+ All Categories
Home > Documents > Updated via email 10/21/2016--L.D. We will dig 12 holes...

Updated via email 10/21/2016--L.D. We will dig 12 holes...

Date post: 09-Aug-2020
Category:
Upload: others
View: 0 times
Download: 0 times
Share this document with a friend
14
We will dig 12 holes for the footings, digging down 4 to 5 feet or until we hit ledge. If we hit ledge before the 4 foot frost line we will pin directly to the ledge. If the terrain permits we will use sono tubes filled with concrete and re-bar. If there is too much moisture we will then use 6x6 pressure treated Lumber to post down. Current boathouse extends 3 ft beyond mean water level. Only hand machinery will be used. (Jack hammer to break up existing Concrete. Updated via email 10/21/2016--L.D.
Transcript
Page 1: Updated via email 10/21/2016--L.D. We will dig 12 holes ...dec.vermont.gov/sites/dec/files/wsm/lakes/docs/Encroachment/221… · If the terrain permits we will use sono tubes filled

We will dig 12 holes for the footings, digging down 4 to 5 feet or until we hit ledge. If we hit ledge before the 4 foot frost line we will pin directly to the ledge.

If the terrain permits we will use sono tubes filled with concrete and re-bar. If there is too much moisture we will then use 6x6 pressure treatedLumber to post down. Current boathouse extends 3 ft beyond mean water level. Only hand machinery will be used. (Jack hammer to break up existing Concrete.

Updated via em

ail 10/21/2016--L.D.

Page 2: Updated via email 10/21/2016--L.D. We will dig 12 holes ...dec.vermont.gov/sites/dec/files/wsm/lakes/docs/Encroachment/221… · If the terrain permits we will use sono tubes filled
Page 3: Updated via email 10/21/2016--L.D. We will dig 12 holes ...dec.vermont.gov/sites/dec/files/wsm/lakes/docs/Encroachment/221… · If the terrain permits we will use sono tubes filled
Page 4: Updated via email 10/21/2016--L.D. We will dig 12 holes ...dec.vermont.gov/sites/dec/files/wsm/lakes/docs/Encroachment/221… · If the terrain permits we will use sono tubes filled
Page 5: Updated via email 10/21/2016--L.D. We will dig 12 holes ...dec.vermont.gov/sites/dec/files/wsm/lakes/docs/Encroachment/221… · If the terrain permits we will use sono tubes filled
Page 6: Updated via email 10/21/2016--L.D. We will dig 12 holes ...dec.vermont.gov/sites/dec/files/wsm/lakes/docs/Encroachment/221… · If the terrain permits we will use sono tubes filled
Page 7: Updated via email 10/21/2016--L.D. We will dig 12 holes ...dec.vermont.gov/sites/dec/files/wsm/lakes/docs/Encroachment/221… · If the terrain permits we will use sono tubes filled
Page 8: Updated via email 10/21/2016--L.D. We will dig 12 holes ...dec.vermont.gov/sites/dec/files/wsm/lakes/docs/Encroachment/221… · If the terrain permits we will use sono tubes filled
Page 9: Updated via email 10/21/2016--L.D. We will dig 12 holes ...dec.vermont.gov/sites/dec/files/wsm/lakes/docs/Encroachment/221… · If the terrain permits we will use sono tubes filled
Page 10: Updated via email 10/21/2016--L.D. We will dig 12 holes ...dec.vermont.gov/sites/dec/files/wsm/lakes/docs/Encroachment/221… · If the terrain permits we will use sono tubes filled
Page 11: Updated via email 10/21/2016--L.D. We will dig 12 holes ...dec.vermont.gov/sites/dec/files/wsm/lakes/docs/Encroachment/221… · If the terrain permits we will use sono tubes filled
Page 12: Updated via email 10/21/2016--L.D. We will dig 12 holes ...dec.vermont.gov/sites/dec/files/wsm/lakes/docs/Encroachment/221… · If the terrain permits we will use sono tubes filled
Page 13: Updated via email 10/21/2016--L.D. We will dig 12 holes ...dec.vermont.gov/sites/dec/files/wsm/lakes/docs/Encroachment/221… · If the terrain permits we will use sono tubes filled
Page 14: Updated via email 10/21/2016--L.D. We will dig 12 holes ...dec.vermont.gov/sites/dec/files/wsm/lakes/docs/Encroachment/221… · If the terrain permits we will use sono tubes filled

Recommended