+ All Categories
Home > Documents > Update and Plan for Spring 2011 Yi Guo, Zheng Wang, Wenlin Zhang RavenShield Weekly Meeting Jan. 24,...

Update and Plan for Spring 2011 Yi Guo, Zheng Wang, Wenlin Zhang RavenShield Weekly Meeting Jan. 24,...

Date post: 21-Dec-2015
Category:
View: 218 times
Download: 2 times
Share this document with a friend
Popular Tags:
6
Update and Plan for Spring 2011 Yi Guo, Zheng Wang, Wenlin Zhang RavenShield Weekly Meeting Jan. 24, 2011
Transcript

Update and Plan for Spring 2011

Yi Guo, Zheng Wang, Wenlin Zhang

RavenShield Weekly Meeting Jan. 24, 2011

Agenda

• Personnel changes• Feedback from the IPR meeting and discussion of

ideas• Plan for Spring 2011

Centralized vs. Distributed Spectrum Sensing

• Centralized Scheme:– Fusion center (common

receiver) – Reporting channels

• Distributed Scheme:– Local information

exchange without the central station

Potential Testbed Development(In collaboration with Profs. Yingying Chen and Yu-Dong Yao)

Mornitoring and Management Server

LAN

User End

Internet

WiMax NetworkTV Band

3G Network

Secondary User (USRP)

About 10 - 20 USRPs are needed (currently 4 available).

Using Agilent signal generator to simulate different kinds of signal band, e.g., TV band, 3G, etc.

Potential Testbed Development - Software Architecture

User EndMonitoring & Management System

Mobility Control Component

Spectrum Sensing Component

Application-Specific Component

GNU Radio Interface

Consensus Sensing Block

Security Block

Resource Mangement Block

Internet

Mobile Driver

Robotsinterface

VechiclesInterface

… USRP Interface

– Mobility Control Component: Controlling the mobility of the primary or secondary users in the system;

– Spectrum Sensing Component: Sensing the spectrum usage for different kinds of wireless networks;

– Application-specific Component: Applying different functionality in the system.

Next Step

• Theoretical proof of the proposed distributed consensus-based spectrum sensing algorithm

• Extensive simulations• Performance comparisons• A comprehensive report and a GLOBECOM paper

(deadline March 1, 2011)

• Laboratory testbed development


Recommended