMOLITION, (NOTTO BE REMOVED) SHALL BE CAPPED BEHIND FINISHED SURFACES INACCORDANCE WITH ALL APPLICABLE STATE AND LOCAL CODES.SURFACES DISTURBED WILL BE PATCHED AND FINISHED SIMILAR TO THEADJACENT SURFACES.

11. EXECUTE CUTTING AND REMOVAL BY METHODS WHICH SHALLPREVENT DAMAGE TO OTHER WORK, AND SHALL PROVIDE PROPERSURFACES TO RECEIVE INSTALLATION OF PATCHING.

12. CUT BY SAWING OR GRINDING, RATHER THAN BY HAMMERING ORCHOPPING. CUT HOLES NEATLY TO MINIMUM SIZES REQUIRED.

13. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE COORDINATIONOF ALL CUTTING, CORE DRILLING, TRENCHING AND PATCHINGREQUIRED BY ALL SUBCONTRACTORS TO MINIMIZE THE NUMBER OFTRENCHES AND COMBINE VARIOUS SERVICES IN COMMON TRENCHES.

14. IN ALL AREAS WHICH ARE TO RECEIVE NEW FINISHES, ANY EXISTINGEXPOSED/ SURFACE MOUNTED UTILITY (I.E. CONDUIT, WIREMOLD,WIRING, PIPING, ETC.) SHALL BE RE-ROUTED SO THE UTILITY ISCONCEALED IN WALL AND/OR CEILING. PROPERLY CUT AND PATCHWALL AND/OR CEILING AS REQUIRED TO RECEIVE NEW FINISH.

15. INSTALL INFILL / PATCHING TO MATCH ADJACENT WORK IN FINISH,STRUCTURAL QUALITIES, COURSING IF MASONRY, AND OTHERCHARACTERISTICS.

a) INFILL / PATCH SURFACES WHICH SHALL BE EXPOSED TO WEATHERIN THE FINISHED WORK TO BE AIRTIGHT AND WEATHERTIGHT.

b) INFILL / PATCH SURFACES TO COMPLY WITH FIRE RATINGS,SMOKE-TIGHT RATINGS, ACOUSTICAL CRITERIA AND OTHERPERFORMANCE CRITERIA INDICATED.

c) INFILL / PATCH SO THAT INSULATING CHARACTERISTICS AND VAPORRETARDANCE OF PATCHED SURFACES ARE NOT REDUCED.

d) WHERE INFILLING / PATCHING OR CUTTING AND PATCHING AREPERFORMED SUBSEQUENT TO FINISHING OF SURFACE, OR WHERE NOSUBSEQUENT FINISH IS INDICATED OR SPECIFIED, REFINISH ENTIRESURFACE AS NECESSARY TO PROVIDE AN EVEN / LEVEL FINISH TOMATCH ADJACENT FINISHES.

e) IF SURFACE TO BE INFILLED / PATCHED OR CUT AND PATCHED ISINDICATED OR SPECIFIED TO BE COVERED BY PAINTING OR OTHERFINISH SYSTEM, AND IF INFILL / PATCHING OR CUTTING ANDPATCHING IS PERFORMED PRIOR TO INSTALLATION OF FINISH, THENFINISHING OF SAID AREAS SHALL BE INCLUDED AS WORK OFFINISHING SECTION.

EXHAUST NOTES:1. THE CONTRACTOR SHALL FURNISH AND INSTALL ALL FOOD

SERVICE EQUIPMENT RELATED EXHAUST FAN SYSTEMS, MAKE-UPAIR FAN SYSTEMS, DISHWASHING/POT WASHING EXHAUST FANSYSTEMS, AND ALL REQUIRED DUCT WORK AS SPECIFIED ANDDESIGNATED ON THE ARCHITECT'S AND MECHANICAL ENGINEER'SPLANS & DOCUMENTS. ALL SYSTEMS & ASSOCIATED COMPONENTSINCLUDING THE DUCT WORK TO BE IN COMPLIANCE WITHGOVERNING NATIONAL, STATE, AND LOCAL CODES.

2. ALL FOOD SERVICE EXHAUST/MAKE-UP AIR VENTILATORS ARE TOBE IN FULL COMPLIANCE WITH N.F.P.A.#96 REGULATIONS, TO BEU.L. LISTED, AND TO MEET NSF REGULATIONS. ALL SAIDVENTILATORS SHALL BEAR THE APPROPRIATE LABEL AFFIXED TOTHE EXTERIOR. ALL EXHAUST/MAKE-UP AIR VENTILATORS SHALL BEPROVIDED WITH A MINIMUM OF A 3" AIR-GAP WHERE THEVENTILATOR WILL BE INSTALLED ADJACENT TO A COMBUSTIBLESURFACE.

3. THE CONTRACTOR SHALL FURNISH AND INSTALL ALL REQUIREDCOMPONENTS, INCLUDING BUT NOT LIMITED TO ALL ROOFCURBS, WALL MOUNTING BRACKETS, DISCHARGE PANS, FLASHING,ETC. REQUIRED TO SET THE EXHAUST AND MAKE-UP AIR FANPACKAGES. THE CONTRACTOR SHALL PROVIDE ALL ROOFOPENINGS AND PENETRATIONS REQUIRED FOR THE DUCTWORKAND ASSOCIATED ELECTRICAL SERVICES AND TO FULLY FLASHAND SEAL ALL OPENINGS AS REQUIRED COMPLETING THEINSTALLATION.

4. THE CONTRACTOR SHALL FURNISH AND INSTALL REQUIRED"UNI-STRUT" BRACING SECURED TO THE BASE BUILDINGSTRUCTURE IN THE AREA WHERE ANY VENTILATOR IS PROPOSEDTO BE INSTALLED. THE CONTRACTOR SHALL FURNISH ANDINSTALL ALL REQUIRED MATERIALS INCLUDING BUT NOT LIMITEDTO ALL-THREAD RODS, BRACKETS, CLIPS AND HANGERS, TOSECURE HOOD TO SUPPORT STRUCTURE PROVIDED IN A FIXEDAND RIGID POSITION AS SHOWN ON PLANS, READY FOR FINALCONNECTIONS TO THE BUILDING DUCTWORK. ALL STANDARDBOX TYPE WALL OR ISLAND STYLE FOOD SERVICEEXHAUST/MAKE-UP AIR VENTILATORS SHALL BE MOUNTED SUCHTHAT THE LEADING EDGE IS AT 6'-8" ABOVE FINISHED FLOOR,UNLESS OTHERWISE DIRECTED BY THE ARCHITECT OR ENGINEER.ALL OTHER STYLES OF VENTILATORS SHALL BE MOUNTED INACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONSAND APPLICABLE CODES.

5. ALL STANDARD BOX TYPE WALL OR ISLAND STYLE FOOD SERVICEEXHAUST/MAKE-UP AIR VENTILATORS SHALL BE MOUNTED SUCHTHAT THE LEADING EDGE IS AT 6'-8" ABOVE THE FINISHED FLOOR,UNLESS OTHERWISE DIRECTED BY THE ARCHITECT ORMECHANICAL ENGINEER. ALL OTHER STYLES OF VENTILATORSSHALL BE MOUNTED IN ACCORDANCE WITH MANUFACTURER'SRECOMMENDATIONS AND APPLICABLE CODES. ON ALLSTANDARD BOX TYPE WALL OR ISLAND STYLE FOOD SERVICEEXHAUST/MAKE-UP AIR VENTILATORS. THE CONTRACTOR IS TOFURNISH AND INSTALL STAINLESS STEEL TRIM AND OR CLOSUREPANELS FROM THE TOP OF THE VENTILATOR TO 3" ABOVE THEFINISHED CEILING IN THE AREA. ON ALL OTHER STYLEVENTILATORS, THE CONTRACTOR SHALL FURNISH AND INSTALLAN 18 GA. STAINLESS STEEL DUCT ENCLOSURE EXTENDING FROMTHE TOP OF THE HOOD AT THE COLLAR TO 3" ABOVE THEFINISHED CEILING AND PROVIDE REQUIRED ANGLE TRIM AT THEOPENING THROUGH THE CEILING.

6. ALL EXHAUST/MAKE-UP AIR VENTILATORS, LOCATED OVERCOOKING EQUIPMENT, ARE TO BE FURNISHED FULLY PRE-PIPEDAND PRE-WIRED FOR AN INTEGRAL FIRE SUPPRESSION SYSTEM. ALLCOMPONENTS WITHIN THE VENTILATOR TO BE U.L. LISTED AND INFULL COMPLIANCE WITH GOVERNING CODES AND ALLPENETRATIONS THROUGH THE HOOD FOR PIPING OR NOZZLEDROPS TO BE FULLY SEALED WITH APPROVED GASKETS.

REFLECTED CEILING PLAN LEGEND FOR HOOD PACKAGE

AS PART OF THE NEW EXHAUST HOOD PROJECT,EXISTING HVAC DIFFUSER TO BE RELOCATED, EXTENDDUCTWORK AS REQUIRED. CONTRACTOR TOTHOROUGHLY CLEAN EXISTING GRILL. COORDINATEWITH 2/KH-1 FOR NEW LOCATION & THE ENGINEERINGDWGS. FOR ADDITIONAL INFORMATION.

EXIST'G LIGHT FIXTURE TO BE DEMO'ED OR RELOCATED("RL") AS PART OF DINING ROOM RENOVATIONPROJECT. COORDINATE SCHEDULING OF THEDEMOLITION / RELOCATION WITH THE GENERALCONTRACTOR UNDER SEPARATE OWNER CONTRACT.

C

EXISTING CEILING DEVICE; SECURITY CAMERA ("C")HEAT / SMOKE DETECTOR ("H"), TO BE TEMPORARILYREMOVED OR RELOCATED AS PART OF DINING ROOMRENOVATION PROJECT. COORDINATE SCHEDULING OFTHIS WORK WITH THE GENERAL CONTRACTORUNDER SEPARATE OWNER CONTRACT.

H

RL

AS PART OF THE NEW EXHAUST HOOD PROJECT,EXISTING CEILING TILE & GRID, REMOVE / RECONFIGUREAS REQUIRED FOR THE INSTALLATION OF THE NEWEXHAUST HOOD, ASSOCIATED DUCTWORK, UTILITIES,ETC. RECONFIGURATION OF THE EXISTING GRIDAROUND THE NEW HOOD IS PART OF THE HOODPACKAGE WORK.

RL

BOTTOM OF CEILINGTO MATCH EXIST'G

±8'-6" V.I.F. NEW EXHAUST HOOD

8'-0"

STAINLESS STEEL WALL PANEL PROVIDED UNDER NEW EXHAUST HOODINSTALLATION PROJECT

CEILING PLAN1

1/4"=1'-0"KH-1

REFLECTED CEILING PLAN2

1/4"=1'-0"KH-1

DEMOLITION REFLECTED

KH-1

ARCHITECTURALPLANS AND ELEVATION

DRAWING TITLE:

KEY PLAN:

SEAL:

PROJECT NO.:

DRAWN BY:

CHECKED BY:

SCALE:

SHEET NO.:

Xcelerated Concepts LLC 2019

Xcelerated

Co

ncep

ts

XC

325 Mill St. Suite 101Danville, PA 17821

T 570.275.6130 F 570.275.6841

Xcelerated Concepts, LLC

UNIVERSITY OF SOUTHCAROLINA UPSTATE

KITCHEN EXHAUST HOODINSTALLATION AT THE

HORACE C. SMITH SCIENCEBUILDING'S RETAIL FOOD

COURT (WOW)

AS NOTED

XCXC

ISSUED FOR BID 8/9/19

NOTE:THE OWNER WILL AWARD A SEPARATE CONTRACT FOR THE RENOVATION OF THECURRENT RETAIL SPACE WHICH SHALL INCLUDE DEMOLITION, NEW MILLWORK,EQUIPMENT, CEILING TILE, AND FINISHES. THIS WORK SHALL RUN CONCURRENT WITHTHE NEW EXHAUST HOOD INSTALLATION PROJECT AS DOCUMENTED HEREIN. THECONTRACTOR SHALL INCLUDE IN HIS BID AN AMOUNT SUFFICIENT TO COVER HISCOST OF FURNISHING NECESSARY ADMINISTRATIVE AND SUPERVISORY FORCES TOCOORDINATE HIS OWN WORK AND THAT OF THE OWNER'S FORCES.

3

KH-1

EXHAUST HOOD ELEVATION3

1/2"=1'-0"KH-1

EXHAUST HOOD

Page 3: UNIVERSITY OF SOUTH CAROLINA UPSTATE KITCHEN EXHAUST …purchasing.sc.edu/solicitations/2019 0809 Bid Smith Hood.pdf · mechanical dateissued for - cvrcover sheet md-1mechanical demolition

ISS

UE

D F

OR

BID

8/9/

19

Page 4: UNIVERSITY OF SOUTH CAROLINA UPSTATE KITCHEN EXHAUST …purchasing.sc.edu/solicitations/2019 0809 Bid Smith Hood.pdf · mechanical dateissued for - cvrcover sheet md-1mechanical demolition

ISS

UE

D F

OR

BID

8/9/

19

Page 5: UNIVERSITY OF SOUTH CAROLINA UPSTATE KITCHEN EXHAUST …purchasing.sc.edu/solicitations/2019 0809 Bid Smith Hood.pdf · mechanical dateissued for - cvrcover sheet md-1mechanical demolition

ISS

UE

D F

OR

BID

8/9/

19

Page 6: UNIVERSITY OF SOUTH CAROLINA UPSTATE KITCHEN EXHAUST …purchasing.sc.edu/solicitations/2019 0809 Bid Smith Hood.pdf · mechanical dateissued for - cvrcover sheet md-1mechanical demolition

ISS

UE

D F

OR

BID

8/9/

19

Page 7: UNIVERSITY OF SOUTH CAROLINA UPSTATE KITCHEN EXHAUST …purchasing.sc.edu/solicitations/2019 0809 Bid Smith Hood.pdf · mechanical dateissued for - cvrcover sheet md-1mechanical demolition

ISS

UE

D F

OR

BID

8/9/

19

Page 8: UNIVERSITY OF SOUTH CAROLINA UPSTATE KITCHEN EXHAUST …purchasing.sc.edu/solicitations/2019 0809 Bid Smith Hood.pdf · mechanical dateissued for - cvrcover sheet md-1mechanical demolition

ISS

UE

D F

OR

BID

8/9/

19

Page 9: UNIVERSITY OF SOUTH CAROLINA UPSTATE KITCHEN EXHAUST …purchasing.sc.edu/solicitations/2019 0809 Bid Smith Hood.pdf · mechanical dateissued for - cvrcover sheet md-1mechanical demolition

ISSUED FOR BID 8/9/19

Page 10: UNIVERSITY OF SOUTH CAROLINA UPSTATE KITCHEN EXHAUST …purchasing.sc.edu/solicitations/2019 0809 Bid Smith Hood.pdf · mechanical dateissued for - cvrcover sheet md-1mechanical demolition

ISSUED FOR BID 8/9/19

Page 11: UNIVERSITY OF SOUTH CAROLINA UPSTATE KITCHEN EXHAUST …purchasing.sc.edu/solicitations/2019 0809 Bid Smith Hood.pdf · mechanical dateissued for - cvrcover sheet md-1mechanical demolition

ISSUED FOR BID 8/9/19


Recommended