Upper right side edentulous site with missing teeth upper second bicuspid and upper first molarIn determining a treatment plan for this side evaluating closely the topography of the bone and gingiva is essential to the esthetic final result
SMILEBYDESIGNNY.COM
Diagnostic casts displays the planning stage for placing 2 implants the upper left side quadrant.
SITE #14,15 GUIDE PINS FOR SITE #14,15
SMILEBYDESIGNNY.COM
Angulation of placement ,width of the bone is evaluated
SURGICAL STENT PLANNINGA three dimensional view of the entry point to confirm the parallelism of our procedure. This will be incorporated in the surgical stent once every aspect of the design has been confirmed.
SMILEBYDESIGNNY.COM
CT SCAN REPRESENTATION OF UL EDENTULOUS AREA SITE #13 AND 14 FOR TOOTH REPLACEMENT
A cross section of the edentulous site shows there is sufficient height of >12mm at site #13 and 10mm height at site #14 to proceed with implant placement.
SITE #14
SMILEBYDESIGNNY.COM
CT SCAN OF SITE #13THE HEIGHT IS APPROX 10MM FROM THE CREST OF THE BONE TO THE BASE OF THE SINUS
SITE #13
SMILEBYDESIGNNY.COM
CLINICAL VIEW OF SITE #13 AND 14 BETWEEN THE UL FIRST BICUSPID AND UL SECOND MOLAR
SMILEBYDESIGNNY.COM
SURGICAL STENT UR SIDE FOR #13,14 IMPLANT PLACEMENT
SMILEBYDESIGNNY.COM
FIRST GUIDE PIN IN OSTEOTOMY FOR INITITIATION PLACEMENT OF IMPLANT
SMILEBYDESIGNNY.COM
MEASUREMENT WITH PERIO PROBE OF BONE WIDTH IN SITE #13,14
SMILEBYD
ESIGN
NY.CO
M
GUIDE PINS #13 14
SMILEBYDESIGNNY.COM
GUIDE PIN PLACED AFTER OSTEOTOMYIN SITE #14
SMILEBYDESIGNNY.COM
SMILEBYDESIGNNY.COM
8.
0MM
10M
M
IMPL
#142.
3 M
M
DRILL
13M
M
SMILEBYDESIGNNY.COM
3.4/2.8 MM DRILL
SMILEBYDESIGNNY.COM
Placed a 4.7x13mm in site #13 and a 4.7x10mm in site #14
SMILEBYDESIGNNY.COM
2.5M
M
2.5MM
7.5MM10
.5 M
M
IMPL
BO
DY
10 MM IMPL
#12
#15
SMILEBYDESIGNNY.COM
FINAL SUTURES PLACED
SMIL
EBYD
ESIG
NN
Y.CO
M
HEALING AFTER 3 MONTHS IMPLANT PLACEMENT AT SITE #13,14 AND SECOND STAGE UNCOVERING
PLACEMENT OF PROVISIONAL CROWNS
PLACEMENT OF SCREW RETAINED PROVISIONALS IN SITE #13,14
SIDE VIEW OF SCREW RETAINED PROVISIONALS IN SITE #13,14
THE END