Update on the Giant Magellan Telescope Project 1 Sarah Brough (UNSW)
Transcript
Page 1: Update on the Giant Magellan Telescope Project · AO system Installation M1 Segment Installation Instruments Installation Mount Contract Start Enclosure Concrete M1 Cell Testing Mount

Update on the Giant Magellan Telescope Project

1

Sarah Brough (UNSW)

Page 2: Update on the Giant Magellan Telescope Project · AO system Installation M1 Segment Installation Instruments Installation Mount Contract Start Enclosure Concrete M1 Cell Testing Mount

2

Extremely large telescopes!

Page 3: Update on the Giant Magellan Telescope Project · AO system Installation M1 Segment Installation Instruments Installation Mount Contract Start Enclosure Concrete M1 Cell Testing Mount

The GMT partners: 12 institutions, 5 nations

Page 4: Update on the Giant Magellan Telescope Project · AO system Installation M1 Segment Installation Instruments Installation Mount Contract Start Enclosure Concrete M1 Cell Testing Mount

The GMT partners: 12 institutions

Korea

Sao Paulo, Brazil

Texas A&M

Arizona

Page 5: Update on the Giant Magellan Telescope Project · AO system Installation M1 Segment Installation Instruments Installation Mount Contract Start Enclosure Concrete M1 Cell Testing Mount

GMT site – Las Campanas Observatory

LSST

GMT

GMT is 1º north of LSST and at same longitude

GMT is 6º south of ALMA

ALMA

6° N

GMT will operate in Chile under agreement with the University of Chile

Agreement recognized by Chilean Foreign Ministry

Chilean astronomers get 10% of the observing time

Page 6: Update on the Giant Magellan Telescope Project · AO system Installation M1 Segment Installation Instruments Installation Mount Contract Start Enclosure Concrete M1 Cell Testing Mount

GMT on Las Campanas site

6

Warehouse / M1 Factory /M2 Metrology

Summit Utility Building

Summit Support Building

Enclosure

Page 7: Update on the Giant Magellan Telescope Project · AO system Installation M1 Segment Installation Instruments Installation Mount Contract Start Enclosure Concrete M1 Cell Testing Mount

¡ Aplanatic Gregorian design§ Wide FOV: 10 arcmin as-is

and 20 arcmin with corrector

¡ Optical + infrared (0.3–25µm)¡ 25-metre diameter aperture¡ Conjugated primary and

secondary segments § Enables adaptive secondary

mirrors for wavefront correction

¡ Fast beam: f/8.2 (f/0.7 M1)§ Compact structure: cost

effective, high stiffness§ Enables instruments with

wide field of view

GMT optical layout

Page 8: Update on the Giant Magellan Telescope Project · AO system Installation M1 Segment Installation Instruments Installation Mount Contract Start Enclosure Concrete M1 Cell Testing Mount

GMT primary mirrors - in production

8

Polishing complete

Front surface polishing

Ready for front surface

generating

Rear surface polishing

Cast in Nov 2017

Glass on hand

Glass on order1

2

3

4

5

6

7

Page 9: Update on the Giant Magellan Telescope Project · AO system Installation M1 Segment Installation Instruments Installation Mount Contract Start Enclosure Concrete M1 Cell Testing Mount

5.2m

G-CLEF20,000<R<100,000echelle

GMACSvisiblewide-fieldMOS

GMTIFSAO-fedIFUspectrographandimagerGMTNIRS

AO-fed1-5micronechelle

GMT first-generation science instruments

MANIFESTfacilityfibre system

Page 10: Update on the Giant Magellan Telescope Project · AO system Installation M1 Segment Installation Instruments Installation Mount Contract Start Enclosure Concrete M1 Cell Testing Mount

GMT instrument configuration

10

Page 11: Update on the Giant Magellan Telescope Project · AO system Installation M1 Segment Installation Instruments Installation Mount Contract Start Enclosure Concrete M1 Cell Testing Mount

GMT construction schedule

Site Development

Enclosure Installation

Telescope Installation

AO systemInstallation

M1 Segment Installation

InstrumentsInstallation

Mount Contract

Start

EnclosureConcrete

M1 Cell Testing

Mount Factory

Acceptance

Mount Site Acceptance

Engineering First Light

G-C

LEF

Com

Cam

GM

ACS

GM

TIFS

GM

TNIR

S

MAN

IFES

T

11

Page 12: Update on the Giant Magellan Telescope Project · AO system Installation M1 Segment Installation Instruments Installation Mount Contract Start Enclosure Concrete M1 Cell Testing Mount

¡ September 13–15, 2018¡ Honolulu, Hawaii¡ Deadline for contributed talks:

July 2, 2018¡ No conference fee!¡ http://www.gmtconference.org

GMT Community Science Meeting