URBAN STREAM URBAN STREAM REHABILITATION REHABILITATION
Transcript
Page 1: URBAN STREAM REHABILITATION. CASE STUDIES Contents: 1Approach 2Case studies 3Impacts of urban river rehabilitations 4Planning and implementation process.

URBAN STREAM URBAN STREAM REHABILITATIONREHABILITATION

Page 2: URBAN STREAM REHABILITATION. CASE STUDIES Contents: 1Approach 2Case studies 3Impacts of urban river rehabilitations 4Planning and implementation process.

CASE STUDIESCASE STUDIES

Page 3: URBAN STREAM REHABILITATION. CASE STUDIES Contents: 1Approach 2Case studies 3Impacts of urban river rehabilitations 4Planning and implementation process.

Contents:Contents:11 Approach Approach

22 Case studiesCase studies

33 Impacts of urban river rehabilitationsImpacts of urban river rehabilitations

44 Planning and implementation process Planning and implementation process

55 Aesthetic evaluation methods Aesthetic evaluation methods

66 Social appraisal and participationSocial appraisal and participation

77 Rehabilitation techniquesRehabilitation techniques

88 Summary and conclusionsSummary and conclusions               

Page 4: URBAN STREAM REHABILITATION. CASE STUDIES Contents: 1Approach 2Case studies 3Impacts of urban river rehabilitations 4Planning and implementation process.

1 ApproachApproach

• Survey on urban rehabilitation schemes (Europe, others)Survey on urban rehabilitation schemes (Europe, others)

• Case study approachCase study approach

- urban setting- urban setting

- rehabilitation (ecological improvement) - rehabilitation (ecological improvement)

- scheme completed - scheme completed

• Standardised enquiry formStandardised enquiry form

• Quantitative and qualitative analysis of each Quantitative and qualitative analysis of each casecase

• Comparison of tools, techniques, procedures Comparison of tools, techniques, procedures and impactsand impacts

Page 5: URBAN STREAM REHABILITATION. CASE STUDIES Contents: 1Approach 2Case studies 3Impacts of urban river rehabilitations 4Planning and implementation process.

AA

high good mod. poor bad high good mod. poor bad

I Ecological State1 Biological State

a) phytoplankton b) macrophytes and phytobenthosc) benthic invertebrate faunad) fish fauna

2 Hydro-morphologya) hydrological regimeb) river continuityc) morphological conditions

Ecological and Chemical State

State of water body (according Water Framework Directive ) before and after implementation

evaluation scaleparameter

state of water body before revitalization (reference date: ………...)

state of water body after revitalization (reference date: ………...)

Urban River Basin Enhancement Methods (URBEM) Case Studies of Existing Successful River Enhancement Projects(A) Ecological and Chemical State

1. Approach

Page 6: URBAN STREAM REHABILITATION. CASE STUDIES Contents: 1Approach 2Case studies 3Impacts of urban river rehabilitations 4Planning and implementation process.

1 Selected case studies

2 Comparison of General Characteristics 

2. Case studies -Brief description

Page 7: URBAN STREAM REHABILITATION. CASE STUDIES Contents: 1Approach 2Case studies 3Impacts of urban river rehabilitations 4Planning and implementation process.

Austria:

Vienna - Wienfluss

2. Case studies -Brief description

Page 8: URBAN STREAM REHABILITATION. CASE STUDIES Contents: 1Approach 2Case studies 3Impacts of urban river rehabilitations 4Planning and implementation process.

Germany:

Munich – Isar

2. Case studies -Brief description

Page 9: URBAN STREAM REHABILITATION. CASE STUDIES Contents: 1Approach 2Case studies 3Impacts of urban river rehabilitations 4Planning and implementation process.

Italy:

Florence – Mugnone Brook

2. Case studies -Brief description

Page 10: URBAN STREAM REHABILITATION. CASE STUDIES Contents: 1Approach 2Case studies 3Impacts of urban river rehabilitations 4Planning and implementation process.

Switzerland:

Zurich – Brook Concept

Albisrieder Dorfbach2. Case studies -Brief description

Page 11: URBAN STREAM REHABILITATION. CASE STUDIES Contents: 1Approach 2Case studies 3Impacts of urban river rehabilitations 4Planning and implementation process.

Czech Republic:

Chrudim – Náhon

2. Case studies -Brief description

Page 12: URBAN STREAM REHABILITATION. CASE STUDIES Contents: 1Approach 2Case studies 3Impacts of urban river rehabilitations 4Planning and implementation process.

2. Case studies -Brief description

Page 13: URBAN STREAM REHABILITATION. CASE STUDIES Contents: 1Approach 2Case studies 3Impacts of urban river rehabilitations 4Planning and implementation process.

Cananda:

Toronto – Mud Creek

2. Case studies -Brief description

Page 14: URBAN STREAM REHABILITATION. CASE STUDIES Contents: 1Approach 2Case studies 3Impacts of urban river rehabilitations 4Planning and implementation process.

United States:

Wilmington – Christina River

2. Case studies -Brief description

Page 15: URBAN STREAM REHABILITATION. CASE STUDIES Contents: 1Approach 2Case studies 3Impacts of urban river rehabilitations 4Planning and implementation process.

1 Objectives of urban river 1 Objectives of urban river rehabilitationrehabilitation

2 Objectives of ecological 2 Objectives of ecological improvementimprovement

3 Length of urban river rehabilitation 3 Length of urban river rehabilitation schemesschemes

4 Total costs of urban river rehabilitation 4 Total costs of urban river rehabilitation schemesschemes

2 Case studies -Case studies - CharacterisationCharacterisation

2. Case studies -Characterisation

Page 16: URBAN STREAM REHABILITATION. CASE STUDIES Contents: 1Approach 2Case studies 3Impacts of urban river rehabilitations 4Planning and implementation process.

Objectives of ecological improvementin urban rehabilitation projects

8 (36%)

7 (32%)

11 (50%)

5 (23%)

5 (23%)

6 (27%)

2 (9%)

3 (14%)

0 2 4 6 8 10 12 14

other parameters

vegetation

target species

lateral connectivity

continuum

stream morphology

hydrlology / hydaulics

w ater quality

nam

ed o

bje

ctiv

es o

f ec

olo

gca

l en

han

cem

ent

number of namings (n=22)

2. Case studies -Characterisation

Page 17: URBAN STREAM REHABILITATION. CASE STUDIES Contents: 1Approach 2Case studies 3Impacts of urban river rehabilitations 4Planning and implementation process.

Objectives of urban river rehabilitation projects

9 (39%)

22 (96%)

6 (26%)

10 (43%)

10 (43%)

8 (35%)

5 (22%)

8 (35%)

0 5 10 15 20

others

education

Public involvement

urban upgrading

amenity/recreation

visual improvement

ecological improvement

f lood control

nam

ed

ob

jecti

ves o

f u

rban

riv

er

reh

ab

ilit

ati

on

pro

jects

number of namings (n=23)

2. Case studies -Characterisation

Page 18: URBAN STREAM REHABILITATION. CASE STUDIES Contents: 1Approach 2Case studies 3Impacts of urban river rehabilitations 4Planning and implementation process.

Total costs of rehabilitation projects and costs per meter

3,244

12,040

1,5150,500 0,576 0,007 0,310 0,005

0,800

5,100

0,190 0,135 0,027

18,100

0,6041,275

2,524

0,300

12,000

4,400

0,952

27,00026,0002.907

4.393

1.782

333230 245

3.375

3.100

2.737

10

200

1.457

169

6368

2.9573.385

585

1.000

2.1032.014

0

5

10

15

20

25

30

case studiy

tota

l cos

ts o

f reh

abili

tatio

n pr

ojec

t (M

io €

)

1

10

100

1.000

10.000

proj

ect c

osts

per

met

er (€

)la

nd p

urch

ase

cost

s (T

EU)

total costs

costs per meter

land purchase costs

12.06715.000

1.000 TEU 1.000 TEU

500 TEU

5.600 TEU

2. Case studies -Characterisation

Page 19: URBAN STREAM REHABILITATION. CASE STUDIES Contents: 1Approach 2Case studies 3Impacts of urban river rehabilitations 4Planning and implementation process.

Length of rehabilitated river sections and size of area

1.116

2.741

850

1.500

30 100

500

4.000

3.500

3.000

800

400

1.500

300

2.180

1.200

300

800

1.300

322

2.500

370

500

400

250

113024866

40 80,02

100 136

0

1.000

2.000

3.000

4.000

5.000

6.000

case study

leng

th o

f reh

abili

tate

d se

ctio

n (m

)

-400

500

size

of a

ffect

ed a

rea

(100

0m2)

length of section

size of rehabilitated area

9,5 km 8,0 km550

660

520

0

area size: if not mentioned = no data

2. Case studies -Characterisation

Page 20: URBAN STREAM REHABILITATION. CASE STUDIES Contents: 1Approach 2Case studies 3Impacts of urban river rehabilitations 4Planning and implementation process.

3. Impacts of river rehabilitation 3. Impacts of river rehabilitation schemes schemes

• Ecological impactsEcological impacts

• Social impactsSocial impacts

• Economic impactsEconomic impacts

• Impacts on public health and safetyImpacts on public health and safety

3. Impacts of river rehabilitation schemes

Page 21: URBAN STREAM REHABILITATION. CASE STUDIES Contents: 1Approach 2Case studies 3Impacts of urban river rehabilitations 4Planning and implementation process.

Hydro-morphologic conditions of urban waters before and after rehabilitation

case study

stat

e cl

ass

of w

ater

bo

dy (W

FD)

hydrological regime

river continuity

morphological conditions

very good

good

moderate

poor

bad

3. Impacts of river rehabilitation schemes

Page 22: URBAN STREAM REHABILITATION. CASE STUDIES Contents: 1Approach 2Case studies 3Impacts of urban river rehabilitations 4Planning and implementation process.

Biological conditions of urban waters before and after rehabilitation

case study

stat

e cl

ass

of

wat

er

bo

dy

(WF

D)

macrophytes and phytobenthos

benthic invertebrate fauna

fish fauna

very good

good

moderate

poor

bad

3. Impacts of river rehabilitation schemes

Page 23: URBAN STREAM REHABILITATION. CASE STUDIES Contents: 1Approach 2Case studies 3Impacts of urban river rehabilitations 4Planning and implementation process.

Overall acceptance of urban river rehabilitation sites before and after rehablitation

case study

esti

mat

ion

of

con

dit

ion

Frequency by local population

Frequency by tourists

Frequency by school classes

above average

average

below average

3. Impacts of river rehabilitation schemes

Page 24: URBAN STREAM REHABILITATION. CASE STUDIES Contents: 1Approach 2Case studies 3Impacts of urban river rehabilitations 4Planning and implementation process.

Impact of urban river rehabilitation schemeson fish fauna

0

00

1 (6%)

5 (31%)

10 (63%)

8 (50%)

2 (13%)

1 (6%)

5 (31%)

0 2 4 6 8 10 12

bad

poor

moderate

good

very good

sta

te c

las

s a

cc

ord

ing

WF

D

number of case studies

after rehabilitation (n=16)

before rehabilitation (n=16)

3. Impacts of river rehabilitation schemes

Page 25: URBAN STREAM REHABILITATION. CASE STUDIES Contents: 1Approach 2Case studies 3Impacts of urban river rehabilitations 4Planning and implementation process.

Visual and spatial experience along urban river rehabilitationsections before and after rehabilitation

case study

estim

atio

n of

con

diti

on

presence of focal pointspresence of view ing pointsdistinctive open spacesvisual aversion experiences

above average

average

below average

3. Impacts of river rehabilitation schemes

Page 26: URBAN STREAM REHABILITATION. CASE STUDIES Contents: 1Approach 2Case studies 3Impacts of urban river rehabilitations 4Planning and implementation process.

Morphological conditions and biological indicators of urban waters before and ofter rehabilitation

case study

stat

e cl

ass

of w

ater

bod

y (W

FD)

morphological conditionsbenthic invertebrate faunafish fauna

very good

good

moderate

poor

bad

3. Impacts of river rehabilitation schemes

Page 27: URBAN STREAM REHABILITATION. CASE STUDIES Contents: 1Approach 2Case studies 3Impacts of urban river rehabilitations 4Planning and implementation process.

• Initiation of urban river rehabilitation projectsInitiation of urban river rehabilitation projects

• Site selectionSite selection

• Project managementProject management

4. Planning and 4. Planning and implementation processimplementation process

• Almost 90 % public administration initiationsAlmost 90 % public administration initiations

• primary initiative usually from citizen groupsprimary initiative usually from citizen groups

• 20 % responding to legal demands20 % responding to legal demands

• Most aim at rehabilitation of certain river sectionMost aim at rehabilitation of certain river section

• Selection methods on basin or city scale, determination of Selection methods on basin or city scale, determination of potential for rehabilitationpotential for rehabilitation

• 21% used some kind of site selection method 21% used some kind of site selection method

4. Planning and implementation 4. Planning and implementation processprocess

Page 28: URBAN STREAM REHABILITATION. CASE STUDIES Contents: 1Approach 2Case studies 3Impacts of urban river rehabilitations 4Planning and implementation process.

19751980198519901995200020052010

case study

year

initiation idea funding process planning process

implementation post-implementation appraisal

4. Planning and implementation 4. Planning and implementation processprocess

Page 29: URBAN STREAM REHABILITATION. CASE STUDIES Contents: 1Approach 2Case studies 3Impacts of urban river rehabilitations 4Planning and implementation process.

Initiators of urban river rehabilitation projects

1 (4%)

6 (26%)

9 (39%)

20 (87%)

0 4 8 12 16 20

Other initiatives

Interest group initiative

Civic initiative

Public administration initiative

number of namings(% of case studies, n=23)

4. Planning and implementation 4. Planning and implementation processprocess

Page 30: URBAN STREAM REHABILITATION. CASE STUDIES Contents: 1Approach 2Case studies 3Impacts of urban river rehabilitations 4Planning and implementation process.

5. 5. Aesthetic EvaluationAesthetic Evaluation

Aspects of Aesthetic Perception and Aspects of Aesthetic Perception and Recreational UsabilityRecreational Usability

• extracted from Part B and Part C of the extracted from Part B and Part C of the enquiry, state conditions and enquiry, state conditions and implemented measuresimplemented measures

• quite diverse understanding of what quite diverse understanding of what aesthetics for urban rivers isaesthetics for urban rivers is

5. 5. Aesthetic Aesthetic Evaluation Evaluation

Page 31: URBAN STREAM REHABILITATION. CASE STUDIES Contents: 1Approach 2Case studies 3Impacts of urban river rehabilitations 4Planning and implementation process.

74.00%

35.00%

30.00%

78.00%

70.00%

35.00%

13.00%

22.00%

0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%

Visual and Spatial Aspects

Aspects of Smell and Sound

Remedy of Aversion Experience

Aspects of Accessibility

Aspects of Social and Cultural Infrastructure

Aspects of Accident Prevention

Aspects of Public Health

Aesthetical Evaluation methods

5. 5. Aesthetic Aesthetic Evaluation Evaluation

Page 32: URBAN STREAM REHABILITATION. CASE STUDIES Contents: 1Approach 2Case studies 3Impacts of urban river rehabilitations 4Planning and implementation process.

Aspects of Aesthetic Perception Aspects of Aesthetic Perception and Recreational Experienceand Recreational Experience

Aesthetic Evaluation MethodsAesthetic Evaluation Methods• expert assessmentsexpert assessments• surveyssurveys

5. 5. Aesthetic Aesthetic Evaluation Evaluation

5. 5. Aesthetic EvaluationAesthetic Evaluation

Page 33: URBAN STREAM REHABILITATION. CASE STUDIES Contents: 1Approach 2Case studies 3Impacts of urban river rehabilitations 4Planning and implementation process.

74.00%

35.00%

30.00%

78.00%

70.00%

35.00%

13.00%

22.00%

0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%

Visual and Spatial Aspects

Aspects of Smell and Sound

Remedy of Aversion Experience

Aspects of Accessibility

Aspects of Social and Cultural Infrastructure

Aspects of Accident Prevention

Aspects of Public Health

Aesthetical Evaluation methods

5. 5. Aesthetic Aesthetic Evaluation Evaluation

Page 34: URBAN STREAM REHABILITATION. CASE STUDIES Contents: 1Approach 2Case studies 3Impacts of urban river rehabilitations 4Planning and implementation process.

6.Social appraisal and 6.Social appraisal and Public Public

Involvement Involvement • Legal requirements for public Legal requirements for public

participationparticipation

• Stakeholders and Identification of Stakeholders and Identification of StakeholdersStakeholders

• Informing stakeholders Informing stakeholders

• Involving Stakeholders Involving Stakeholders

• Stewardshop and AdvocacyStewardshop and Advocacy

6.Social appraisal and Public 6.Social appraisal and Public Involvement Involvement

Page 35: URBAN STREAM REHABILITATION. CASE STUDIES Contents: 1Approach 2Case studies 3Impacts of urban river rehabilitations 4Planning and implementation process.

• legal requirements for public information legal requirements for public information and involvement have been mentioned for and involvement have been mentioned for almost half of the projecsalmost half of the projecs

• how did project responsibles deal with this how did project responsibles deal with this legislation?legislation?

• involvement from public information to involvement from public information to comprehensive participation of diverse comprehensive participation of diverse stakeholder groupsstakeholder groups

6.Social appraisal and Public 6.Social appraisal and Public Involvement Involvement

Page 36: URBAN STREAM REHABILITATION. CASE STUDIES Contents: 1Approach 2Case studies 3Impacts of urban river rehabilitations 4Planning and implementation process.

48.00%

61.00%

87.00%

0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%

Legal Requirements for Public Participation Legal Requirements for Public Participation

ExceededProjects w ith any Kind of Public Participation

c

6.Social appraisal and Public 6.Social appraisal and Public Involvement Involvement

Page 37: URBAN STREAM REHABILITATION. CASE STUDIES Contents: 1Approach 2Case studies 3Impacts of urban river rehabilitations 4Planning and implementation process.

• citzen: residents, property ownerscitzen: residents, property owners

• NGOs on national, regional and local NGOs on national, regional and local levellevel

• commercial assosiations (Anacostia commercial assosiations (Anacostia River Business Coalition)River Business Coalition)

• Politicians (Isar)Politicians (Isar)• Identification of stakeholders Identification of stakeholders (Kaitzbach(Kaitzbach, , SkerneSkerne))

6.Social appraisal and Public Involvement - 6.Social appraisal and Public Involvement - Stakeholders Stakeholders

Page 38: URBAN STREAM REHABILITATION. CASE STUDIES Contents: 1Approach 2Case studies 3Impacts of urban river rehabilitations 4Planning and implementation process.

87. 00%

17. 00%

65. 00%

26. 00%

43. 00%

0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%

Citizen

Political Groups

NGO's (Non-Government Organisations)

Commercial Associations or Single Businesses

other Social Groups

c

6.Social appraisal and Public Involvement - 6.Social appraisal and Public Involvement - Stakeholders Stakeholders

Page 39: URBAN STREAM REHABILITATION. CASE STUDIES Contents: 1Approach 2Case studies 3Impacts of urban river rehabilitations 4Planning and implementation process.

• increase of social awareness and increase of social awareness and appraisalappraisal

• first step to public participationfirst step to public participation• Guided toursGuided tours• Information boards onsite Information boards onsite • Exhibitions Exhibitions • InstallationsInstallations

6.Social appraisal and Public Involvement – Informing 6.Social appraisal and Public Involvement – Informing Stakeholders Stakeholders

Page 40: URBAN STREAM REHABILITATION. CASE STUDIES Contents: 1Approach 2Case studies 3Impacts of urban river rehabilitations 4Planning and implementation process.

96. 00%

57. 00%

43. 00%

52. 00%

0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%

Paper Related (Brochures, Billboards,New spaper/Journals)

World Wide Web

Local TV-Station/Radio

Presentations, Lectures etc.

c

6.Social appraisal and Public Involvement – Informing 6.Social appraisal and Public Involvement – Informing Stakeholders Stakeholders

Page 41: URBAN STREAM REHABILITATION. CASE STUDIES Contents: 1Approach 2Case studies 3Impacts of urban river rehabilitations 4Planning and implementation process.

• Collection of ideas and site selection Collection of ideas and site selection

• competitionscompetitions• surveys surveys • workshops workshops • public discussion meetingspublic discussion meetings

• on site involvement (Wandse, Toronto)on site involvement (Wandse, Toronto)

6.Social appraisal and Public Involvement – Involving 6.Social appraisal and Public Involvement – Involving Stakeholders Stakeholders

Page 42: URBAN STREAM REHABILITATION. CASE STUDIES Contents: 1Approach 2Case studies 3Impacts of urban river rehabilitations 4Planning and implementation process.

57. 00%

65. 00%

35. 00%

35. 00%

0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%

In Course of Different Project Phases

Collection of Ideas

Site Selection

Voluntary Clean-up Events

c

6.Social appraisal and Public Involvement – Involving 6.Social appraisal and Public Involvement – Involving Stakeholders Stakeholders

Page 43: URBAN STREAM REHABILITATION. CASE STUDIES Contents: 1Approach 2Case studies 3Impacts of urban river rehabilitations 4Planning and implementation process.

• active support for river enhancement active support for river enhancement through stakeholdersthrough stakeholders

• Partnerships: brook sponsorships, Partnerships: brook sponsorships, NGOs, coalitionsNGOs, coalitions

• continuous activities: newsletter, continuous activities: newsletter, guided tours, school days, monitoringguided tours, school days, monitoring

• single events: inauguration of single events: inauguration of schemes, river related festivals schemes, river related festivals

• information for rivers non-project information for rivers non-project relatedrelated

6.Social appraisal and Public Involvement 6.Social appraisal and Public Involvement Stewardship and Stewardship and advocacyadvocacy

Page 44: URBAN STREAM REHABILITATION. CASE STUDIES Contents: 1Approach 2Case studies 3Impacts of urban river rehabilitations 4Planning and implementation process.

30. 00%

52. 00%

52. 00%

0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%

Partnerships and Coalitions for River Stew ardship

River Advocacy through Continuous Activities

River Advocacy through Single Events

c

6.Social appraisal and Public Involvement 6.Social appraisal and Public Involvement Stewardship and Stewardship and advocacyadvocacy

Page 45: URBAN STREAM REHABILITATION. CASE STUDIES Contents: 1Approach 2Case studies 3Impacts of urban river rehabilitations 4Planning and implementation process.

7. 7. Rehabilitation techniquesRehabilitation techniques

• Improving Water QualityImproving Water Quality

• Improving Hydrology and Improving Hydrology and HydrodynamicsHydrodynamics

• Improving Stream ConnectivityImproving Stream Connectivity

• Restoration Techniques for Aquatic Restoration Techniques for Aquatic and Riverine Ecosystemsand Riverine Ecosystems

• Techniques Incorporating Features to Techniques Incorporating Features to Improve Public Health and SafetyImprove Public Health and Safety

• Measures Practiced Basin WideMeasures Practiced Basin Wide

7. 7. Rehabilitation techniquesRehabilitation techniques

Page 46: URBAN STREAM REHABILITATION. CASE STUDIES Contents: 1Approach 2Case studies 3Impacts of urban river rehabilitations 4Planning and implementation process.

35%

13%

37%

48%

44%

55%

48%

52%

87%

22%

0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%

Measures to Reduce Point Sources of Pollution

Measures to Reduce Non-Point Sources of Pollution

Ameliorationg Stream Hydrology

Measures to Control the Sediment Balance

Channel Reconstruction by Improving LongitudinalConnectivity

Channel Stabilisation and Enhancing LateralConnectivity

Re-establishing Vertical Connectivity

Restoration of Aquatic Vegetation

Restoration of Riparian Vegetation

Restoration of Aquatic Populations and Fisheries

Groups of individual measures can be found aiming at the Groups of individual measures can be found aiming at the same rehabilitation target same rehabilitation target

7. 7. Rehabilitation techniques – measure Rehabilitation techniques – measure groupsgroups

Page 47: URBAN STREAM REHABILITATION. CASE STUDIES Contents: 1Approach 2Case studies 3Impacts of urban river rehabilitations 4Planning and implementation process.

Measures: Measures:

wet ponds with extended detentionwet ponds with extended detentiongrassy filter strips grassy filter strips constructed wetlandsconstructed wetlands bioretentionbioretention structural enhancement structural enhancement silt trapping devicessilt trapping devices

7. 7. Rehabilitation techniques – water Rehabilitation techniques – water qualityquality

Page 48: URBAN STREAM REHABILITATION. CASE STUDIES Contents: 1Approach 2Case studies 3Impacts of urban river rehabilitations 4Planning and implementation process.

22%

52%

30%

17%

9%

0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%

Construction of biological treatment plants

Stormw ater storage and treatment

Sew er separation

Sediment control (erosion prevention)

Control of chemical pollutants

7. 7. Rehabilitation techniques – water Rehabilitation techniques – water qualityquality

Page 49: URBAN STREAM REHABILITATION. CASE STUDIES Contents: 1Approach 2Case studies 3Impacts of urban river rehabilitations 4Planning and implementation process.

• one fourth of case studies used one fourth of case studies used stormwater infiltration for detaining stormwater infiltration for detaining peak flowpeak flow

• measures ‘managing discharge from measures ‘managing discharge from detention basins in accordance to detention basins in accordance to natural runoff’, or ‘water management in natural runoff’, or ‘water management in collaboration with power plant’ to collaboration with power plant’ to ‘master-planning advices for the ‘master-planning advices for the catchment area’catchment area’

sediment balance: sediment balance: • sediment traps, such as sediment sediment traps, such as sediment

ponds, ponds, • check dams for sediment control check dams for sediment control • the management of construction the management of construction

sites (temporary runoff diversions sites (temporary runoff diversions and chutes)and chutes)

7. 7. Rehabilitation techniques – Hydrology and Rehabilitation techniques – Hydrology and HydrodynamicsHydrodynamics

Page 50: URBAN STREAM REHABILITATION. CASE STUDIES Contents: 1Approach 2Case studies 3Impacts of urban river rehabilitations 4Planning and implementation process.

48%

26%

48%

0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%

Managing w ater w ithdraw el & adapting thedischarge regime to a less disturbed situation

Enhancement of base f low through stormw aterinfiltration

Measures to establish a less disturbed sedimentbalance

7. 7. Rehabilitation techniques – Hydrology and Rehabilitation techniques – Hydrology and HydrodynamicsHydrodynamics

Page 51: URBAN STREAM REHABILITATION. CASE STUDIES Contents: 1Approach 2Case studies 3Impacts of urban river rehabilitations 4Planning and implementation process.

Longitudinal m.:Longitudinal m.:

• Alignment and meanderingAlignment and meandering

• Biological continuityBiological continuity

Techniques for longitudinal, vertical and lateral Techniques for longitudinal, vertical and lateral connectivity 1connectivity 1

MeasuresMeasures::• drops were removed, drops were removed, ground ground

rampsramps, , fish ladders, fish ladders, daylightingdaylighting

7. 7. Rehabilitation techniques – Improving ConnectivityRehabilitation techniques – Improving Connectivity

Page 52: URBAN STREAM REHABILITATION. CASE STUDIES Contents: 1Approach 2Case studies 3Impacts of urban river rehabilitations 4Planning and implementation process.

57%

43%

22%

70%

43%

30%

0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%

Removal & bypassing of structural f low and migrationbarriers (dams, w eirs, steps)

Bypassing ecologically poor river sections

Construction/ modif ications of damming and/orretaining structures

Restoration of the river gradient

Restoration of stream alignment (according channeltype)

Day lighting of streams

7. 7. Rehabilitation techniques – Improving ConnectivityRehabilitation techniques – Improving Connectivity

Page 53: URBAN STREAM REHABILITATION. CASE STUDIES Contents: 1Approach 2Case studies 3Impacts of urban river rehabilitations 4Planning and implementation process.

• pool and riffle zones were madepool and riffle zones were made

• Gravel beds and current deflectors Gravel beds and current deflectors have been successfully re-have been successfully re-introduced introduced

Vertical Vertical m.:m.:

• BedformBedformss

Techniques for longitudinal, vertical and lateral Techniques for longitudinal, vertical and lateral connectivity 3connectivity 3

7. 7. Rehabilitation techniques – Improving ConnectivityRehabilitation techniques – Improving Connectivity

Page 54: URBAN STREAM REHABILITATION. CASE STUDIES Contents: 1Approach 2Case studies 3Impacts of urban river rehabilitations 4Planning and implementation process.

48%

48%

0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%

Inf ill or/and cleaning of river bed sediments Removal of hard bed lining re-establishing the

connection to ground w ater body

7. 7. Rehabilitation techniques – Improving ConnectivityRehabilitation techniques – Improving Connectivity

Page 55: URBAN STREAM REHABILITATION. CASE STUDIES Contents: 1Approach 2Case studies 3Impacts of urban river rehabilitations 4Planning and implementation process.

8. Summary8. Summary• Most projects occur on streams and Most projects occur on streams and

small riverssmall rivers

• Low number of completed urban Low number of completed urban rehabilitation schemes rehabilitation schemes

• Ecological aspects play an increasing Ecological aspects play an increasing role role

• Social aspectsSocial aspects

• Wide variety of soft techniquesWide variety of soft techniques

• Scarce use of evaluation methodsScarce use of evaluation methods

• Schemes need systematic Schemes need systematic performance controlperformance control

8. Summary8. Summary

Page 56: URBAN STREAM REHABILITATION. CASE STUDIES Contents: 1Approach 2Case studies 3Impacts of urban river rehabilitations 4Planning and implementation process.

1. Case studies1. Case studies

More info…More info…

For more information follow this linkFor more information follow this link

Page 57: URBAN STREAM REHABILITATION. CASE STUDIES Contents: 1Approach 2Case studies 3Impacts of urban river rehabilitations 4Planning and implementation process.