SAAD K. LAFTA Contact information Full Name: Saad Kadhum Lafta Email adders: [email protected] Mobile Phone: 00964 7801075841 Country: Basra, Iraq Experience; 24 Years - QA/ QC Manager in Al Fayha For Precast; worked for many international companies, like Samsung Engineering Co. & CGC & Saipem & Shell in Majnoon Oil Field, Shell Gas, HLG, Alstom, ENI ; 2015. - Control batch plant and design trail mix for different grads of concrete for Precast and ready mix work. - Control production quality in al fayha factory which is – Piles, T-Wall, Wall, Pipe Slippers for Oil pipe lines, Concrete Water Tanks, Manholes, …etc. - Control all raw materials enter in production and check it meeting with International Standards like ASTM, BS EN, ACI, …etc.
Transcript
Page 1: Update Engineer Saad CV

SAAD K. LAFTA

Contact information

Full Name: Saad Kadhum Lafta

Email adders: [email protected]

Mobile Phone: 00964 7801075841

Country: Basra, Iraq

Experience; 24 Years

- QA/ QC Manager in Al Fayha For Precast; worked for many international companies, like

Samsung Engineering Co. & CGC & Saipem & Shell in Majnoon Oil Field, Shell Gas, HLG,

Alstom, ENI ; 2015.

- Control batch plant and design trail mix for different grads of concrete for Precast and ready mix

work.

- Control production quality in al fayha factory which is – Piles, T-Wall, Wall, Pipe Slippers for Oil

pipe lines, Concrete Water Tanks, Manholes, …etc.

- Control all raw materials enter in production and check it meeting with International Standards

like ASTM, BS EN, ACI, …etc.

Page 2: Update Engineer Saad CV

- Construction Manager in HCG worked in Majnoon oil field under Shell Company 2014.

- Lead 12 Engineering Site work with Road & Infrastructure Construction Work in Majnoon Oil Field.

- Supervise on Roadwork in Majnoon Field & Facility work inside Shell PC Camp, as shown in photos.

- Supervise on Cables works done in DS1 & DS2 & CPF.

- Supervise on works for Storm Water Drainages, done in CPF near CCF Office.

- Supervise on works in Dyke & Extend in Majnoon Oil Field.

Page 3: Update Engineer Saad CV

- QC/QA Work, Do Plate Bearing Test for heavy Crain 400 Tons, in CPF, Saipem compressor, H2S Zone.

This test done under supervisor from Eng. Mohammad Mohammad from Shell QC/QA Staff.

Reference:

- Mr. Robert, Infrastructure Construction Manager in Shell.

- Mr. Alexsander, Infrastructure Construction Supervisor in Shell.

- Mr. Waseem, Infrastructures Construction Manager in Shell.

- Mr. Mohammad Mohammad, QC/QA in Shell Staff.

- Deputy Director & Manager of Field Laboratory in Al Fao Company for Engineering Testing, 2014.

- Work as Third party with HCG under Shell Petroleum Company in Iraq SIPD works.

- Concrete & Aggregate investigation; chemicals & physical test.

- Soil investigation for Shell in airport area inside Majnoon field, as 3rd Party with HCG group.

- All Chemicals & Physics test

- All laboratory test done for HCG group in Majnoon field due to ASTM & ISO & BS EN standards

- Static & Dynamic Pile test using PDA & Integrity from Pile company, www.pile.com

- QC/QA for Civil works.

- QC/QA for materials.

Page 4: Update Engineer Saad CV
Page 5: Update Engineer Saad CV
Page 6: Update Engineer Saad CV
Page 7: Update Engineer Saad CV

- Planer engineer in ABAM Co, Contractor under ENI Co., Basra Zuber, 2013.

- Project Manager, Mabani Al Fayha Construction Company, 2012.

- Project Manager, Majmaa Al Bahrain Company, 2008-2011.

- Water system project.

- Construction Manager, in Al Nahrain Company for Construction & General Trading,

2005-2007.

- Design complete reverse Osmosis system for drinking purpose.

- Manufacture RO System.

- Design & Install Fire Fitting System.

- Water System Design.

- Construction Engineer in Industrial Project Company, Bagdad, 1998-2003.

- Design & repair main water treatment plant in Babylon City.

- Re repair Karbala Cement Factory project.

- Install new Rubber line in Babylon Tire Factory in Al Najaf City.

- Install Water Compact Unit for small Villages in Babylon.

- Install Water pipe line 15 Km. in small Villages in Babylon.

- High Way Road work north Bagdad.

- Design Engineer in Engineering Design Center, Bagdad, 1992-1998.

- Design Water Treatment System for Town.

- Design Wastewater Treatment system South Bagdad.

Education

- Bachelor's Degree Engineering Science, University Of Technology, UOT, Baghdad, Iraq 1992.

Specialists.

- High Computer literature in all office automation tools (Excel, Access, Power Point, Word, etc.).

- High literature in data base management.

- Good ability to translate results number to charts to make it easy for understanding.

- Good ability to report works & results to managements.

- Flexible to deal with conditions it in site.

- Have ability to create criteria for the job to have best results depend on work properties.

- Fluent in English.

- Good knowledge of procurement process steps.

- Good ability to work due to ASTM & ISO& BS EN & ACI standards.

Languages

- English, Fluent in English.

- Arabic, Primary Language.

Page 8: Update Engineer Saad CV

Shell HSE Passport

(Contain training with HSE & H2S gas)

Page 9: Update Engineer Saad CV
Page 10: Update Engineer Saad CV
User
Text Box
L-SS-ALF-0014
Page 11: Update Engineer Saad CV

t'IL'IL'IL'I

}I L'IE E, L'IfiE L'IE€ L'I{= t'IfH t'If H L],q L'r' L't

t'It]L'tL'lL'lL'lL'lL'tL'tL'tt'tL'tL'lL'IL'It'It'IL'lL't

gv;>EH d.<i EEEFU),t'e xl.:,9;E F:g s.Ea:"1)+t i<!Es.E3sFql:i9

\E .ri

I

s$

q

:

I

U

EU

tr

kll

a{

z

{

{

L'lL'lL'lL'lL'lL'lL'lL'lL'lL'lL'lL'lL'ltlt'tL'lt'lL'lL'IL'tL'It]tIL]L'tL'lL'lL'lL'lL]L'tL]

L'rL'TLTLtHHHL'tL'tLILtLtt'tHL'lL'lL'tt'tt'tL'tL'tLlLtL'r

!tIoA

| \l

L'IL'It'It'It]t'IL:L'IL]L]L'IL'IL'IL]L'IL'IL'IL'IL]L]L]L]t'IL'I


Recommended