UO Lewis Integrative Science Building
CUG Meeting - Schematic Design
Wednesday, October 7
• Budget Status
• Design Status
• Schedule
• CPC planning
• Next Steps
Agenda
1. Sitework• Site Boundaries
2. Building Size• Basement• Fourth Floor• Streisinger Rooftop
3. Building Envelope• Glazing• Penthouse Cladding• Lightwells• Skylights
4. Interior Finishes• Glazing• Ceilings
5. Systems• Lighting• Laboratories
6. General• Basement Labs• Shell Space• Contingencies
Adjustments
Site Development
Plan Development
BASEMENT PLAN
SECOND FLOOR PLAN
THIRD FLOOR PLAN
FOURTH FLOOR PLAN
PENTHOUSE FLOOR PLAN
ROOF PLAN
Building Development
South
North
East
West
Aerial View from North East
Aerial View from North West
Street Level View from North
Street Level View from East
View from Huestis Hall Roof
View from Science Green
Section View – “Up-and-Over” Connection
Cut-away View – Science Green Connection
End
Schedule
• Campus Planning Meeting – October 12• Schematic Design Report• Design Development – User Meetings• Design Schedule
• DD Oct 09 – Feb 10• CD March 10 – Sept 10• Permitting & Bidding• Phased Bid Packages
• Construction Start Target
Details
• Campus Planning Meeting• SD approval process• Project Websitehttp://www.uoregon.edu/~eeng/lisb.html• Other?