University of Surrey, George Edwards Building +
Transcript
Page 1: University of Surrey, - D+B Facades UK LtdUniversity of Surrey, George Edwards Building + REFERENCE CONTACT Ian Collis, Project Manager, Estates & Facilities Management University

U n i v e r s i t y o f S u r r e y,

G e o r g e E d w a r d s B u i l d i n g

+

Page 2: University of Surrey, - D+B Facades UK LtdUniversity of Surrey, George Edwards Building + REFERENCE CONTACT Ian Collis, Project Manager, Estates & Facilities Management University

+U n i v e r s i t y o f S u r r e y, G e o r g e E d w a r d s B u i l d i n g

REFERENCE CONTACT

Ian Collis, Project Manager, Estates & Facilities ManagementUniversity of SurreyGuildford, Surrey GU2 7XHT: 01483 689230E:[email protected]

TYPE OF CONTRACTJCT Intermediate Sub-Contract withContractor Design

CONTRACT VALUE £0.7m

PROJECT DURATIONCompleted in two phases, Jun – Sept2012 and April 2013 - May 2013

PROJECT SCOPEInsulated aluminium rainscreen overcladding andreplacement windows to three elevations delivered intwo phases to meet client needs. In addition to thedemands of keeping the library operational at alltimes, the building also housed a bank and otherservice businesses at ground level which requireduninterrupted access in order to maintain businesscontinuity. Despite these severe constraints, expertaccess planning and design of temporary worksincluding protective scaffold tunnels robust enough tosupport point loads of mastclimbers enabled thewhole project to be delivered with minimal disruptionto building users.

Client Testimonial

“The George Edwards building houses theUniversity’s main library which operates extendedopening hours throughout the year, being openalmost 24/7. It was essential therefore that thebuilding remained fully operational throughoutthis refurbishment project. d+b facade’s provendesign and delivery methodology enabled this tohappen with no impact upon this critical studentservice. We found the d+b team to be flexible inmeeting our specific needs, including deliveringthe project in two separate phases”.

Ian Collis, Project Manager, Estates & Facilities Management

Page 3: University of Surrey, - D+B Facades UK LtdUniversity of Surrey, George Edwards Building + REFERENCE CONTACT Ian Collis, Project Manager, Estates & Facilities Management University

+U n i v e r s i t y o f S u r r e y, G e o r g e E d w a r d s B u i l d i n g

Page 4: University of Surrey, - D+B Facades UK LtdUniversity of Surrey, George Edwards Building + REFERENCE CONTACT Ian Collis, Project Manager, Estates & Facilities Management University

+U n i v e r s i t y o f S u r r e y, G e o r g e E d w a r d s B u i l d i n g