+ All Categories
Home > Documents > Upgrading Al Salam Street and Eastern Corniche S A The Projectsrauk.co.uk/pdf/AlSalam.pdf ·...

Upgrading Al Salam Street and Eastern Corniche S A The Projectsrauk.co.uk/pdf/AlSalam.pdf ·...

Date post: 08-May-2020
Category:
Upload: others
View: 8 times
Download: 0 times
Share this document with a friend
6
Upgrading Al Salam Street and Eastern Corniche The Project S A SRA Consultancy Services Ltd is registered in England and Wales as a Limited Company Registration Number 6313626 1 The project comprises of 2.4 KM of tunnel construction, 1.0 Km of tunnel approaches, 4 no. underpasses, one major bridge and approximately 7.7KM of road construction, in addition to major utility works. In addition to the above, it is proposed to use the latest technology and state of the art integrated highway management and communication systems to operate the main tunnel, (SCADA and TCS systems). Challenges Dense Urban Location Geotechnical Conditions Necessity to maintain live traffic in the area Excavation Support System Close proximity of buildings Cavity Complexity of utility Network Solutions Necessity to maintain live traffic in the CBD area: Closure of Al Salam in Stages Maintain intersections to remain open to traffic Carefully planned detours to complete surface, service and by pass roads Construction of temporary structures Utility bridges and corridors Traffic / working decks Pedestrian bridges (detour)
Transcript
Page 1: Upgrading Al Salam Street and Eastern Corniche S A The Projectsrauk.co.uk/pdf/AlSalam.pdf · Upgrading Al Salam Street and Eastern Corniche The Project S A SRA Consultancy Services

Upgrading Al Salam Street and Eastern Corniche

The Project S A

SRA Consultancy Services Ltd is registered in England and Wales as a Limited Company

Registration Number 6313626 1

The project comprises of 2.4 KM of tunnel construction, 1.0 Km of tunnel approaches, 4 no. underpasses, one major bridge and approximately 7.7KM of road construction, in addition to major utility works. In addition to the above, it is proposed to use the latest technology and state of the art integrated highway management and communication systems to operate the main tunnel, (SCADA and TCS systems).

Challenges Dense Urban Location Geotechnical Conditions Necessity to maintain live traffic in the area Excavation Support System Close proximity of buildings Cavity Complexity of utility Network Solutions Necessity to maintain live traffic in the CBD area: Closure of Al Salam in Stages Maintain intersections to remain open to traffic Carefully planned detours to complete surface, service and by pass roads Construction of temporary structures Utility bridges and corridors Traffic / working decks Pedestrian bridges (detour)

Page 2: Upgrading Al Salam Street and Eastern Corniche S A The Projectsrauk.co.uk/pdf/AlSalam.pdf · Upgrading Al Salam Street and Eastern Corniche The Project S A SRA Consultancy Services

Upgrading Al Salam Street and Eastern Corniche

Tunnel Base Slab Construction S A

SRA Consultancy Services Ltd is registered in England and Wales as a Limited Company

Registration Number 6313626 2

Page 3: Upgrading Al Salam Street and Eastern Corniche S A The Projectsrauk.co.uk/pdf/AlSalam.pdf · Upgrading Al Salam Street and Eastern Corniche The Project S A SRA Consultancy Services

Upgrading Al Salam Street and Eastern Corniche

Progress & Construction Performance – Storm Water Line - UAE S A

Manhole Construction

SRA Consultancy Services Ltd is registered in England and Wales as a Limited Company

Registration Number 6313626 3

Page 4: Upgrading Al Salam Street and Eastern Corniche S A The Projectsrauk.co.uk/pdf/AlSalam.pdf · Upgrading Al Salam Street and Eastern Corniche The Project S A SRA Consultancy Services

Upgrading Al Salam Street and Eastern Corniche

Main Tunnel – Progress & Construction Performance - UAE S A

SRA Consultancy Services Ltd is registered in England and Wales as a Limited Company

Registration Number 6313626 4

As with any project of this magnitude, it has its fair share of challenges, however what makes this project so unique, and stands way out above the rest, is the major challenges’ in dealing with pedestrians, live traffic through the city centre, adjacent buildings and above all the mammoth task of diverting the main arteries of utility services that runs through the city.

Page 5: Upgrading Al Salam Street and Eastern Corniche S A The Projectsrauk.co.uk/pdf/AlSalam.pdf · Upgrading Al Salam Street and Eastern Corniche The Project S A SRA Consultancy Services

Upgrading Al Salam Street and Eastern Corniche

Main Tunnel – Progress & Construction Performance - UAE S A

SRA Consultancy Services Ltd is registered in England and Wales as a Limited Company

Registration Number 6313626 5

Page 6: Upgrading Al Salam Street and Eastern Corniche S A The Projectsrauk.co.uk/pdf/AlSalam.pdf · Upgrading Al Salam Street and Eastern Corniche The Project S A SRA Consultancy Services

Upgrading Al Salam Street and Eastern Corniche

Construction of Al Reem Bridge – UAE S A


Recommended