UPC.edu renewalDegree in Multimedia. Final project
Irene Escudé Capdevila
November 2012
Project plan
➠Who does it concern?Dimension of the project
➠What is the starting point?Description of the current situation
➠What must be done?Conceptual definition of the project
Project plan
➠What must be done?Conceptual definition of the project
A promotional website, of the studies, research and services for businesses
A unified website, the importance falls on the new, not the source.
A renovated look of the homepage that suits the previous requests.
Project plan
➠Who does it concern?Dimensions of the project
Information systems: studies DB, intranets and UPC websites, Genweb, press room, Alumni UPC portal, UPCtv, DRAC, Chinese version, Meteocat webservice.
Teams and units: SCP, OMC, UPCnet, SRI.
System users: university community (students, professors and staff), companies linked with the university, prospective students, secondary education teachers.
Project plan
➠What is the starting point?Description of the current situation
Project plan
➠Project planningProject phases and UCD plan
Project plan
Phase I: Definition and planning
Phase II: Development. Iterative design
Phase III: Implementation and migration
Phase IV: Release
Project plan
Phase I: Definition and planning
Phase II: Development. Iterative design
Phase III: Implementation and migration
Phase IV: Release
Project plan
Phase I: Definition and planning
Phase II: Development. Iterative design
Phase III: Implementation and migration
Phase IV: Starting-up
UCD implementation
➠Plan execution. Context requirements
➠Plan execution. IA design
➠Plan execution. Definition
➠Plan execution. GUI design
UCD implementation. Definition
➠Plan execution. Definition
➠ Stakeholder meeting1
UCD implementation. Definition
➠Plan execution. Definition
➠ Stakeholder meeting1
✔Initial project specifications
UCD implementation. Context requirements
➠Plan execution. Context requirements
➠ Brainstorming
➠ Usability test
➠ Interviews with subject matter experts
2
1
UCD implementation. Context requirements
➠Plan execution. Context requirements
➠ Brainstorming
➠ Usability test
➠ Interviews with subject matter experts
2
1
✔Requirements report
UCD implementation. IA design
➠Plan execution. IA design
➠ Competitor analysis
➠ Statistics analysis
➠ Card Sorting
➠ Navigation test
3
1 2
UCD implementation. IA design
➠Plan execution. IA design
➠ Competitor analysis
➠ Statistics analysis
➠ Cardsorting
➠ Navigation test
3
1 2
✔Definitive Information Architecture proposal
UCD implementation. GUI design
➠Plan execution. GUI design
➠ Braindrawing. Parallel design
➠ High fidelity paper prototyping. Screen testing
➠ Evaluate prototype
4
1 2 3
UCD implementation. GUI design
➠Plan execution. GUI design
➠ Braindrawing. Parallel design
➠ High fidelity paper prototyping. Screen testing
➠ Evaluate prototype
4
1 2 3
✔Definitive Graphic User Interface proposal
Next step
➠Implementation and migration phase➠ Study of edition use cases
➠ Functional prototype
➠ Usability test (content edition)
➠ Checking and creation contents
➠ Migration
1 2 3 4
Conclusions
1 2 3 4
➠Users’ engagement in a disinterested way
➠Solution of detected problems
➠Two relevant changes of shape and concept
Thanks
Irene Escudé Capdevila
November 2012