+ All Categories
Home > Documents > Unmitigated Mitigated Slight Beneficial (day 1) Slight ...

Unmitigated Mitigated Slight Beneficial (day 1) Slight ...

Date post: 11-Mar-2022
Category:
Upload: others
View: 7 times
Download: 0 times
Share this document with a friend
1
Figure 10-120 Residual Visual Impact During Construction and Operation – Ha Che (S) Visual Envelope Locaon of Visually Sensive Receiver (VSR) and direcon of main views VSR 500M Study Area Work Limit Boundary North 1:5000 VSR7 VSR6 VSR4 VSR5 VSR3 VSR1 VSR2 VSR9 VSR8 HC-VSR1 Construction Operation Slight / Moderate Insubstantial / Slight Slight Slight Beneficial (day 1) Slight Beneficial (year 10) Unmitigated Mitigated HC-VSR2 Construction Operation Slight Insubstantial Insubstantial Insubstantial (day 1) Insubstantial (year 10) Unmitigated Mitigated HC-VSR3 Construction Operation Moderate Moderate Slight / Moderate Slight (day 1) Slight Beneficial (year 10) Unmitigated Mitigated HC-VSR5 Construction Operation Substantial Moderate / Substantial Moderate / Substantial Slight / Moderate (day 1) Slight Beneficial (year 10) Unmitigated Mitigated HC-VSR6 Construction Operation Moderate / Substantial Moderate Moderate Slight / Moderate (day 1) Slight / Insubstantial (year 10) Unmitigated Mitigated HC-VSR4 Construction Operation Substantial Moderate / Substantial Moderate / Substantial Slight / Moderate (day 1) Slight Beneficial (year 10) Unmitigated Mitigated HC-VSR7 Construction Operation Substantial Moderate Moderate Slight (day 1) Slight / Insubstantial(year 10) Unmitigated Mitigated HC-VSR8 Construction Operation Substantial Moderate Moderate Slight / Moderate (day 1) Slight / Insubstantial (year 10) Unmitigated Mitigated HC-VSR9 Construction Operation Slight Insubstantial Slight Insubstantial (day 1) Insubstantial (year 10) Unmitigated Mitigated A3 Jan 2016 Jan 2016 Jan 2016 Jan 2016 Copyright – The Government of the Hong Kong SAR Map reproduced by Permission of the Director of Land
Transcript

Figure 10-120

Residual Visual Impact During Construction and Operation

– Ha Che (S)

Visual Envelope

Location of Visually Sensitive Receiver (VSR) and direction of main views

VSR

500M Study Area

Work Limit Boundary

North

1:5000

VSR7

VSR6

VSR4VSR5

VSR3

VSR1

VSR2

VSR9

VSR8

HC-VSR1Construction OperationSlight / Moderate

Insubstantial / Slight

Slight Slight Beneficial (day 1)Slight Beneficial (year 10)

UnmitigatedMitigated

HC-VSR2Construction OperationSlight InsubstantialInsubstantial Insubstantial (day 1)

Insubstantial (year 10)

UnmitigatedMitigated

HC-VSR3Construction OperationModerate ModerateSlight / Moderate

Slight (day 1)Slight Beneficial (year 10)

UnmitigatedMitigated

HC-VSR5Construction OperationSubstantial Moderate / SubstantialModerate / Substantial

Slight / Moderate (day 1)Slight Beneficial (year 10)

UnmitigatedMitigated

HC-VSR6Construction OperationModerate / Substantial

Moderate

Moderate Slight / Moderate (day 1)Slight / Insubstantial (year 10)

UnmitigatedMitigated

HC-VSR4Construction OperationSubstantial Moderate / SubstantialModerate / Substantial

Slight / Moderate (day 1)Slight Beneficial (year 10)

UnmitigatedMitigated

HC-VSR7Construction OperationSubstantial ModerateModerate Slight (day 1)

Slight / Insubstantial(year 10)

UnmitigatedMitigated

HC-VSR8Construction OperationSubstantial ModerateModerate Slight / Moderate (day 1)

Slight / Insubstantial (year 10)

UnmitigatedMitigated

HC-VSR9Construction OperationSlight InsubstantialSlight Insubstantial (day 1)

Insubstantial (year 10)

UnmitigatedMitigated

A3 Jan 2016 Jan 2016 Jan 2016 Jan 2016

Copyright – The Government of the Hong Kong SARMap reproduced by Permission of the Director of Land

MOKM2504
Textbox
9.
Recommended