  • 7/29/2019 Upgrade Manufacturing and OM

    1/81

    Upgrade to R12 Now

    Manufacturing andOrder Management

    Presented by:

    Bob Bullman, BizTech

  • 7/29/2019 Upgrade Manufacturing and OM

    2/81

    Upgrade to R12 Now OAUG eLearning

    Sessions

    Presentation Date Presenter Company

    Upgrade to R12 Now A

    Financials OverviewJul 19, 2012 Lee Briggs

    Upgrade to R12 Now A

    Deep Dive into General

    Ledger

    Jul 26, 2012 Mohan Iyer

    Upgrade to R12 Now The

    International and Multi-

    National Arena

    Aug 2, 2012

    Marsha

    Edgell/Thomas

    Simkiss

    Upgrade to R12 Now

    Improvements in Cost

    Management

    Aug 9, 2012 Douglas Volz

    Upgrade to R12 Now

    Manufacturing and OrderProcessing Aug 15, 2012 Bob Bullman

    Upgrade to R12 Now

    Realizing Enterprise Value

    with Projects R12

    Aug 23, 2012 Mike Lennon

    Upgrade to R12 Now

    Round Table DiscussionAug 30, 2012 Thomas Simkiss

    2

  • 7/29/2019 Upgrade Manufacturing and OM

    3/81

    Bob Bullman

    Oracle Applications Practice DirectorProfessional Summary:

    Professional Supply Chain Consultant (15+ years implementing Oracle Applications)

    Held multiple management positions at Oracle within the Applications group

    Advanced Planning and Distribution optimization expert

    R12 Solution Architect ( Manufacturing, Order Management, and Service )

    Techno-Functional consultant

    Qualification Summary:

    APICS Certified at the Fellow level

    Prior certification in Oracle Manufacturing and Supply Chain modules Bachelors Degree in Finance

    Project Experience:

    Full suite R12 Financials, Order Management, and Manufacturing, including VAT taxation

    Implemented many other R12 and 11i installs, as well as prior version of Oracle including CRM (E-Bus only)

    Presented at many different types user groups and professional organizations (APICS, OAUG)

    Designed and coded many extensions to the E-Business suite, as well as performed numerous data

    conversions.

    3

  • 7/29/2019 Upgrade Manufacturing and OM

    4/81

    Objective

    Emphasize the changes in R12 that are improvements /

    advancements from prior 11i versions based on my experiences.

    Discuss the benefit or business requirement that can be satisfied.

    Manufacturing modules (BOM, WIP, INV, PO/MRP)

    Order Management

    Service Contracts and Installed Base

    PIM (Product Information Management

    Data Hub)

    Quality Module New reporting tools available

    Module trivia

    4

  • 7/29/2019 Upgrade Manufacturing and OM

    5/81

    Why upgrade now?

    Why Not?

    More features and

    functions

    Much Improvedreporting capability

    Improved Tech Stack

    Tables remain the same

    OPM using more

    common functions

    5

    Services Order Management

    Purchasing

    Inventory

    WIP

  • 7/29/2019 Upgrade Manufacturing and OM

    6/81

    Checked each version for this one.

    6

    RM

    WIP FG

  • 7/29/2019 Upgrade Manufacturing and OM

    7/81

    Balance Sheet by FG Product type

    Needed separate finished goods accounts so

    balance sheet has values in different accounts

    Modems Detergents

    Antennas Household cleaners Routers Candles

    Also received items might be finished goods

    Distributors

    Spare Parts

    No more logical sub inventories for account numbers!

    7

  • 7/29/2019 Upgrade Manufacturing and OM

    8/81

    SLA = Centralized Accounting Model,Rules, Engine and RepositoryDr Cr

    Projectseceivables

    Payables

    Inventory

    General Ledgereneral Ledger

    Work in Process Purchasing

    You can change the

    accounting without using triggers.

  • 7/29/2019 Upgrade Manufacturing and OM

    9/81

    Modules with very little change

    Engineering (same approvals)

    Capacity

    Work-In-Process

    PO Receiving

    Bills and Routings

    Makes upgrading easier

    9

  • 7/29/2019 Upgrade Manufacturing and OM

    10/81

    BizTech Vision Instance

    10

  • 7/29/2019 Upgrade Manufacturing and OM

    11/81

    Bill of Material

    Fixed component usage support

    Inverse component usage

    Update Material Control in Common Bills

    (caused not using common bills) Phantom Labor can be included in cost rollup!

    11

  • 7/29/2019 Upgrade Manufacturing and OM

    12/81

    Lot basis just like in Routings

    12

  • 7/29/2019 Upgrade Manufacturing and OM

    13/81

    Two boxes only even

    if you make 100

    13

  • 7/29/2019 Upgrade Manufacturing and OM

    14/81

    Quantity per of 1 (lot)

    14

    Always wanted to define on a BOM that they

    just need one or two with each Discrete Job.

  • 7/29/2019 Upgrade Manufacturing and OM

    15/81

    Some Examples of Use

    Tooling

    Track pallets

    Setup kit, drawing

    Inverse component usage

    .002 or 500

    15

  • 7/29/2019 Upgrade Manufacturing and OM

    16/81

    500 per Box

    16

  • 7/29/2019 Upgrade Manufacturing and OM

    17/81

    Update Material Control in

    Common Bills While retaining a common BOM relationship, users can update the

    following attributes at the org level:

    Operation Sequence

    WIP Supply Type

    Sub-Inventory

    Locator Include in cost roll-up

    Benefits:

    Facilitates standardization by deploying common bills while enabling

    typical organization overrides

    17

  • 7/29/2019 Upgrade Manufacturing and OM

    18/81

    Common BOM process is the same

    18

  • 7/29/2019 Upgrade Manufacturing and OM

    19/81

    Locks all but the new fields

    19

  • 7/29/2019 Upgrade Manufacturing and OM

    20/81

    Material Control different in E1

    20

  • 7/29/2019 Upgrade Manufacturing and OM

    21/81

    Phantom Labor included in cost rollup option

    Phantoms have many uses

    One is to define parts being made and the

    labor time, but no need to transact them

    Problem was the labor did not rollup

    21

  • 7/29/2019 Upgrade Manufacturing and OM

    22/81

    22

  • 7/29/2019 Upgrade Manufacturing and OM

    23/81

    Work In Process

    Component Usage EnhancementsReport Fixed Component Usage

    Scheduling Workbench New Features

    Print Gantt Charts

    23

  • 7/29/2019 Upgrade Manufacturing and OM

    24/81

    Making 100, but need

    2 boxes for each Job

    24

  • 7/29/2019 Upgrade Manufacturing and OM

    25/81

    Inventory

    Material Status Used for Lot control before QA Approval is

    complete you can not reserve a lot.

    Defining Picking Rules

    Used to only be one for shipping and Discrete Job

    picking.

    Now you can have many!

    OPM Inventory Convergence

    Uses common inventory (lot status and more)

    Shipping and reserving

    25

  • 7/29/2019 Upgrade Manufacturing and OM

    26/81

    Material Status control restricts the movement and usage of

    portions of on-hand inventory. Using material status control enables you to control whether

    you can pick or ship an internal order or sales order, or issue

    material for a work order. You can also specify whether

    material needs to be quarantined until you inspect it. In addition, you can determine whether products with a

    particular status can be reserved, included in available to

    promise calculations, or netted in production planning.

    You assign material statuses at four levels: subinventory,locator, lot, and serial.

    Used to have a creative way of doing this one (first locator had

    security turned on) RW- I-1-A-1 move to RW A-1-1FDA

    approved 26

    Material Status

  • 7/29/2019 Upgrade Manufacturing and OM

    27/81

    27

    Here is one example

  • 7/29/2019 Upgrade Manufacturing and OM

    28/81

    28

    Examples

    Control transactions without having to move inventory to anon-reserve-able sub-inventory.

    Hold lots until they are approved or expired

    QC must approved or test before production can use the

    material (or ship it).

  • 7/29/2019 Upgrade Manufacturing and OM

    29/81

    You can create picking rules that enable you to sort picksbased on criteria that you define for sales orders, process

    manufacturing batches, or work in process jobs.

    Oracle Inventory reviews the picking criteria order and the

    options for each criterion.

    29

    Enhanced Picking Rules

  • 7/29/2019 Upgrade Manufacturing and OM

    30/81

    30

    There was only one rule shared w/Shipping

    and WIP in 11i

  • 7/29/2019 Upgrade Manufacturing and OM

    31/81

    Serial / Lot Genealogy and TrackingAlways Know the Source and Placement of Each Part

    Boards R UsDenver, CO

    Acme ChipFab 12

    E. StorageAustin, TX

    SKD Co.S. Korea

    Nippon FabJapan

    IrelandManufacturing

    Partner

    Comp

    osition

    Where

    Used

    Suppliers

    Trace a customer shipment back to the original source

    Trace a lot or individually serialized product through supply base

    Server

    (S.No. 512)

    Disk B

    (S.No. 339)Disk A

    (S.No. 676)

    Disk Array

    (S.No. 892)Memory

    (Lot No. 115)CPU

    (S.No. 232)

    Storage

    (S.No. 929)PCI Board

    (S.No. 717)

  • 7/29/2019 Upgrade Manufacturing and OM

    32/81

    Purchasing/MRP

    Auto-Approval Tolerances for Change Orders

    This one is long overdue, still creates new revision.

    Changing dates when not using iSupplier can be very time

    consuming and most often didnt require approval.

    Buyer Work Center

    HTML PO Summary and change without so many levels. Easier user interface with all a buyer needs in one html form

    Auto-create PO, create and query POs and blankets

    Rescheduling of PO from ASCP ******

    Works well for Planner/Buyer role (i.e. the planner for an item is the

    buyer too)

    Could always do this with unreleased Discrete Jobs.

    BI/XML Publisher used for PO layout.

    32

  • 7/29/2019 Upgrade Manufacturing and OM

    33/81

    33

    WithinTolerances?

    ChangePO

    BypassApproval

    Routefor

    Approval

    Tolerances

  • 7/29/2019 Upgrade Manufacturing and OM

    34/81

    HTML Maintenance

    34

  • 7/29/2019 Upgrade Manufacturing and OM

    35/81

    Single level change, just click on tab

    35

  • 7/29/2019 Upgrade Manufacturing and OM

    36/81

    Order Management

    Adaptable User Interface

    Item Order-ability

    Enhanced Inventory Reservations(Reservations against WIP and Purchasing)

    36

  • 7/29/2019 Upgrade Manufacturing and OM

    37/81

    Adaptable User Interface

    37

  • 7/29/2019 Upgrade Manufacturing and OM

    38/81

    Quick Organizer Configurability

    Study order entry flow and streamline (Masschange was missing and more in the past)

    Map to improve user experience

    Many other tools are available Defaulting rules

    Forms personalization

    38

  • 7/29/2019 Upgrade Manufacturing and OM

    39/81

    Item Order-ability

    Businesses need to be able to order specific products depending on specific

    customers. Instead of being able to view and select all items for all customers inthe sales orders window, you can now restrict the item list based on customer and

    other related criteria.

    If the value of the profile option OM: Use Materialized View for Items LOV

    (Honours Item Orderability Rules) is set to No, then the Ordered Items LOV lists all

    the items of the item validation organization of the current operating unit. Thisdoesn't consider the defined item orderability rules, however if there is a defined

    rule that prevents the item from being ordered, then an error message is displayed

    during the saving of the order. You will not be able to save the order.

    39

  • 7/29/2019 Upgrade Manufacturing and OM

    40/81

    Item Order-ability

    40

  • 7/29/2019 Upgrade Manufacturing and OM

    41/81

    Link Item and Customer Category

    41

  • 7/29/2019 Upgrade Manufacturing and OM

    42/81

    Reservations Improvements

    Reserve inbound supply including POs New screen for improved manual allocations

    42

  • 7/29/2019 Upgrade Manufacturing and OM

    43/81

    Improved Reservation Screen

    43

  • 7/29/2019 Upgrade Manufacturing and OM

    44/81

    New Tools option

    44

  • 7/29/2019 Upgrade Manufacturing and OM

    45/81

    Default Qty. makes selecting easy.

    45

    Enter and book Sales Order

  • 7/29/2019 Upgrade Manufacturing and OM

    46/81

    Progress the line and a Discrete Job will be created.

    View the Job number by going to the following action results

    screen.

    Reserving Discrete Jobs

  • 7/29/2019 Upgrade Manufacturing and OM

    47/81

    Here are the reservations that you can view.

    Reservation is to Discrete Job until the product is

    reported as made.

    Did a WIP Move complete transaction and the inventory

    is now reserved.

    Reservation changes to be linked to inventory after the product is made,

    but the tables still track the original discrete job link. Here is the shipped

    order status after the shipping process is completed.

    Linking Sales Order lines to Discrete Jobs

  • 7/29/2019 Upgrade Manufacturing and OM

    48/81

    Service Contracts

    Improved Approvals

    AME and Portal Approval

    Renewals can skip approval

    Launchpad Improved, well as HTML available (New Search

    and Inquiry using HTML) Enhanced Installed Base Integration

    Easy add screen Forms or HTML

    Easy select of current records

    New Search and Inquiry using HTML

    Deferred Revenue options available

    48

  • 7/29/2019 Upgrade Manufacturing and OM

    49/81

    Launchpad is still nice, IB improved

    49

  • 7/29/2019 Upgrade Manufacturing and OM

    50/81

    Installed Base records show below

    50

    Q i k dd f I t ll d B d

  • 7/29/2019 Upgrade Manufacturing and OM

    51/81

    Quick add of Installed Base records

    from Contract

    51

    F Si i / A l d

  • 7/29/2019 Upgrade Manufacturing and OM

    52/81

    For Signing / Approval use respond

    for portal access

    52

  • 7/29/2019 Upgrade Manufacturing and OM

    53/81

    Portal Approval

    53

  • 7/29/2019 Upgrade Manufacturing and OM

    54/81

    Installed-Base

    Entirely new HTML userinterface...dramatically improved functionality

    11.5.10 to be virtually unusable in its former state

    Increased integration across Service Contracts,OM and Field Service allowing easy instance

    creation, update and transfer

    54

  • 7/29/2019 Upgrade Manufacturing and OM

    55/81

    55

  • 7/29/2019 Upgrade Manufacturing and OM

    56/81

    PIM Functionality (Introduction only)

    Product Information ManagementData Hub

    PIM Functionality can satisfy the following:

    Upload new Items Assign new Items to categories

    Assign new Items to orgs

    56

  • 7/29/2019 Upgrade Manufacturing and OM

    57/81

    Sample

    Scenario: Need to setup 10+ new items Create Master Items in Master Org (V1)

    Assign Items to Inventory Org (M1)

    Update Category Assignments for all Items (in M1org)

    57

  • 7/29/2019 Upgrade Manufacturing and OM

    58/81

    Excel import options

    58

  • 7/29/2019 Upgrade Manufacturing and OM

    59/81

    Excel import template w/data

    59

  • 7/29/2019 Upgrade Manufacturing and OM

    60/81

    Upload Parameters

    60

    Upload Parameters

  • 7/29/2019 Upgrade Manufacturing and OM

    61/81

    Conc. Request & Log File w/results

    61

  • 7/29/2019 Upgrade Manufacturing and OM

    62/81

    View Log & Query Item Master

    62

  • 7/29/2019 Upgrade Manufacturing and OM

    63/81

    Manual Item Creation

    63

  • 7/29/2019 Upgrade Manufacturing and OM

    64/81

    Inventory Setup Functions

    Can perform the following functions in PIM, same as

    in Inventory responsibility

    Define item templates

    Define item catalog categories

    Define item attachment categories

    Define item statuses

    Define cross-reference types

    64

    l d l

  • 7/29/2019 Upgrade Manufacturing and OM

    65/81

    Quality Module

    Sample Plans Skip Plans

    HTML entry (single and multiple line entry)

    65

    Q li M d l

  • 7/29/2019 Upgrade Manufacturing and OM

    66/81

    Quality Module

    66

    Supplier Input Production Field Failures

    Quality Collection Plans

    Data

    Repository

    Quality Analysis Tools

    Reports Online Inquiries Charts

    ActionsandNotifications

    ElectronicDocuments

    S ifi i

  • 7/29/2019 Upgrade Manufacturing and OM

    67/81

    Specifications

    67

    Item: 2601

    Item Name: Automotive Pinion

    Process Procedure

    Pinion stock is cut with spines and the shaft is turned to

    specifications to fit sleeve.

    Characteristics

    Shaft Diameter

    Spine Cut DepthShaft Cut Length

    UOM

    Inches

    InchesInches

    Target Value

    3.14

    0.622.5

    Lower

    Spec.

    Limit

    3.135

    0.595

    22.494

    Upper

    Spec.

    Limit

    3.145

    0.605

    22.505

    Data Collection Options

  • 7/29/2019 Upgrade Manufacturing and OM

    68/81

    ata Co ect o Opt o s

    68

    Directly

    Transactions

    CollectionImport

    Quality DataRepository

    Query, Report, and Export Data

  • 7/29/2019 Upgrade Manufacturing and OM

    69/81

    Q y, p , p

    69

    Quality Data

    Repository

    Query

    Reports

    Export

    Ski l t l

  • 7/29/2019 Upgrade Manufacturing and OM

    70/81

    70

    Skip lot example

    S l Pl E l

  • 7/29/2019 Upgrade Manufacturing and OM

    71/81

    Sample Plan Example

    71

    S l Pl E l ti d

  • 7/29/2019 Upgrade Manufacturing and OM

    72/81

    Sample Plan Example continued

    72

    O l R t

  • 7/29/2019 Upgrade Manufacturing and OM

    73/81

    73

    Oracle Reports

    Seeded report discussion Mainly RDFs for Years

    Some C reports (MRP Outputs)

    Spawned reports layouts- Receipt traveler - Pick Slip

    - Statements - Packing Slip

    PL/SQL Packages with delimiters BI Publisher (better)

    I t ll th l t

  • 7/29/2019 Upgrade Manufacturing and OM

    74/81

    74

    Install the sample - steps

    Create Concurrent Program Create Data Definition

    Update XML

    Create Template Upload RTF

    Add to Request Group

    Test Report (PDF or Excel)

    Process Overview

  • 7/29/2019 Upgrade Manufacturing and OM

    75/81

    75

    Creating customized reports using XML Publisher can be divided into two phases:

    Design Time and Runtime.

    Design Time

    1. Register the E-Business Suite report as a Data Definition in the Template Manager.

    Create a Data Definition in the Template Manager for E-Business Suite reports that

    you wish to customize using XML Publisher.

    2. Design your template.

    Your template files can be either in Rich Text Format (RTF) or Portable Document

    Format (PDF).3. Register your Template in the Template Manager.

    When you create the template in the Template Manager, you register and upload

    your RTF or PDF template files. The Template must be assigned to the Data

    Definition Code of the E-Business Suite report with which it will be merged.

    Runtime

    1. Set the concurrent program to generate XML.

    2. Run the concurrent program using standard request submission. If you are using the Submit Request form, the Layout field of the Upon

    Completion region displays the currently selected template. To change the

    template, template language, or output format select the Options button.

    Here is what you get!

  • 7/29/2019 Upgrade Manufacturing and OM

    76/81

    Here is what you get!

    Reports output right into Excel Layout changes done using MS Word

    PL/SQL can be loaded from within the Apps

    Etc

    76

    Old Standard Reports

  • 7/29/2019 Upgrade Manufacturing and OM

    77/81

  • 7/29/2019 Upgrade Manufacturing and OM

    78/81

    What I didnt cover

  • 7/29/2019 Upgrade Manufacturing and OM

    79/81

    What I didn t cover

    Discrete Manufacturing with MES ASCP

    OPM

    Additional improvements across the SupplyChain modules

    Edge products integration

    Configurator (very good in R12) Etc

    79

    Why upgrade now?

  • 7/29/2019 Upgrade Manufacturing and OM

    80/81

    Why upgrade now?

    Why Not?

    More features and

    functions

    Much Improvedreporting capability

    Improved Tech Stack

    Tables remain the same

    OPM using more

    common functions

    80

    Services Order Management

    Purchasing

    Inventory

    WIP

  • 7/29/2019 Upgrade Manufacturing and OM

    81/81

    Any Questions?

    Bob BullmanDirector, Oracle Applications

    Practice

    [email protected]

    mailto:[email protected]:[email protected]:[email protected]