Description:
Updates of the APGrid PMA. Yoshio Tanaka APGrid PMA, Chair Grid Technology Research Center, AIST, Japan. APGridPMA: Members. Geographical locations (except US and AU). APGrid CAs (accredited, 1/3). Australia APACGrid CA Accredited in Nov. 2005 Started the operation in Feb. 2006 - PowerPoint PPT Presentation
Popular Tags:
16
National Institute of Advanced Industrial Science and Technology Updates of the APGrid PMA Yoshio Tanaka Yoshio Tanaka APGrid PMA, Chair APGrid PMA, Chair Grid Technology Research Center, Grid Technology Research Center, AIST, AIST, Japan Japan
Transcript
Page 1: Updates of the APGrid PMA

National Institute of Advanced Industrial Science and Technology

Updates of the APGrid PMA

Yoshio TanakaYoshio TanakaAPGrid PMA, ChairAPGrid PMA, Chair

Grid Technology Research Center,Grid Technology Research Center,AIST,AIST, Japan Japan

Page 2: Updates of the APGrid PMA

APGridPMA: MembersAffiliation Name Production CA Experimental CA

AIST / Japan Yoshio Tanaka in operation in operation (limited use)

ASCC / Taiwan Eric Yen in operation none

KISTI / Korea Sangwan Kim in operation none

CNIC/SDG / China Kai Nan under review in operation

IHEP / China Gonxing Sun in operation none

APAC/Australia David Bannon in operation will close

NAREGI/Japan Masataka Kanamori in operation closed

NCHC / Taiwan Tsung-Ying Wu accredited in operation (limited use)

SDSC(PRAGMA) / USA Mason Katz planning planning

NECTEC / Thailand Sornthep Vannarat Planning in operation

NGO / Singapore Jon Lau under review none

ThaiGrid / Thailand Sugree Phatanapherom Planning Planning

KEK / Japan Takashi Sasaki in operation will close

HKU / HongKong Chen Lin, Elaine no plan in operation

U of Hyd / India Arun Agarwal no plan in operation

USM / Malaysia Boon Yaik no plan in operation

Osaka U / Japan Susumu Date planning in operation

Page 3: Updates of the APGrid PMA

Geographical locations (except US and AU)

Page 4: Updates of the APGrid PMA

APGrid CAs (accredited, 1/3)AustraliaAustralia

APACGrid CAAccredited in Nov. 2005Started the operation in Feb. 2006Audited in March 2006David Bannon, Graham Jenkins, Chris KendrickIssues certificates for LCG

ChinaChinaIHEP CA

Accredited in May 2005 (already in operation)Audited in December 2005

profile of the root cert. has been changedGongxing Sun, Gang Chen, Fan HuaXiangIssues certificates for LCG

CNIC / SDG CAAccredited in Dec. 2005.Not yet in operationGoing to launch a new CA

hierarchical CAneed to be accredited again

Kai Nan, Morrise Xu,

Page 5: Updates of the APGrid PMA

APGrid CAs (accredited, 2/3)

JapanJapanAIST GRID CA

Accredited in Sep. 2004Started the operation in March 2005Audited in March 2005 Yoshio Tanaka, + 5 staffs

NAREGI CAAccredited in Nov. 2005Started the operation in Feb. 2006Not yet auditedCurrently, removed from IGTF CA distributionMasataka Kanamori, + 4 staffs

KEK Grid CAAccredited in Jan. 2006Started the operation in Feb. 2006Not yet auditedTakashi Sasaki, + 2~3 staffsIssues certificates for LCG

Page 6: Updates of the APGrid PMA

APGrid CAs (accredited, 3/3)KoreaKorea

KISTI GRID CAAccredited in Aug. 2004. (already in operation)Not yet auditedSangwan Kim, Jae-hyuck KwakIssues certificates for LCG

TaiwanTaiwanASGCC CA

Operated by Academia Sinica Grid Computing CenterAccredited in Sep. 2004. (already in operation)Audited in Aug. 2005Eric Yen, C.C. Chang, + 1~2 operatorsIssues certificates for LCG

NCHC Grid CAOperated by National Cener for High-performance ComputingAccredited in Feb. 2006Not yet in operationAlex Wu, Weicheng Huang, + 1~2 operators

Page 7: Updates of the APGrid PMA

APGrid CAs (under review, planned)SingaporeSingapore

NGO CAwill be operated by National Grid Office and Netrust Inc.CP/CPS under reviewwill issue certificates for LCG

ThailandThailandNECTEC CA

will be operated by National Electronics and Computer Technology Centerdrafting CP/CPS

Thai National Grid Centerwill be operated by Thai National Grid Centerdrafting CP/CPS

USAUSAPRAGMA CA

will be operated by SDSCplanning to be a catch-all CA for PRAGMA membersdrafting CP/CPS

Page 8: Updates of the APGrid PMA

APGrid CAs (general membership)

ChinaChinaUniv. of Hong Kong

IndiaIndiaUniv. of Hyderabad

JapanJapanOsaka Univ.

MalaysiaMalaysiaUniv. Sains Malaysia

Page 9: Updates of the APGrid PMA

Grid Communities in Asia Pacific – at a glance –

ApGrid: Asia Pacific Partnership for Grid ComputingApGrid: Asia Pacific Partnership for Grid ComputingOpen Community as a focal point

more than 40 member institutions from 15 economicsKick-off meeting: July 2000, 1st workshop: Sep. 2001

PRAGMA: Pacific Rim Applications and Grid Middleware AssemblyPRAGMA: Pacific Rim Applications and Grid Middleware AssemblyNSF funded project led by UCSD/SDSC

30 member institutionsEstablish sustained collaborations and advance the use of the grid technologies1st workshop: Mar. 2002, 10th workshop: next month!

APAN (Asia Pacific Advanced Network) Grid CommitteeAPAN (Asia Pacific Advanced Network) Grid CommitteeBridging APAN application communities and Grid communities outside of APANGrid WG was launched in 2002, re-organized as a committee in 2005

APGrid PMA: Asia Pacific Grid Policy Management AuthorityAPGrid PMA: Asia Pacific Grid Policy Management AuthorityGeneral Policy Management Authority in the Asia Pacific Region

16 member CAsA founding member of the IGTF (International Grid Trust Federation)Officially started in June 2004

APEC/TEL APGridAPEC/TEL APGridBuilding social frameworkSemi-annual workshops

APAN (Asia Pacific Advanced Network) Middleware WGAPAN (Asia Pacific Advanced Network) Middleware WGShare experiences on middleware.Recent topics include ID management and National Middleware Efforts.Approved in January 2006.

Page 10: Updates of the APGrid PMA

NSF-funded project lead by NSF-funded project lead by UCSD/SDSC. UCSD/SDSC.

11stst workshop was held in March workshop was held in March 2002.2002.

Establish sustained collaborations Establish sustained collaborations and advance the use of the Grid and advance the use of the Grid technologies for applications.technologies for applications.

Expected outcomes:Expected outcomes:Advance scientific applicationsIncrease productive and effective use of the grid by researchers and scientists in the Pacific RimIncrease interoperability of grid middleware in Pacific Rim and throughout the world

Tightly collaborating with ApGrid.Tightly collaborating with ApGrid.Having workshops 2~3 times a year.Having workshops 2~3 times a year.

Pacific Rim Application and Grid Middleware

Assembly

Page 11: Updates of the APGrid PMA

PRAGMA && TAGPMA

ChilleChilleCICESE (Centro de Investigacion Cientifica y de Education Superior de Ensenada)

MexicoMexicoUNAM (Universidad Nacional Autonoma de Mexico)

As of today, UNAM is not an institutional member

USAUSANCSAPNG (Pacific Northwest Gigapop)Starlight (located at Univ. Illinois, Chicago)Transpac (located at Indiana Univ.)UCSDSDSC

Page 12: Updates of the APGrid PMA

APGridPMA: Status & ActivitiesAccreditation of CAsAccreditation of CAs

9 accredited CAsAIST, APAC, ASGCC, CNIC, IHEP, KEK, KISTI, NAREGI, NCHC

7 CAs are in operationCNIC/SDG will change the structure and will be re-accredited

AuditAuditAIST, APAC, ASGCC, IHEP have been audited by the other CAs.

Regular (monthly) VTC.Regular (monthly) VTC.Brief status reports of each CAIn-depth report of a CADecisions

Examination for accreditation of a CAApproval of charter, minimum CA requirements, etc.

Open discussions(physical) face-to-face meeting (at least) once per year.(physical) face-to-face meeting (at least) once per year.

1st face-to-face meeting was in Dec. 2005, Beijing.2nd meeting will be in Oct. 15, 2006, Osaka, Japan.

Page 13: Updates of the APGrid PMA

Some UpdatesIssues to be discussedIssues to be discussed

Accreditation of NGO/Netrust CASome information are confidentialToo short validity period of CRLNetrust CA agreed with disclosing audit report to the APGrid PMA auditors

Accreditation of CNIC/SDG CAhierarchical CA

IGTF CA distribution from the APGrid PMAWill need to limit the number of CAs per region

Japanese universities will build UPKIChina has some national/international Grid projectNeed to consider hierarchical structure of PMAs

Page 14: Updates of the APGrid PMA

Proposed audit items

NAREGI PKI WG has subjectively selected criteria for auditinNAREGI PKI WG has subjectively selected criteria for auditing Grid CAs.g Grid CAs.

based on AICPA/CICA WebTrustSM/TM Program for Certification Authorityminimum CA requirements of APGrid PMA and EUGrid PMA

Web TrustWeb TrustWebTrust is a seal awarded to web sites that consistently adhere to certain business standards established by the Canadian Institute of Chartered Accountants (CICA.ca) and the American Institute of Certified Public Accountants (AICPA). In the program, “Web Trust Principles and Criteria for Certification Authorities” lists criteria for CAs.

may too much for Grid CAs.

Page 15: Updates of the APGrid PMA

Audit checklist

Simply pickup items from WebTrustSimply pickup items from WebTrustSM/TMSM/TM criteria ba criteria based on minimum CA requirements.sed on minimum CA requirements.The number of criteria:The number of criteria:

WebTrustWebTrustSM/TMSM/TM Check ListCheck List

Principle 1Principle 1 4545 1313

Principle 2Principle 2 188188 1414

Principle 3Principle 3 165165 77

OthersOthers 44

Page 16: Updates of the APGrid PMA

Rough procedures for auditing

Pre examination (few days)Pre examination (few days)Review all available documents

CP/CPS, User’s manual, Operational manual, CRL, CA Certificate, etc.Prepare score sheet

Main examination (half day)Main examination (half day)Interview to CA staffs

Detailed flow of identifying end entities and issuing certificatesHow accesses to the CA private key is controlled

Inspection of equipmentsCA server, CA room, backup media, archived logs, a safe box, etc.

Post examination (half day)Post examination (half day)Draft and send an audit reportThe audited CA is requested to send a report on plans for the improvements in 1 week