. -.-cvv'V* . Phase II
"■wSM-
U.S. Army Corps of EngineersPhiladelphia District
Volume II - Building Reports for aComprehensive AsbestosSurvey In Various Buildings atFort Monmouth, New Jersey
Contract Number DAGA61-89-D-0013
June 1991
Prepared for:
U.S. ARMY ENGINEER DISTRICTU.S. Custom HousePhlladelphia, Pennsylvania 19106055
'•am
' IZ-
;.s
■•VV5~(ys
1 X-'M
•W
. . i-,v?.
Vi'.t
:;-T^
rrv
i
T^-.i
f.S.
S'
Prepared by:
--f.-:tc::-m
Roy F. Weston, Inc.West Chester,
Pennsylvania 19380 200.1e FTMM_01.08_0645_a
-"S ■
'.if'
BUILDING REPORTSFOR A COMPREHENSIVE ASBESTOS SURVEY
IN VARIOUS BUILDINGS AT
FORT MONMOUTH, NEW JERSEY
VOLUME n
CONTRACT NO. DACA61-89-r)-0013
•->K
Prepared For:
U.S. ARMY CORPS OF ENGINEERS
Philadelphia, Pennsylvania
June 1991
Prepared By:
ROY F. WESTON, INC.1 Weston Way
West Chester, Pennsylvania 19380
Weston Work Order No. 3886-41-06
1374WG 6/10/91
*# BUILDING REPORTS
TABLE OF CONTENTS
Section
SECTION 288
Title
ADMINISTRATIVE BUILDING
288.1 General
288.2 ACM and Exposure Assessment
Page
288-1
288-1
288-1
2883 Recommendations/Conclusions288.4 Photographs
288-2
288-8
SECTION 291 ADMINISTRATIVE BUILDING 291-1
291.1 General
2913 ACM and Exposure Assessment291.3 Recommendations/Conclusions291.4 Photographs
291-1
291-1
291-2
291-8
SECTION 296 ADMINISTRATIVE BUILDING (DATACOMMUNICATIONS) 296-1
296.1 General
296.2 ACM and Exposure Assessment2963 Recommendations/Conclusions
296-1
296-1
296-2
SECTION 360 BOQ BUILDING 360-1
360.1 General
360.2 ACM and Exposure Assessment360.3 Recommendations/Ctonclusions360.4 Photographs
360-1
360-1
360-2
360-11
SECTION 361 BEQ BUILDING 361-1
361.1 General
3613 ACM and Exposure Assessment3613 Recommendations/Conclusion
361-1
361-1
361-2
SECTION 363 BOQ BUILDING 363-1
363.1 General
3633 ACM and Exposure Assessment3633 Recommendations/Conclusions
363-1
363-1
363-2
1374WG ii 6/10/91
BUILDING REPORTS
TABLE OF CONTENTS
(continued)
Section
SECTION 364
Title
BOQ BUILDING
364.1 General
364.2 ACM and Exposure Assessment364.3 Recommendations/Conclusions364.4 Photographs
SECTION 492 ADMINISTRATIVE BUILDING
492.1 General
492.2 ACM and Exposure Assessment4923 Recommendations/Conclusions
SECTION 492A ADMINISTRATIVE BUILDING
492A1 General
492A2 ACM and Exposure Assessment492A3 Recommendations/Conclusions
SECTION 552 RECREATION BUILDING
552.1 General
552.2 ACM and Exposure Assessment552.3 Recommendations/Conclusions552.4 Photographs
SECTION 811 YOUTH CENTER
811.1 General
811.2 ACM and Exposure Assessment811.3 Recommendations/Conclusions
SECTION 812 COMMUNITY SERVICE CENTER
812.1 General
8123 ACM and Exposure Assessment812.3 Recommendations/Conclusion
Page
364-1
364-1
364-1
364-2
364-8
492-1
492-1
492-1
492-2
492A-1
492A-1
492A-1
492A-2
552-1
552-1
552-1
552-2
552-9
811-1
811-1
811-1
811-2
812-1
812-1
812-1
812-2
1374WG m S/IO/W
BUILDING REPORTS
TABLE OF CONTENTS
(continued)
Section Title Page
SECTION 876 ENVIRONMENTAL HEALTH BUILDING 876-1
876.1 General
876.2 ACM and Exposure Assessment876.3 Recommendations/Conclusions
876-1
876-1
876-2
SECTION 900 VEHICLE MAINTENANCE SHOP 900-1
900.1 General
900.2 ACM and Exposure Assessment900.3 Recommendations/Conclusions
900-1
900-1
900-2
SECTION 906 ADMINISTRATIVE BUILDING 906-1
906.1 General
906.2 ACM and Exposure Assessment906.3 Recommendations/Conclusions
906-1
906-1
906-2
SECTION 907 GENERAL WAREHOUSE 907-1
907.1 General
907.2 ACM and Exposure Assessment907.3 Recommendations/Conclusions
907-1
907-1
907-2
SECTION 918 ADMINISTRATIVE BUILDING 918-1
918.1 General
918.2 ACM and Exposure Assessment918.3 Recommendations/Conclusions918.4 Photographs
918-1
918-1
918-2
918-8
SECTION 1078 BOQ BUILDING 1078-1
1078.1 General
1078.2 ACM and Exposure Assessment1078.3 Recommendations/Conclusions1078.4 Photographs
1078-1
1078-1
1078-2
1078-9
1374WG IV 5/10/91
BUILDING REPORTS
TABLE OF CONTENTS
(continued)
Section Title Page
SECTION 1212 ADMINISTRATIVE BUILDING 1212-1
1212.1 General
1212.2 ACM and Exposure Assessment1212.3 Recommendations/Conclusions
1212-1
1212-1
1212-2
SECTION 2105 FAMILY HOUSING 2105-1
2105.1 General
2105.2 ACM and Exposure Assessment2105.3 Recommendations/Conclusions2105.4 Photographs
2105-1
2105-1
2105-2
2105-8
SECTION 2251 FAMILY HOUSING 2251-1
2251.1 General
2251.2 ACM and E3q)osure Assessment2251.3 Recommendations/Conclusions2251.4 Photographs
2251-1
2251-1
2251-2
2251-8
SECTION 2266 FAMILY HOUSING 2266-1
2266.1 General
2266.2 ACM and Exposure Assessment2266.3 Recommendations/Conclusions
2266-1
2266-1
2266-2
SECTION 2276 FAMILY HOUSING 2276-1
2276.1 General
2276.2 ACM and Exposure Assessment2276.3 Recommendations/Conclusions
2276-1
2276-1
2276-2
SECTION 2462 FAMILY HOUSING 2462-1
2462.1 General
2462.2 ACM and Exposure Assessment2462.3 Recommendations/Conclusion2462.4 Photographs
2462-1
2462-1
2462-2
2462-8
1374WG V 6/10/91
BUILDING REPORTS
TABLE OF CONTENTS
(continued)
Section Title
SECTION 2463 FAMILY HOUSING 2463-1
2463.1 General
2463.2 ACM and E3q)osure Assessment2463.3 Recommendations/Conclusions2463.4 Photographs
SECTION 2466 FAMILY HOUSING
2463-1
2463-1
2463-2
2463-8
2466-1
2466.1 General
2466.2 ACM and Exposure Assessment2466.3 Recommendations/Conclusions2466.4 Photographs
2466-1
2466-1
2466-2
2466-8
1374WG VI 3/15/91
288
ADMINISTRATIVE BUILDING
288.1 GENERAL
Building 288 was surveyed WESTON technicians on 3 December 1990.
The first three portions of this facility report summarize the results of this inspection.
Photographs of some sample locations are provided in Section 288.4.
Polarized Light Microscopy (PI^I) with dispersion staining was used to analyze 13 san^jles
of suspect material collected from the building. Of these samples, 9 were found to be
asbestos-containing materials (ACM). Table 288.1 lists the analytical results for the bulk
samples.
288.2 ACM AND EXPOSURE ASSESSMENT
The location, description, and analytical results for each bulk sample from Building 288 are
presented in Table 288.1. An area-lty-area inventory of ACM is provided in Tables 288.2
and 288.3. "Other Asbestos-Containing Materials," listed in Table 288.3, are materials that
do not correspond to the standard cation categories listed in Table 2882. A prioritized
listing of e^^osure assessments is presented in Table 288.4. An itemized area-by-area cost
estimate for removal and replacement is provided in Table 288.5. The method by which
removal/replacement costs are calculated is described in the ISSUES COMMON TO ALL
BUILDINGS Section of this report Building floor plans (see attachment) indicate sample
locations and building area names as they are listed in Tables 288.2 and 2885.
288-1 j/u/n
288.3 RECOMMENDATIONS/CONCLUSIONS
WESTON recommends:
The first floor computer room (Rm. #2), first floor stairwell area, andmechanical/boiler room qualify for the Army Asbestos Deficiency AbatementProject.
Asbestos-containing materials should be labeled under the O&M Program.
137WG 288-2 3/15/91
Mon •.r = --;aST£RN ANALYTICAL CCWPOBATION
Bin.K SAMPLE ANALYSIS REPORT
CLIENT: E-Systems
FACILITY:
NAG #; Al-1232-007
SAMPLE DESCRIPTIONAND LOCATION:
C90-409
(3ti
1
!
!
SAMPLE NUMBER:
U
01i
1
ASBESTOS:
Chrysotile ND
Amosite ND1
Crocidolite ND 1
Other ND
NON-ASBESTOS:
Cellulose 1-2%1
Fibrous Glass 92-94%
Quartz
Binders BALANCE
Calcite
Perlite
Vermiculite
Synthetic Fibers
Gypsum
Mica
Talc
Glass Bejids-....^ - / ... 2-3%
I
hn/i DATE: 12-11-9'jANALYST: V
ND: NONE DETECTfitt Detection Limit; 1'% EPA defines A3bestos-Contair.:ng Materials (ACM) asthose containing greater than 1% asbestos.
Methodology: 'Interim Method for the Determination of .Asbestos in Bnlk Insulition Samples," 40 CFRChapter 1 (1-1-87) Part 763, Subpart F, Appendix A.
TABLE 288.1
BULK SAMPLE ANALYSIS RESULTS - BUILDING 288, ADMINISTRATIVE BLDG.
SAMPLE PERCENT ASBESTOS
LAYERED®NO. LOCATION ITEM DESCRIPTION CH AH OT
FH250 1ST FLR. - RM. #21.BELOW CEILING FLOOR TILE BROWN,OTH,9X9 FL TL 10 YES
FH251 1ST FLR. RH #21,BELOW CEILING CEILING TILE WHITE,OTH,2X4 CL TL - - YES
FH252 1ST FLR. - UPR. HALL,BELOW CEILING FLOOR TILE BR0WN,0TH,9X9 FL TL 10 - YES
FH253 1ST FLR. - STAIRWELL.BELOW CEILING ACOUSTICAL WALL TILE WHITE,OTH,1X1 WL TL 2 - YES
FH254 1ST FLR. HALLWAY,BELOW CEILING CEILING TILE WHITE,OTH,2X4 CL TL - - YES
FH255 1ST FLR. ALCOVE/BATH,BELOW CEILING FLOOR TILE GRAY.OTH,12X12 FT - - YES
FH256 1ST FLR. - ROOM #2,BELOW CEILING FLOOR TILE BROWN,OTH,9X9 FL TL - - YES
FH257 BOILER RM.\MECH RM.,BELOW CEILING BOILERS/TANKS WHITE,HHW.TANK INSUL 50 - YES
FH258 BOILER RM.NMECH RM.,BELOW CEILING BOILERS/TANKS WHITE,HHW.TANK INSUL 60 - YES
FH259 BOILER RM.\MECH RM.,BELOW CEILING BOILERS/TANKS GRAY,HHW.TANK INSUL 40 - YES
FH260 BOILER RM.XMECH RM.,BELOW CEILING BOILERS/TANKS GRAY,HHW.TANK INSUL 60 - NO
FH261 BOILER RM.VMECH RM.,BELOW CEILING <4" PIPE FITTING GRAY,UNK,<4 FITT. 15 - YES
FH262 BOILER RM.\MECH RM..BELOW CEILING >14" PIPE RUN GRAY.OTH,>14 BREECH 25 " NO
to0000
CO
Asbestos content presented for layered samples represents the highest concentration layer.
Quadrant Codes System Codes Asbestos Tvoes
C = Center STM = Steam , CH = ChrysotileN = North CHW = Chilli Water AM = Amosite
E = East HHW = Heating Hot Water OT = OtherS = South DOM = Domestic Water
W = West OTH = Other
NE = Northeast UNK = Unknown
NW = Northwest
SE = Southeast
SW = Southwest
TABLE 288.2
ASBESTOS-CONTAINING MATERIALS - BUILDING 288, ADMINISTRATIVE BLDG.
AREA
PIPE FITTINGS (EA)
<4" 4-8" 9-14" >14"
PIPE RUMS (LF)
<4" 4-8" 9-14" >14"
SPRAY/TROWELED FLOOR TILE BOILERS/ AIR HANDLING
CEILINGS (HSF) (HSF) TANKS (HSF) EQUIPMENT THSFT OTHER
1st Fl. Comp. Rtn. 21st Fir. (Entire)1st Fir. - Rm. #21
1st Fir. - Stairwell
1st Fir. - Upr. HallBoiler Rm.VMech Rm.
TOTALS
_15
15
10
10
10.10
1.20
2.00
13.30
0.18
0.18
N50000
1
other Material Present In Various Units Of Measure
EA - Each
LF - Linear Feet
MSF - Thousand Square Feet
Table 288.3
Other Asbestos-Containing Material - Building 288, Admin.Type Occupancy: Adults (Public)
Area Material Type Quantity (Unit)
1st Fl. Comp. Rm. 21st Fl. Stairwell
Acoustical Wall Tile
Acoustical Wall Tile
0.150 (MSF)0.010 (MSF)
EA - Each
LF - Linear Feet
MSF - Thousand Square Feet
N500CO
Ln
1374WG 6/6/91
TABLE 288.4
EXPOSURE ASSESSMENTS (PRIORITY ORDER) - BUILDING 288, ADMINISTRATIVE BLDG.
PRIOR. PRIORITY AVG.
SAMPLE MATERIAL INDEX INDEX EXPOSURE FACTORS EXP. X
NO. AREA TYPE CODE NUMBER 1 2 3 4 5 HOURS ASB.
FH253 1st Fl. Comp. Rm. 2 ACOUSTICAL WALL TILE C 4.8a0E03 2 2 1 2 40 40.00 2
FH2S3 1st Fir. - Stairwell ACOUSTICAL WALL TILE C 4.800E03 2 2 1 2 40 40.00 2
FH257 Boiler Rm.\Mech Rm. BOILERS/TANKS C 1.500E03 3 2 2 2 1 2.00 50
FH258 Boiler Rm.\Mech Rm. BOILERS/TANKS C I.SOOEOB 3 2 2 2 1 2.00 60
FH259 Boiler Rm.\Mech Rm. BOILERS/TANKS C 1.5D0E03 3 2 2 2 1 2.00 40
FH260 Boiler Rm.VMech Rm. BOILERS/TANKS C 1.500E03 3 2 2 2 1 2.00 60
FH261 Boiler Rm.VMech Rm. <4" PIPE FITTING B 5.500E02 3 2 2 2 1 2.00 15
FH262 Boiler Rm.VMech Rm. >14" PIPE RUN B 5.500E02 3 2 2 2 1 2.00 25
FH251 1st Fir. (Entire) CEILING TILE A 0 2 2 1 2 40 40.00 0
FH251 1st Fir. Rm #21 CEILING TILE A 0 2 2 1 2 40 40.00 0
FH254 1st Fir. Hallway CEILING TILE A 0 2 2 1 2 40 40.00 0
to0000
Priority Index Codes
A [=] Long Term Corrective MeasureB [=] Review Managetnent Special Considerations/RemarksC [=] Army Asbestos Deficiency Abatement Project
Priority Index Nunbers Are In Scientific Notation
Extxasure Factors
Material FriabilityOccupant AccessabiIityMaterial ConditionLevel Of ActivityNumber Of Assigned Occupants
1 [=]2 [=]3 [=]4 [=15 [=1
I •
TABLE 288.5
COST ESTIMATE* - BUILDING 288, ADMINISTRATIVE BLDG.
DESCRIPTIONUNIT^
COST ($)AREA
1ARE| ARE| Area
4ARE| AREg
TOTAL
N300
00
I
Pipe^jjittings (EA),$;?4ii>U"
Pipe Runs (LF)<4"
>14"
Sprayed/T roweIed^ Ceilings (SF)Floor Tile (SF)
Boilers/Tanks (SF)
Air HandlingEquipment (SF)
Other
SUBTOTAL
Difficulty Allowance
9.60
5.60
37.90
20.00
.7
.7
56.6
56.6
6.7
6.7
0.1
0.1
11.2
11.2
1.1
0.6
6.9
8.5
1.1
0.6
74.5
6.9
1.8
84.8
SUBTOTAL 1.7 56.6 6.7 0.1 11.2 8.5 84.8
Depontamioation UnitsMobilization i:l u 1:1 u
SUBTOTAL 3.5 58.4 8.6 1.9 13.0 10.4 95.8
Contingency a 15.00% 0.5 8.8 1.31 0.3 2.0 1.6 14.4
SUBTOTAL 4.0 67.2 9.8 2.2 15.0 11.9 110.1
Design Fee 3 10.00% 0.4 6.7 1.0 0.2 1.5 1.2 11.0
SUBTOTAL 4.4 73.9 10.8 2.5 16.5 13.1 121.1
Air Monitoring 3 10.00%*** 2.0 2.0 2.0 2.0 2.0 2.0 12.1
TOTAL 6.4 75.9 12.8 4.5 18.5 15.1 133.3
Amounts Are In Thousands Of Dollars
""less Than $100 For The Area; Amount Not Printed But Included In Total(s)The Minimum Air Monitoring Fee Is $500.00 Per Building
4REA 1: ]st El. Comp. Ri
Iri - Upfm li ili Sp! il lli.flf; S'ffieiiAREA 6: Boiler Rm.\Mech Rm.
I
50~J
on
41 06
Bldg. 288 Room No. 21 (9 In. x 9 In.) Dark Brown Floor Tiles(Under Carpet). Sample No. FH250 Tested Positive.
288-8
t
()6i(
V
Bldg. 288 Mechanical Room: Tank Insulation (End Cap) SampleFH257 Tested Positive. Tank Insulation Side of
Tank (Picture Not Shown); Sample FH258 Also TestedPositive.
O)
lO
OM
COIPOCo
I
Bldg. 288 Mechanical Room: Tank Insulation (Elevated Tanks)Sample No. FH259 Tested Positive.
288-9
\i 26 H
Bldg. 288 Mechanical Room: (Less Than 4 In.) Fitting(Associated With An American Standard Boiler ModelA72B52) Sample FH261 Tested Positive.
288-10
162li0600
Bldg. 288 Mechanical Room: (Greater Than 14 In.) BreechingInsulation (Associated With An American StandardBoiler Model A72B-52) Sample FH262 Tested Positive.
288-11
FH258 FH260
on
FH261 FH259McCH. ROOM
jFH25l| ^i250 |FH254 FH262 FH257FH253 FH252 FH255 FH256
n ROOM n ROOM 5 n □ D • □
ROOM 2
ROOM 21
CORRIDORROOM 22
-n -
\P □
ROOM 16•.' NOFFICE
ROOM 20 ROOM 19\ s
ROOM 8□
ROOM 6• □
TViy-
OWOMENROOM 16A
> ORECaviNGMEN
1 o7
BLDG. 288
LEGEND
^Hf¥^ POSITIVE SAMPLE
FKnnn NEGATIVE SAMPLE
MWWGERS OESnNER&CONSULTANn288-12
291
ADMINISTRATIVE BUILDING
291.1 GENERAL
Building 291 was surveyed by WESTON technicians on 4 December 1990.
The first three portions of this facility report summarize the results of this inspection.
Photographs of some sample locations are provided in Section 291.4.
Polarized Light Microscopy (PLM) with dispersion staining was used to analyze 9 samples
of suspect material collected from the building. Of these samples, 5 were found to be
asbestos-containing materials (ACM). Table 291.1 lists the analytical results for the bulk
samples.
291.2 ACM AND EXPOSURE ASSESSMENT
The location, description,"and analytical results for each bulk sample from Building 291 are
presented in Table 291.1. An area-by-area inventory of ACM is provided in Tables 291.2
and 291.3. "Other Asbestos-Containing Materials," listed in Table 291.3, are materials that
do not correspond to the standard caption categories listed in Table 291.2. A prioritized
listing of exposure assessments is presented in Table 291.4. An itemized area-by-area cost
estimate for removal and replacement is provided in Table 291.5. The method by which
removal/replacement costs are calculated is described in the ISSUES COMMON TO ALL
BUILDINGS Section of this report. Building floor plans (see attachment) indicate sample
locations and building area names as they are hsted in Tables 291.2 and 291.5.
1374WG 291-1 5/10/91
2913 RECOMMENDATIONS/CONCLUSIONS
WESTON recommends:
• Asbestos-containing pipe insulation, jBtting insulation, floor tile, and acoustical walltile should be labeled under the O&M Program.
1374WG 291-2 5/10/91
TABLE 291.1
BULK SAMPLE ANALYSIS RESULTS - BUILDING 291, ADMIN-NEW EQUIP TRNG
SAMPLE
NO. LOCATION ITEM DESCRIPTION
PERCENT ASBESTOS
CH AM OT LAYERED®
FH263 HECH. ROOM,BELOW CEILING >14" PIPE RUN WHITE,OTH,>14 BREECH 20 20 NO
FH264 HECN. ROOM,BELOW CEILING 4-8" PIPE FITTING WHITE,UNK,4-8 FITT. 10 - YES
FH265 HECH. ROOM,BELOW CEILING OTHER MATERIAL WHITE,OTH,MUD PACK. - - YES
FH266 MECH. ROOM,BELOW CEILING <4" PIPE FITTING WHITE,UNK,<4 FITT. - - NO
FH267 HALLWAY,BELOW CEILING FLOOR TILE WHITE,OTH,9X9 FL TL 10 - YES
FH268 OFFICE # 1,BELOW CEILING CEILING TILE WHITE,OTH,2X4 CL TL - - YES
FH269 ROOM #6,BEL0W CEILING FLOOR TILE BROWN,OTH,9X9 FL TL 7 - YES
FH270 ROOM #2,BELOW CEILING ACOUSTICAL WALL TILE WHITE,0TH,1X1 WL TL - 1 YES
FH271 ROOM #14,BELOW CEILING ACOUSTICAL WALL TILE WHITE,OTH,1X1 WL TL - - YES
VO
ILO Asbestos content presented for layered samples represents the highest concentration layer.
Quadrant Codes System Codes Asbestos Tvoes
C = Center STM = Steam CH = ChrysotileN = North CHW = Chilled Water AM = Amosite
E = East HHW = Heating Hot Water OT = Other
S = South DOM = Domestic Water
W = West OTH = Other
NE = Northeast UNK = Unknown
NW = Northwest
SE = Southeast 1
SW = Southwest1
TABLE 291.2
ASBESTOS-CONTAINING MATERIALS - BUILDING 291, ADMIN-NEW EQUIP TRNG
PIPE FITTINGS (EA) PIPE RUNS (LF) SPRAY/TROUELED FLOOR TILE BOILERS/ AIR HANDLING
AREA <4" 4-8" 9-14" . >14" <4" 4-8" 9-14" >14" CEILINGS (MSF) (MSF) TANKS (MSF) EQUIPMENT (MSF) OTHER
HalluayMech. Roomoffices (entire)
Room #2
Room #6
1
1 1 1 11 1 1 1 11
t 1 1 11
20
- 1.00
12.00
1.95
_ *
TOTALS 1 • • • 20_
14.95_ _ •
tsJVOI—*
I4S
Other Material Present In Various Units Of Measure
EA - Each
LF - Linear Feet
MSF - Thousand Square Feet
Table 2913
Other Asbestos-Containing Material - Building 291, New Equip. Tmg.Type Occupancy: Adults (Public)
Area Material Type Quantity (Unit)
Room #2 Acoustical Wall Tile 0.700 (MSF)
to
VO
Ln
EA - Each
LF - Linear Feet
MSF - Thousand Square Feet
1374WG 5/10/91
TABLE 291.4
EXPOSURE ASSESSMENTS (PRIORITY ORDER) - BUILDING 291, ADMIN-NEW EQUIP TRNG
PRIOR. PRIORITY AVG.
SAMPLE MATERIAL INDEX INDEX EXPOSURE FACTORS EXP. %NO. AREA TYPE CODE NUMBER 1 2 3 4 5 HOURS ASB.
FH263 Mech. Room >14" PIPE RUN A 2.900E-1 3 1 1 1 1 2.00 40FH264 Mech. Room 4-8" PIPE FITTING A 1.050E-1 3 1 1 1 1 2.00 10
FH270 Room #2 ACOUSTICAL WALL TILE A 5.500E-2 1 1 1 2 50 40.00 1FH266 Mech. Room <4" PIPE FITTING A 0 3 1 1 1 1 2.00 0
FH268 Office # 1 CEILING TILE A 0 1 1 1 2 50 40.00 0
FH268 Offices (entire) CEILING TILE A 0 1 1 1 2 50 40.00 0
FH271 Room #14 ACOUSTICAL WALL TILE A 0 1 1 1 2 50 40.00 0
to
VO
I0\
Priority Index Codes
A [=] Long Term Corrective MeasureB [=] Review Management Special Considerations/RemarksC [=] Army Asbestos Deficiency Abatement Project
Priority Index Numbers Are In Scientific Notation
Exposure Factors
Material FriabilityOccupant AccessabiIityMaterial Condition
Level Of ActivityNumber Of Assigned Occupants
1
II
2
11
3
11
4
11
5 t=]
TABLE 291.5
COST ESTIMATE* - BUILDING 291, ADMIN-NEW EQUIP TRNG
DESCRIPTIONUNIT^
COST ($)ARE^ ARE| ARE^ AREA
4ARE^
TOTAL
toVO
I-o
Pipe Fittings (EA)
>14"[4"
Pipe Runs (LF)'^<4"
m,>14"
Sprayed/T roweledCfeitings (SF)
Floor Tile (SF)
Boilers/Tanks (SF)
Air HacidlingEquipment (SF)
Other
SUBTOTAL
Difficulty Allowance
SUBTOTAL
Decpntamination UnitsHoDilization
SUBTOTAL
Contingency a 15.00X
SUBTOTAL
Design Fee a 10.00%
SUBTOTAL
Air Monitoring a 10.00X*TOTAL
9.60
5.60
37.90
20.00
5.6
5.6
1.2
1.3
67.2
67.2
7.7
7.7
10.9
10.9
1.2
83.7
7.7
92.7
5.6 1.3 67.2 7.7 10.9 92.7
u u u i:l u7.3 3.0 68.9 9.4 12.6 101.2
1.1 0.5 10.3 1.4 1.9 15.2
8.4 3.5 79.2 10.8 14.5 116.4
0.8 0.3 7.9 1.1 1.5 11.6
9.2 3.8 87.2 11.9 16.0 128.0
2.6 2.6 2.6 2.6 2.6 12.8
11.8 6.4 89.7 14.5 18.5 140.9
Amounts Are In Thousands Of Dollars
**Less Than $100 For The Area; Amount Not Printed But Included In Totai(s)The Minimum Air Monitoring Fee is $500.00 Per Building
AREAAREA
i! mi:5: Room
waylce|(entire)
» IB
VO
Bldg. 291 Mechanical Room: (4 In. - 8 In.) FittingInsulation Sample FH264 Tested Positive. Pipe RunInsulation is Fiberglass.
291-8
FH263 FH270J CFH2671 IFH268
rI « cpvBOtLEa nOOM ^
OFFICE IS I OFFICE " OFFICE IS fv VOMENSOFFKJEMEN8 TOLET
It
TOILET
rDDOn
2iAr=nAf
(OACLASSROOM
10
2CLASSROOMCLASSROOM 0
4 LABORATOnv
nI0A
FH271 FH269 FH264 FH265
BLDG. 291 LEQEND
(FHnn^ POSITIVE SAMPLEjpHnnnl NEGATIVE SAMPLE
MWMOEnS moescoNUMns
296
ADMINISTRATIVE BUILDING
296.1 GENERAL
Building 296 was surveyed by WESTON technicians on 4 December 1990.
The first three portions of this facility report summarize the results of this inspection.
Polarized Light Microscopy (PLM) with dispersion staining was used to analyze 7 samples
of suspect material collected from the building. Of these samples, 5 were found to be
asbestos-containing materials (ACM). Table 296.1 lists the analytical results for the bulk
samples.
296^ ACM AND EXPOSURE ASSESSMENT
The location, description, and analytical results for each bulk sample from Building 296 are
presented in Table 296.1. An area-by-area inventory of ACM is provided in Tables 296.2
and 296.3. "Other Asbestos-Containing Materials," listed in Table 2963, are materials that
do not correspond to the standard caption categories listed in Table 2963. A prioritized
listing of exposure assessments is presented in Table 296.4. An itemized area-by-area cost
estimate for removal and replacement is provided in Table 296.5. The method by which
removal/replacement costs are calculated is described in the ISSUES COMMON TO ALL
BUI1X)INGS Section of this report. Building floor plans (see attachment) indicate sample
locations and building area names as they are listed in Tables 2963 and 2963.
1374WG 296-1 5/10/91
2963 RECOMMENDATIONS/CONCLUSIONS
WESTON recommends:
• Asbestos-containing floor tile, transite panel board, and pipe insulation should belabeled under the O&M Program.
1374WG 296-2 5/10/91
CUTTOM ENVXIOIMEHTAL COMSULTAHTS, IHC.
data sheet Clayton Project No.: 16621-47,
>!• ID E-SYSTEMS, INC./SAI. %
j. 9^0^■boretonrS^le 10 #
Hachod - PLM + Strntmint:ro«« SMpl«^P«ar«ac«(*nc*r BUBter;•»<>«• c<»lor)
HoBogiBiOMi, flbreuBHoaOgOBOOUO^ BOBflbrOMfUtaregaMOBo, flbrouoMotorogoBoooo
(•ttc«r BUMb«r)
*«»uoc of »tac«rlal
#C88-3
101258
, nonflbroHaCorogaoBouB, alsBd
of f-whitofibrousmixture
1.2. UacrBBCBA
<•«)
uboscoo Ttboobc(«QC«r Btaibor•oA porcoBC)
1. AkmIcbChiyaocllBCrocldellt*Othor, apBcify
2. <11
4.
^•rcoBC Total Aabaatoa Pr A U Saapla <lt
>cKar Flbroua IkargtaaaHloaral WoolCalluloaaSynchaclc flbarn
iatarlal PrtaoBC 2. 2. 20«(•Btar BuMbar 3.and parcaot) 4.
)<onflbroua KaCarlala Pra;>arcanc)
C (Aaacrlptloo and1. Cxpaua2. Slllcaca3. Sand
4.
5. MicaOthar6.
ND • No ggbegtos dotocted
r£'sr
TABLE 296.1
BULK SAMPLE ANALYSIS RESULTS - BUILDING 296, ADMIN.(DATA COMM.)
SAMPLE
NO. LOCATION ITEM DESCRIPTION
PERCENT ASBESTOS
CH AM OT LAYERED
FH272 HALLWAY NORTH,BELOW CEILING FLOOR TILE GRAY,OTH,12X12 FL YES
FH273 HALLWAY NORTH,BELOW CEILING FLOOR TILE WHITE,0TH,9X9 FL TL 2 YES
FH274 ROOM #2,BEL0W CEILING FLOOR TILE WHITE,OTH,9X9 FL TL 3 YES
FH275 ROOM #2,BELOW CEILING FLOOR TILE BROWN,OTH,9X9 FL TL 5 YES
FH276 ROOM #5,BELOW CEILING TRANSITE PANEL BOARD WHITE,OTH,TRAN.PANEL 30 YES
FH277 MECH. ROOH,BELOW CEILING >U" PIPE RUN WHITE,OTH,>H BREECH 40 NO
FH278 MECH. ROOM,BELOW CEILING EXPANSION JOINT(S) WHITE,OTH,EXP.JOINT • " NO
M
VO
a*ILO
Asbestos content presented for layered samples represents the highest concentration layer.
Quadrant Codes System Codes Asbestos Tvoes
C = Center STH = Steam CH = ChrysotileN = North CHW = Chilled Water AH = Amosite
E = East HHW = Heating Hot Water OT = Other
S = South DOM = Domestic Water
W = West OTH = Other
NE = Northeast UNK = Unknown
NW = Northwest
SE = Southeast
SW = Southwest
TABLE 296.2
ASBESTOS-CONTAINING MATERIALS - BUILDING 296, ADMIN.(DATA COMM.)
AREA
PIPE FITTINGS (EA)
<411 4-8" 9-14" >14"PIPE RUNS (IF)
<411 4-8" 9-14" >14"SPRAY/TROWELED FLOOR TILE BOILERS/ AIR HANDLING
CEILINGS (MSF) (HSF) TANKS (HSF) EQUIPMENT (MSF) OTHER
1st Fir. - Offices
Halluay NorthMech. RoomRoom #2
Room #5
3.00
0.80
0.64
TOTALS 4.44
N3VO
I
Other Material Present In Various Units Of Measure
EA - Each
LF - Linear Feet
MSF - Thousand Square Feet
Table 296.3
Other Asbestos-Containing Material - Building 296, Administrative (Data Communications)lype Occupancy: Adults (Public)
Area Material Type Quantity (Unit)
Room #5 Transite Panel Board 1.00 (MSF)
EA - Each
LF - Linear Feet
MSF - Thousand Square Feet
ho
vo
IUi
1374WG 5/10/91
TABLE 296.4
EXPOSURE ASSESSMENTS (PRIORITY ORDER) - BUILDING 296, ADMIN.(DATA COMM.)
PRIOR. PRIORITY AVG.
SAMPLE MATERIAL INDEX INDEX EXPOSURE FACTORS EXP. XNO. AREA TYPE CODE NUMBER 1 2 3 4 5 HOURS ASB.
FH276 Room #5 TRANSITE PANEL BOARD A 9.750E-2 1 1 1 2 15 40.00 30FH277 ' Mech. Room >14" PIPE RUN A 5.000E-2 2 1 1 1 1 2.00 40FH27B Hech. Room EXPANSION JOINTS A 0 2 1 1 1 1 2.00 0
VOcyi
CT>
Priority Index Codes
A [=] Long Term Corrective MeasureB [=] Review Management Special Considerations/RemarksC [=] Army Asbestos Deficiency Abatement Project
Priority Index Numbers Are In Scientific Notation
Exposure Factors
1 [=] Material Friability[=] Occupant AccessabiIity[=] Material Condition
Level Of Activity[=]
[=] Nunber Of Assigned Occupants
TABLE 296.5
COST ESTIMATE* - BUILDING 296, ADMIN.(DATA COMM.)
DESCRIPTIONUNIT,,
COST ($)ARE^ ARE| ARE^ AREA
4ARE^
TOTAL
N3VO
ON
Pipe.Eittings (EA)<4"
>14"
Pipe,Runs (LF)<4"A .nil
9-T4">14"
Sprayed/T roweI edCfellings (SF)
Floor Tile (SF)
Boilers/Tanks (SF)
Air HacidlingEquipment (SF)
Other
SUBTOTAL
Difficulty Allowance
20.00
16.8
16.8
4.5
4.5
3.6
3.6
11.0
11.0
24.9
11.0
35.9
SUBTOTAL 16.8 4.5 ** 3.6 11.0 35.9
Decgntamioation UnitsMobilization H u H u u
SUBTOTAL 18.5 6.2 1.8 5.3 12.7 44.4
Contingency 8 15.00% 2.8 0.9 0.3 0.8 1.9 6.7
SUBTOTAL 21.3 7.1 2.0 6.1 14.6 51.1
Design Fee 8 10.00% 2.1 0.7 0.2 0.6 1.5 5.1
SUBTOTAL 23.4 7.8 2.2 6.7 16.1 56.2
Air Monitoring 8 10.00%*** 1.1 1.1 1.1 1.1 1.1 5.6
TOTAL 24.5 8.9 3.4 7.8 17.2 61.8
Amounts Are In Thousands Of Dollars
''''less Than $100 For The Area; Amount Not Printed But Included In TotaKs)The Minimum Air Monitoring Fee is $500.00 Per Building
.1st. FlAREAAREAAREA oom »]
- Officesoom ussy,"!!!"""'
FH274 FH275 FH276 FH273 FH272
RM. tIMS PtA.9
fKLHlO
ILirzj I I
RU.2WOliCN mie
FH277
FURNACE
a
iMlFH278I
An HANDLER An HANDLER
1 1,
LEGEND
BLDG. 296
(fhkt^ positive saiwwle|FKnnn| NEGATIVE SAMPLE
UANMSERS N, OESKSCRMXyOULTMnB
360
BOQ BUILDING
360.1 GENERAL
Building 360 was surveyed by WESTON technicians on 5 December 1990.
The first three portions of this facility report summarize the results of this inspection.
Photographs of some sample locations are provided in Section 360.4.
Polarized Light Microscopy (PLM) with dispersion staining was used to analyze 38 samples
of suspect material collected from the building. Of these samples, 33 were found to be
asbestos-containing materials (ACM). Table 360.1 lists the analytical results for the bulk
samples.
360.2 ACM AND EXPOSURE ASSESSMENT
The location, description, and analytical results for each bulk sample &"om Building 360 are
presented in Table 360.1. An area-by-area inventory of ACM is provided in Tables 360.2
and 360.3. "Other Asbestos-Containing Materials," listed in Table 360.3, are materials that
do not correspond to the standard caption categories listed in Table 360.2. A prioritized
listing of exposure assessments is presented in Table 360.4. An itemized area-by-area cost
estimate for removal and replacement is provided in Table 360.5. The method by which
removal/replacement costs are calculated is described in the ISSUES COMMON TO ALL
BUILDINGS Section of this report. Building floor plans (see attachment) indicate sample
locations and building area names as they are listed in Tables 360.2 and 360.5.
1374WG 360-1 5/10/91
3603 RECOMMENDATIONS/CONCLUSIONS
WESTON recommends:
• Asbestos-containing pipe insulation, fitting insulation, and floor tile should be labeledunder the O&M Program.
1374WG 360-2 5/10/91
TABLE 360.1
BULK SAMPLE ANALYSIS RESULTS - BUILDING 360, BOQ
SAMPLE
NO. LOCATION ITEM DESCRIPTION
PERCENT ASBESTOS
CH AM OT LAYERED®
FH301 MECH ROOM.BELOW CEILING 4-8" PIPE RUN WHITE,UNK,4-8IN. RUN 15.
YES
FH302 MECH ROOM.BELOW CEILING 4-8" PIPE FITTING WHITE,UNK,4-81N. FIT 10 - YESFH303 MECH ROOH.BELOW CEILING >14" PIPE RUM WHITE,OTH,>14 BREECH - - NO
FH30A MECH ROOM,BELOW CEILING >14" PIPE RUN WHITE,OTH,>14 BREECH - NO
FH305 MECH ROOM,BELOW CEILING 4-8" PIPE FITTING WHITE,UNK,4-8IN. FIT 50 - YES
FH306 MECH ROOM,BELOW CEILING 4-8" PIPE RUM WHITE,UNK,4-8IN. RUN 10 - YES
FH307 MECH ROOM,BELOW CEILING 4-8" PIPE FITTING WHITE,UNK,4-8IN. FIT 30 - YES
FH308 MECH ROOM,BELOW CEILING 4-8" PIPE RUN WHITE,UNK,4-8IN. RUN 10 - YES
FH309 MECH ROOM,BELOW CEILING 4-8" PIPE RUN WHITE,UNK,4-8IN. RUN 15 25 NO
FH310 MECH ROOM,BELOW CEILING 4-8" PIPE RUN WHITE,UNK,4-8IN. RUN 10 30 NO
FH311 MECH ROOH,BELOW CEILING 4-8" PIPE RUN WHITE,UNK,4-8IN. RUN 10 35 NO
FH312 MECH ROOM,BELOW CEILING <4" PIPE RUN WHITE,UNK,<4IN. RUN 20 YES
FH313 1ST FLOOR LOUNGE,BELOW CEILING FLOOR TILE BLACK,0TH,9X9 FL TL 3 YES
FH314 1ST FLOOR LOUNGE,BELOW CEILING FLOOR TILE GREEN,OTH,9X9 FL TL 5 YES
FH315 1ST FLOOR LOUNGE,BELOW CEILING CEILING TILE WHITE,OTH,2X4 CL TL - YES
FH316 1ST FLOOR LOUNGE,BELOW CEILING CEILING TILE WHITE,OTH,1X1 CL TL - YES
FH317 1ST FLOOR LAUNDRY,BELOW CEILING <4" PIPE FITTING WHITE,UNK,<4IN. FIT 25 YES
FH318 1ST FLOOR LAUNDRY,BELOW CEILING <4" PIPE RUN WHITE,UNK,<4IN. RUN 10 - YES
FH319 1ST FL. PIPE CHASE,BELOW CEILING <4" PIPE FITTING WHITE,UNK,<4IN. FIT 20 YES
FH320 1ST FL. PIPE CHASE,BELOW CEILING <4" PIPE RUN WHITE,UNK,<4IN. RUN 10 YES
FH321 1ST FLR. PIPE CHASE,BELOW CEILING <4" PIPE FITTING WHITE,UNK,<4IN. FIT 25 - YES
FH322 1ST FL. LOBBY EAST,BELOW CEILING FLOOR TILE WHITE,OTH,12X12 FL 3 - YES
FH323 1ST FLR JANT. CLOSET,BELOW CEILING 4-8" PIPE FITTING WHITE,UNK,4-8IN. FIT 30 - YES
FH324 1ST FLR JANT; CLOSET,BELOW CEILING 4-8" PIPE RUN
4-8" PIPE FITTINGWHITE,UNK,4-8IN. RUN 10 - YES
FH325 1ST FLR JANT. CLOSET,BELOW CEILING WHITE,UNK,4-8IN. FIT 30 - YES
cy>
01OJ
Asbestos content presented for layered samples represents the highest concentration layer.
Quadrant Codes
C = Center
N = North
E = East
S = South
W = West
NE = Northeast
NW = NorthwestSE = Southeast
SW = Southwest
System Codes
STH = Steam
CHW = Chilled Water
HHU = Heating Hot WaterDOM = Domestic Water
OTH = Other
UNK = Unknown
Asbestos Types
CH = ChrysotileAM = Amosite
OT = Other
TABLE 360.1(continued)
BULK SAMPLE ANALYSIS RESULTS - BUILDING 360, BOQ
SAMPLE
NO. LOCATION ITEM DESCRIPTION
PERCENT ASBESTOS
CH AM OT LAYERED'
FH326 1ST FLR JANT. CLOSET.BELOW CEILING 4-8" PIPE RUN WHITE,UNK,4-8IN. RUN 15_
YES
FH327 1ST FLR JANT. CLOSET,BELOW CEILING <4" PIPE FITTING WHITE,UNK,<4IN. FIT 30 - YES
FH328 1ST FLR JANT. CLOSET,BELOW CEILING <4" PIPE RUN WHITE,UNK,<4IN. RUN 15 - YES
FH329 1ST FLR JANT. CLOSET,BELOW CEILING 4-8" PIPE FITTING WHITE,UNK,4-8IN. FIT 25 - YES
FH330 1ST FLR JANT. CLOSET,BELOW CEILING 4-8" PIPE RUN WHITE,UNK,4-8IN. RUN 15 10 YES
FH331 1ST FLR JANT. CLOSET,BELOW CEILING 4-8" PIPE FITTING WHITE,UNK,4-8IN. FIT 45 - YES
FH332 1ST FLR JANT. CLOSET,BELOW CEILING 4-8" PIPE RUM WHITE,UNK,4-8IN. RUN 15 15 YES
FH333 1ST FLR JANT. CLOSET,BELOW CEILING 4-8" PIPE FITTING WHITE,UNK,4-8IN. FIT 25 - YES
FH334 1ST FLR JANT. CLOSET,BELOW CEILING 4-8" PIPE RUM WHITE,UNK,4-8IN. RUN 15 15 YES
FH335 1ST FLOOR HALLWAY,BELOW CEILING CEILING TILE WHITE,OTH,2X2 CL TL - - YES
FH336 1ST FL. ROOMS ENTIRE,BELOW CEILING FLOOR TILE BLACK,OTH,9X9 FL TL 3 - NO
FH337 2ND FLOOR ROOM 228,BELOW CEILING FLOOR TILE GRAY,OTH,9X9 FL TL 3 - YES
FH338 3RD FLOOR ROOM 358,BELOW CEILING FLOOR TILE GRAY,OTH,9X9 FL TL 5 - YES
LO
ON0
145-
Asbestos content presented for layered samples represents the highest concentration layer.
Quadrant Codes System Codes Asbestos Tvoes
C = Center STM = Steam CH = ChrysotileN = North CHW = Chi lied Water AM = Amosite
E = East HHW = Heating Hot Water OT = Other
S = South DOM = Domestic Water
W = West OTH = Other
NE = Northeast UNK = Unknown
NW = Northwest
SE = Southeast
SW = Southwest
TABLE 360.2
ASBESTOS-CONTAINING MATERIALS - BUILDING 360, BOQ
AREA <4"
PIPE FITTINGS (EA)
4-8" 9-14" >14"
PIPE RUNS (LF)
<4" . 4-8" 9-14" >14"
SPRAY/TROWELED FLOOR TILE BOILERS/ AIR HANDLINGCEILINGS (HSF) (HSF) TANKS (MSF) EQUIPMENT (HSF) OTHER
CO
0
1Ln
1st Fl. Lobby East -
1st Fl. Lobby West -
1st Fl. Pipe Chase 5
1st Fl. Rooms Entire -
1st Floor Laundry 4
1st Floor Lounge 2
1st Fir Jant. Closet 10
1st Fir. Pipe Chase 3
2nd Fl. Rooms Entire
2nd Floor Room 228
3rd Fl. Rooms Entire3rd Floor Room 358
3rd Fir. Rooms(Entr)Mech Room
TOTALS 24
50
26
25
16
90 810
57
50 297
207 1107
0.360.36
5.40
0.70
5.40
0.45
5.40
0.45
5.40
23.92
Other Material Present In Various Units Of Measure
EA - Each
LF - Linear Feet
HSF - Thousand Square Feet
Table 360.3
Other Asbestos-Containing Material - Building 360, BOQl^pe Occupancy: Adults (Public)
Area Material Type Quantity (Unit)
No Other Asbestos-Containing Material Found in this Building
LO
O
BON
EA - Each
LF - Linear Feet
MSF - Thousand Square Feet
1374WO 5/10/91
TABLE 360.4
EXPOSXJRE ASSESSMENTS (PRIORITY ORDER) - BUILDING 360, BOQ
PRIOR. PRIORITY AVG.
SAMPLE MATERIAL INDEX INDEX EXPOSURE FACTORS EXP. X
NO. AREA TYPE CODE NUMBER 1 2 3 4 5 HOURS ASB.
FH317 1st Floor Laundry <4" PIPE FITTING A 6.300E01 2 1 1 2 30 40.00 25
FH317 1st Floor Lounge <4" PIPE FITTING A 6.300E01 2 1 1 2 30 40.00 25FH318 1st Floor Laundry <4" PIPE RUN A 6.300E01 2 1 1 2 30 40.00 10
FH318 1st Floor lounge <4" PIPE RUN A 6.300E01 2 1 1 2 30 40.00 10
FH319 1st Fl. Pipe Chase <4" PIPE FITTING A 6.300E01 2 1 1 2 30 40.00 20
FH320 1st Fl. Pipe Chase <4" PIPE RUN A 6.300E01 2 i 1 2 30 40.00 10
FH321 1st Fir. Pipe Chase <4" PIPE FITTING A 6.300E01 2 1 1 2 30 40.00 25
FH323 1st Fir Jant. Closet 4-8" PIPE FITTING A 6.300E01 2 1 1 2 30 40.00 30
FH305 Mech Room 4-8" PIPE FITTING A 8.100E-1 3 1 2 1 1 2.00 50
FH309 Mech Room 4-8" PIPE RUN A 8.100E-1 3 1 2 1 1 2.00 40
FH310 Mech Room 4-8" PIPE RUN A 8.100E-1 3 1 2 1 1 2.00 40
FH311 Mech Room 4-8" PIPE RUN A 8.100E-1 3 1 2 1 1 2.00 45
FH301 Mech Room 4-8" PIPE RUN A 2.900E-1 3 1 2 1 1 2.00 15
FH302 Mech Room 4-8" PIPE FITTING A 2.900E-1 3 1 2 1 1 2.00 10
FH306 Mech Room 4-8" PIPE RUN A 2.900E-1 3 1 2 1 1 2.00 10
FH307 Mech Room 4-8" PIPE FITTING A 2.900E-1 3 1 2 1 1 2.00 30
FH308 Mech Room 4-8" PIPE RUN A 2.900E-1 3 1 2 1 1 2.00 10
FH312 Mech Room <4" PIPE RUN A 2.900E-1 3 1 2 1 1 2.00 20FH331 1st Fir Jant. Closet 4-8" PIPE FITTING A 5.DaOE-2 2 1 1 1 1 2.00 45
FH324 1st Fir Jant. closet 4-8" PIPE RUN A 1.850E-2 2 1 1 1 1 2.00 10
FH325 1st Fir Jant. Closet 4-8" PIPE FITTING A 1.850E-2 2 1 1 1 1 2.00 30
FH326 1st Fir Jant. Closet 4-8" PIPE RUN A 1.850E-2 2 1 1 1 1 2.00 15
FH327 1st Fir Jant. Closet <4" PIPE FITTING A 1.850E-2 2 1 1 1 1 2.00 30
FH328 1st Fir Jant. Closet <4" PIPE RUN ' A 1.85aE-2 2 1 1 1 1 2.00 15
FH329 1st Fir Jant. Closet 4-8" PIPE FITTING A 1.850E-2 2 1 1 1 1 2.00 25
FH330 1st Fir Jant. Closet 4-8" PIPE RUN A 1.850E-2 2 1 1 1 1 2.00 25
< FH332 1st Fir Jant. Closet 4-8" PIPE RUN A 1.850E-2 2 1 1 1 1 2.00 30
FH333 1st Fir Jant. Closet 4-8" PIPE FITTING A 1.850E-2 2 1 1 1 1 2.00 25
FH334 1st Fir Jant. Closet 4-8" PIPE RUN A 1.850E-2 2 1 1 1 1 2.00 30
FH303 Mech Room >14" PIPE RUN A 0 3 1 2 1 1 2.00 0
LO
CT>
O
Priority Index Codes
A [=] Long Term Corrective MeasureB [=] Review Management Special Considerations/RemarksC t=] Army Aslsestos Deficiency Abatement Project
Priority Index Nuribers Are In Scientific Notation
Exposure Factors
1 t=] Material Friability2 [=] Occupant AccessabiIity3 1=] Material Condition4 [=] Level of Activity5 t=] Number Of Assigned Occupants
TABLE 360,4(continued)
EXPOSURE ASSESSMENTS (PRIORITY ORDER) - BUILDING 360, BOQ
PRIOR. PRIORITY AVG.
SAMPLE MATERIAL INDEX INDEX EXPOSURE FACTORS EXP. X
NO. AREA TYPE CODE NUMBER 1 2 3 4 5 HOURS ASB.
FH304 Mech Room >14" PIPE RUN A 0 3 1 2 1 1 2.00 0
FH315 1st Floor Lounge CEILING TILE A 0 2 1 1 2 30 40.00 0FH316 1st Floor Lounge CEILING TILE A 0 2 1 1 2 30 40.00 0
FH335 1st Floor Hallway CEILING TILE A 0 2 1 1 2 30 40.00 0
LOa>
0100
Priority Index Codes
A [=] Long Term Corrective MeasureB [=] Review Management Special Considerations/RemarksC [=] Army Asbestos Deficiency Abatement Project
Priority Index Numbers Are In Scientific Notation
Exposure Factors
1 [=] Material Friability[=] Occupant Accessability[=] Material Condition
Level Of Activityt=][=] Number Of Assigned Occupants
TABLE 360.5
COST ESTIMATE* - BUILDING 360, BOQ
DESCRIPTIONUNIT. AREA ARE| ARE^ AREA ARE| ARE^ ARE^ AREg ARE^ AR^g AR^^
WCTi
01VO
Pipe,Fittings (EA)<All rg.jQ - - 0.4 -
O 11
0.1 u 0.2_
-
y-iA">14" 551:88 - - - - - - - - - - -
Pipe,Runs (LF)<4"
>14" if-
-
0.7-
0.7 0.4 -
-
- -
9.60 - - - - - - - - - - -
Floor Tile (SF) 5.60 2.0 2.0 - 30.2 - 3.9 - - 30.2 2.5 30.2
Boilers/Tanks (SF) 37.90 - - - - - - - - - - -
Air,.HaodlingEquipment (SF) 20.00 - - - - - - - - - - -
Other - - - - - - - - - - -
SUBTOTAL 2.0 2.0 1.0 30.2 0.9 4.5 32.1 0.2 30.2 2.5 30.2
Difficulty Allowance 1.0 - 0.5 - 0.1 0.3 16.0 0.1 - - -
SUBTOTAL 3.0 2.0 1.6 30.2 1.1 4.8 48.1 0.3 30.2 2.5 30.2
Depontamioation UnitsHobilization i:l k\ k\ 3:1 3:1 3:1 3:1 3:1 3:1 3:1
SUBTOTAL 4.2 3.2 2.8 31.5 2.3 6.0 49.3 1.5 31.5 3.7 31.5
Contingency a 15.00% 0.6 0.5 0.4] 4.7 0.3 0.9 7.4 0.2 4.7 0.6 4.7
SUBTOTAL 4.9 3.7 3.2 36.2 2.6 6.9 56.7 1.8 36.2 4.3 36.2
Design Fee a 10.00% 0.5 0.4 0.3 3.6 0.3 0.7 5.7 0.2 3.6 0.4 3.6
SUBTOTAL 5.4 4.1 3.5 39.8 2.9 7.6 62.4 1.9 39.8 4.7 39.8
Air Monitoring a 10.00%"r*
2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0
TOTAL 7.3 6.1 5.5 41.8 4.9 9.5 64.4 3.9 41.8 6.7 41.8
Amounts Are In Thousands Of Dollars
**Less Than $100 For The Area; Amount Mot Printed But Included In Total(s)***The Hininun Air Monitoring Fee is $500.00 Per Building
AREAApAAREAAREAAREAAREA
^ase. -aundry
r Jant. ClosetR joomsRooms
ntire:ntire
ABgA 2: StAREA 4: StAREA 6: StAREA ,8: ; StAREA 10; >nd
ooms Entireoor tounger. Pipe Chaseoor Room 228
TABLE 360.5
(continued)
COST ESTIMATE* - BUILDING 360, BOQ
DESCRIPTIONUNIT^
COST ($)AR^I AR^I AR^g
TOTAL
LO
a>
01
Pipe Fittings (EA)<^ll
>14"
Pipe,Runs <LF)<4"
>14"
Sprayed/Troweled9.60
0.6
I-} zU
Floor Tile (SF) 5.60 2.5 30.2 - 134.0
Boilers/Tanks (SF) 37.90 - - - -
Air HandlingEquiprient (SF) 20.00 - - - -
Other - - - -
SUBTOTAL 2.5 30.2 11.0 179.8
Difficulty Allowance - - 4.1 22.2
SUBTOTAL 2.5 30.2 15.0 201.9
Pepgntamination UnitsMobilization J:1 l:\ 1:8
SUBTOTAL 3.7 31.5 16.3 218.9
Contingency 3 15.00% 0.6 4.7 2.41 32.8
SUBTOTAL 4.3 36.2 18.7 251.8
Design Fee 3 10.00% 0.4 3.6 1.9 25.2
SUBTOTAL 4.7 39.8 20.6 277.0
Air Monitoring 3 10.00%*** 2.0 2.0 2.0 27.7
TOTAL 6.7 41.8 22.6 304.7
Amounts Are In Thousands Of Dollars
**Less Than $100 For The Area; Amount Not Printed But Included In Total(s)***The Minimum Air Monitoring Fee is $500.00 Per Building
itliis til 8Ea,'Jsss AREA 13: 3rd Fir. Rooms(Entr)
Bldg, 360
t
□m
m
««!l!
Mechanical Room: (Sample FH301)(4 In. - 8 In.) Pipe Run Insulation TestedPositive. Pipe Fitting Insulation Associated WithThis Run Also Tested Positive (Sample FH302).
Bldg. 360
^ r' fi .1.
■M
y O '"•0
4 06
Mechanical Room: (Sample FH309)(4 In. - 8 In.) Pipe Run Insulation TestedPositive. Total Of Six Pipe Runs In Pipe Chase AllTested Positive.
360-11
J
LMr
FK33886 41
1
Bldg. 360 First Floor, Janitor's Closet: (Sample FH334) (4In. - 8 In.) Pipe Run Insulation Tested Positive.All Pipe Runs and Fitting Insulation On First FloorTested Positive.
Bldg. 360
fff
A!
iO
iThird Floor, Room 358: (Sample FH338) (9 In. x 9In.) Gray Floor Tile. Black Floor Tile (9 In. x 9In.) Also Tested Positive. Floor Tiles In EntireBuilding Tested Positive.
360-12
Op
FH330 CFn325) rFH323) C FH324 FH313
|FH335| FH3^ H333 FH326 FH317J CFH318 FH314
slrHHi
RM105 SuLFW 101 ^ijl RM 103RM 102 RM 104 RM 106 RM 107 RM 108 RM 109
OPFlCe.122
jnTJlLin IT^-IJ .
i fOK
STAR HALL
100 JANCLO 124I"
ua LOUNGE 125
1- fi ■ ■ . 6 126LJ! O iOJ
VESTBULE 1
m 1 ^==FH336RM 120 RM 119 RM lie RM 117 RM116 RM 115 RM114 ZJC RM 112X D'lRM 113 FM 111
\ 1FH316|
FH3^ iFHSIsjFH329
FH332FH328J CFH3271 r FH322
FH321FH330
BLDG. 360
FIRST FLOOR PLAN
LEGEND
^Hnn^ POSITIVE SAMPLE|FKnnn| NEGATIVE SAMPLE
IMNMJEflS DESX»CRS«(MULW(n
360-13
RM3S3 1 RM3SSAM 355 ST"'Tr^^ *r-^
-in; r AM 359AM 341 RM)47 RM3S7RM345 I
j^1 J
RM 343 m349 z:p J
f_
rwtT
nn =po
rTjiJL4ir\==™iHALL O T O 0 It c
n i ztt- 300 I
rii^Sjr u Hilij-v
W-"T" »:r. ^
I • ^ ■' u I ^ ' LI—/• '• s f IAM 342 P AM 344 S AM 346 JJ | AM 346 AM 350 PpT^ 5 AM 352 I- AM 354
THRD FLOOR
"T- ='nT7' -■-■r 3 -i "LJi.TL Mr-iJ—, r 0
^ iEViFM360am 356RM 356
ai
FH338
SECOND FLOOR
fT'v 7*/' ''""TfijAM 221 "
LJ200
AM 223
? O 1^ Oi o P V .
m
■ "soy '4
prurf
iii: _pLiir'
° j "" i <•'
■/
:✓
. mta , nlli D """-' f (' ''S* 1^, , ,BM 2!6 3Fn I I'M 020 ' RM 230 pj) O I "M 232
FH337
M237 [ ~RM23a
- ir-
o u >3
'Jit
FH301FH304
FH305 FH302FH303
1 1. 1Qi ' ' 'i:^
i -aPf€TABCH
I. O T « iI
hCOlAM
LOUNGE 125
o w
H=1 Loeer lae
; J7": uvr STORAGE /=3
3 U'TTLli P?-
E FH306AM 236 AM 238 AM 240
* '/ * miU
FH307 FH309J CFH310J CFH311
FH308J CFH312
BLDG. 360
SECOND AND THIRD FLOORS
LEGEND
^Knr^ POSITIVE SAMPLEjPHnrml NEGATIVE SAMPLE
UWMXRS OESOCRSCONSULTMnS
360-14
361
BEQ BUILDING
361.1 GENERAL
Building 361 was surveyed by WESTON technicians on 6 December 1990.
The jBrst three portions of this facility report summarize the results of this inspection.
Polarized Light Microscopy (PLM) with dispersion staining was used to analyze 14 samples
of suspect material collected from the building. Of these samples, 10 were found to be
asbestos-containing materials (ACM). Table 361.1 lists the analytical results for the bulk
samples.
361.2 ACM AND EXPOSURE ASSESSMENT
The location, description, and analytical results for each bulk sample from Building 361 are
presented in Table 361.1. An area-by-area inventory of ACM is provided in Tables 361.2
and 361.3. "Other Asbestos-Containing Materials," listed in Table 361.3, are materials that
do not correspond to the standard caption categories listed in Table 361.2. A prioritized
listing of exposure assessments is presented in Table 361.4. An itemized area-by-area cost
estimate for removal and replacement is provided in Table 361.5. The method by which
removal/replacement costs are calculated is described in the ISSUES COMMON TO ALL
BUILDINGS Section of this report. Building floor plans (see attachment) indicate sample
locations and building area names as they are listed in Tables 361.2 and 361.5.
1374WG 361-1 5/10/91
3613 RECOMMENDATIONS/CONCLUSIONS
WESTON recommends:
• Asbestos-containing floor tile and pipe insulation should be labeled imder the O&MProgram.
1374WG 361-2 5/10/91
TABLE 361.1
BULK SAMPLE ANALYiSIS RESULTS - BUILDING 361, BEQ
SAMPLE PERCENT ASBESTOS
LAYERED®NO. LOCATION ITEM DESCRIPTION CH AM OT
FH339 2ND FLOOR ROOM 227,BEL0W CEILING FLOOR TILE GRAY,0TH,9X9 FL TL,HORIZONTAL 5. .
YES
FH340 2ND FLOOR ROOM 240,BELOW CEILING FLOOR TILE BROWN,0TH,9X9 FL TL,HORIZONTAL 7 - - YESFH341 3RD FLOOR ROOM 356,BELOW CEILING FLOOR TILE GREEN,0TH,9X9 FL TL,HORIZONTAL 5 - - NOFH342 1ST FLOOR ROOM 104,BELOW CEILING FLOOR TILE BROWN,OTH,9X9 FL TL,HORIZONTAL 7 - - YES
FH343 1ST FLOOR ROOM 119,BEL0U CEILING FLOOR TILE BROWN,OTH,9X9 FL TL,HORIZONTAL 7 - - YES
FH344 1ST FL. ENTRANCE SO.,BELOW CEILING ,FLOOR TILE ' WH1TE,0TH,12X12 FL,HORIZONTAL 2 - - YES
FH345 1ST FLOOR HALLWAY,BELOW CEILING CEILING TILE WHITE,OTH,2X2 CL TL,HORIZONTAL - - - YES
FH346 1ST FLOOR HALLWAY,BELOW CEILING 4-8" PIPE FITTING WHITE,UNK,4-8IN. FIT,HORIZONTAL 2 - - YES
FH347 1ST FLOOR HALLWAY,BELOW CEILING 4-8" PIPE FITTING WHITE,UNK,4-8IN. FIT,HORIZONTAL 3 - - YES
FH348 1ST FLOOR HALLWAY,BELOW CEILING 4-8" PIPE FITTING WHITE,UNK,4-8IN. FIT,HORIZONTAL 2 - - YES
FH349 TRANSFORMER ROOM,BELOW CEILING 4-8" PIPE FITTING WHITE,UNK,4-8IN. FIT,HORIZONTAL 15 - - YESFH350 MECH ROOM,BELOW CEILING >14" PIPE RUN WHITE,OTH,>14 BREECH,HORIZONTAL - - - NO
FH351 MECH ROOM,BELOW CEILING >14" PIPE RUN WHITE,0TH,>14 BREECH,HORIZONTAL - - - YES
FH352 MECH ROOM.BELOW CEILING 9-14" PIPE RUN WHITE,0TH,9-14 BREEC,HORIZONTAL - - NO
a\
LO
Asbestos content presented for layered samples represents the highest concentration layer.
Quadrant Codes System Codes Asbestos TvoesC = Center STM = Steam CH = ChrysotileN = North CHW = Chilled Water AM = AmositeE = East HHW = .Heating Hot Water OT = OtherS = South DOM - Domestic Water
W = West OTH = Other
NE = Northeast UNK = Unknown
NW = Northwest
SE = Southeast
SW = Southwest
TABLE 361.2
ASBESTOS-CONTAINING MATERIALS - BUILDING 361, BEQ
AREA
1st Fl. Entrance So1st Floor Entire
1st Floor Hallway1st Floor Room 104
1st Floor Room 119
1st Fir. Ent. North
2nd Floor Entire
2nd Floor Room 227
2nd Floor Room 240
(Jj 3rd Floor Entire
3rd Floor Room 3561—'
1 Transformer Room■P-
TOTALS
<4"PIPE FITTIMGS (EA)
4-8" 9-14"
60
>14"PIPE RUNS (IF)
<4" 4-8" 9-14" >14"SPRAY/TROWELED FLOOR TILECEILIWGS (HSF) (HSF)
BOILERS/ AIR HANDLINGTANKS (HSF) EQUIPMENT (HSF) OTHER
0.147.20
200.000.147.200.200.007.20
20
69 22.48
Other Material Present In Various Units Of Measure
EA - EachLF - Linear FeetMSF - Thousand Square Feet
Table 361.3
Other Asbestos-Containing Material - Building 361, BEQType Occupancy: Adults (Public)
Area Material Type Quantity (Unit)
No Other Asbestos-Containing Material Found in this Building
U)
ILn
EA - Each
LF - Linear Feet
MSF - Thousand Square Feet
1374WG 5/10/91
TABLE 361.4
EXPOSURE ASSESSMENTS (PRIORITY ORDER) - BUILDING 361, BEQ
PRIOR. PRIORITY AVG.
SAMPLE MATERIAL INDEX INDEX EXPOSURE FACTORS EXP. %
NO. AREA TYPE CODE NUMBER 1 2 3 4 5 HOURS ASB.
FH349 Transformer Room 4-8" PIPE FITTING A 8.250E0O 2 2 2 1 1 1.00 15FH346 1st Floor Hallway 4-8" PIPE FITTING A 1.300EOO 2 1 1 1 20 40.00 2FH347 1st Floor Hallway 4-8" PIPE FITTING A 1.300E00 2 1 1 1 20 40.00 3
FH348 1st Floor Hallway 4-8" PIPE FITTING A 1.300E00 2 1 1 1 20 40.00 2
FH345 1st Floor Entire CEILING TILE A 0 2 1 1 1 20 40.00 0
FH345 1st Floor Hallway CEILING TILE A 0 2 1 1 1 20 40.00 0
FH345 2nd Floor Entire CEILING TILE A 0 1 1 1 1 20 40.00 0
FH345 3rd Floor Entire CEILING TILE A 0 2 1 1 1 20 40.00 0
FH350 Mech Room >14" PIPE RUN A 0 2 1 2 1 2 2.00 0
FH351 Mech Room >14" PIPE RUN A 0 2 1 2 1 2 2.00 0
FH352 Mech Room 9-14" PIPE RUN A 0 2 1 2 1 2 2.00 0
CO
o^
I(Ti
Priority Index Codes
A [=] Long Term Corrective MeasureB [=] Review Management Special Considerations/RemarksC [=] Army Asbestos Deficiency Abatement Project
Priority Index Numbers Are In Scientific Notation
Exposure Factors
1 [=] Material Friability2 [=] Occupant Accessabi Iity3 [=] Material Condition4 1=] Level Of Activity5 [=] Number Of Assigned Occupants
TABLE 361.5
COST ESTIMATE* - BUILDING 361, BEQ
DESCRIPTION
Plpe^jjittings (EA)
>14"
Pipe^guns (LF)
>14"
Spray^/T rowe I edCeilings (SF)
COS '111.ARE^ ARE| ARE| AREA
4ARE| AREg AREA AREA AREA ARE AREA
WOi
I
9.60
5.1
Floor Tile (SF) 5.60 0.8 40.3 - 1.1 ** 0.8 40.3 1.1 ** 40.3 1.1
Boilers/Tanks (SF) 37.90 - - - - - - - - - - -
Air HandlingEquipment (SF) 20.00 - - - - - - - - - - -
Other - - - - - - - - - - -
SUBTOTAL 0.8 40.3 5.1 1.1 ** 0.8 40.3 1.1 ** 40.3 1.1
Difficulty Allowance - - - - - - - - - - -
SUBTOTAL 0.8 40.3 5.1 1.1 ** 0.8 40.3 1.1 ** 40.3 1.1
Decontamination UnitsMobilization 0.3 0.3 0.3 6.3 6.3 6.3 6.3 6.3 6.3 6.3 6.3
SUBTOTAL 1.1 40.6 5.4 1.4 0.3 1.1 40.6 1.4 0.3 40.6 1.4
Contingency a 15.00% 0.2 6.1 0.8 0.2 ** 0.2 6.1 0.2 ** 6.1 0.2
SUBTOTAL 1.3 46.7 6.3 1.6 0.3 1.3 46.7 1.6 0.3 46.7 1.6
Design Fee a 10.00% 0.1 4.7 0.6 0.2 ** 0.1 4.7 0.2 ** 4.7 0.2
SUBTOTAL 1.4 51.4 6.9 1.8 0.4 1.4 51.4 1.8 0.4 51.4 1.8
Air Monitoring a 10.00%*** 1.4 1.4 1.4 1.4 1.4 1.4 1.4 1.4 1.4 1.4 1.4
TOTAL 2.8 52.8 8.3 3.2 1.8 2.8 52.8 3.2 1.8 52.8 3.2
Amounts Are In Thousands Of Dollars
**Less Than $100 For The Area; Amount Not Printed But Included In Total(s)itirit
The Minimum Air Monitoring Fee is $500.00 Per Building
AREAAREAAREAAREAAREAAREA
StSt oor
ooroor
Entrance So.'allwaHaR Y9oomEntin!
oor Room 240oor Room 356
AREAAREA iAREA (AREA AAREA 1(
oor Entire_,oor Room 104,r. Ent. Northoor Room 227oor Entire
TABLE 361.5
(continued)
COST ESTIMATE* - BUILDING 361, BEQ
DESCRIPTIONUNIL
COST ($)AR^I
TOTAL
(jJON
I00
Pipe^Mttings (EA)<4"
Pipe Runs (LF)<4"
>14"
Sprayed/T roue I edCfeitings <SF)
Floor Tile (SF)
Boilers/Tanks (SF)
Air HandlingEquipment (SF)
Other
SUBTOTAL
Difficulty Allowance
SUBTOTAL
Decontamination UnitsMobilization
SUBTOTAL
Contingency a 15.00%
SUBTOTAL
Design Fee a 10.00%
SUBTOTAL
Air Monitoring a 10.00%*TOTAL
20.00
0.8
0.8
0.4
1.2
0.3
1.4
0.2
1.7
0.2
1.8
1.4
3.3
5.9
125.9
131.8
0.4
132.2
3.5
135.7
20.4
156.0
15.6
171.6
17.2
188.8
Amounts Are In Thousands Of Dollars•fife
Less Than $100 For The Area; Amount Not Printed But Included In Total(s)
The Minimum Air Monitoring Fee is $500.00 Per Building
AREA 12: Transformer Room
FH344 FH345FH348FH346 FH349FH352 FH351
i;STAIRiSTAIR::
MECH.
i L::=1
ROOM
r—1
FIRST FLOOR PLANFH347 FH343 FH342 FH350
FH340
STAR STAR
=1? 1
U "□ TORAQI
SECOND FLOOR PLAN FH339
FH341
L_lSTAR STARn__i
n
L_iLI
|TOWAQ^Ji_.
THFD FLOOR PLAN
BLDG361 LEGEND
(FHnr^ POSITIVE SAMPLEjFRnnnl NEGATIVE SAH»>LE
OC«WRM)ONSUlTAHn361-9
363
BOQ BUILDING
363.1 GENERAL
Building 363 was surveyed by WESTON technicians on 7 December 1990.
The first three portions of this facility report summarize the results of this inspection.
Polarized light Microscopy (PLM) with dispersion staining was used to analyze 10 samples
of suspect material collected from the building. Of these samples, 6 were found to be
asbestos-containing materials (ACM). Table 363.1 lists the analytical results for the bulk
samples.
363.2 ACM AND EXPOSURE ASSESSMENT
The location, description, and analytical results for each bulk sample from Building 363 are
presented in Table 363.1. An area-by-area inventory of ACM is provided in Tables 363.2
and 363.3. "Other Asbestos-Containing Materials," listed in Table 3633, are materials that
do not correspond to the standard caption categories listed in Table 363.2. A prioritized
listing of exposure assessments is presented in Table 363.4. An itemized area-by-area cost
estimate for removal and replacement is provided in Table 363.5. The method by which
removal/replacement costs are calculated is described in the ISSUES COMMON TO ALL
BUILDINGS Section of this report. Building floor plans (see attachment) indicate sample
locations and building area names as they are listed in Tables 363.2 and 363.5.
1374WG 363-1 5/10/91
3633 RECOMMENDATIONS/CONCLUSIONS
WESTON recommends:
• Asbestos-containing floor tile and fitting insulation should be labeled imder theO&M Program.
1374WG 363-2 5/10/91
TABLE 363.1
BULK SAMPLE ANALYSIS RESULTS - BUILDING 363, BOQ
SAMPLE PERCENT ASBESTOS
HO. LOCATIOM ITEM DESCRIPTION CH AM OT layered"
FH353 I8T FLR.-N. ENTRANCE,BELOU CEILING FLOOR TILE TAN,OTH,12X12 FL,HORIZONTAL 5 NO1ST FLR.-N. HALL,BELOU CEILING CEILING TILE UNITE,OTH,2X2 CL TL,HORIZONTAL - - • YES
FH355 1ST FLR.- SOUTH HALL,BELOU CEILING <4" PIPE FITTING UNITE,UNK,<4IN. FIT,HORIZONTAL T . . YES
FH356 18T FLR. - RM. 101,BELOU CEILING FLOOR TILE TM,OTH,9X9 FL TL,HORIZONTAL 5 . . YES
FH357 1ST FLR. - RH. 120,BELOU CEILING FLOOR TILE TAN,OTH,9X9 FL TL,HORIZONTAL 7 - • YES
FH358 2ND FLR. - ROOM 239,BEL0U CEILING FLOOR TILE TAN,OTH,9X9 FL TL,HORIZONTAL 7 - - YES
FH359 HECH. ROOM,BELOU CEILING >U" PIPE RUN WHITE,OTH,>14 BREECH,HORIZONTAL - - - NO
FH360 MECH. ROOM,BELOU CEILING >U" PIPE RUN UNITE,OTH,>14 BREECH,HORIZONTAL - - - NO
FH361 HECH. ROOM,BELOU CEILING 9-U" PIPE RUN UNITE,OTH,9-14 BREEC.HORIZOHTAL • - . YES
FH362 HECH. ROOM,BELOU CEILING 4-8" PIPE FITTING UNITE,UNK,4-8IN. FIT,HORIZONTAL 1 - - YESOJ
u
Iw
VtbMtos contant prMantad for tayerod sanples represent* the highest concentrstlon layer.
Quadrant Codes Svstan Codes Asbestos Tvnes
C « Center STM ■ Steam CH ■ ChrysotileN - North CHU B Chilled Uater AM ■ Amoslte
E • East HHU B Heating Hot Uater OT B Other
S « South DOM B Domestic Uater
U - Uest OTH B Other
NE * Northeast UNK B Unknown
NU ■ Northwest
SE ■ Southeast '
SU B Southwest
TABLE 363.2
ASBESTOS-CONTAINING HATERIALS - BUILDING 363, BOQ
Pin FITTIMGS tiki
»-U" >U"
PIPE RUWS tLF>
4<4" -B" 9-U"
SPRAY/TROUELEO FLOOR TILE BOILERS/ AIR HANDLINGCEILINGS CHSFi (HSF> TANKS (MSFT EQUIPMENT fHSF> OTHER
w
I
1st Fir <Entfre)
1st Fir. ■ Rm. 101
Ist Fir. - Rn. 120
1st Fir. North Hall
1st Fir.- South Halt
1st Flr.-N. Entrance
Ist Fir.-South Entr.
2nd Fir {Entire)2nd Fir. * Roon 239
3rd Fir. (Entire)Mech. Room
TOTALS
20
20
1.50
0.12
0.12
0.10
0.10
0.80
0.12
0.80
10 \ 3.96
Other Material Present In Various Units Of Measure
EA - Each
LF • Linear Feet
HSF - Thousand Square Feet
Table 363.3
Other Asbestos-Containing Material - Building 363, BOQT>pe Occupancy: Adults (Public)
Area Material Type Quantity (Unit)
No Other Asbestos-Containing Material Found in this Building
CO
ONLO
I
EA - Each
LF - Linear Feet
MSF - Thousand Square Feet
1374WG 5/10/91
TABLE 363.4
EXPOSURE ASSESSMENTS (PRIORITY ORDER) - BUILDING 363, BOQ
PRIOR. PRIORITY AVG.
SAMPLE MATERIAL INDEX INDEX EXPOSURE FACTORS EXP. XHO. AREA TYPE CODE NUMBER 1 2 3 4 5 HOURS ASS.
FH362 H«ch. Roan 4-8" PIPE FtTTIHG A 2.OOOE00 2 1 2 2 2 40.00 1
■""FHSSS 1st Fir. North Hall <4" PIPE FITTIHO A 4.000E-3 1 1 1 1 20 40.00 1FH355 Ist Fir.- South Kail <4" PIPE FITTING A 4.000E-3 1 1 1 1 20 40.00 1FH35A Ist Fir (Entire) CEILING TILE A 0 1 1 1 1 20 40.00 0FH3S4 lat Flr.-H. Hall CEILING TILE A 0 1 1 1 1 20 40.00 0FK3S4 2nd Fir (Entire) CEILING TILE A 0 1 1 1 1 20 40.00 0FK3S4 3rd Fir. (Entire) CEILING TILE A 0 1 3 1 3 20 40.00 0FII3S9 Mech. Rocn >14" PIPE RUN A 0 2 1 2 2 2 40.00 0FH360 Mech. Rooai >14" PIPE RUN A 0 2 1 2 2 2 40.00 0FH361 Mech. Room 9-14" PIPE RUN A 0 2 1 2 2 2 40.00 0
u>
uI
Prioritv Index Codes Fxnnsiire FactorsA [s] Long Tern Corrective Measure 1 [>] Material FriabilityB [=] Review Management Special Considerations/Remarks 2 (■] 0cct4>snt AccessabilityC M Anav Asbestos Deficiency Abatement Project 3 t*] Material Condition
4 (>] Level Of ActivityPriority Index Hunt>ers Are In Scientific Notation 5 (■) Nmfcer Of Assign^ Occupants
TABLE 363.5
COST ESTIMATE* - BUILDING 363, BOQ
DESCRIPTIOMUNI
COST 1$) *''!8 ARI!!
LOONCO
I
Pipe.Fittings (EA) .<4
UrPipe^Runs (LF)
Ijs"Sprayed/T roweI ed
Ceitings <SF)
Floor Tile (SF)
Boilers/Tanks (SF)
Air HandlingEquipment (SF)
Other
1.4 1.4
10.1 0.7 0.7 0.6 0.6 4.5 0.7
Amounts Are In Thousands Of Dollars
**Less Than $100 For The Area; Amount Not Printed But Included In Total(s)***The Minimum Air Monitoring Fee is $500.00 Per Building
AREAAREAAREAAREAAREAAREA
StstSt
<:n
Rech.
r (Entire) „r. - Rm.^120,,r.- South Hallr.-South Entr.r. - Room 239Room
AREA <AREA IAREA iAREA 1AREA 1(
F: No??fi J21ir.-N. Entrancerr.(Entice)". (Entire)
4.5
0.9
SUBTOTAL 10.1 0.7 0.7 1.4 1.4 0.6 0.6 4.5 0.7 4.5 0.9
Difficulty Allowance - - - - 0.7 - - - - - -
SUBTOTAL 10.1 0.7 0.7 1.4 2.1 0.6 0.6 4.5 0.7 4.5 0.9
Decontamination UnitsMobilization 0.3 6.3 0.3 6.3 6.3 6.3 6.3 6.3 6.3 6.3 6.3
SUBTOTAL 10.4 1.0 1.0 1.7 2.4 0.9 0.9 4.8 1.0 4.8 1.2
Contingency a 15.00% 1.6 0.1 b.ii 0.3 0.4 0.1 0.1 0.7 0.1 0.7 0.2
SUBTOTAL 12.0 1.1 1.1 2.0 2.8 1.0 1.0 5.5 1.1 5.5 1.4
Design Fee a 10.00% 1.2 0.1 0.1 0.2 0.3 . 0.1 0.1 0.6 0.1 0.6 0.1
SUBTOTAL 13.2 1.3 1.3 2.2 3.1 1.1 1.1 6.1 1.3 6.1 1.5
Air Monitoring a 10.00%*** 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3
TOTAL 13.5 1.6 1.6 2.5 3.4 1.5 1.5 6.4 1.6 6.4 1.8
TABLE 363.5
(continued)
COST ESTIMATE* - BUILDING 363, BOQ
DESCRIPTIONUNIT^
COST ($) TOTAL
w
LO
I00
Pipe fittings (EA)<4"
>14"
Pipe^t|uns (LF)Ik..>14"
Spra^l^/Troweled
Floor Tile (SF)
Boilers/Tanks (SF)
Air HaodlingEquiptnent (SF)
Other
SUBTOTAL
Difficulty Allowance
SUBTOTAL
Depgntaniination UnitsMobilization
SUBTOTAL
Contingency a 15.00%
SUBTOTAL
Design Fee a 10.00%
SUBTOTAL
Air Monitoring a 10.00%*TOTAL
9.60
5.60
37.90
20.00
u
22.2
25.8
0.7
26.5
3.5
30.0
4.5
34.6
3.5
38.0
3.8
41.8
Amounts Are In Thousands Of Dollars
**Less Than $100 For The Area; Amount Not Printed But Included In Total(s)ichlt
The Minimum Air Monitoring Fee is $500.00 Per Building
r
360 3M 356 354 352 350 346
3342344
dn I !
L350 357 355 n353 351 340 347 343 .345 341.-
THIRD FLOOR PLAN
BLDG. 363
m ] □236 230 226 224232 222240 238 226234
[13n.
J1LI
□230 220237 235 231 L L233 227 225 223 221
FH358j[
SGCOtO FUXm PLAN
FH354| FH353FH357
FH362
3 ii iir-i
120 116 116 . I 112 106114 110 . . . 106 104 102
.
FH355
FH361 MECH.
FH356M9 Hi , 115 109 107113 111 103105
FH359
FIRST FLOOR PLANLEGEND
(^Hnn^ POSITIVE SAMPLEFKrvml NEGATIVE SAMPLE
HWiMXES DESOCn&OQOULTWn
363-9
364
BOQ BUILDING
364.1 GENERAL
Building 364 was surveyed by WESTON technicians on 10 December 1990.
The first three portions of this facility report summarize the results of this inspection.
Photographs of some sample locations are provided in Section 364.4.
Polarized light Microscopy (PLM) with dispersion staining was used to analyze 7 samples
of suspect material collected from the building. Of these samples, all 7 were found to be
asbestos-containing materials (ACM). Table 364.1 lists the analytical results for the bulk
samples.
364.2 ACM AND EXPOSURE ASSESSMENT
The location, description, and analytical results for each bulk sample from Building 364 are
presented in Table 364,1. An area-by-area inventory of ACM is provided in Tables 364.2
and 364.3. "Other Asbestos-Containing Materials," listed in Table 3643, are materials that
do not correspond to the standard caption categories listed in Table 364.2. A prioritized
listing of exposure assessments is presented in Table 364.4. An itemized area-by-area cost
estimate for removal and replacement is provided in Table 364.5. The method by which
removal/replacement costs are calculated is described in the ISSUES COMMON TO ALL
BUILDINGS Section of this report. Building floor plans (see attachment) indicate san:q>le
locations and building area names as they are listed in Tables 364.2 and 3643."
1374WG 364-1 5/10/91
3643 RECOMMENDATIONS/CONCLUSIONS
WESTON recommends:
• Asbestos-containing floor tile and tank insulation should be labeled under the O&MProgrjim.
1374WG 364-2 5/10/91
TABLE 364.1
BULK SAMPLE ANALYSIS RESULTS - BUILDING 364, BOQ
SAMPLE
NO. LOCATION ITEM DESCRIPTION
PERCENT ASBESTOS
CH AM OT LAYERED®
FH363 1ST FLOOR ROOM #4,BELOW CEILING FLOOR TILE BROWN,OTH,9X9 FL TL 7_
YES
FH364 1ST FLOOR SUITE #11,BELOW CEILING FLOOR TILE BROWN,OTH,9X9 FL TL 10 - NO
FH365 2ND FLOOR ROOM #19,BEL0W CEILING FLOOR TILE BROWN,OTH,9X9 FL TL 10 1 YES
FH366 MECH ROOM,BELOW CEILING BOILERS/TANKS WHITE,HHW,TANK INSUL 50 - YES
FH367 MECH ROOM,BELOW CEILING BOILERS/TANKS WHITE,HHW.TANK INSUL 50 - YES
FH368 MECH R(X)M,BELOW CEILING BOILERS/TANKS WHITE,HHW,TANK INSUL 50 - NO
FH369 MECH ROOM,BELOW CEILING BOILERS/TANKS WHITE,HHW,TANK INSUL 50 NO
■tf-Iw
Asbestos content presented for layered samples represents the highest concentration layer.
Quadrant CodesC = CenterN = NorthE = EastS = SouthU = WestNE = NortheastNU = NorthwestSE = SoutheastSU = Southwest
System CodesSTN = SteamCHW = Chilled WaterHHW = Heating Hot WaterDOM = Domestic WaterOTH = OtherUNK = Unknown
Asbestos TypesCH = chrysotileAH = AmositeOT = Other
TABLE 364.2
ASBESTOS-CONTAINING MATERIALS - BUILDING 364, BOQ
AREA <4"
PIPE FITTINGS (EA)
4-8" 9-14" >14" <4"
PIPE RUNS (LF)
4-8" 9-14" >14"
SPRAY/TROWELEO FLOOR TILE BOILERS/ AIR HANDLINGCEILINGS (HSF) (HSF) TANKS (HSF) EQUIPMENT (HSF) OTHER
1st Fl. Entire Area
1st Floor Room #4
1st Floor Suite #11
2nd Floor Room #19
2nd Fir. Entire
Hech Room
TOTALS
5.28
0.40
0.800.40
5.28
12.16
0.30
0.30
LO
o^
■P- Other Material Present In Various Units Of Measure
EA - EachLF - Linear FeetMSF - Thousand Square Feet
Table 364.3
Other Asbestos-Containing Material - Building 364, BOQl^e Occupancy: Adults (Public)
Area Material Type Quantity (Unit)
No Other Asbestos-Containing Material Found in this Building
LO
o>
Ln
EA - Each
LF - Linear Feet
MSF - Thousand Square Feet
1374WG 5/10/91
TABLE 364.4
EXPOSURE ASSESSMENTS (PRIORITY ORDER) - BUILDING 364, BOQ
PRIOR. PRIORITY AVG.
SAMPLE MATERIAL INDEX INDEX EXPOSURE FACTORS EXP. X
NO. AREA TYPE CODE NUMBER 1 2 3 4 5 HOURS ASB.
FH366 Mech Room BOILERS/TANKS A 2.900E-1 3 1 1 1 1 2.00 50
FH367 Hech Room BOILERS/TANKS A 2.900E-1 3 1 1 1 1 2.00 50FH368 Mech Room BOILERS/TANKS A 2.900E-1 3 1 1 1 1 2.00 50
FH369 Mech Room BOILERS/TANKS A 2.900E-1 3 1 1 1 1 2.00 50
w
(yi
Io^
Priority Index Codes ExDosure Factors
A [=] Long Term Corrective Measure 1 [=] Material FriabilityB [=] Review Management Special Considerations/Remarks 2 [=] Occupant AccessabiIityC [=] Army Asbestos Deficiency Abatement Project 3 [=] Material Condition
4 t=] Level Of ActivityPriority Index Numbers Are In Scientific Notation 5 [=] Ninber Of Assigned Occupants
TABLE 364.5
COST ESTIMATE* - BUILDING 364, BOQ
DESCRIPTIONUNIT^
COST ($)ARE^ AREi ARE| AREA
4ARE| AREg
TOTAL
wON4N
Pipe,Fittings (EA)<4"
>U"
Pipe Runs (LF)
>U"
Sprays/TroweledCeilings <SF)
Floor Tile (SF)
Boilers/Tanks (SF)
Air HaSlingEquipment (SF)
Other
SUBTOTAL
Difficulty Allowance
9.60
5.60
37.90
20.00
29.6
29.6
2.2
2.2
4.5
4.5
2.2
2.2
29.6
29.6
11.4
11.4
68.1
11.4
79.5
SUBTOTAL 29.6 2.2 4.5 2.2 29.6 11.4 79.5
Decontamioation UnitsMobilization ill gj g:l 8J 1:8
SUBTOTAL 32.4 5.1 7.3 5.1 32.4 14.2 96.5
Contingency S 15.00% 4.9 0.8 1.11 0.8 4.9 2.1 14.5
SUBTOTAL 37.3 5.8 8.4 5.8 37.3 16.4 111.0
Design Fee a 10.00% 3.7 0.6 0.8 0.6 3.7 1.6 11.1
SUBTOTAL 41.0 6.4 9.3 6.4 41.0 18.0 122.1
Air Monitoring a 10.00%*** 2.0 2.0 2.0 2.0 2.0 2.0 12.2
TOTAL 43.0 8.5 11.3 8.5 43.0 20.0 134.3
Amounts Are In Thousands Of Dollars
**Less Than $100 For The Area; Amount Not Printed But Included In Total(s)***The Minimum Air Monitoring Fee is $500.00 Per Building
AREAAREA [1?? Entire
mAREA Rech R
oor Room.oor RoomRoom
FHj 6 „
3886-4106 w
4
Bldg. 364; Mechanical Room: Tank insulation (side of tank)Sample No. FH366 tested positive. Tank insulationend cap of tank (Sample No. FH367) also testedpositive.
364-8
Ji
inH-rmrrmrrr•ri-
[ l|36 8LI
3886-41-06
L>Vi-j...jr
Bldg. 364: Mechanical Room: Tank insulation (side of tank)sample FH368 tested positive.
CO
COPoPOC
LUO
/
Bldg. 364: Mechanical Room: Tank insulation (end cap) sampleFH369 tested positive.
364-9
FH369
FH368
HO
FH366
DOM.
FH367H.O
MECH. ROOM DETAILFH363 FH364
M^ROOM'RM #1 RM#6RM ¥A RM#B RM #10
> .
nri crw aV -u CORRIDOR
unDujy c
SRM#11RM #3 RM#9RM#7RM#S
[?=n ==fl
LQ
LEGEND
BLDG. 364
FIRST FLOOR PLAN
^Hnr^ POSITIVE SAMPLE|FKnnn| NEGATIVE SAMPLE
UANMZRS DESnCRSAXMULTWnS
9=
u !/1
RM#16
zA 2
RM#1B
/ILVUaM
RM #20
2RM #22
-JvJS
m*24
K hCORRIDOR
TL/RM #15
£RM#17 RM#1B 1^ RRRM
ru
#23
BLDG. 364
SECOND FLOOR PLAN
LEGEND
^Hnn^ POSITIVE SAMPLE|FKnnn| NEGATIVE SAMPLE
WUMGERS DEsnrcRSiOMuUNns
LO
ON4S
II—•
N3
O
□
BLDG. 364PARTIAL ATTIC PLAN(NO SUSPECT MATERIAL FOUND IN ATTIC)
LEQEND
^Knn^ POSITIVE SAMPLE|FHi¥in| NEGATIVE SAMPLE
MUMZm tnocR&coNniTiiMS
492
ADMINISTRATIVE BUILDING (SATO)
492.1 GENERAL
Building 492 was surveyed by WESTON technicians on 11 December 1990.
The first three portions of this facility report summarize the results of this inspection-
Polarized Light Microscopy (PLM) with dispersion staining was used to analyze 6 samples
of suspect material collected from the building. Of these samples, 3 were found to be
asbestos-containing materials (ACM). Table 492.1 lists the analytical results for the bulk
samples.
492.2 ACM AND EXPOSURE ASSESSMENT
The location, description, and analytical results for each bulk sample from Building 492 are
presented in Table 492.1. An area-by-area inventory of ACM is provided in Tables 492.2
and 492.3. "Other Asbestos-Containing Materials," listed in Table 492.3, are materials that
do not correspond to the standard caption categories listed in Table 492.2. A prioritized
listing of exposure assessments is presented in Table 492.4. An itemized area-by-area cost
estimate for removal and replacement is provided in Table 492.5. The method by which
removal/replacement costs are calculated is described in the ISSUES COMMON TO ALL
BUILDINGS Section of this report. Building floor plans (see attachment) indicate sample
locations and building area names as they are listed in Tables 492.2 and 492.5.
1374WG 492-1 5/10/91
4923 RECOMMENDATIONS/CONCLUSIONS
WESTON recommends:
• Asbestos-containing floor tile should be labeled under the O&M Program.
1374WG 492-2 5/10/91
TABLE 492.1
BULK SAMPLE ANALYSIS RESULTS - BUILDING 492, SATO
SAMPLE
NO. LOCATION ITEM DESCRIPTION
PERCENT
CH
ASBESTOS
AM OT LAYERED®
FH370 ENTIRE BUILDING,BELOW CEILING CEILING TILE WHITE,OTH,2X2 CL TL,HORIZONTAL _ _
YES
FH371 ENTIRE BUILDING,BELOW CEILING FLOOR TILE BLACK,OTH,9X9 FL TL,HORIZONTAL 5 - - YES
FH372 BATHROOMS,BELOW CEILING FLOOR TILE WHITE,OTH,12X12 FL,HORIZONTAL - - - YES
FH373 ENTIRE BUILDING,BELOW CEILING FLOOR TILE GREEN,OTH,9X9 FL TL,HORIZONTAL 3 - - YES
FH374 ENTIRE BUILDING,BELOW CEILING CEILING TILE WHITE,OTH,2X2 CL TL,HORIZONTAL - - - YES
FH381 MECH ROOM,BELOW CEILING FLOOR TILE GREEN,OTH,9X9 FL TL,HORIZONTAL 10 ~ " YES
Asbestos content presented for layered samples represents the highest concentration layer.
voNJ
ILO
Quadrant Codes System Codes
C = Center STH = Steam
N = North CHW = Chilled Water
E = East HHW = Heating Hot WaterS = South DOM = Domestic Water
W = West OTH = Other
NE = Northeast UNK = Unknown
NW = Northwest
SE = Southeast
SW = Southwest
Asbestos Types
CH = ChrysotileAH = Amosite
OT = Other
TAiBLE 492.2
ASBESTOS-CONTAINING MATERIALS - BUILDING 492, SATO
PIPE FITTINGS (EA) PIPE RUNS (LF) SPRAY/TROWELED FLOOR TILE BOILERS/ AIR HANDLINGAREA <411 4-811 9-1411 >1411 <411 4-811 9-1411 >14" CEILINGS (MSF) (MSF) TANKS (MSF) EQUIPMENT (MSF) OTHER
Entire BuildingMech Room
. .
- - 1.60
0.12
- -
TOTALS - - - - 1.72
-|i»VD
ro
I
*
Other Material Present In Various Units Of Measure
EA - Each
LF - Linear Feet
MSF - Thousand Square Feet
Table 492.3
Other Asbestos-Containing Material - Building 492, Admin. (SATO)Type Occupancy: Adults (Public)
Area Material Type Quantity (Unit)
No Other Asbestos-Containing Material Found in this Building
4S
VO
toIUl
EA - Each
LF - Linear Feet
MSF - Thousand Square Feet
1374WG 5/10/91
TABLE 492.4
EXPOSURE ASSESSMENTS (PRIORITY ORDER) - BUILDING 492, SATO
SAMPLE MATERIAL
PRIOR;
INDEX
PRIORITY
INDEX EXPOSURE FACTORS
AVG.
,EXP. %NO. AREA TYPE CODE NUMBER 1 2 3 4 5 HOURS ASB.
FH370FH374
Entire BuildingEntire Building
CEILING
CEILING
TILE
TILE
A
A
0
0
1 2 1
1 2 1
3 10
3 10
40.00
40.00
0
0
■ISvotoICTi
Priority Index CodesA [=] Long Term Corrective MeasureB [=] Review Management Special Considerations/RemarksC [=] Army Asbestos Deficiency Abatemerit Project
Priority Index Nimbers Are In Scientific Notation
Exposure Factors1 [=] Material Friability2 [=] Occupant AccessabiIity3 [=] Material Condition4 [=] Level Of Activity5 [=] Number Of Assigned Occupants
TABLE 492.5
COST ESTIMATE* - BUILDING 492, SATO
DESCRIPTIONUNIT.
COST ($)ARE^ ARE|
TOfAL
4^VO
Pipe Fittings (EA)-<«"
>14"
Pipe Runs (LF)<4"
9:1^">14"
Sprayed/TroueledCallings (SF)
Floor Tile (SF)
Boilers/Tanks (SF)
Air HandlingEquipment (SF)
Other
SUBTOTAL
Difficulty Allowance
SUBTOTAL
Decontamination UnitsMobilization
SUBTOTAL
Contingency a 15.00%
SUBTOTAL
Design Fee a 10.00X
SUBTOTAL
Air Monitoring a 10.00%
TOTAL
20.00
9.0
9.0
0.7
0.7
9.6
9.6
9.0 0.7 9.6
i.8 i.8 3.5
10.7 2.4 13.1
1.6 0.4 2.0
12.3 2.8 15.1
1.2 0.3 1.5
13.5 3.1 16.6
0.8 0.8 1.7
14.4 3.9 18.3
Amounts Are In Thousands Of Dollars
**Less Than $100 For The Area; Amount Not Printed But Included In Total(s)***The Minimum Air Monitoring Fee is $500.00 Per Building
AREA 1: Entire Building AREA 2: Mech Room
VD
ro
00
BLDG. 492
HALL ENTRANCE
FH372FH370 I FH371MECH ROOM
FH381
rFH373
FH374
LEGEND
^Hnn^ POSITIVE SAMPLE|FKnnn| NEGATIVE SAMPLE
IWMGERS DESXSNER&COOULTMnS
492A
ADMINISTRATIVE BUILDING
492A. 1 GENERAL
Building 492A was surveyed by WESTON technicians on 11 December 1990.
The first three portions of this facility report summarize the results of this inspection.
Polarized light Microscopy (PLM) with dispersion staining was used to analyze 6 samples
of suspect material collected from the building. Of these samples, 5 were found to be
asbestos-containing materials (ACM). Table 492A-1 lists the analytical results for the bulk
samples.
492A2, ACM AND EXPOSURE ASSESSMENT
The location, description, and analytical results for each bulk sample from Building 492A
are presented in Table 492A-1. An area-by-area inventory of ACM is provided in Tables
492A.2 and 492A.3. "Other Asbestos-Containing Materials," listed in Table 492A3, are
materials that do not correspond to the standard caption categories listed in Table 492A2.
A prioritized listing of exposure assessments is presented in Table 492A4. An itemized
area-by-area cost estimate for removal and replacement is provided in Table 492A.5. The
method by which removal/replacement costs are calculated is described in the ISSUES
COMMON TO ALL BUILDINGS Section of this report. Building floor plans (see
attachment) indicate sample locations and building area names as they are listed in Tables
492A.2 and 492A5.
1374WG 492A-1 5/10/91
492A3 RECOMMENDATIONS/CONCLUSIONS
WESTON recommends:
• Asbestos-contaimng floor tile, pipe insulation, and fitting insulation should be labeledunder the O&M Program.
1374WG 492A-2 5/10/91
TABLE 492-A.l
BULK SAMPLE ANALYSIS RESULTS - BUILDING 492-A, ADMIN.(TRANSPORT)
SAMPLE
NO. LOCATION ITEM DESCRIPTION
PERCENT
CH
ASBESTOS
AM OT LAYERED®
FH375 E. HALF OF TRANSPORT,BELOW CEILING FLOOR TILE GRAY,OTH,9X9 FL TL 15_
YES
FH376 E. HALF OF TRANSPORT,BELOW CEILING FLOOR TILE WHITE,OTH,12X12 FL - - YES
FH377 OFFICE,BELOW CEILING . FLOOR TILE GRAY,OTH,9X9 FL TL 15 - YES
FH378 MECH ROOM,BELOW CEILING CEILING BOARD WHITE,OTH,4X4 CL BD 60 - NO
FH379 MECH ROOM,BELOW CEILING <4" PIPE RUN WHITE,UNK,<4IN. RUN 15 10 YES
FH380 MECH ROOM,BELOW CEILING <4" PIPE FITTING WHITE,UNK,<4IN. FIT 60 ■ YES
VON3
>ILO
Asbestos content presented for layered samples represents the highest concentration layer.
Quadrant Codes System Codes
C = Center STM = Steam
N = North CHW = chilled Water
E = East HHW = Heating Hot WaterS = South DOM = Domestic Water
W = West OTH = Other
NE = Northeast UNK = Unknown
NW = Northwest
SE = Southeast
SW = Southwest
Asbestos Types
CH = ChrysotileAH = Amosite
OT = Other
TABLE 492-A.2
ASBESTOS-CONTAINING MATERIALS - BUILDING 492-A, ADMIN.(TRANSPORT)
AREA
PIPE FITTINGS (EA)
<4" ^-8" 9-U" >14"
PIPE RUNS (LF)<411 4-Bii 9-1411 >1411
SPRAY/TROWELED FLOOR TILE BOILERS/ AIR HANDLING
CEILINGS (HSF) (HSF) TANKS (HSF) EQUIPMENT (HSF) OTHER
E. Half of TransportMech Room 3Office
TOTALS 3
10
1.40
1.40
10 2.80
Other Material Present In Various Units Of Measure
voEA - Each
LF - Linear Feet
MSF - Thousand Square Feet
Table 492A.3
Other Asbestos-Containing Material - Building 492A, TransportationType Occupancy: Adults (Public)
Area Material Type Quantity (Unit)
Mechanical Room Ceiling Board 0.010 (MSF)
EA - Each
LF - Linear Feet
MSF - Thousand Square Feet
VO
N)
rLn
1374WG 5/10/91
TABLE 492-A.4
EXPOSURE ASSESSMENTS (PRIORITY ORDER) - BUILDING 492-A, ADMIN.(TRANSPORT)
PRIOR. PRIORITY AVG.
SAMPLE MATERIAL INDEX INDEX EXPOSURE FACTORS EXP. %
NO. AREA TYPE CODE NUMBER 1 2 3 4 5 HOURS ASB.
FH378 Hech Room CEILING BOARD A 4.600E01 2 2 2 1 1 2.00 60
FH380 Hech Room <4" PIPE FITTING A 4.600E01 2 2 2 1 1 2.00 60
FH379 Mech Room <4" PIPE RUN A 1.650E01 2 2 2 1 1 2.00 25
VOho
ro^
Priority Index Codes ExDosure Factors
A [=] Long Term Corrective Measure 1 [=] Material FriabilityB [=] Review Management Special Considerations/Remarks 2 [=] Occupant AccessabiIityC [=] Army Asbestos Deficiency Abatement Project 3 [=] Material Condition
4 [=] Level Of ActivityPriority Index Numbers Are In Scientific Notation 5 [=] Number Of Assigned Occupants
TABLE 492-A.5
COST ESTIMATE* - BUILDING 492-A, ADMIN.(TRANSPORT)
DESCRIPTIONUNIT.
COST ($)ARE^ AREg ARE^
TOTAL
N5
Pipe^Fittings (EA)<4"
^3">14"
Pipe Runs (LF)<4"
>14"
Sprayed/Troweled
Floor Tile (SF)
Boilers/Tanks (SF)
Air HacidlingEquipment (SF)
Other
SUBTOTAL
Difficulty Allowance
20.00
Amounts Are In Thousands Of Dollars**,
Les
7.8
7.8
0.2
0.3
0.5
7.8
7.8
0.2
0.3
15.7
16.2
SUBTOTAL 7.8 0.5 7.8 16.2
Pepgntamipation UnitsHobuization B B - B
SUBTOTAL 10.7 3.3 10.7 24.7
Contingency S 15.00X 1.6 0.5 1.6| 3.7
SUBTOTAL 12.3 3.8 12.3 28.4
Design Fee 3 10.00% 1.2 0.4 1.2 2.8
SUBTOTAL 13.5 4.2 13.5 31.2
Air Monitoring a 10.00%*** 1.0 1.0 1.0 3.1
TOTAL 14.5 5.3 14.5 34.3
s Than $100 For The Area; Amount Not Printed But Included In Total(s)
The Minimum Air Monitoring Fee is $500.00 Per Building
Ills Jl StfSll' •" AREA 2: Mech Room
Mon Northeascern Analytical Corp
BULK SAMPLE ANALYSIS REPORT
TEST REPORT NO. NAC89-0988
JOB SITE:
61
CLIENT: E-Systems, Inc./SAIBuilding 166,Riverside Drive
Fort Monmouth, NJ
Analyst:
SAMPLE LOCATION
C89-115
f]C89-116
SAMPLE NUMBER NAC89A-0988-1 NAC89A-0988-2
ASBESTOS
1. CHRYSOTILE ND 30-35%
2. AMOSITE ND ND
3. CROCIDOLITE ND ND
4. OTHER ND ND
MON-ASBESTOS
1. Cellulose 75-80% 35-40%
2. Fibrous
Glass
3. Perlite 3-5%
4. Venniculite
5. Quartz 3-5% 3-5%
6. Binders Balance Balance
7. Mica
8. SyntheticFibers
9. Gypsum
10. Talc
11. Calcite
12. Other
Date Ans.yzed; 6/1S/89ND: None Detected, Detection Limit: IX EPA defines Asbestos-Containing Materials (ACM) as those ccntaining greater
than IX asbestos.
Methodology: EPA Interim method for Asbestos Identification -'or Bulk Sample Testing.
4l
4?-vo
N)
t>
00
HALL ENTHA^CE
BLDG. 492A
|fH376
L(fH3^
/'\ A
FH375
SECURfTV lAOCS
■ X
FH379
CHEF
FH380S10CK
MECHROOM
FH378LEGEND
^Knr^ POSITIVE SAMPLE|FKnnn| NEGATIVE SAMPLE
MMMQERS DESnNER&OONRJlTAKTS
551
EDUCATION CENTER
551.1 GENERAL
Building 551 was surveyed by WESTON technicians on 11 February 1991.
The first three portions of this facility report siiTnTTianV.fi the results of this inspectioiL
Polarized light Microscopy (PLM) with dispersion staining was used to analyze 17 samples
of suspect material collected from the building. Of these samples, 12 were found to be
asbestos-containing materials (ACM). Table 551.1 lists the analytical results for the bulk
samples.
S512 ACM AND EXPOSURE ASSESSMENT
The location, description, and analytical results for each bulk sample from Building 551 are
presented in Table 551.1. An area-by-area inventory of ACM is provided in Tables 551.2
and 5513. "Other Asbestos-Containing Materials," listed in Table 5513, are materials that
do not correspond to the standard caption categories listed in Table 5512. A prioritized
listing of e3q)osure assessments is presented in Table 551.4. An itemized area-by-area cost
estimate for removal and replacement is provided in Table 5513. The method by which
removal/replacement costs are calculated is described in the ISSUES COMMON TO ALL
BUILDINGS Section of this report Building floor plans (see attachment) indicate sample
locations and building area names as they are listed in Tables 5513 and 5513.
139ZWG 551-1 3/29/91
5513 RECOMMENDATIONS/CONCLUSIONS
WESTON recommends:
Asbestos-contaming floor tile, pipe insulation, fitting insulation, boiler packing, ductinsulation, tank insulation, expansion joint, and plaster ceiling should be labeledunder the O&M Program.
1392WG 551-2 5/8/91
TABLE 551,1
BULK SAMPLE ANALYSIS RESULTS - BUILDING 551, EDUCATION CENTER
1
SAMPLE PERCENT ASBESTOS
LAYERED®NO. LOCATION ITEM DESCRIPTION CH AM OT
FH645 RESOURCE CENTER,BELOW CEILING CEILING TILE WHITE,OTH,2X4 CL TL,HORIZONTAL .
NOFH646 RESOURCE CENTER,BELOW CEILING CEILING TILE WHITE,OTH,1X1 CL TL,HORIZONTAL - - - NO
FH647 CORRIDOR (ALL),BELOW CEILING FLOOR TILE TAN,OTH,12X12 FT,HORIZONTAL - - NO
FH648 STORAGE A,BELOW CEILING FLOOR TILE TAN,OTH,9X9 FL TL,HORIZONTAL 2 - NO
FH649 STORAGE B,BELOW CEILING OTHER MATERIAL WHITE,OTH,PLAST. CL,HORIZONTAL - - YES
FH650 CORRIDOR,BELOW CEILING <4" PIPE FITTING WHITE,DOM,<4IN. FIT,HORIZONTAL 10 NO
FH651 CLASSROOM 14, 15, 16,BELOW CEILING CEILING TILE WHITE,OTH,2X4 CL TL,HORIZONTAL - NO
FH652 CLASSROOM 14, 15, 16,BEL0W CEILING <4" PIPE FITTING WHITE,HHW,<4IN. FIT,HORIZONTAL 10 NO
FH653 CLASSROOM 14, 15, 16,BELOW CEILING <4" PIPE FITTING WHITE,HHW,<4IN. FIT,HORIZONTAL 5 NO
FH654 MECH. ROOM,BELOW CEILING 4-8" PIPE FITTING WHITE,HHW,4-8IN. FIT,HORIZONTAL 5 NO
FH655 MECH. ROOM,BELOW CEILING 4-8" PIPE FITTING WHITE,HHW,4-8IN. FIT,HORIZONTAL 5 NO
FH656 MECH. ROOM,BELOW CEILING AIR HANDLING EQUIPMENT WHITE,OTH,DUCT INSUL,HORIZONTAL 45 NO
FH657 MECH. ROOM,BELOW CEILING BOILERS/TANKS WHITE,OTH,TANK INSUL,HORIZONTAL 5 NO
FH658 MECH. ROOM,BELOW CEILING 9-14" PIPE RUN UHITE,OTH,BOILER PCK,HORIZONTAL 5 NO
FH659 MECH. ROOM,BELOW CEILING EXPANSION JOINT(S) WHITE,OTH,EXP. JOINT,HORIZONTAL 65 YES
FH660 MECH. ROOM,BELOW CEILING OTHER MATERIAL WHITE,OTH,BOILER PCK,HORIZONTAL 1 NO
FH661 ADMIN. HALLWAY,BELOW CEILING OTHER MATERIAL WHITE,OTH,PLASTER CL,HORIZONTAL 5 NO
UiLn
IUl
Asbestos content presented for layered samples represents the highest'concentration layer.
Quadrant Codes System Codes
C = Center STM =' steam
N = North CHW = Chilled Water
E = East HHW = Heating Hot WaterS = South DOM = Domestic Water
w = West OTH = Other
NE = Northeast UNK = Unknown
NW = Northwest
SE = Southeast
SW = Southwest
Asbestos TypesCH = ChrysotileAM = Amosite
OT = Other
TABLE 551.2
ASBESTOS-CONTAINING MATERIALS - BUILDING 551, EDUCATION CENTER
AREA
PIPE FITTINGS (EA)
<4" 4-8" 9-14" >U"PIPE RUNS (IF)
<4" 4-8" 9-14" >14"SPRAY/TROWELED FLOOR TILE BOILERS/ AIR HANDLINGCEILINGS (HSF) (HSF) TANKS (HSR) EQUIPHENT (MSF) OTHER
Lnl_n
i-*
I■O
Adnln. HallwayClassroom IDA and BClassroom 11Classroom 12Classroom 14, 15, 16Classroom 17, 18, 19CorridorCorridor Area 1Janitor's ClosetHech. RoomStorage AStorage B
TOTALS
44
12126
36
38 36
70 0.080.290.29
70 0.58 0.08
0.300.100.35
0.75
Other Naterial Present In Various Units Of Heasure
EA - EachLF - Linear FeetHSF - Thousand Square Feet
Table 551.3
Other Asbestos-Containing Material - Building 551, Education CenterType Occupancy: Adults (Public)
Area Material Type Quantity (Unit)
Admin. HallwayMech. Room
Classroom 10 A & B
Plaster CeilingBoiler PackingPlaster Ceiling
0.600 (MSF)1 (EA)
14.0 (MSF)
LnL/i
ILn
EA - Each
LF - Linear Feet
MSF - Thousand Square Feet
1392WG 3/29/91
TABLE 551.4
EXPOSURE ASSESSMENTS (PRIORITY ORDER) - BUILDING 551, EDUCATION CENTER
PRIOR. PRIORITY AVG.
SAMPLE MATERIAL INDEX INDEX EXPOSURE FACTORS EXP. XNO. AREA TYPE CODE NUMBER 1 2 3 4 5 HOURS ASB.
FH656 Mech. Room AIR HANDLING EQUIPMENT B 2.650E02 3 2 2 1 1 2.00 45FH659 Mech. Room EXPANSION JOINTS B 2.650E02 3 2 2 1 1 2.00 65FH650 Corridor <4" PIPE FITTING A 5.920E01 2 1 1 1 160 40.00 10FH652 Classroom 11 <4" PIPE FITTING A 5.920E01 2 1 1 1 160 40.00 10FH652 Classroom 12 <4" PIPE FITTING A 5.920E01 2 1 1 1 160 40.00 10FH652 Classroom 14, 15, 16 <4" PIPE FITTING A 5.920E01 2 1 1 1 160 40.00 10FH652 Classroom 17, 18, 19
Mech. Room
<4" PIPE FITTING A 5.920E01 2 1 1 1 160 40.00 10FH654 4-8" PIPE FITTING A 1.650E01 3 2 2 1 1 2.00 5FH655 Mech. Room 4-8" PIPE FITTING A 1.650E01 3 2 2 1 1 2.00 5FH657 Mech. Room BOILERS/TANKS 1.650E01 3 2 2 1 1 2.00 5FH657 Mech. Room BOILERS/TANKS A 1.650E01 3 2 2 1 1 2.00 5FH658 Mech. Room 9-14" PIPE RUN A 1.650E01 3 2 2 1 1 2.00 5FH660 Mech. Room GASKET A 1.650E01 3 2 2 1 1 2.00 1FH653 Classroom 14, 15, 16 <4" PIPE FITTING A 1.040E01 2 1 1 1 160 40.00 5FH656 Corridor Area 1 AIR HANDLING EQUIPMENT A 1.D00E01 2 1 1 1 10 40.00 45FH661 Adnin. Hallway PLASTER CEILINGS & WALLS 1.950E00 2 1 1 1 30 40.00 5FH661 Classroom 10A and B PLASTER CEILINGS & WALLS A 1.950Ea0 2 1 1 1 30 40.00 5FH656 Janitor's Closet AIR HANDLING EQUIPMENT A 5.000E-2 2 1 1 1 1 2.00 45FH645 Administration Area CEILING TILE 0 2 1 1 1 20 40.00 0
FH645 Classroom IDA and B CEILING TILE A 0 2 1 1 1 30 40.00 0
FH645 Classroom 11 CEILING TILE A 0 2 1 1 1 160 40.00 0
FH645 Classroom 12 CEILING TILE A 0 2 1 1 1 160 40.00 0
FH645 Classroom 19 CEILING TILE A 0 1 2 1 2 15 40.00 0
FH645 Corridor (All) CEILING TILE ' A 0 2 1 1 1 20 40.00 0
FH645 Resource Center CEILING TILE A 0 3 1 1 1 10 40.00 0
FH645 Storage A CEILING TILE A 0 1 1 1 1 1 2.00 0FH646 Corridor (Vending) CEILING TILE A 0 2 1 1 1 20 40.00 0
FH646 New Office 116 CEILING TILE A 0 3 1 1 1 10 40.00 0
FH646 Resource Center CEILING TILE A 0 3 1 1 1 10 40.00 0
FH6A6 Storage B CEILING TILE A 0 1 1 1 1 1 2.00 0
UlLn
Ia\
Priority Index Codes
A [=] Long Term Corrective MeasureB [=] Review Management Special Considerations/RemarksC [=] Army Asbestos Deficiency Abatement Project
Priority Index Numbers Are In Scientific Notation
Exposure Factors
1 [=] Material Friability2 [=] Occupant Accessability3 [=] Material Condition
A [=] Level Of Activity5 [=] Number Of Assigned Occupants
TABLE 551.4(continued)
EXPOSURE ASSESSMENTS (PRIORITY ORDER) - BUILDING 551, EDUCATION CENTER
PRIOR. PRIORITY AVG.SAMPLE MATERIAL INDEX INDEX EXPOSURE FACTORS EXP. XNO. AREA TYPE CODE NUMBER 1 2 3 4 5 HOURS ASB.
FH649 Entire Area 1 (Old) PLASTER CEILINGS & WALLS A 0 2 1 1 1 10 40.00 0FH649 storage B PLASTER CEILINGS & WALLS A 0 1 1 1 1 1 2.00 0FH651 ■ Classroom 14, 15, 16 CEILING TILE A 0 2 1 1 1 160 40.00 0FH651 Classroom 17, 18, 19 CEILING TILE A 0 2 1 1 1 160 40.00 0
LnLn
Priority Index Codes
A [=] Long Term Corrective HeasureB [=] Review Management Special Considerations/RemarksC [=] Army Asbestos Deficiency Abatement Project
Priority Index Numbers Are In Scientific Notation
Exposure Factors
1 t=] Material Friability2 [=] Occupant AccessabiIity3 [=] Material Condition
4 1=] Level Of Activity5 [=] Number Of Assigned Occupants
TABLE 551.5
COST ESTIMATE* - BUILDING 551, EDUCATION CENTER
DESCRIPTION COS1^?'liLAREA ARE.I ARE^ AREA
4ARE^ ARE^ ARE^ AREg AREg AR^g AR^^
LnLnh-*
I00
Pipe.Fittings (EA)<4"
i;!5"Pipe Runs (LF)
fiis"'f'SSfiSgTfSftFloor Tile (SF)
.60
60
0.3 0.3 0.8 0.8 0.43.1
3.0
1.6
Boilers/Tanks (SF) 37.90 - - - - - - - - 3.0 -
Air HandlingEquipment (SF> 20.00 - - - - - - - 6.0 1.9 7.0 _
Other 4.2 9.8 - - - - - - - 0.7 -
SUBTOTAL 4.2 9.8 0.3 0.3 0.8 0.8 0.4 6.0 1.9 16.8 1.6
Difficulty Allowance 8.4 19.6 0.6 0.6 0.8 0.8 0.2 21.0 1.0 6.1 -
SUBTOTAL 12.6 29.4 0.8 0.8 1.7 1.7 0.6 27.0 2.9 22.9 1.6
Decontamination UnitsMobilization 8:? u u H 8:1 u u 8:! u u 8:?
SUBTOTAL 13.6 30.4 1.9 1.9 2.7 2.7 1.7 28.0 3.9 23.9 2.7
Contingency a 15.00X 2.0 4.6 0.3 1 0.3 0.4 0.4 0.3 4.2 0.6 3.6 0.4
SUBTOTAL 15.7 35^0 2.2 2.2 3.1 3.1 1.9 32.2 4.5 27.5 3.1
Design Fee a 10.00X 1.6 3.5 0.2 0.2 0.3 0.3 0.2 3.2 0.5 2.7 0.3
SUBTOTAL 17.3 38.5 2.4 2.4 3.5 3.5 2.1 35.5 5.0 30.2 3.4
Air Monitoring a 10.D0X*** 1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2
TOTAL 18.5 39.7 3.6 3.6 4.7 4.7 3.3 36.7 6.2 31.5 4.6
Amounts Are In Thousands Of Dollars
**Less Than $100 For The Area; Amount Not Printed But Included In Total(s)'''^^The Minimum Air Monitoring Fee is $500.00 Per Building
AREA T: Admin. HallwayAREA 3: C passroom 11AREA 5: Classroom 14. 15, 16AREA 7: Corridor .AREA Janitor's ClosetAREA 11: Storage A
areaAREA■REAAl.ARI
ClassroomClassroom
Corridor ..Hech. Room
IS'j |8,lA and B
19
TABLE 551.5
(continued)
COST ESTIMATE* - BUILDING 551, EDUCATION CENTER
DESCRIPTIOMUNIT
cosfm TOTAL
Ln
Ln
Ivo
Pipe Fittings (EA)<^ii
>14"
Pipe Runs (LF)
hi..>i4"
Floor Tile (SF)
Boilers/Tanks (SF)
Air HacidlingEquipment (SF)
Other
SUBTOTAL
Difficulty Allouance
SUBTOTAL
PecQptamioation UnitsMobinzation
SUBTOTAL
Contingency S 15.COX
SUBTOTAL
Design Fee 3 10.OCX
SUBTOTAL
Air Monitoring a 10.COX*TOTAL
20.00
1.6
1.6
1.6
8:12.7
0.4
3.1
0.3
3.4
1.2
4.6
3.0
3.2
3.0
14.9
14.7
44.6
59.0
103.7
'H116.2
17.4
133.6
13.4
146.9
161.6
Amounts Are In Thousands Of Dollars!
**Less Than $100 For The Area; Amount Not Printed BUt Included In Total(s)***The Minimum Air Monitoring Fee is $500.00 Per Building
AREA 12: Storage B
t
BUUDINGSSI
.
FH661
FH6S1
FHesr
FH652
FH655 J CFH650J CFHSeOFH6S3
FK6S4
FH64S
FH64e
wwx» »«x 1
If ITVOCN ! t(»cct>i M)C9i i ! • sTouQf
FH6S0 FH649 f FH648 )!; FH647
^Hnr^ POSITIVE SAMPLE|FHftnni NEGATIVE SAMPLE
www X*/otao<i«o*iiwn 551-10
i
552
RECREATION BUILDING
552.1 GENERAL
Building 552 was surveyed by WESTON technicians on 13 December 1990.
The first three portions of this facility report summarize the results of this inspection.
Photographs of some sample locations are provided in Section 552.4.
Polarized light Microscopy (PLM) with dispersion staining was used to analyze 14 samples
of suspect material collected from the building. Of these samples, 8 were found to be
asbestos-containing materials (ACM). Table 552.1 lists the analytical results for the bulk
samples.
552.2 ACM AND EXPOSURE ASSESSMENT
The location, description, and analytical results for each bulk sample from Building 552 are
presented in Table 552.1. An area-by-area inventory of ACM is provided in Tables 552.2
and 5523. "Other Asbestos-Containing Materials," listed in Table 552.3, are materials that
do not correspond to the standard caption categories listed in Table 5523. A prioritized
listing of exposure assessments is presented in Table 552.4. An itemized area-by-area cost
estimate for removal and replacement is provided in Table 5523. The method by which
removal/replacement costs are calculated is described in the ISSUES COMMON TO ALL
BUILDINGS Section of this report. Building floor plans (see attachment) indicate sample
locations and building area names as they are listed in Tables 552.2 and 552.5.
1374WG 552-1 5/10/91
811
YOUTH CENTER '
811.1 GENERAL
Building 811 was surveyed by WESTON technicians on 13 December 1990.
The first three portions of this facility report summarize the results of this inspection.
Polarized Light Microscopy (PLM) with dispersion staining was used to analyze 10 samples
of suspect material collected from the building. Of these samples, 6 were found to be
asbestos-containing materials (ACM). Table 811.1 lists the analytical results for the bulk
samples.
811.2 ACM AND EXPOSURE ASSESSMENT
The location, description, and analytical results for each bulk sample from Building 811 are
presented in Table 811.1. An area-by-area inventory of ACM is provided in Tables 811.2
and 811.3. "Other Asbestos-Containing Materials," listed in Table 811.3, are materials that
do not correspond to the standard caption categories listed in Table 811.2. A prioritized
listing of e:q)osure assessments is presented in Table 811.4. An itemized area-by-area cost
estimate for removal and replacement is provided in Table 811.5. The method by which
removal/replacement costs are calculated is described in the ISSUES COMMON TO ALL
BUILDINGS Section of this report. Building floor plans (see attachment) indicate sample
locations and building area names as they are listed in Tables 811.2 and 811.5.
1374WG 811-1 5/10/91
8113 RECOMMENDATIONS/CONCLUSIONS
WESTON recommends:
• Asbestos-containing floor tile and wall tile should be labeled imder the O&MProgram.
1374WG 811-2 5/10/91
TABLE 811.1
BULK SAMPLE ANALYSIS RESULTS - BUILDING 811, YOUTH CTR(LATCH KEY)
SAMPLE
NO. LOCATION ITEM DESCRIPTION
PERCENT ASBESTOS
FH388 1ST FLR. HALL/FOYER,BELOW CEILING FLOOR TILE GRAY,OTH,9X9 FL TL 15 YESFH389 1ST FLOOR KITCHEN,BELOW CEILING ACOUSTICAL WALL TILE WHITE,OTH,12X12 WL - - . YESFH390 1ST FL. KIT. & FOYER,BELOW CEILING CEILING TILE WHITE,OTH,1X3 CL TL . - . YESFH391 1ST FLOOR CLASSROOM,BELOW CEILING FLOOR TILE BROWN,OTH,9X9 FL TL 7 - - YESFH392 1ST FLOOR STORAGE,BELOW CEILING ACOUSTICAL WALL TILE WHITE,OTH,1X1 WL TL - 2 - YESFH393 2ND FL. STORAGE AREA,BELOW CEILING FLOOR TILE BROWN,OTH,9X9 FL TL 10 . . NOFH394 1ST FLh. BOY&GIRL RM,BELOW CEILING FLOOR TILE GRAY,OTH,12X12 FL - . - NOFH395 1ST FL. HLWY & GAME,BELOW CEILING FLOOR TILE BLACK,0TH,9X9 FL TL 12 - - YESFH396 1ST FLOOR OFFICE,BELOW CEILING FLOOR TILE BROWN,OTH,9X9 FL TL 7 - - NOFH397 HECH ROOM,BELOW CEILING >14" PIPE RUM WHITE,OTH,>14 BREECH - -
- YES00
IOJ
dAsbestos content presented for layered sanples represents the highest concentration layer.
Quadrant Codes System CodesC = Center STM = steam
N = North CHW = Chilled WaterE = East HHW = Heating Hot WaterS = South DOM = Domestic Water
W = West OTH = Other
NE = Northeast UNK = Unknown
NW = Northwest
SE = Southeast1
SW = Southwest
Asbestos Types
CH = ChrysotileAM = Annsite
OT = Other
•TABLE 811.2
ASBESTOS-CONTAINING MATERIALS - BUILDING 811, YOUTH CTR(LATCH KEY)
AREA <A"
PIPE FITTINGS (EA)
4-8" 9-14" >14" <4"
PIPE RUMS (IF)
4-8" 9-14" >14"
SPRAY/TROWELED FLOOR TILE BOILERS/ AIR HANDLING
CEILINGS (HSF) (HSF) TANKS (HSFI EQUIPHENT (HSF) OTHER
1st Ft. Hlwy & Game1st Floor Classroom1st Floor Office
1st Floor Storage1st Fir. Hall/Foyer2nd Fl. Storage Area
2.801.93
0.36
0.14
0.26
0.33
TOTALS 5.82
00
I
Other Material Present In Various Units Of Measure
EA - Each
LF - Linear Feet
MSF - Thousand Square Feet
Table 8ll.3
Other Asbestos-Containing Material - Building 811, Latch KeyType Occupancy: Adults (Public)
Area Material Type Quantity (Unit)
1st Floor Storage Acoustical Wall Tile 0.120 (MSF)
00
ILn
EA - Each
LF - Linear Feet
MSF - Thousand Square Feet
1374WG 5/10/91
TABLE 811.4
EXPOSURE ASSESSMENTS (PRIORITY ORDER) - BUILDING 811, YOUTH CTR(LATCH KEY)
PRIOR. PRIORITY AVG.
SAMPLE MATERIAL INDEX INDEX EXPOSURE FACTORS EXP. XNO. AREA TYPE CODE NUMBER 1 2 3 4 5 HOURS ASB.
FH392 1st Floor Storage ACOUSTICAL WALL TILE B 1.544E02 1 3 1 3 71 15.00 2FH389 1st Floor Kitchen ACOUSTICAL WALL TILE A 0 1 3 1 3 71 15.00 0
FH390 1st Fl. Kit. & Foyer CEILING TILE A 0 1 3 1 3 71 15.00 0FH390 2nd Floor Storage CEILING TILE A 0 1 3 1 3 71 15.00 0FH397 Mech Room >14" PIPE RUN A 0 2 1 1 1 1 2.00 0
00
ON
Priority Index Codes
A t=] Long Term Corrective MeasureB [=] Review Management Special Considerations/RemarksC [=] Army Asbestos Deficiency Abatement Project
Priority Index Numbers Are In Scientific Notation
Exposure Factors
1 [=] Material Friability2 [=] Occupant AccessabiIity3 [=] Material Condition4 t=] Level Of Activity5 [=] Number Of Assigned Occupants
TABLE 811; 5
COST ESTIMATE* - BUILDING 811, YOUTH CTR(LATCH KEY)
DESCRIPTIONUNIT
COST ($)ARE^ AREA ARE^ AREA
4ARE| AREg
TOTAL
I
Pipe Fittings (EA)<All
>14"
Pipe Runs (LF)<h"
>14"
Sprayed/T roweIedCeilings (SF)
6.
9.60
Floor Tile (SF) 5.60 15.7 10.8 2.0 0.8 1.5 1.8 32.6
Boilers/Tanks (SF) 37.90 - - - - - - -
Air HaodlingEquipment (SF) 20.00 - - - - - - -
Other - - - 1.3 - - 1.3
SUBTOTAL 15.7 10.8 2.0 2.1 1.5 1.8 33.9
Difficulty Allowance - - - - - - -
SUBTOTAL 15.7 10.8 2.0 2.1 1.5 1.8 33.9
Depontamioation UnitsModilization H 1:1 hi hi hi hi 1:8
SUBTOTAL 17.5 12.6 3.8 4.0 3.3 3.7 44.9
Contingency a 15.00% 2.6 1.9 0.6| 0.6 0.5 0.6 6.7
SUBTOTAL 20.1 14.5 4.4 4.6 3.8 4.2 51.7
Design Fee 8 10.00% 2.0 1.5 0.4 0.5 0.4 0.4 5.2
SUBTOTAL 22.2 16.0 4.9 5.0 4.2 4.7 56.8
Air Monitoring 8 10.00%*** 0.9 0.9 0.9 0.9 0.9 0.9 5.7
TOTAL 23.1 16.9 5.8 6.0 5.1 5.6 62.5
Amounts Are In Thousands Of Dollars
**Less Than $100 For The Area; Amount Not Printed But Included In Total(s)A##
The Minimum Air Monitoring Fee is $500.00 Per Building
AREAAREAAREA
^ Game
)foyerAREAAREAAREA
oor Classroomoor storage. Storage Area
GMICROOM
FH393
BMjCCNT
GFFCEFOfm
mno
FH395FH396
FH3941
FH389i
^FH390|
KITCHEN
SrCRMZ
FH388QWCEAREABOt£RROOM POOUM VESIBU£
STORME
wo»e<
FH392FH391
BLDG. 811
LEGEND
^Hnn^ POSITIVE SAMPLE|FKnnn| NEGATIVE SAMPLE
WMMZRB OCSOCPS^XMULTANn811-8
B//
ASBESTOS CONSULTANCY SERVICE INC.
NEW JERSEY: THE HOLIDAY BUILDING 12- 3TA~E HiGHWAY 36 WEST LONG BRANCH NEW JERSEY 07764
PHONE 201 571 1400 FA- 20" 57" 3328
VIRGINIA SUITE 204 6095 INDIAN = VEF ROAD VIRGINIA BEACH VIRGINIA 23464
PHONE: 804 420 7200 FA- 804 523 6476
BULK ASBESTOS ANALYSIS REPORT
DATE Cf REPORT:
REPORT NO;
GLXEMT:
5A4/90
B1033 / SanEle 1 of 3
E-SYSTEMS
P.O. BOX 360
FORT NJ 07703
SAMPLE LOCATION; FORT M^^MXTH/Kr
SAMPLE ID: #C90-309
IJie sarrple was inhomogeneous and subsairples vrere analyzed separately.
SAMPLE COLC»: BROWN WKCEl
Sample does not contain asbestos.
FIBROUS OCWTENT: CELLULOSE 90%
Sanple diain of custody was conplete.
LABC»ATORY DIRECTOR:
APPROVED SI®IATORY:
LABORATORY NVLAP CODE:
DR. R J Willey BSc PhD MInstP MBOHS MIOSH
B. MONROE
1543
Ihis report relates only to the material tested. It should only be reproducedin full, with the written approval of Asbesrios Consultancy Service. It shouldnot be used by the client to claim product aidorsement by NVIAP or any agencyof the U.S. Government.
All sanples analyzed are retained for a period of 6 months prior to disposal.
All sanples are analyzed ty E.P.A. Me-rhod E?A 600/M4-82-020 Dec 1982.
la-
0//
ASBESTOS CONSULTANCY SERVICE INC.NEW JERSEY: THE HOLIDAY BUILD NG 121 STATE HIGHWAY 36 WEST LONG BRANCH NEW JERSEY 07764
PHONE: 201 571 140: FAX: 201 571 3328
VIRGINIA: SUITE 204 6095 NDIAN RIVER ROAD VIRGINIA BEACH VIRGINIA 23464PHONE; 804 420 7202 FAX: 804 523 6476
DATE OF REPCRT;
REPORT NO:
CLIENT:
5A4/90
B1033 / Sartple 2 of 3
E-SYSTEMS
P.O. BCK 360
PORT lOWOOTH NJ 07703
SAMPLE LOCATIC»I:
SAMPLE ID:
POTT M*W0UniA4J
iC90-310
The sait^ile was inhoaogeneoos and subsanples were analyzed separately.
SAMPLE COLOT: BROWN WHITE
Sanple does not contciin asbestos.
FIBROUS CONTENT: CELLULOSE 70%
Sanple diain of custody was ccciplete.
IABOTAT1OTY DIRECTOR;
APPROVED SIGNATORY:
LABORATORY NVLAP CODE:
DR. R J Willey BSc PhD MInstP MBOHS MIOSH
B.MOTROE
1543
This report relates caily to the material tested. It should only be reproducedin full, with the written approval of Asbestos Consultancy Service. It shouldnot be used by the clieit to claim product endorsement by NVLAP or any agencyof the U.S. Government.
All sartples analyzed are retained for a period of 6 months prior to disposal.
All sanples are analyzed ty E.P.A. Method E3>A 600/M4-82-020 Dec 1982.
£
e//
ASBESTOS CONSULTANCY SERVICE INC.^4EW JERSEY: THE HOLIDAY BUILD NG I2l STATE HIGHWAY 36 WES" LONG BRANCH NEW JERSEY 07764
PHONE: 201 571 140: FAX. 201 571 3328
/IRGINiA: SUITE 204 6095 NDIAN RIVER ROAD VIRGINIA 5EACH VIRGINIA 23464
PHONE: 804 420 72(X FAX: 804 523 6476
%
DRTE CF BEPCFT:
REPORT NO:
CLIEOT:
5/14/90
B1033 / Sample 3 of 3
E-SYSTEMS
P.O. BOX 360
PFT icmxmi NJ 07703
SAMPLE LOCATION:
SAMPLE ID:
FCRT MDNMOOTH/NJ
#090-311
The sample was hcmogeneoiis.
SW^LE COLC»: GREY
Sanple contains asbestos.
FIBROUS COTTEa^r: CHRYSOTILE
CELLULOSE
5%
<1%
Sanple chain of custody vas oonplete.
lABORATORY DIRECTC®;
APPROVED SIGNATCRY:
LABCFATORY NVLAP OFE:
DR. R J willey BSC PhD MInstP MBOHS MIOSH
B.MCWRQE
1543
This report relates only to the material tested. It should only be reproducedin full, with the writtai approval of Asbestos Consultancy Service. It shouldnot be used by the client to claim product endorsement b^' NVLAP or any agencyof the U.S. Government.
All sanples analyzed are retained for a period of 6 nonths prior to disposal.
All sanples are analyzed by E.P..A. Method EPA 600/M4-82-020 Dec 1982.
iCi
e//
Mon Northeastern Analytical Corp.* "" BULK SAMPLE ANALYSIS REPORT
TEST REPORT NO. NAC89A-2170 CLIENT: E-Systens/SAI
SAMPLE LOCATION
(JC89-176 C89-177
SAMPLE NUMBER NAC89A-2170-1 NAC89A-2170-2
ASBESTOS
1. CHRYSOTILE ND 20-25%
2. AMOSITE ND ND
3. CROCIDOLITE ND ND
4. OTHER ND ND
NON-ASBESTOS
1. Cellulose 10-15%
2. FibrousGlass
90-95% 35-40%
3. Perlite
4. Vermiculite
5. Quartz BALANCE
6. Binders
7. Mica
8. SyntheticFibers
9. Gypsum
10. Talc
11. Calcite BALANCE 10-15%
12. Other
Date Analyzed:. 9/26/89Analyst; _ - %t- ^HO: None De^cte^, Det'ection Lmit: IX/ EPA defines Asbestos-Containing Materials (ACM) as those containing greater
than 11 asbestos.
Laboratory Accreditation: HVLAP lab Code 1333Methodology: "Interim Method of the Determination of Asbestos in Bulk Insulation Samples," 40 CFR Chapter I
(1-1-87) Part 763, Subpart F, Appendix A.
iCX
812
COMMUNITY SERVICE CENTER
812.1 GENERAL
Building 812 was surveyed by WESTON technicians on 13 December 1990.
The first three portions of this facility report summarize the results of this inspection.
Polarized light Microscopy (PLM) with dispersion staining was used to analyze 7 samples
of suspect material collected from the building. Of these samples, 1 was foimd to be
asbestos-containing materials (ACM). Table 812.1 Usts the analytical results for the bulk
samples.
8122 ACM AND EXPOSURE ASSESSMENT
The location, description, and analytical results for each bulk sample.from Building 812 are
presented in Table 812.1. An area-by-area inventory of ACM is provided in Tables 8122
and 812.3. "Other Asbestos-Containing Materials," listed in Table 812.3, are materials that
do not correspond to the standard caption categories listed in Table 812.2. A prioritized
listing of e3q)osure assessments is presented in Table 812.4. An itemized area-by-area cost
estimate for removal and replacement is provided in Table 8123. The method by which
removal/replacement costs are calculated is described in the ISSUES COMMON TO ALL
BUILDINGS Section of this report. Building floor plans (see attachment) indicate sample
locations and building area names as they are listed in Tables 812.2 and 8123.
1374WG 812-1 5/10/91
812J RECOMMENDATIONS/CONCLUSIONS
WESTON recommends:
• Asbestos-contaming floor tile should be labeled under the O&M Program.
1374WG 812-2 5/10/91
TABLE 812.1
BULK SAMPLE ANALYSIS RESULTS - BUILDING 812, COM. SERV. CTR.
SAMPLE
NO. LOCATION ITEM DESCRIPTION
PERCENT ASBESTOS
CH AM OT LAYERED®
FH382 1ST FLR - HALLWAY,BELOW CEILING FLOOR TILE WHITE,0TH,12X12 FL,HORIZONTAL NO
FH383 1ST FLR. HALLWAY,BELOW CEILING CEILING TILE WHITE,OTH,2X2 CL TL,HORIZONTAL - YES
FH384 1ST FLR. OFFICE,BELOW CEILING FLOOR TILE GREEN,0TH,9X9 FL TL,HORIZONTAL 10 YESFH385 1ST FLR - HENS ROOM,BELOW CEILING FLOOR TILE WHITE,OTH,12X12 FL,HORIZONTAL - NO
FH386 1ST FLR - HALLWAY,BELOW CEILING FLOOR TILE WHITE,OTH,12X12 FL,HORIZONTAL - NO
FH387 MECH. ROOM,BELOW CEILING >14" PIPE RUN WHITE,0TH,>14 BREECH,HORIZONTAL - YES
FH422 MECH. ROOM,BELOW CEILING OTHER MATERIAL WHITE,OTH,FURN. INSL,HORIZONTAL - NO
00»—•
hO
ILO
Asbestos content presented for layered samples represents the highest concentration layer.
Quadrant Codes System Codes Asbestos Types
C = Center STM = Steam CH = ChrysotileN = North CHW = Chilled Water AM = Amosite
E = East HHW = Heating Hot Water OT = OtherS = South DOM = Domestic Water
W = West OTH = Other
NE = Northeast UNK = Unknown
NW = Northwest
SE = Southeast
SW = Southwest
TABLE 812.2
ASBESTOS-CONTAINING MATERIALS - BUILDING 812, COM. SERV. CTR.
PIPE FITTINGS (EA) PIPE RUNS (LF) SPRAY/TROWELED FLOOR TILE BOILERS/ AIR HANDLING
AREA <411 4-811 9-14" >14" <411 4-8" 9-14" >14" CEILINGS (MSF) (MSF) TANKS (MSF) EQUIPMENT (MSF) OTHER
1st Fir. Office • . . • • ■ • 0.27_
TOTALS_ _ _ _
-.
0.27
*
other Material Present In Various Units Of Measure
EA - Each
LF - Linear Feet
00 HSF - Thousand Square FeetI—•
to
1
Table SU3
Other Asbestos-Containing Material - Building 812, Community Service CenterType Occupant^: Adults (Public)
Area Material Type Quantity (Unit)
00
ro
1
No Other Asbestos-Containing Material Found in this Building
EA - Each
LF - Linear Feet
MSF - Thousand Square Feet
1374wa 5/10/91
TABLE 812.4
EXPOSURE ASSESSMENTS (PRIORITY ORDER) - BUILDING 812, COM. SERV. CTR.
PRIOR. PRIORITT AVG.
SAMPLE MATERIAL INDEX INDEX EXPOSURE FACTORS EXP. X
NO. AREA TTPE CODE NUMBER 1 ? 4 5 imtRS ASB.
FH383 1st fir. Hallway CEILING TILE A 0 1 1 1 3 12 40.00 0
FH387 NecM. Rood >14" PIPE RUN A 0 1 1 1 1 2 2.00 0
FH422 Mech. Rood GASKET A 0 1 1 1 1 2 2.00 0
001—
ro
Ov
Pricrttv Index Codes
A [=] Long Term Corrective MeesureB [>] Review Hanegement Special Conslderations/RemrksC [>) Army Asbestos Deficiency Abetement Project
Priority index Hwbers Are In Scientific Notation
Exposure Factors
Material FriabilityOccupant AccessabilityMaterial Condition
Level Of ActivityNunber Of Assigned 0cei4>ants
1 t"]
2
11
3
II
4 (■]S (■]
00h-*
to
1
COST ESTIMATE*
TABLE 812.5
- BUILDING 812, COM. SERV. CTR.
DESCRIPTION
Pipe Fittings (EA)<4"
>14"
Pipe Runs (LF)<4"
>14"
Sprayed/T roweIedc4ilings (SF)
Floor Tile (SF)
Boilers/Tanks (SF)
Air HaodlingEquipment (SF)
Other
SUBTOTAL
Difficulty Allowance
SUBTOTAL
BecQntamioation UnitsoDilization
SUBTOTAL
Contingency 3 15.00%
SUBTOTAL
Design Fee 3 10.00%
SUBTOTAL
Air Monitoring 3 10.00%*TOTAL
I;6.
9.60
5.60
37.90
20.00
1.5
1.5
1.5
3.5
5.0
0.8
5.8
0.6
6.3
0.6
7.0
1.5
1.5
1.5
3.5
5.0
0.8
5.8
0.6
6.3
0.6
7.0
Amounts Are In Thousands Of Dollars
**Less Than S100 For The Area; Amount Not Printed But Included In TotaUs)***The Minimun Air Monitoring Fee is $500.00 Per Building
AREA 1: 1st Fir. Office
00
I—*
N3
CO
i«CHNOOUstoMAce
STCtK nooM
WAIT NO AREA
|FH387|
PIU#B
FH383| |FH382| QH384 FH385| |FH'386| |fH422
BLD& 812
LEGEND
^Hnr^ POSITIVE SAMPLE|FKnnn| NEGATIVE SAMPLE
IWMGERS 0E9QNB««(MUlTMm
876
ENVIRONMENTAL HEALTH BUILDING
876.1 GENERAL
Building 876 was surveyed by WESTON technicians on 17 December 1990.
The first three portions of this facility report summarize the results of this inspection.
Polarized light Microscopy (PLM) with dispersion staining was used to analyze 3 samples
of suspect material collected from the building. Of these samples, 1 was found to be
asbestos-containing materials (ACM). Table 876.1 lists the analytical results for the bulk
samples.
876.2 ACM AND EXPOSURE ASSESSMENT
The location, description, and analytical results for each bulk sample from Building 876 are
presented in Table 876.1. An area-by-area inventory of ACM is provided in Tables 876.2
and 876.3. "Other Asbestos-Containing Materials," listed in Table 8763, are materials that
do not correspond to the standard caption categories listed in Table 876.2. A prioritized
listing of exposure assessments is presented in Table 876.4. An itemized area-by-area cost
estimate for removal and replacement is provided in Table 876.5. The method by which
removal/replacement costs are calculated is described in the ISSUES COMMON TO ALL
BUILDINGS Section of this report. Building floor plans (see attachment) indicate sample
locations and building area names as they are listed in Tables 876.2 and 876.5.
1374WG 876-1 5/10/91
8763 RECOMMENDATIONS/CONCLUSIONS
WESTON recommends:
• Asbestos-containing floor tile should be labeled imder the O&M Program.
1374WG 876-2 5/10/91
TABLE 876.1
BULK SAMPLE ANALYSIS RESULTS - BUILDING 876, ENV. HEALTH
SAMPLE
NO. LOCATION ITEM DESCRIPTION
PERCENT ASBESTOS
CH AM OT LAYERED®
FH423FH424
FH425
ENTRANCE/OFFICE,BELOW CEILINGEXIT LABORATORY,BELOW CEILINGLATRINE #1,BELOW CEILING
SPRAYED/TROWELED MATERIALCEILING TILE
<4" PIPE FITTING
JR0WN,0TH,9X9 FL TL,HORIZONTALWHITE,OTH,2X4 CL TL,HORIZONTALWHITE,D0M,<4IN. FIT,HORIZONTAL
10
-
YES
YES
NO
Asbestos content presented for layered samples represents the highest concentration layer.
00-vl
o^ILO
Quadrant Codes
C = Center
N = North
E = East
S = South
U = West
NE = Northeast
NW = Northwest
SE = Southeast
SU = Southwest
System Codes
STM = Steam
CHW = Chilled Water
HHW = Heating Hot WaterDOH = Domestic Water
OTH = Other
UNK = Unknown
Asbestos Types
CH = ChrysotileAM = Amosite
OT = Other
TABLE 876.2
ASBESTOS-CONTAINING MATERIALS - BUILDING 876, ENV. HEALTH
PIPE FITTINGS (EA) PIPE RUNS (LF) SPRAY/TROWELED FLOOR TILE BOILERS/ AIR HANDLING
AREA <4" 4-8" 9-14" >14" <4" 4-8" 9-14" >14" CEILINGS (MSF) (MSF) TANKS (MSF) EQUIPMENT (MSF) OTHER
Entire BuildingEntrance/Office
.
- - 0.10
2.49
- - -
TOTALS . . . . . . . 2.59.
00
o>
I■>
Other Material Present in Various Units Of Measure
EA - EachLF - Linear FeetMSF - Thousand Square Feet
Table 876.3
Other Asbestos-Containing Material - Building 876, Env. HealthType Occupancy: Adults (Public)
Area Material Type Quantity (Unit)
No Other Asbestos-Containing Material Found in this Building
00
ON1Ui
EA - Each
LF - Linear Feet
MSF - Thousand Square Feet
1374WG 5/10/91
TABLE 876.4
EXPOSURE ASSESSMENTS (PRIORITY ORDER) - BUILDING 876, ENV. HEALTH
PRIOR. PRIORITY AVG.
SAMPLE MATERIAL INDEX INDEX EXPOSURE FACTORS EXP. %
NO. AREA TYPE CODE NUMBER 1 2 3 4 5 HOURS ASB.
FH423 Entire Building SPRAYED/TROWELED MATERIAL A 1.260E01 1 2 1 2 6 40.00 10
FH423 Ent rance/Of f i ce SPRAYED/TROWELED MATERIAL A 1.260E01 1 2 1 2 6 40.00 10FH424 Exit Laboratory CEILING TILE A 0 1 2 1 2 6 40.00 0
FH425 Latrine #1 <4" PIPE FITTING A 0 1 2 1 2 6 40.00 0
00
ON
ION
Priority Index Codes
A [=] Long Term Corrective MeasureB [=] Review Management Special Considerations/RemarksC [=] Army Asbestos Deficiency Abatement Project
Priority Index Numbers Are In Scientific Notation
Exposure Factors
1 [=] Material Friability2 [=] Occupant AccessabiIi ty3 [=] Material Condition4 [=] Level Of Activity5 [=] Number Of Assigned Occupants
TABLE 876.5
COST ESTIMATE* - BUILDING 876, ENV. HEALTH
DESCRIPTIONUNIT
COST ($)ARE^ ARE|
TOTAL
00
ON
I
Pipe Fittings (EA)
>14"
Pipe,Runs (LF)<4"
>14"
Spraye^/Troweled
Floor Tile (SF)
Boilers/Tanks (SF)
Air HandlingEquipment (SF)
Other
SUBTOTAL
Difficulty Allowance
6.
9.60
5.60
37.90
20.00
1.0 23.9 24.9
1.0 23.9 24.9
SUBTOTAL 1.0 23.9 24.9
Peppntamination UnitsMobilization i.8 i.8 3.5
SUBTOTAL 2.7 25.7 28.4
Contingency 8 15.00% 0.4 3.8 4.31
SUBTOTAL 3.1 29.5 32.6
Design Fee 8 10.00% 0.3 3.0 3.3
SUBTOTAL 3.4 32.5 35.9
Air Monitoring 8 10.00%*** 1.8 1.8 3.6
TOTAL 5.2 34.2 39.5
Amounts Are In Thousands Of Dollars
**Less Than $100 For The Area; Amount Not Printed But Included In Total(s)***The Minimum Air Monitoring Fee is $500.00 Per Building
AREA 1: Entire Building AREA 2: Entrance/Office
<x>VI
I00
FH424FH425 FH423
rcHiI •vu'nrM/n«*4f/sw ««Av
Ln
II glS2tt-fl»r*
mmrrntnwrv
BLOG 876LEQETO
(fhtwi^ positive sample|FKnnn| NEGATIVE SAMPLE
uwMEnV,^ rww»wocMu.tw»T>
900
VEHICLE MAINTENANCE SHOP
900.1 GENERAL
Building 900 was surveyed by "WESTON technicians on 17 December 1990.
The first three portions of this facility report summarize the results of this inspection.
Polarized Light Microscopy (PLM) with dispersion staining was used to analyze 12 samples
of suspect material collected from the building. Of these samples, 11 were found to be
asbestos-containing materials (ACM). Table 900.1 lists the analytical results for the bulk
samples.
900.2 ACM AND EXPOSURE ASSESSMENT
The location, description, and analytical results for each bulk sample from Building 900 are
presented in Table 900.1. An area-by-area inventory of ACM is provided in Tables 900.2
and 900.3. "Other Asbestos-Containing Materials," listed in Table 900.3, are materials that
do not correspond to the standard caption categories listed in Table 900.2. A prioritized
listing of exposure assessments is presented in Table 900.4. An itemized area-by-area cost
estimate for removal and replacement is provided in Table 900.5. The method by which
removal/replacement costs are calculated is described in the ISSUES COMMON TO ALL
BUILDINGS Section of this report. Building floor plans (see attachment) indicate sample
locations and building area names as they are hsted in Tables 900.2 and 900.5.
1374WG 900-1 5/10/91
9003 RECOMMENDATIONS/CONCLUSIONS
WESTON recommends:
• Asbestos-containing transite panel board, floor tile, and tank insulation should belabeled under the O&M Program.
1374WG 900-2 5/10/91
TABLE 900.1
BULK SAMPLE ANALYSIS RESULTS - BUILDING 900, VEHICLE MAINT.(TACT)
SAMPLE PERCENT ASBESTOS
LAYERED®NO. LOCATION ITEM DESCRIPTION CH AM OT
FH426 OPEN BAY AREA - ADD.,BELOU CEILING TRANSITE PANEL BOARD WHITE,OTH,1X1 TRANS. 40_ _
NO
FH427 BAY AREA NORTH END,BELOW CEILING TRANSITE PANEL BOARD WHITE,OTH,1X1 TRANS. 40 - - NO
FH428 BAY AREA-EAST SIDE,BELOW CEILING TRANSITE PANEL BOARD WHITE,OTH,1X1 TRANS. 40 - - NO
FH429 BAY AND BREAK ROOM,BELOW CEILING FLOOR TILE BLACK,0TH,9X9 FL TL 10 - - YES
FH430 BAY & BREAK ROOM,BELOW CEILING FLOOR TILE GREEN,OTH,9X9 FL TL 7 - - YES
FH431 SUPPLY ROOM,BELOW CEILING FLOOR TILE TAN,OTH,12X12 FL 1 - - YES
FH432 SUPPLY ROOM,BELOW CEILING CEILING TILE WHITE,OTH,12X12 CL - - - YES
FH433 BOILER HOUSE 11,BELOW CEILING BOILERS/TANKS WHITE,HHW,TANK INSUL 5 10 - YES
FH434 BOILER HOUSE 11,BELOW CEILING BOILERS/TANKS WHITE,HHW,TANK INSUL 7 5 - YES
FH435 NEW ADDITION,BELOW CEILING EXTERIOR SIDING TAN,OTH,TRAN. SIDE 40 - - YES
FH436 NEW ADDITION,BELOW CEILING EXTERIOR SIDING TAN,OTH,TRAN. SIDE 40 - - YES
FH437 BOILER HOUSE II EXTERIOR SIDING TAN,OTH,TRAN. SIDE 40 • • YES
vo
o0
1OJ
Asbestos content presented for layered samples represents the highest concentration layer.
Quadrant Codes System Codes Asbestos TypesC = Center STH = Steam CH = ChrysotileN = North CHW = Chilled Water AH = Amosite
E = East HHW = Heating Hot Water OT = Other
S = South DOM = Domestic Water
W = West OTH = Other
NE = Northeast UNK = 1 UnknownNW = Northwest
SE = Southeast
SW = Southwest
TABLE 900.2
ASBESTOS-CONTAINING MATERIALS - BUILDING 900, VEHICLE MAINT.(TACT)
AREA
PIPE FITTINGS (EA)
<4" 4-8" 9-U"
PIPE RUNS (LF)
>14" <4" 4-8" 9-14" >14"
SPRAY/TROWELED FLOOR TILE BOILERS/ AIR HANDLING
CEILINGS (HSF) (HSF) TANKS (HSF) EQUIPMENT (HSF) OTHER
OO
Bay & Break RoomBay Area North EndBay Area-East SideBay and Break RoomBoiler House II
New Addition
Office
Open Bay Area - Add.Supply Room
TOTALS
0.01
2.15
0.13
0.15
2.44
0.03
0.03
Other Material Present .In Various Units Of Measure
EA - Each
LF - Linear Feet
MSF - Thousand Square Feet
Table 900.3
Other Asbestos-Containing Material - Building 900, Vehicle Maint. (Tactical)Type Occupant^: Adults (Public)
Area Material Type Quantity (Unit)
Bay Area North EndBay Area East EndBoiler House 11
New Addition
Open Bay Area - Addition
Training Ceiling TileTransite Wall TileExterior SidingExterior Siding
Transite Ceiling Tile
0.001 (MSF)0.100 (MSF)0.480 (MSF)2.040 (MSF)5.250 (MSF)
VO
OO
Ln
EA - Each
LF - Linear Feet
MSF - Thousand Square Feet
1374WO 5/10/91
TABLE 900.4
EXPOSURE ASSESSMENTS (PRIORITY ORDER) - BUILDING 900, VEHICLE MAINT.(TACT)
PRIOR. PRIORITY AVG.
SAMPLE MATERIAL INDEX INDEX EXPOSURE FACTORS EXP. %
NO. AREA TYPE CODE NUMBER 1 2 3 4 5 HOURS ASB.
FH426 Open Bay Area - Add. trAnsite panel board A 5.400E-2 1 1 1 2 3 40.00 40
FH427 Bay Area North End TRANSITE PANEL BOARD A 5.400E-2 1 1 1 2 3 40.00 40
FH428 Bay Area-East Side TRANSITE PANEL BOARD A 5.400E-2 1 1 1 2 3 40.00 40
FH435 New Addition EXTERIOR SIDING A 5.400E-2 1 1 1 2 3 40.00 40FH436 New Addition EXTERIOR SIDING A 5.400E-2 1 1 1 2 3 40.00 40
FH437 Boiler House II EXTERIOR SIDING A 5.400E-2 1 1 1 2 3 40.00 40
FH433 Boiler House II BOILERS/TANXS A 1.950E-2 1 1 1 2 3 40.00 15
FK434 Boiler House II BOILERS/TANKS A 1.950E-2 1 1 1 2 3 40.00 12FH432 Office CEILING TILE A 0 1 1 1 2 3 40.00 0
FH432 Supply Room CEILING TILE A 0 1 1 1 2 3 40.00 0VO
o0
1ON
Priority Index Codes
A [=] Long Term Corrective MeasureB [=] Review Management Special Considerations/RemarksC [=] Army Asbestos Deficiency Abatement Project
Priority Index Numbers Are In Scientific Notation
Exposure Factors
1 t=] Material Friability2 [=] Occupant AccessabiIity3 [=] Material Condition
4 [=] Level Of Activity5 [=] Number Of Assigned Occupants
TABLE 900.5
COST ESTIMATE* - BUILDING 900, VEHICLE MAINT.(TACT)
DESCRIPTIONUNIT^
COST (£)AREAL
AREA ARE^ AREA4
AREA ARE;g ARE^ AREgTOTAL
vo
O
o
Pipe,Fittings <EA)<4"
>14"
Pipe^Runs (IF)
>14"
9.60
Floor Tile (SF) 5.60 •kic- - 12.0 - - 0.7 - 0.8 13.7
Boilers/Tanks (SF) 37.90 - - - - 1.3 - - - - 1.3
Air HandlingEquipment (SF) 20.00 - -
- " ' ' ■ ' ■ "
Other - 1.1 1.1 - 5.3 31.4 - 57.8 - 96.7
SUBTOTAL ** 1.1 1.1 12.0 6.5 31.4 0.7 57.8 0.8 111.6
Difficulty Allouance - 1.1 1.1 - 3.3 47.1 - 57.8 - 110.4
SUBTOTAL ** 2.2 2.2 12.0 9.8 78.6 0.7 115.5 0.8 221.9
Decontamination UnitsMobilization B B B B B B B B B 1:8
SUBTOTAL 1.3 3.4 3.4 13.3 11.0 79.8 2.0 116.7 2.0 232.9
Contingency a 15.00% 0.2 0.5 0.5| 2.0 1.7 12.0 0.3 17.5 0.3 34.9
SUBTOTAL 1.5 3.9 3.9 15.3 12.7 91.8 2.3 134.2 2.4 267.9
Design Fee a 10.00% 0.1 0.4 0.4 1.5 1.3 9.2 0.2 13.4 0.2 26.8
SUBTOTAL 1.6 4.3 4.3 16.8 13.9 100.9 2.5 147.7 2.6 294.6
Air Monitoring a 10.00%**' 3.3 3.3 3.3 3.3 3.3 3.3 3.3 3.3 3.3 29.5
TOTAL 4.9 7.6 7.6 20.1 17.2 104.2 5.8 150.9 5.9 324.1
Amounts Are In Thousands Of Dollars
^^Less Than $100 For The Area; Amount Not Printed But Included In Total(s)The Minimum Air Monitoring Fee is $500.00 Per Building
arIaAREAAREA
reer
Break Room.-East.Sidiouse II
le
Siippfy RoomarIaAREA
Bay Area North, End
Open Bay Area - Add.
Mnn Noriheaslern Analytical Corp.
BULK SAMPLE ANALYSIS REPORT
TEST REPORT NO. NAC89A-2155 CLIENT;
JOB SITE:
E-SystemsRiverside Drive
Ft. Mormouth, NJ 07703
SAMPLE LOCATION
• '^00r\iiar <Zc i 0 Z'iPuM< ^
6l4^. QoO
SAMPLE NUMBER NAC89A-2155-3 C89-170 NAC89A-2155-4 C89-171
ASBESTOS
1. CHRYSOTILE 55-60% 55-60%
2. AMOSITE NO NO
3. CROCIDOLITE NO ND
4. OTHER NO NO
NOM-ASBESTOS
1. Cellulose <1%
2. Fibrous
Glass
3. Perlite
4. Vermiculite
5. Quartz
6. Binders BALANCE
7. Mica
8. SyntheticFibers
9. Gypsiun BALANCE 5-10%
10. Talc
11. Calcite 20-25% 15-20%
12. Other
Analyst;
NO: Norte Dented/ Detection Limit;than asbestos.
^X
Date Analvted: 9/22/89
A defines Asbestos-Containing Haterials (ACH) as those containing greater
Methodology: EPA Interim method for Asbestos Identification for Sulk Sanple testing
/dZ
BLbG. 900
FH436
FH428
FH433
^H434>- 'IB
FH427OURHOUKS
FH437
Fm35
FH426
FH429
FH430BREAK ROOM
|FH43^
Bumy
FH431
OFFCE
BOm HOUSE 1 LEQEND
^Hnn^ POSITIVE SAMPLE|FHnnn| NEQATIVE SAMPLE
MDNMnS
"1
morcn&cmiuiTMns
906
ADMINISTRATIVE BUILDING
906.1 GENERAL
Building 906 was surveyed by WESTON technicians on 18 December 1990.
The first three portions of this facility report summarize the results of this inspection.
Polarized Light Microscopy (PLM) with dispersion staining was used to analyze 11 samples
of suspect material collected from the building. Of these samples, all 6 were found to be
asbestos-containing materials (ACM). Table 906.1 lists the analytical results for the bulk
samples.
906.2 ACM AND EXPOSURE ASSESSMENT
The location, description, and analytical results for each bulk sample fi:om Building 906 are
presented in Table 906.1. An area-by-area inventory of ACM is provided in Tables 906.2
and 906.3. "Other Asbestos-Containing Materials," listed in Table 906.3, are materials that
do not correspond to the standard caption categories listed in Table 906.2. A prioritized
listing of exposure assessments is presented in Table 906.4. An itemized area-by-area cost
estimate for removal and replacement is provided in Table 906.5. The method by which
removal/replacement costs are calculated is described in the ISSUES COMMON TO ALL
BUILDINGS Section of this report. Building floor plans (see attachment) indicate sample
locations and building area names as they are listed in Tables 906.2 and 906.5.
1374WG 906-1 5/10/91
9063 RECOMMENDATIONS/CONCLUSIONS
WESTON recommends:
• Asbestos-containing pipe insulation and floor tile should be labeled under the O&MProgram.
1374WG 906-2 5/10/91
TABLE 906.1
BULK SAMPLE ANALYSIS RESULTS - BUILDING 906, ADMIN(SPACE SYSTEMS)
SAMPLE
NO. LOCATION ITEM DESCRIPTION
PERCENT ASBESTOS
CH AM OT LAYERED
FH438 AREA I LIBRARY,BELOW CEILING <4" PIPE RUN WHITE,DOM,<4IN. RUN 50 NO
FH439 AREA I OFFICE,BELOW CEILING <4" PIPE RUM WHITE,D0M,<4IN. RUN 50 YES
FH440 AREA I OFFICE,BELOW CEILING <4" PIPE RUN WHITE,D0M,<4IN. RUN 30 YES
FH441 AREA I OFFICE,BELOW CEILING 4-8" PIPE RUN WHITE,D0H,<4IN. RUN 50 YES
FH442 AREA I COMBINED,BELOW CEILING FLOOR TILE TAN,OTH,12X12 FL - NO
FH443 AREA I COMBINED,BELOW CEILING FLOOR TILE TAN,OTH, 12X12 FL - NO
FH444 AREA I ROOM 6,BEL0W CEILING FLOOR TILE RED,OTH,12X12 FL 5 YES
FH445 AREA III COMBINED,BELOW CEILING FLOOR TILE TAN,OTH, 12X12 FL - YES
FH446 AREA III COMBINED,BELOW CEILING FLOOR TILE TAN,OTH,12X12 FL - NO
FH447 AREA III TEST AREA,BELOW CEILING FLOOR TILE GREEN,OTH,9X9 FL TL 7 YES
FH448 HECH. ROOM,BELOW CEILING BOILERS/TANKS WHITE,OTH,TANK INSUL " NOvo
o(Ti
CO
Asbestos content presented for layered sanples represents the highest concentration layer.
Quadrant Codes
C = Center
N = North
E = East
S = South
U = West
NE = Northeast
NW = Northwest
SE = Southeast
SU = Southwest
System Codes
STM = Steam
CHU = Chilled WaterHHW = Heating Hot WaterDOM = Domestic Water
OTH = Other
UNK =, Unknown
Asbestos Types
CH = chrysotileAM = Amosite
OT = Other
TABLE 906.2
ASBESTOS-CONTAINING MATERIALS - BUILDING 906, ADMIN(SPACE SYSTEMS)
PIPE FITTINGS (EA) PIPE RUNS (LF) SPRAY/TROWELED FLOOR TILE BOILERS/ AIR HANDLING
AREA <4" 4-8" 9-14" >14" <4" 4-8" 9-14" >14" CEILINGS (MSF) (MSF) TANKS (MSF) EQUIPMENT (MSF) OTHER
Area I LibraryArea I OfficeArea I Room 6
Area III Test Area
-
132
264 95 -
-
0.31
0.84
- -
TOTALS_
396 95_ _
1.15
0a^
1
other Material Present In Various Units Of Measure
EA - Each
LF - Linear Feet
MSF - Thousand Square Feet
Table 906.3
Other Asbestos-Containing Material - Building 906, Administrative (Space Systems)I^e Occupancy: Adults (Public)
Area Material Type Quantity (Unit)
No Other Asbestos-Containing Material Found in this Building
VO
OON
Ln
EA - Bach
LF - Linear Feet
MSF - Thousand Square Feet
1374WG 5/10/91
TABLE 906.4
EXPOSURE ASSESSMENTS (PRIORITY ORDER) - BUILDING 906, ADMIN(SPACE SYSTEMS)
PRIOR. PRIORITY AVG.
SAMPLE MATERIAL INDEX INDEX EXPOSURE FACTORS EXP. %
NO. AREA TYPE CODE NUMBER 1 2 3 4 5 HOURS ASB.
FH438 Area I Library <4" PIPE RUN A 6.200E-2 1 1 1 1 20 40.00 50
FH439 Area I Office <4" PIPE RUN A 6.200E-2 1 1 1 1 20 40.00 50
FH441 Area I Office 4-8" PIPE RUN A 6.200E-2 1 1 1 1 20 40.00 50
FH440 Area I Office <4" PIPE RUN A 2.200E-2 1 1 1 1 20 40.00 30
FH4A8 Mech. Room BOILERS/TANKS A 0 1 1 1 1 20 40.00 0
vo0
<T>1ON
Priority Index Codes .
A [=] Long Term Corrective MeasureB [=] Review Management Special Considerations/RemarksC [=] Army Asbestos Deficiency Abatement Project
Priority Index Numbers Are In Scientific Notation
Exposure Factors
1 [=] Material Friability2 [=] Occupant AccessabiIity3 [=] Material Condition1 [=] Level Of Activity5 [=] Number Of Assigned Occupants
TABLE 906.5
COST ESTIMATE* - BUILDING 906, ADMIN(SPACE SYSTEMS)
DESCRIPTIONUNIT
COST ($)
Ui
<
ARE| ARE| AREA4 TOTAL
vo
0<y>1•-J
Pipe Fittings (EA)<4
>14"
Pipe Runs (LF)<4"
tiis"Sprayed/Troweled
Floor Tile (SF)
Boilers/Tanks (SF)
Air HandlingEquipment (SF)
Other
60
60
37 90
20.00
3.5
.7 4.7 6.4
SUBTOTAL 3.5 9.9 1.7 4.7 19.8
Difficulty Allowance 1.7 4.9 2.4 9.0
SUBTOTAL 5.2 14.8 1.7 7.1 28.9
Peppntamioation UnitsMobilization u u u u u
SUBTOTAL 8.0 17.6 4.5 9.8 39.9
Contingency S) 15.00% 1.2 2.6 0.7' 1.5 6.0
SUBTOTAL 9.2 20.2 5.1 11.3 45.8
Design Fee 3 10.00% 0.9 2.0 0.5 1;1 4.6
SUBTOTAL 10.1 22.3 5.6 12.4 50.4'k'ttit
Air Monitoring 3 10.00% 1.3 1.3 1.3 1.3 5.0
TOTAL 11.4 23.5 6.9 13.7 55.5
Amounts Are In Thousands Of Dollars
**Less Than $100 For The Area; Amount Not Printed But Included In Total(s)***The Minimum Air Monitoring Fee is $500.00 Per Building
AREAAREA
1: Area I Library3: Area t Room 6 l\ SPII llVnit Area
a
\ /\ / \\ / \ RAUP\ / \
\ /\ / \\ /\ /
/
\ t
ay
n
L
FH446
A/C
UMT
FH445
FH447.
f1TEST Ecunerr asea
C/
BivnomeNTAL tnr area
IPt
U
<'
c
( MMTEII ASEA
V;—i L
Uu
■«WMEM ME* r.FH444J
OFFICEOFFICE AREAMEM
VILI_inmFH439
LMRARY
/ \J2nooM
JFH443||fH442J fFHA^ ^R+W1 FH440
MECK ROOM
FH448
TO A»ITB«* PmTTOBM
MEZZANMEPLAN
BLiXa906
FLOOR PLANLEGEND
(pHnt^ POSITIVE SAMPLE|FKnnn| NEGATIVE SAMPLE
IWNMZRS X. ^ DE9GrCRSAXNSULTM4n 906-8
907
GENERAL WAREHOUSE
907.1 GENERAL
Building 907 was surveyed by WESTON technicians on 15 November 1990 and 16
November 1990.
The first three portions of this facility report summarize the results of this inspection.
Polarized Light Microscopy (PLM) with dispersion staining was used to analyze 2 samples
of suspect material collected from the building. Of these samples, 1 was found to be
asbestos-containing materials (ACM). Table 907.1 lists the analytical results for the bulk
samples.
907.2 ACM AND EXPOSURE ASSESSMENT
The location, description, and analytical results for each bulk sample firom Building 907 are
presented in Table 907.1. An area-by-area inventory of ACM is provided in Tables 907.2
and 907.3. "Other Asbestos-Containing Materials," listed in Table 907.3, are materials that
do not correspond to the standard caption categories listed in Table 9072. A prioritized
listing of exposure assessments is presented in Table 907.4. An itemized area-by-area cost
estimate for removal and replacement is provided in Table 907.5. The method by which
removal/replacement costs are calculated is described in the ISSUES COMMON TO ALL
BUILDINGS Section of this report. Building floor plans (see attachment) indicate sample
locations and building area names as they are listed in Tables 907.2 and 907.5.
1374WG 907-1 5/10/91
9073 RECOMMENDATIONS/CONCLUSIONS
WESTON recommends:
• Asbestos-containing expansion joint shonld be labeled under the O&M Program.
1374WG 907-2 5/10/91
TABLE 907.1
BULK SAMPLE ANALYSIS RESULTS - BUILDING 907, SATO
SAMPLE
NO. LOCATION ITEM DESCRIPTION
PERCENT ASBESTOS
CH AM OT LAYERED®
FH474 ROOF,BELOW CEILING OTHER MATERIAL GREEN,OTH,ROOFING,HORIZONTAL YES
Asbestos content presented for layered samples represents the highest concentration layer.
VO
o
Quadrant Codes
C = Center
N = North
E = East
S = South
U = West
NE = Northeast
NW = Northwest
SE = Southeast
SW = Southwest
System Codes
STH = Steam
CHW = Chilled Water
HHW = Heating Hot WaterDOH = Domestic Water
OTH = Other
UNK = Unknown
Asbestos Types
CH = ChrysotileAH = Amosite
OT = Other
VO
0
1■p-
TABLE 907.2
ASBESTOS-CONTAINING MATERIALS - BUILDING 907, SATO
PIPE FITTINGS (EA) PIPE RUNS (IF) SPRAY/TROWELED FLOOR TILE BOILERS/ AIR HANDLINGAREA <4" A-8" 9-14" >14" <4" 4-8" 9-14" >14" CEILINGS (HSF) (HSF) TANKS fHSF) EQUIPMENT (HSF) OTHER
No Asbestos Containing Material Detected In This Building
*
Other Material Present In Various Units Of Measure
EA - EachLF - Linear FeetHSF - Thousand Square Feet
Table 907J
Other Asbestos-Containing Materiai - Building 907, SATOl^e Occupancy: Adults (Public)
Area Material Type Quantity (Unit)
Mechanical Room Expansion Joint 1.0 (EA)
EA - Each
LF - Linear Feet
MSF - Thousand Square Feet
VO
0
1Ol
1374WG 5/10/91
TABLE 907.4
EXPOSURE ASSESSMENTS (PRIORITY ORDER) - BUILDING 907, SATO
PRIOR. PRIORITY AVG.
SAMPLE MATERIAL INDEX INDEX EXPOSURE FACTORS EXP. X
NO. AREA TYPE CODE NUMBER 1 2 3 4 5 HOURS ASB.
vo
o
ON No Asbestos Containing Material Detected In This BuildingExposure Assessments Are Not Available
Priority Index Codes
A 1=] Long Term Corrective MeasureB [=] Review Management. Special Considerations/RemarksC [=] Army Asbestos Deficiency Abatement Project
Priority Index Numbers Are In Scientific Notation
Exposure Factors
1 [=] Material Friability2 [=] Occupant AccessabiIity3 t=] Material Condition4 [=] Level Of Activity5 t=] Number Of Assigned Occupants
TABLE 907.5
COST ESTIMATE* - BUILDING 907, SATO
No Asbestos Containing Material Detected In This Building
vo
0
1
vo
0
100
FH475
BLDG. 907
FH474 — ROOFMG MATERIAL
LEGEND
POSITIVE SAMPLE
|FKnnn| NEGATIVE SAMPLE
UANAGERS OE9QrcnSlO(MULUMTS
MDH Nonr.easiern Analytical Corp.i 5--=^ BULK SAMPLE ANALYSIS REPORT
test report no. NAC89A-2062 CLIENT: E-Systems Inc./SAI
JOB SITE: l3kJU , W , QO~~l
OJoU
SAMPLE LOCATION C89-138 C89-139
SAMPLE NUMBER NAC89A-2062-13 NAC89A-2062-14
ASBESTOS
1. CHRYSOTILE ND ND
2. AMOSITE ND ND
3. CROCIDOLITE ND ND
4. OTHER ND ND
NON-ASBESTOS
1. Cellulose 10-15% 15-20%
2. FibrousGlass
3. Perlite
4. Vermiculite
Is. Quartz Balance Balance
16. Binders
7. Mica
8. SyntheticFibers
9. Gypsum 30-35% 35-40%
10. Talc
11. Calcite 30-35% 30-35%
112. Other
Analyst: ^ Date Analyzed: August 21. 1989
done D^y6te4/Detection Liait: IX ^^A defines Asbestos-Containing Materials (ACH) as those containing greaterthan lyasbestos.
Laboratory Accreditation: NVLAP lab Co* 13J3Methodology: "Interim Method of the Determination of Asbestos in Bulk Insulation Samples," 40 CFR Chapter I
(1-1-87) Part 763, Subpart F, Append:* A.
Z.cr
Mon Norihe&siern i.-aiyCi:ai Corp" ~ BULK SAMPLE ANALYSIS REPORT
TEST REPORT NO. NAC89A-2062
JOB SITE:
CLIENT: E-Systems Inc./SAI
90"7
SAMPLE LOCATION
P"Icor n7)<2-
C89-140
SAMPLE NUMBER NAC89A-2062-15
ASBESTOS
1. CHRYSOTILE 5-10%
2. AMOSITE ND
3. CROCIDOLITE ND
4. OTHER ND
NGN-ASBESTOS
1. Cellulose 2-3%
2. Fibrous
Glass
3. Perlite
4. Venniculite
5. Quartz 25-30%
6. Binders Balance
7. Mica
8. SyntheticFibers
9. Gypsum
10. Talc
11. Calcite 5-6%
12. Other
IX
Date Analyzed; August 21. 1989
defines Asbestos-Containing Haterials (ACH) as those containing greaterAnalyst:,ND: None Det^ted,detection Li
than IX^sbestos.laboratory Accreditation: KVLAP Lab Cod^ 1333Methodology: "Interim Method of the Determination of Asbestos in Bulk Insulation Samples," AO CFR Chapter I
(1-1-87) Part 763, Subpart F, Appendix A.
Jin Ott FYI cc: Desai, Sears
June 24. 1992
• From; Charles ApplebyRegarding: Heston Asbestos Report. BLDG.907
General:
^ Bldg. 907 is slated for demo. Reggie Sears is coordinatingthe activities. Reggie used the Weston Report to determine
the amount of asbestos to be cleaned out of the building/ prior to demo.
* The report states "NO ASBESTOS CONTAINING MATERIAL IN THIS
BUILDING"
Reggie acted accordingly and inspected the building and' found a large amount of asbestos not detected by Heston. He
informed Desai and Desai asked me to inspect the building,which I did.
I inspected the building and found the following:
approx. 720 sq.ft. of asbestos floor tileapprox. 55 ft. of 1.5'Z2' asbestos ductan attached furnace room not noted in the Heston Report
the room is approx. 15'X20'it contains asbestos gaskets in several areasaround the furnace
the furnace room has an asbestos ceiling which Isampled and has been confirmed to be 70% Asbestos
the gaskets and ceiling are in poor condition and are
very friableNote: I did not inspect the attic do to the lack of access.
Heston was made aware of my findings and I conducted a site visit
with Ben and Bruno on 6/23/92 at 1430 hrs.
I identified the areas I found earlier and Ben and Bruno
' agreed to the general conclusion that the inspection of
Bldg. 907 was less than satisfactory. They stated that theywere going to look into the problem and get back to Desaiwith a response.
Conclusion:
Large amounts of obvious asbestos material in Bldg. 907were completely overlooked by the Heston
InspectorsA sample was taken by Heston (ID#FH475) was not
reported in the reportThe extent of the unsatisfactory inspection and
reporting by Weston may have resulted in the issuance
of a contract for demolition with no asbestos removal
and therefor would have resulted in the need to issue
additional mods for the removal of asbestos as it
was discovered by the demo contractor or the demo
debris may have been sent to the landfill andrejected due to the asbestos content resulting in amuch greater expense to the Government
Problem: The Heston Report is not accurateSolution: DEH.Environmental should inspect 05-10% of the Bldgs..
If errors persist further action should involve the U.S.Army Corp. of Engineers.
918
ADMINISTRATIVE BUILDING
918.1 GENERAL
Building 918 was surveyed by "WESTON technicians on 20 December 1990.
The first three portions of this facility report summarize the results of this inspection.
Photographs of some sample locations are provided in Section 918.4.
Polarized light Microscopy (PLM) with dispersion staining was used to analyze 13 samples
of suspect material collected from the building. Of these samples, 6 were found to be
asbestos-containing materials (ACM). Table 918.1 lists the analytical results for the bulk
samples.
918.2 ACM AND EXPOSURE ASSESSMENT
The location, description, and analytical results for each bulk sample from Building 918 are
presented in Table 918.1. An area-by-area inventory of ACM is provided in Tables 918.2
and 918.3. "Other Asbestos-Containing Materials," listed in Table 918.3, are materials that
do not correspond to the standard caption categories listed in Table 918.2. A prioritized
listing of exposure assessments is presented in Table 918.4. An itemized area-by-area cost
estimate for removal and replacement is provided in Table 918.5. The method by which
removal/replacement costs are calculated is described in the ISSUES COMMON TO ALL
BUILDINGS Section of this report. Building floor plans (see attachment) indicate sample
locations and building area names as they are listed in Tables 918.2 and 918.5.
1374WG 918-1 5/10/91
918^ RECOMMENDATIONS/CONCLUSIONS
WESTON recommends:
• Asbestos-containing floor tile should be labeled under the O&M Program.
1374WG 918-2 5/10/91
TABLE 918.1
BULK SAMPLE ANALYSIS RESULTS - BUILDING 918, P & T
SAMPLE
NO. LOCATION ITEM DESCRIPTION
PERCENT ASBESTOS
CH AM OT LAYERED®
FH461 MAIN office a & B,BELOW CEILING FLOOR TILE TAN,OTH,12X12 FL,HORIZONTAL 2 YES
FH462 MAIN OFFICE A S B,BELOW CEILING FLOOR TILE BR0WN,0TH,9X9 FL TL,HORIZONTAL 7 YES
FH463 MAIN OFFICE A & B,BELOW CEILING CEILING TILE WHITE,OTH,2X4 CL TL,HORIZONTAL YES
FH464 MEN'S LAV.,BELOW CEILING CEILING TILE WHITE,OTH,2X4 CL TL,HORIZONTAL YES
FH465 GENERAL CLASSROOM,BELOW CEILING CEILING TILE WHITE,OTH,12X12 CL,HORIZONTAL YES
FH466 STUDENT LOUNGE,BELOW CEILING CEILING TILE WHITE,OTH,12X12 CL,HORIZONTAL YES
FH467 WAVE SOLD. ROOM,BELOW CEILING FLOOR TILE GRAY,OTH,12X12 FL,HORIZONTAL NO
FH468 INSTRUCTOR'S OFFICE,BELOW CEILING FLOOR TILE BLUE,OTH,12X12 FL,HORIZONTAL YES
FH469 HAND SOLD. ROOM,BELOW CEILING FLOOR TILE TAN,OTH,12X12 FL,HORIZONTAL 1 NO
FH470 BRANCH OFFICES,BELOW CEILING FLOOR TILE BROWN,OTH,9X9 FL TL,HORIZONTAL 10 NO
FH471 MEAS. & DRAFT. ROOM,BELOW CEILING FLOOR TILE TAN,OTH,12X12 FL,HORIZONTAL 1 NO
FH472 MEAS. & DRAFT. ROOM,BELOW CEILING FLOOR TILE BR0WN,0TH,9X9 FL TL,HORIZONTAL 10 YES
FH473 BOILER ROOM,BELOW CEILING <4" PIPE FITTING WHITE,UNK,<4IN. FIT,HORIZONTAL ■ NO
00
ILo
Asbestos content presented for layered samples represents the highest concentration layer.
Quadrant Codes
C = Center
N = North
E = East
S = South
U = West
NE = Northeast
NU = NorthwestjSE = Southeast
SU = Southwest
System Codes
STH = Steam
CHW = Chilled WaterHHW = Heating Hot WaterDOM = Domestic Water
OTH ='otherUNK = (Jnkhown
Asbestos Types
CH = ChrysotileAM = Amosite
OT = Other
TABLE 918.2
ASBESTOS-CONTAINING MATERIALS - BUILDING 918, P & T
PIPE FITTINGS (EA> PIPE RUNS (LF) SPRAY/TROWELED FLOOR TILE BOILERS/ AIR HANDLINGAREA <4" 4-8" 9-1 A" >14" <«" 4-8" 9-14" >1A" CEILINGS (HSF) (HSF> TANKS (HSF) EQUIPMENT (HSFT OTHER
Branch office - - - - - - 0.58Branch Offices - - - - - - - - - - 0.58
General Classroom
Hand Sold. Room
Main Office A & B
Meas. & Draft. Room
Student Lounge
0.670.86
0.96
4.50
0.34
TOTALS : : :: :: : : : 8.49
VO
*
9° other Material Present In Various Units Of Measure
EA - Each
LF - Linear Feet
MSF - Thousand Square Feet
Table 9l8.3
Other Asbestos-Containing Material - Building 918, Admin. (P and T)l^e Occupancy: Adults (Public)
Area Material Type Quantity (Unit)
No Other Asbestos-Containing Material Found in this Building
00
I
EA - Each
LF - Linear Feet
MSF - Thousand Square Feet
1374WG 5/10/91
TABLE 918.4
EXPOSURE ASSESSMENTS (PRIORITY ORDER) - BUILDING 918, P & T
PRIOR. PRIORITY AVG.
SAMPLE MATERIAL INDEX INDEX EXPOSURE FACTORS EXP. X
NO. AREA TYPE CODE NUMBER 1 2 3 4 5 HOURS ASB.
FH463 AFH Lav. CEILING TILE A 0 1 1 1 1 2 1.00 0FH463 Hall I CEILING TILE A 0 1 1 1 1 2 1.00 0
FH463 Hall II CEILING TILE A 0 1 1 1 1 Z 1.00 0
FH463 Hand Sold. Room CEILING TILE A 0 1 1 1 1 2 1.00 0
FN463 Instructor's Office CEILING TILE A 0 1 1 1 1 2 1.00 0
FH463 Main Office A & B CEILING TILE A 0 1 1 1 1 2 1.00 0
FH463 Meas. & Draft. Room CEILING TILE A 0 1 1 1 1 2 1.00 0
FH463 Uave Solo. Room CEILING TILE A 0 1 1 1 1 2 1.00 0
FH463 Women's Lav. CEILING TILE A 0 1 1 1 1 2 1.00 0
FH463 Work Room CEILING TILE A 0 1 1 1 1 2 1.00 0
FH464 Men's Lav. CEILING TILE A 0 1 1 1 1 2 1.00 0
FH465 Branch Office CEILING TILE A 0 1 1 1 1 2 1.00 0
FH465 General Classroom CEILING TILE A 0 1 1 1 1 2 1.00 0
FH466 Student Lounge CEILING TILE A 0 1 1 1 1 2 1.00 0
FH473 Boiler Room <4" PIPE FITTING A 0 1 1 1 1 2 1.00 0
voI—•
00
CT>
Priority Index Codes
A [=] Long Term Corrective MeasureB [=] Review Management Special Considerations/RemarksC [=] Army Asbestos Deficiency Abatement Project
Priority Index Numbers Are In Scientific Notation
Exposure Factors
1 [=1 Material Friability2 [=] Occupant Accessability3 [=] Material ConditionU t=] Level Of Activity5 [=] Number Of Assigned Occupants
TABLE 918.5
COST ESTIMATE* - BUILDING 918, P & T
DESCRIPTIOWUNir
COSTARE^ AREA AREiI ARE^ ARE| AREg
TOTAL
00
I
Pipe Fittings (EA)<4"
>14"
Pipe^jjuns <LF>
>14"
Sprgyff/Troweled9.60
Floor Tile (SF) 5.60 3.2 3.2 3.7 4.8 5.4 25.2 1-9 47.5
Boilers/Tanks (SF) 37.90 - - - - - - -
Air HacidlingEquipment (SF) - 20.00 - - - - - - - -
Other - - - - --
- -
SUBTOTAL 3.2 3.2 3.7 4.8 5.4 25.2 1.9 47.5
Difficulty Allowance - 1.6 - - 1.3 6.3 - 9.3
SUBTOTAL 3.2 4.8 3.7 4.8 6.7 31.5 1.9 56.8
Pepontamioation UnitsMobiiization 6.5 6.5 6.5 6.5 6.5 6.5 6.5 3.5
SUBTOTAL 3.7 5.3 4.2 5.3 7.2 32.0 2.4 60.3
Contingency a 15.00% 0.6 0.8 0.6 1 0.8 1.1 4.8 0.4 9.0
SUBTOTAL 4.3 6.1 4.9 6.1 8.3 36.8 2.8 69.3
Design Fee a 10.00% 0.4 0.6 0.5 0.6 0.8 3.7 0.3 6.9
SUBTOTAL 4.7 6.8 5.4 6.8 9.1 40.5 3.1 76.3
Air Monitoring a 10.00%*** 1.1 1.1 1.1 1.1 1.1 1.1 1.1 7.6
TOTAL 5.8 7.8 6.4 7.8 10.2 41.6 4.2 83.9
Amounts Are In Thousands Of Dollars
**Less Than $100 For The Area; Amount Not Printed But Included In Total(s)***The Minimum Air Monitoring Fee is $500.00 Per Building
AREAAREA
Branch.OfficeGeoeral.ClassroMain Orfice A &Student Lounge
AREAAREAAREA
Branch OfficesHand Sold. Roomeas. & Draft. Room
r
4 1)60
{)()
V
I
IA
.
Bldg. 918; 12 X 12" tan floor tile with 9 x 9" brown floortile below tested positive.
FH 46 2
380 6 41 060
Bldg. 918; 9 X 9" brown floor tile under 12 x 12" tan floortile tested positive.
918-8
i
|FH464|
FH462
FH463| |FH465|
i l lV
WAVE SOUERMO ROOM
WORK RMOFFICE 3
fgeneral GCASSROOM
HALL
OFFICE A
WOMEm
LAV.lARHAmUEA
OlgMEHSLAV
1=^P
WASUREKCNT AM) ORAFTNQ ROOM
HALL IHALL
O HAM) •OrEflNQ ROOM
I sun
BRANCH OFFCeSSnCENT LOUNQE WSTROCTORS*
OFFICE
IBOURROOM
r
f f I
H472) rFH471 |FH466| |FH473 |FH468| ^H469CONOOCMdUNT
ONQRAK
FH470
LEGEND
JAR COOIB> COfOeOER
BLDG. 918(pHnr^ POSltlVE SAMPLE|FKnnn| NEGATIVE SAMPLE
MWWGERS OCSQrCR&OaNaUlTMITS
1078
BOQ BUILDING
1078.1 GENERAL
Building 1078 was surveyed by WESTON technicians on 14 December 1990.
The first three portions of this facility report summarize the results of this inspection.
Photographs of some sample locations are provided in Section 1078.4.
Polarized light Microscopy (PLM) with dispersion staining was used to analyze 10 samples
of suspect material collected from the building. Of these samples, 9 were found to be
asbestos-containing materials (ACM). Table 1078.1 lists the analytical results for the bulk
samples.
1078.2 ACM AND EXPOSURE ASSESSMENT
The location, description, and analytical results for each bulk sample from Building 1078 are
presented in Table 1078.1. An area-by-area inventory of ACM is provided in Tables 1078.2
and 1078.3. "Other Asbestos-Containing Materials," listed in Table 1078.3, are materials that
do not correspond to the standard caption categories listed in Table 1078.2. A prioritized
listing of exposure assessments is presented in Table 1078.4. An itemized area-by-area cost
estimate for removal and replacement is provided in Table 1078.5. The method by which
removal/replacement costs are calculated is described in the ISSUES COMMON TO ALL
BUILDINGS Section of this report. Building floor plans (see attachment) indicate sample
locations and building area names as they are listed in Tables 1078.2 and 1078.5.
1374WG 1078-1 5/10/91
1078J RECOMMENDATIONS/CONCLUSIONS
WESTON recommends:
• Asbestos-containing tank insulation, floor tile, and pipe insulation should be labeledimder the O&M Program.
1374WG 1078-2 5/10/91
TABLE 1078•!
BULK SAMPLE ANALYSIS RESULTS - BUILDING 1078, BOQ
SAMPLE PERCENT ASBESTOS
LAYERED®NO. LOCATION ITEM DESCRIPTION CH AM OT
FH412 MECH ROOM,BELOW CEILING BOILERS/TANKS WHITE,HHW,TANK INSUL 5 NO
FH413 MECH ROOM,BELOW CEILING BOILERS/TANKS WHITE,HHW,TANK INSUL 15 25 NO
FH414 MECH ROOM,BELOW CEILING <4" PIPE FITTING WHITE,UNK,<4IN. FIT - - YES
FH415 CENTER STAIRWELL,BELOW CEILING FLOOR TILE TAN,OTH,12X12 FL 3 - YES
FH416 UNIT 3B - HALLWAY,BELOW CEILING FLOOR TILE GRAY,0TH,9X9 FL TL 10 - YES
FH417 UNIT 3B - KITCHEN,BELOW CEILING FLOOR TILE GRAY,OTH,9X9 FL TL 10 - NO
FH418 UNIT 3B - BATHROOM,BELOW CEILING <4" PIPE FITTING WHITE,UNK,<4IN. FIT 5 - NO
FH419 UNIT 3B - BATHROOM,BELOW CEILING <4" PIPE RUN WHITE,UNK,<4IN. RUN 15 15 NO
FH420 MECH ROOM PIPE TRNCH,BELOW CEILING <4" PIPE RUN WHITE,UNK,<4IN. RUN 15 25 NO
FH421 MECH. RM. PIPE TRNCH,BELOW CEILING <4" PIPE RUN WHITE,UNK,<4IN. RUN 15 25 NO
o
00.
CO Asbestos content presented for layered samples represents the highest concentration layer.
Quadrant Codes Svstefli Codes Asbestos Tvoes
C = Center STM = Steam CH = chrysotileN = North CHW = Chilled Water AM = Amosite
E = East HHW = Heating Hot Water OT = Other
S = South DOM = Domestic Water
W = West OTH = Other
NE = Northeast UNK = Unknown
NW = Northwest
SE = Southeast1
SW = Southwest
TABLE 1078.2
ASBESTOS-CONTAINING MATERIALS - BUILDING 1078, BOQ
AREA <4"
PIPE FITTINGS (EA)
4-8" 9-14" >14" <4"
PIPE RUNS (LF)
4-8" 9-14" >14"
SPRAY/TROWELED FLOOR TILE BOILERS/ AIR HANDLING
CEILINGS (HSF) (HSF) TANKS (HSFI EQUIPMENT (HSR) OTHER
O
00
1
Center StairwellHech Room
Mech Room Pipe TrnchMech. Rm. Pipe TrnchN & S Stairwell
Un
Un
Un
Un
Un
Un
Un
Un
Un
Un
Un
Un
Un
Un
1A
IB
1C
ID
2A
2B
2C
2D
3A
3B
3B
3B
3C
3D
Bathroom
HallwayKitchen
10
10
10
10
10
10
10
10
10
10
10
10
150
1
21
21
21
21
21
21
21
21
21
21
21
21
0.13
0.26
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.01
0.45
0.45
0.11
TOTALS 120 403 5.80 0.11
Other Material Present In Various Units Of Measure
EA - Each
LF - Linear Feet
HSF - Thousand Square Feet
Table 1078.3
Other Asbestos-Containing Material - Building 1078, BOQType Occupancy: Adults (Public)
Area Material Type Quantity (Unit)
No Other Asbestos-Containing Material Found in this Building
O
00
EA - Each
LF - Linear Feet
MSF - Thousand Square Feet
1374WO 5/10/91
TABLE 1078.4
EXPOSURE ASSESSMENTS (PRIORITY ORDER) - BUILDING 1078, BOQ
SAMPLE
NO. AREA
MATERIAL
TYPE
PRIOR.
INDEX
CODE
PRIORITY
INDEX
NUMBER
EXPOSURE
1 2 3
FACTORS
4 5
AVG.
EXP.
HOURS
X
ASB.
FH419 Unit 1A <4" PIPE RUN A 8.400E00 2 1 1 2 4 40.00 30
FH419 Unit 1B <4" PIPE RUN A 8.4O0EOO 2 1 1 2 4 40.00 30
FH419 Unit 1C <4" PIPE RUN A 8.400E00 2 1 1 2 4 40.00 30
FH419 Unit ID <4" PIPE RUN A 8.400E00 2 1 1 2 4 40.00 30
FH419 Unit 2A <4" PIPE RUN A 8.400E00 2 1 1 2 4 40.00 30
FH419 Unit 2B <4" PIPE RUN A 8.400E00 2 1 1 2 4 40.00 30
FH419 Unit 2C <411 PIPE RUN A 8.400E00 2 1 1 2 4 40.00 30
FH419 Unit 2D <411 PIPE RUN A 8.400E00 2 1 1 2 4 40.00 30
FH419 Unit 3A <411 PIPE RUN A 8.400E00 2 1 1 2 4 40.00 30
FH419 Unit 3B - Bathroom <411 PIPE RUN A B.AOOEOO 2 1 1 2 4 40.00 30
FH419 Unit 3C <411 PIPE RUN A 8.400E00 2 1 1 2 4 40.00 30
FH419 Unit 3D <411 PIPE RUN A 8.400E00 2 1 1 2 4 40.00 30
FH413 Mech Room BOILERS/TANKS A 1.620E00 3 1 2 1 2 2.00 40
FH420 Mech Room Pipe Trnch <411 PIPE RUN A 1.620E00 3 1 2 1 2 2.00 40
FH421 Mech. Rm. Pipe Trnch <411 PIPE RUN A 1.620EOO 3 1 2 1 2 2.00 40
FH418 Unit 1A <411 PIPE FITTING A 1.480E00 2 1 1 2 4 40.00 5
FH418 Unit IB <411 PIPE FITTING A 1.480E00 2 1 1 2 4 40.00 5
FH418 Unit 1C <411 PIPE FITTING A 1.480E00 2 1 1 2 4 40.00 5
FH418 Unit ID <411 PIPE FITTING A 1.480E00 2 1 1 2 4 40.00 5
FH418 Unit 2A <411 PIPE FITTING A 1.480E00 2 1 1 2 4 40.00 5
FH418 Unit 2B <411 PIPE FITTING A 1.480E00 2 1 1 2 4 40.00 5
FH418 Unit 2C <411 PIPE FITTING A 1.480Ea0 2 1 1 2 4 40.00 5
FH418 Unit 2D <411 PIPE FITTING A 1.480E00 2 1 1 2 4 40.00 5
FH418 Unit 3A <411 PIPE FITTING ' A 1.480E00 2 1 1 2 4 40.00 5
FH418 Unit 3B - Bathroom <411 PIPE FITTING A 1.480E0a 2 1 1 2 4 40.00 5
FH418 Unit 3C <411 PIPE FITTING A 1.480E00 2 1 1 2 4 40.00 5
FH418 Unit 3D <411 PIPE FITTING A 1.480E00 2 1 1 2 4 40.00 5
FH412 Mech Room BOILERS/TANKS A 1.000E-1 3 1 2 1 2 2.00 5
FH414 Mech Room <4" PIPE FITTING A 0 3 1 2 1 2 2.00 0
o
00
1
Priority Index Codes
A [=] Long Term Corrective MeasureB [s] Review Management ispecial Considerations/RemarksC [=] Arm/ Asbestos Deficiency Abatement Project
Priority Index Numbers Are In Scientific Notation
Exposure Factors
1 [=] Material Friability2 [=] Occupant AccessabiIity3 [sj Material Condition4 [=] Level Of Activity5 [=] Number of Assigned Occupants
TABLE 1078.5
COST ESTIMATE* - BUILDING 1078, BOQ
0
00
1
DESCRIPTIONUNIT..
COST ($)ARE^ ARE| ARE^ AREA
4ARE| AREg ARE^ ARE| ARE§ AR^g AR^^
Pipe Fittings (EA)<AII - - . - - 0.7 0.7 0.7 0.7 0.7 0.7
>14" MI:! -
- - - -
I- - - - -
Pipe Runs (LF)<4" 2A.|n - - 4.0 **
- 0.6 0.6 0.6 0.6 0.6 0.6
>14" i:l8 - -
-
-
- - - - - -
-
Sprayed/T roweI ed^ Ceilings (SF) 9.60 - - - - - - - - - - -
Floor Tile (SF) 5.60 0.7 - - - 1.5 2.5 2.5 2.5 2.5 2.5 2.5
Boilers/Tanks (SF) 37.90 - 4.2 - - - - - - - - -
Air HandlingEquipment (SF) 20.00 - - - - - - - - - -
Other - - - - - - - - - - -
SUBTOTAL 0.7 4.2 4.0 ** 1.5 3.8 3.8 3.8 3.8 3.8 3.8
Difficulty Allowance - - 11.9 **- 2.5 2.5 2.5 2.2 2.5 2.5
SUBTOTAL 0.7 4.2 15.9 0.1 1.5 6.3 6.3 6.3 5.9 6.3 6.3
Pepontamioation UnitsModi Mzat ion l-A k\
SUBTOTAL 2.3 5.7 17.4 1.6 3.0 7.8 7.8 7.8 7.5 7.8 7.8
Contingency 3 15.00% 0.3 0.9 2.^ 0.2 0.4 1.2 1.2 1.2 1.1 1.2 1.2
SUBTOTAL 2.6 6.6 20.0 1.9 3.4 9.0 9.0 9.0 8.6 9.0 9.0
Design Fee 3 10.00% 0.3 0.7 2.0 0.2 0.3 0.9 0.9 0.9 0.9 0.9 0.9
SUBTOTAL 2.9 7.3 22.0 2.1 3.8 9.9 9.9 9.9 9.5 9.9 9.9
Air Monitoring 3 10.00%*' 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8
TOTAL 3.7 8.1 22.9 2.9 4.6 10.7 10.7 10.7 10.3 10.7 10.7
Amounts Are In Thousands Of Dollars
^''less Than $100 For The Area; Amount Not Printed But Included In Total(s)***The Mininun Air Monitoring Fee is $500.00 Per Building
m Center Stairwelllech Room.Pipe,Trnch
. S stairHfell
o11: Unil iIfi \
l!
^IcIi.^SmL Pipe Trnch
TABLE 1078.5
(continued)
COST ESTIMATE* - BUILDING 1078, BOQ
DESCRIPTIONUNIT.
COST ($)AR^I AR^g AR^g AR^^ AR
TOTAL
0
00
100
Pipe.Fittings (EA)<4" .n,n 0.7 0.7 0.7 0.7 - - 0.7 0.7 8.4
1 •
JllJo -
I -
- -
- -
- ■
Pipe,Runs (IF)<4" 2A.5n 0.6 0.6
O 1
0.6 - - 0.6 0.6 10.7
>14" 1:1 - - -
-
-
--
-
■
Spray^/T roue I edCeilings (SF) 9.60 - - - - - - - - -
Floor Tile (SF) 5.60 2.5 2.5 2.5 - 2.5 ** 2.5 2.5 32.5
Boilers/Tanks (SF) 37.90 - - - - - - - - 4.2
Air HandlingEquipment (SF) 20.00 - - - - - - - - -
Other - - - - - -- - -
SUBTOTAL 3.8 3.8 3.8 1.3 2.5 ** 3.8 3.8 55.8
Difficulty Allowance 2.5 2.5 2.5 2.5 - - 2.5 2.5 41.9
SUBTOTAL 6.3 6.3 6.3 3.8 2.5 ** 6.3 6.3 97.7
pecQntamioation UnitsMoDilization Jit Jit Jit Jit Jit Jit Jit Jit 'B
SUBTOTAL 7.8 7.8 7.8 5.3 4.0 1.6 7.8 7.8 126.7
Contingency a 15.00% 1.2 1.2 1.2| 0.8 0.6 0.2 1.2 1.2 19.0
SUBTOTAL 9.0 9.0 9.0 (6.1 4.7 1.8 9.0 9.0 145.7
Design Fee a 10.00% 0.9 0.9 0.9 0.6 0.5 0.2 0.9 0.9 14.6
SUBTOTAL 9.9 9.9 9.9 6.7 5.1 2.0 9.9 9.9 160.3
Air Monitoring a 10.00%*** 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 16.0
TOTAL 10.7 10.7 10.7 7.6 6.0 2.8 10.7 10.7 176.3
Amounts Are In Thousands Of Dollars
**Less Than $100 For The Area; Amount Not Printed But Included In Total(s)***The Minimum Air Monitoring Fee is $500.00 Per Building
S® lllSSiSIS „„iSEiS Hi bs»•
UnitUnitUnjtUnit
;insoomen
I
I
>
3886-4]0^ ..
Bldg. 1078; Bachelor Officers Quarters, Bathroom; <4" mudfitting sample FH418 tested positive. SamplesFH415 12 X 12" tan floor tiles; FH416, 9 x 9" grayfloor tiles; FH517, 9 x 9" gray floor tiles (notshown) also tested positive.
1078-9
4
r:
V-
Bldg. 1078: Mechanical Room Pit: <4" pipe runs goingunderground in pipe trench to Bldg. 1078 testedpositive. Samples FH418 < 4" mud fitting; FH419 <4" pipe run; FH421 < 4" pipe run (not shown) alsotested positive.
l078-10
BOM KOACCM BEOROCM KO nxM IQ)ROOU
1 U
LNT 30 UNIT3C INT 30 UNTTSC UMT 10
KjrOCN LA'MG ARcA
—ll
1 -ll~
AATH ;;
ll
J 11
y
jNgl ■L— ^—' '
SECOND FLOOR PLAN
FH416 1 C FH418 J f FH419
m s,
2 5BROCM ■ATM B>R00y ■EDIOOM MM ■8TROOU BROOM MM ■VM ■S>AOaM
N-ZaJ—H■ lA, r □□
UNiae UMTSA IMT 2B UNR 3A UMT IB UNT 1A
\ P'-WTOCt Kno«4 UVNQROCM UVNSROOM OTOCM IMOROCM IMOROOM
ASIAMHAa
[L_ ilAR HALL
FH417 FH415
FIRST FLOOR PLAN
BLDG. 1078LEGEND
(FHn^ POSITIVE SAMPLE|FKnfn| NEGATIVE SAMPLE
MMiWERS OESOCRSXXMULTNITS 1078-11
BLDG. 1078
PARTIAL PLAN
UTUTY WING BLOa "B'
FH412
FH413
TAr«
LAUNDRY
MECHANICAL EQUP. ROOM
FH414
FH420
SUMPTOILET
FH421
3
LEGEND
(^Kiin^ POSITIVE SAMPLE|FRnnn| NEGATIVE SAMPLE
UMMGERS DeaocB&coNSjiT/wTs1078-12
1212
ADMINISTRATIVE BUILDING
1212.1 GENERAL
Building 1212 was surveyed by WESTON technicians on 19 December 1990.
The first three portions of this facility report summarize the results of this inspection.
Polarized light Microscopy (PLM) with dispersion staining was used to analyze 12 samples
of suspect material collected from the building. Of these samples, 9 were found to be
asbestos-containing materials (ACM). Table 1212.1 lists the analytical results for the bulk
samples.
1212.2 ACM AND EXPOSURE ASSESSMENT
The location, description, and analytical results for each bulk sample from Building 1212 are
presented in Table 1212.1. An area-by-area inventory of ACM is provided in Tables 1212.2
and 1212.3. "Other Asbestos-Containing Materials," listed in Table 1212.3, are materials that
do not correspond to the standard caption categories listed in Table 1212.2. A prioritized
listing of e)q)Osure assessments is presented in Table 1212.4. An itemized area-by-area cost
estimate for removal and replacement is provided in Table 1212.5. The method by which
removal/replacement costs are calculated is described in the ISSUES COMMON TO ALL
BUILDINGS Section of this report. Building floor plans (see attachment) indicate sample
locations and building area names as they are listed in Tables 1212.2 and 1212.5.
1374WG 1212-1 5/10/91
12123 RECOMMENDATIONS/CONCLUSIONS
WESTON recommends:
Asbestos-contaming floor tile, pipe insulation, fitting insulation, and expansion jointshould be labeled under the O&M Program.
1374WG 1212-2 5/10/91
TABLE 1212.1
BULK SAMPLE ANALYSIS RESULTS - BUILDING 1212, USAMPAS
SAMPLE PERCENT ASBESTOS
LAYERED®NO. LOCATION ITEM DESCRIPTION CH AH OT
FH4A9 ADMISSIONS AREA,BELOW CEILING FLOOR TILE BROWN,OTH,12X12 FL,HORIZONTAL 1 YES
FH450 HALLWAY/OFFICES.BELOW CEILING FLOOR TILE BROWN,OTH,12X12 FL,HORIZONTAL 5 - - YES
FH451 FLA. ROOM/PORCH,BELOW CEILING FLOOR TILE GRAY,OTH,12X12 FL,HORIZONTAL 10 - - YES
FH452 FLA. ROOM/PORCH,BELOW CEILING FLOOR TILE GREEN,OTH,9X9 FL TL,HORIZONTAL 10 - - YES
FH453 ALL OFFICES & HALLS,BELOW CEILING CEILING TILE WHITE,OTH,2X4 CL TL,HORIZONTAL - - - YES
FH454 COPY ROON,BELOW CEILING <4" PIPE FITTING WHITE,CHW,<4IN. FIT,HORIZONTAL 1 - - YES
FH455 COPY ROOM.BELOW CEILING <4" PIPE FITTING WHITE,HHW,<4IN. FIT,HORIZONTAL 15 5 - NO
FH456 COPY ROOH.BELOW CEILING CEILING TILE WHITE,OTH,2X4 CL TL,HORIZONTAL - - - YES
FH457 HECH ROOM,BELOW CEILING 4-8" PIPE RUM GRAY,UNK,4-8IN. RUN,HORIZONTAL - 40 - YES
FH458 HECH ROON,BELOW CEILING 4-8" PIPE FITTING GRAY,UNK,4-8IN. FIT,HORIZONTAL 15 1 - YES
FH459 HECH ROON.BELOW CEILING EXPANSION JOINT(S) WHITE,OTH,EXP. CLOTH,HORIZONTAL 70 - - NO
FH46Q MECH ROOH,BELOW CEILING <4" PIPE FITTING GRAY,UNK,<4tN. FIT,HORIZONTAL • • * YESN)»—•
ro
ILO
Asbestos content presented for layered samples represents the highest concentration layer.
Quadrant Codes SvstM Codes Asbestos Tvoes
C = Center STM = Steam CH - ChrysotileN = North CHW = Chilled Water AN = Amosite
E = East HHW = Heating Hot Water OT = Other
S = South DOM = Domestic Water
W = West OTH = Other
NE = Northeast UNK = Unknown
NW = Northwest
SE = Southeast
SW = Southwest
TABLE 1212.2
ASBESTOS-CONTAINING MATERIALS - BUILDING 1212, USAMPAS
AREA
PIPE FITTINGS (EA)
<4" 4-8" 9-14" >14"PIPE RUMS (LF)
<4" 4-8" 9-U" >U"
SPRAY/TROUELED FLOOR TILE BOILERS/ AIR HANDLINGCEILINGS CMSF) (HSF) TANKS (HSF> EQUIPMENT (HSF) OTHER
Admissions AreaConmandant Office
Copy RoomFla. Room/PorchHallway/OfficesLadies Room
Hech Room
Hens I
Resource Management
2
18
2
7
26
0.81
0.77
3.61
S3I—'
N3
I■C-
TOTALS 31 26
Other Material Present In Various Units Of Measure
5.19
EA - EachLF - Linear FeetMSF - Thousand Square Feet
Table 1212.3
Other Asbestos-Containing Material - Building 1212, Admin. (USAMPAS)lype Occupancy: Adults (Public)
Area Material Type Quantity (Unit) |Mech. Room Expansion Joint 3 (EA) 1
N3I—•
N)
I
EA - Each
LF - Linear Feet
MSF - Thousand Square Feet
1374WG 5/10/91
TABLE 1212.4
EXPOSURE ASSESSMENTS (PRIORITY ORDER) - BUILDING 1212, USAMPAS
PRIOR. PRIORITY AVG.
SAMPLE MATERIAL INDEX INDEX EXPOSURE FACTORS EXP. X
NO. AREA TYPE CODE NUMBER 1 2 3 4 5 HOURS ASB.
FH457 Mech Room 4-8" PIPE RUN A 1.240E-2 1 1 1 1 20 8.00 40
FH459 Mech Room EXPANSION JOINTS A 1.240E-2 1 1 1 1 20 8.00 70FH455 Copy Room <4" PIPE FITTING A 4.400E-3 1 1 1 1 20 8.00 20
FH458 Mech Room 4-8" PIPE FITTING A 4.400E-3 1 1 1 1 20 8.00 16
FH454 Conmandant Office <4" PIPE FITTING A 8.000E-4 1 1 1 1 20 8.00 1
FH454 Copy Room <4" PIPE FITTING A 8.000E-4 1 1 1 1 20 8.00 1
FH454 Ladies Room <4" PIPE FITTING A 8.000E-4 1 1 1 1 20 8.00 1
FH454 Mens I <4" PIPE FITTING A 8.000E-4 1 1 1 1 20 8.00 1
FH454 Resource Management <4" PIPE FITTING A 8.000E-4 1 1 1 1 20 8.00 1
FH453 All Offices & Halls CEILING TILE A 0 1 1 1 1 20 8.00 0FH456 Copy Room CEILING TILE A 0 1 1 1 1 20 8.00 0
FH460 Mech Room <4" PIPE FITTING A 0 1 1 1 1 20 8.00 0
roI—'
K3
C3^
Priority Index Codes
A [=] Long Term Corrective MeasureB [=] Review Management Special Considerations/RemarksC [=] Army Asbestos Deficiency Abatement Project
Priority Index Numbers Are In Scientific Notation
Exposure Factors
1 [=] Material Friability2 C=] Occupant AccessabiIity3 [=] Material ConditionA t=] Level Of Activity5 [=] Number Of Assigned Occupants
TABLE 1212.5
COST ESTIMATE* - BUILDING 1212, USAMPAS
DESCRIPTIONUNIT. ARE^ ARE| ARE| ARE^ ARE^ AREg ARE^ AREg ARE|
TOTAL
toI—'
NJ
Pipe Fittings (EA)<^ll
>14" II- 0.1 1.3
- -
0.12.2
0.1 0.5
Pipe Runs (LF)<AII
>14" Ml - -
- -
-
-
6.2-
- 6.2
Sprayed/T roueledCeilings (SF) 9.60 - - - - - - - - - -
Floor Tile (SF) 5.60 4.5 - - 4.3 20.2 - - - - 29.1
Boilers/Tanks (SF) 37.90 - - - - - - - - - -
Air HandlingEquipment (SF) 20.00 - - - - - - - - - -
Other - - - - - - 0.9 - - 0.9
SUBTOTAL 4.5 0.1 1.3 4.3 20.2 0.1 3.3 0.1 0.5 34.5
Difficulty Allowance 2.3 - 1.3 - -
** 1.2 "kit- 4.9
SUBTOTAL 6.8 0.1 2.5 4.3 20.2 0.2 4.5 0.2 0.5 39.4
Decontamination UnitsMobilization 0.4 6.4 6.4 6.4 6.4 6.4 6.4 6.4 6.4 3.5
SUBTOTAL 7.2 0.5 2.9 4.7 20.6 0.6 4.9 0.6 0.9 42.9
Contingency a 15.00% 1.1 ** 0.4| 0.7 3.1 ** 0.7 •kk 0.1 6.4
SUBTOTAL 8.3 0.6 3.4 5.4 23.7 0.7 5.6 0.7 1.0 49.3
Design Fee a 10.00% 0.8 ** 0.3 0.5 2.4 ** 0.6 ** 0.1 4.9
SUBTOTAL 9.1 0.7 3.7 6.0 26.1 0.8 6.2 0.8 1.1 54.3
Air Monitoring a 10.00%*** 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 5.4
TOTAL 9.7 1.3 4.3 6.6 26.7 1.4 6.8 1.4 1.7 59.7
Amounts Are In Thousands Of Dollars
**Less Than $100 For The Area; Amount Not Printed But Included In Total(s)The Minimum Air Monitoring Fee is $500.00 Per Building
AREA 1: Admissions AreaAREA 3: Copy Room,,.AREA 5: Hallway/OfficesAREA 7: Mech RoomAREA 9: Resource Management
'ApA Coflmandant Off.iceTla, Roooom/Porch
Mense| Room
FLA. STORAGE ROOM
FH451
FH449'-J fFH452FH450
V
FH455MENS II
PSCNO
CONFERENCE ROOM
|FH453 FH454BUDGET OFFICE RESOURCE MANAGEMENT
HALL
COPY ROOM
JAN
CLO
/A
HALLADMISSIONS
|FH456|r'
PSO HAU ADMISSIONS OFFICE SCHOOL SECRETARY COMMANDANT ASSIST.
MECH. ROOM
FH457
/ MENS I1st SEARGENT
COMMANDANT COMMANDANT ASSIST.FH458
LOBBY
FH460FH459LADIES
H
LEGEND
POSITIVE SAMPLEBLDG. 1212
FKimnl NEGATIVE SAMPLE
IWNMSERS ^ Dt3GNEBS«0N8ULTAMTS 1212-8
2105
FAMILY HOUSING
2105.1 GENERAL ,
Building 2105 was surveyed by WESTON technicians on 5 December 1990. A complete
inspection (CI) for ACM was performed in Unit 4 of this building. The rest of the units in
Building-2105, Units 1,2, 3, and 5, were assumed to have type and quantity of ACM similar
to that found in Unit 4 and are designated as similar imits (S).
No actual inspection for ACM was performed in the similar imits. Refer to the Guide
Document for further discussions on complete inspections (CI) and similar units (S).
The first three portions of this facility report summarize the results of this inspection.
Photographs of some sample locations are provided in Section 2105.4.
Polarized Light Microscopy (PLM) with dispersion staining was used to analyze 4 samples
of suspect material collected from the building. Of these samples, both were found to be
asbestos-containing materials (ACM). Table 2105.1 lists the analytical results for the bulk
samples.
2105.2 ACM AND EXPOSURE ASSESSMENT
The location, description, and analytical results for each bulk sample from Building 2105 are
presented in Table 2105.1. An area-by-area inventory of ACM is provided in Tables 2105.2
and 2105.3. "Other Asbestos-Containing Materials," listed in Table 2105.3, are materials that
do not correspond to the standard caption categories listed in Table 21052. A prioritized
listing of exposure assessments is presented in Table 2105.4. An itemized area-by-area cost
estimate for removal and replacement is provided in Table 2105.5. The method by which
removal/replacement costs are calculated is described in the ISSUES COMMON TO ALL
1374WG 2105-1 6/10/91
BUILDINGS Section of this report. Building floor plans (see attachment) indicate sample
locations and building area names as they are listed in Tables 2105.2 and 2105.5.
21053 RECOMMENDATIONS/CONCLUSIONS
WESTON recommends:
• Asbestos-containing floor tile should be labeled under the O&M Program.
1374WG 2105-2 6/6/91
TABLE 2105.1
BULK SAMPLE ANALYSIS RESULTS - BUILDING 2105, FAMILY HOUSING
SAMPLE
NO. LOCATION ITEM DESCRIPTION
PERCENT ASBESTOS
CH AH OT LAYERED®
FH293 UNIT 4-IST FLR.,BELOW CEILING FLOOR TILE TAN,OTH,12X12 FL 5 NO
FH294 UNIT 4-1ST FLR.,BELOW CEILING FLOOR TILE TAN,OTH,12X12 FL 7 - YES
FH295 UNIT 4-IST FLR/CLSET,BELOW CEILING FLOOR TILE GRAY,OTH,12X12 FL - - YES
FH296 UNIT 4-2ND FLR.,BELOW CEILING FLOOR TILE GRAY,OTH,12X12 FL " " YES
Asbestos content presented for layered samples represents the highest concentration layer.
ro
001
CO
Quadrant Codes
C = Center
N = North
E = East
S = South
U = West
NE = Northeast
NW = Northwest
SE = Southeast
SW = Southwest
System Codes
STH = Steam
CHW = Chilled WaterHHW = Heating Hot WaterDON = Domestic Water
OTH = Other
UNK = Unknown
Asbestos Types
CH = ChrysotileAH = Amosite
OT = Other
TABLE 2105.2
ASBESTOS-CONTAINING MATERIALS - BUILDING 2105, FAMILY HOUSING
AREA
PIPE FITTINGS (EA>
<4" 4-8" 9-14" >14"
PIPE RUMS (LF)
<4" 4-8" 9-14" >14"
SPRAY/TROWELED FLOOR TILE BOILERS/ AIR HANDLING
CEILINGS (HSF) (HSF) TANKS (HSF) EQUIPMENT (HSF) OTHER
UNIT 1 (S)UNIT
UNIT
UNIT
Unit
(S)
(S)
(S)
(CD
0.90
0.90
0.900.90
0.90
TOTALS 4.50
to
0
1
Other Material Present In Various Units Of Measure
EA - Each
LF - Linear Feet
MSF - Thousand Square Feet
Table 2105.3
Other Asbestos-Containing Material - Building 2105, Family HousingType Occupancy: Adults (Public)
Area Material Type Quantity (Unit)
No Other Asbestos-Containing Material Found in this Building
to
0Ui
1Ln
EA - Each
LF - Linear Feet
MSF - Thousand Square Feet
1374WG 5/10/91
TABLE 2105.4
EXPOSURE ASSESSMENTS (PRIORITY ORDER) - BUILDING 2105, FAMILY HOUSING
SAMPLE
WO. AREA
MATERIAL
TYPE
PRIOR. PRIORITY
INDEX INDEX
CODE NUMBER
EXPOSURE FACTORS
1 2 3 4 5
AVG.
EXP. X
HOURS ASB.
ro
O
Only Non-Friable Material Was Detected In This BuildingExposure Assessments Are Not Available
Priority Index Codes
A [=] Long Term Corrective MeasureB [=] Review Management Special Considerations/RemarksC [s] Army Asbestos Deficiency Abatement Project
Priority Index Numbers Are In Scientific Notation
Exposure Factors
1 t=] Material Friability2 [=] Occupant AccessabiIity3 [=] Material Condition4 t=] Level Of Activity5 [=] Number Of Assigned Occupants
TABLE 2105,5
COST ESTIMATE* - BUILDING 2105, FAMILY HOUSING
DESCRIPTIONUNIT^
COST ($)ARE^ ARE^ ARE^ AREA
4ARE|
TOTAL
roh-»
001
I
Pipe Fittings (EA)
$:?4">14"
Pipe Runs (LF)
>l4"
Spray?d/T roweIedCeilings (SF)
Floor Tile (SF)
Boilers/Tanks (SF)
Air HandlingEquipment (SF)
Other
SUBTOTAL
Difficulty Allowance
SUBTOTAL
pecpntamiDation UnitsHobilization
SUBTOTAL
Contingency S 15.00%
SUBTOTAL
Design Fee 3 10.00%
SUBTOTAL
Air Monitoring 3 10.00%
TOTAL
m
9.60
5.60
37.90
20.00
5.0
5.0
5.0
5.0
5.0
5.0
5.0
5.0
5.0
5.0
25.2
25.2
5.0 5.0 5.0 5.0 5.0 25.2
8:^ 8:^ 8:^ u 8:^
00
6.0 6.0 6.0 6.0 6.0 30.2
0.9 0.9 0.9' 0.9 0.9 4.5
6.9 6.9 6.9 6.9 7.0 34.7
0.7 0.7 0.7 0.7 0.7 3.5
7.6 7.6 7.6 7.6 7.6 38.2
0.8 0.8 0.8 0.8 0.8 3.8
8.4 8.4 8.4 8.4 8.4 42.0
Amounts Are In Thousands Of Dollars
**Less Than $100 For The Area; Amount Not Printed But Included In Total(s)***The Minimum Air Monitoring Fee is $500.00 Per Building
AREAAREAAREA
11 m I IIIi: Unit 4 (c()
IBIi ilHIIiiili
FtSuS86-4H6
«>»
S3¥^
^v.
iTvlfjVi-i.i.
>a -w
B?
rZiUiLAyr
Bldg. 2105 Unit 4, Entire First Floor: (Sample FH293) (12 In.X 12 In.) Tan Floor Tile Tested Positive. GrayFloor Tile (12 In. x 12 In.) On The Second FloorAnd First Floor Closet Tested Negative.
2105-8
FH293 FH295
LIVING ROOM
KITCHEN
ENTRY FOYER
STORAGE
FH294
FH296
LIVING ROOM LIVING ROOM
DINING ROOM DINING ROOM
BALCONY BALCONY
STORAGE STORAGE
FIRST FLOOR SECOND FLOOR
BLDG. 2105LEGEND
(fh^) positive samplejFKnnn I NEGATIVE SAMPLE
IMNMEV V V OESaCR&COaULTiINn2105-9
2251
FAMILY HOUSING
2251.1 GENERAL
Building 2251 was surveyed by WESTON technicians on 5 December 1990. Complete
inspections (CI) for ACM were performed in Units 43 and 45 of this building. The rest of
the units in Building 2251, Units 41 and 47, were assumed to have type and quantity of
ACM similar to that found in Units 43 and 45 and are designated as similar units (S).
No actual inspection or sampling for ACM was performed in the similar units. Refer to the
guide document for further discussions on complete inspections (O) and similar units (S).
The first three portions of this facility report summarize the results of this inspection.
Photographs of some sample locations are provided in Section 2251;4.
Polarized. light Microscopy (PLM) with dispersion staining was used to. analyze 4 samples
of suspect material collected from the building. Of these samples, all 4 were found to be
asbestos-containing materials (ACM). Table 2251.1 lists the analytical results for the bulk
samples.
2251.2 ACM AND EXPOSURE ASSESSMENT
The location, description, and analytical results for each bulk sample from Building 2251 are
presented in Table 2251.1. An area-by-area inventory of ACM is provided in Tables 22512
and 2251.3. "Other Asbestos-Containing Materials," listed in Table 2251.3, are materials that
do not correspond to the standard caption categories listed in Table 2251.2. A prioritized
Listing of exposure assessments is presented in Table 2251.4. An itemized area-by-area cost
estimate for removal and replacement is provided in Table 2251.5. The method by which
removal/replacement costs are calculated is described in the ISSUES COMMON TO ALL
1374WG 2251-1 6/10/91
BUILDINGS Section of this report. Building floor plans (see attachment) indicate sample
locations and building area names as they are listed in Tables 2251.2 and 2251.5.
22513 RECOMMENDATIONS/CONCLUSIONS
WESTON recommends:
• Asbestos-containing floor tile should be labeled under the O&M Program.
1374WG 2251-2 6/6/91
TABLE 2251.1
BULK SAMPLE ANALYSIS RESULTS - BUILDING 2251, FAMILY HOUSING
SAMPLE
NO. LOCATION ITEM DESCRIPTION
PERCENT ASBESTOS
CH AH OT LAYERED®
FH289 UNIT 43 - KITCHEN,BELOW CEILING FLOOR TILE GREEN,OTH,9X9 FL TL 7 NO
FH290 UNIT 43 - LVG. RH.,BELOW CEILING FLOOR TILE GRAY,OTH,9X9 FL TL 7 YES
FH291 UNIT 45 - KITCHEN,BELOW CEILING FLOOR TILE GREEN,OTH,9X9 FL TL 5 NO
FH292 UNIT 45 - LVG. RM.,BELOW CEILING FLOOR TILE BR0WN,0TH,9X9 FL TL 7 YES
^Asbestos content presented for layered samples represents the highest concentration layer.
ho
hoLnI—*
8LO
Quadrant Codes System Codes Asbestos TypesC = Center STH = Steam CH = chrysotileN = North CHW = Chilled Water AH = Amosite
E = East HHW = Heating Hot^Water OT = OtherS = South DOM = Domestic Water
W = West OTH = Other
NE = Northeast UNK = Unknown
NW = Northwest
SE = SoutheastSW = Southwest
TABLE 2251.2
ASBESTOS-CONTAINING MATERIALS - BUILDING 2251, FAMILY HOUSING
PIPE FITTINGS (EA) PIPE RUNS (LF) SPRAY/TROWELED FLOOR TILE BOILERS/ AIR HANDLINGAREA <A" 4-8" 9-14" >14" <4" 4-8" 9-14" >14" CEILINGS (HSF) <HSF) TANKS fHSF) EQUIPMENT (HSF) OTHER
UNIT 41 (S). . . . 0-60
UNIT 47 (S) - - - - - -- - 0.60
Unit 43 (CD - - - - - - - - 0.60
Unit 45 (CD - - - - - - - - 0.60
TOTALS_ _ _ 2.40
*
Other Material Present In Various Units Of Measure
to EA - Each
LF - Linea
MSF - Thousand Square FeetLF - Linear Feet
Table 2251.3
Other Asbestos-Containing Material - Building 2251, Family HousingI^e Occupancy: Adults (Public)
Area Material Type Quantity (Unit)
No Other Asbestos-Containing Material Found in this Building
bON3Ln
Ln
EA - Each
LF - Linear Feet
MSF - Thousand Square Feet
1374WG 5/10/91
TABLE 2251.4
EXPOSURE ASSESSMENTS (PRIORITY ORDER) - BUILDING 2251, FAMILY HOUSING
PRIOR. PRIORITY AVG.
SAMPLE MATERIAL INDEX INDEX EXPOSURE FACTORS EXP. X
NO. AREA TYPE CODE NUMBER 1 2 3 4 5 HOURS ASB.
NJ
MUi
Only Non-Friable Material Was Detected In This BuildingExposure Assessments Are Not Available
Priority Index CodesA t=] Long Term Corrective MeasureB t=] Review Management Special Considerations/RemarksC [=] Army Asbestos Deficiency Abatement Project
Priority Index Numbers Are In Scientific Notation
Exposure Factors
1 [=] Material Friability2 [=] Occupant AccessabiIity3 [=] Material ConditionA [=] Level Of Activity5 t=] Nimber Of Assigned Occupants
TABLE 2251.5
COST ESTIMATE* - BUILDING 2251, FAMILY HOUSING
DESCRIPTIONUNIT^
COST f$)ARE^ AREg ARE^ AREA
4 TOTAL
hotoLn
h-»
I
Pfpe^Ffttings (EA)
liis"Pipe,Runs (LF)
<4"
>14"
Spra^l^/Troweled9.60
Floor Tile (SF) 5.60 3.4 3.4 3.4 3^4 13.4
Boilers/Tanks (SF) 37.90 - - - - -
Air HandlingEquipment (SF) 20.00 - - ■ - -
Other - - - - -
SUBTOTAL 3.4 3.4 3.4 3.4 13.4
Difficulty Allowance - - - - -
SUBTOTAL 3.4 3.4 3.4 3.4 13.4
Decontamination UnitsMobilization J:i J:i 2:1 t:8
SUBTOTAL 5.4 5.4 5.4 5.4 21.4
Contingency a 15.00% 0.8 0.8 0.8 1 0.8 3.2
SUBTOTAL 6.2 6.2 6.2 6.2 24.7
Design Fee a 10.00% 0.6 0.6 0.6 0.6 2.5
SUBTOTAL 6.8 6.8 6.8 6.8 27.1
Air Monitoring a 10.00% 0.7 0.7 0.7 0.7 2.7
TOTAL 7.5 7.5 7.5 7.5 29.8
Amounts Are In Thousands Of Dollars
**Less Than $100 For The Area; Amount Not Printed But Included In Total(s)***The Minimum Air Monitoring Fee is $500.00 Per Building
SliiS I; ilSI! li !l), Slii liffilillill)
MH
m-
V,.
^.,'i'^f
Bldg. 2251 Unit 43, Living Room: (Sample FH290) (9 In. x 9In.) Gray Floor Tile Tested Positive. Floor TileIn The Kitchen (Brown, 9 In. x 9 In.) Also TestedPositive (Sample FH281).
Bldg. 2251
£evil
O.J
-k
V
Unit 45, Living Room: (Sample FH292): (9 In. x 9In.) Brown Floor Tile Tested Positive. Floor TileIn The Kitchen (Green, 9 In. x 9 In.) Also TestedPositive (Sample FH291).
2251-8
FH289 FH291
PJ^r KiTr.KITC
I
R RHEN KITCHEN
dL L□
UNIT 43 UNIT 45
FH292LIVING ROOM LIVING ROOM
rFH290
BLDG. 2251
LEGEND
^Hfw^ POSITIVE SAMPLE|FKnnn| NEGATIVE SAMPLE
Vi^ oesoeB«ON8uir/wi8
2266
FAMILY HOUSING
2266.1 GENERAL
Building 2266 was surveyed by WESTON technicians on 5 December 1990. A complete
inspection (O) for ACM was performed in Unit 40 of this building. The rest of the units
in Building 2266, Units 26, 28, 30, 32, 34, 36, and 38, were assumed to have type and
quantity of ACM similar to that found in Unit 40 and are designated as similar units (S).
No actual inspection or sampling for ACM was performed in the similar units. Refer to the
guide document for further discussions on complete inspections (CI) and similar units (S).
The first three portions of this facility report summarize the results of this inspectiorL
Polarized Light Microscopy (PLM) with dispersion staining was used to analyze 2 samples
of suspect material collected from the building. Both samples were foimd to be asbestos-
containing materials (ACM). Table 2266.1 lists the analytical results for the bulk samples.
2266.2 ACM AND EXPOSURE ASSESSMENT
The location, description, and analytical results for each bulk sample from Building 2266 are
presented in Table 2266.1. An area-by-area inventory of ACM is provided in Tables 2266.2
and 2266.3. "Other Asbestos-Containing Materials," listed in Table 2266.3, are materials that
do not correspond to the standard caption categories listed in Table 2266.2. A prioritized
listing of exposure assessments is presented in Table 2266.4. An itemized area-by-area cost
estimate for removal and replacement is provided in Table 2266.5. The method by which
removal/replacement costs are calculated is described in the ISSUES COMMON TO ALL
BUILDINGS Section of this report. Building floor plans (see attachment) indicate sample
locations and building area names as they are listed in Tables 2266.2 and 2266.5.
1374WG 2266-1 6/10/91
^1^ 22663 RECOMMENDATIONS/CONCLUSIONS
WESTON recommends:
• Asbestos-containing floor tile should be labeled under the O&M Program.
1374WG 2266-2 6/6/91
TABLE 2266.1
BULK SAMPLE ANALYSIS RESULTS - BUILDING 2266, FAMILY HOUSING
SAMPLE
NO. LOCATION ITEM DESCRIPTION
PERCENT ASBESTOS
CH AH OT LAYERED®
FH299
FH300
UNIT 40-KITCHEN,BELOW CEILINGUNIT 40-ISTFLR CLST,BELOW CEILING
FLOOR
FLOOR
TILE
TILE
BROWN,OTH,12X12 FLBROWN,OTH,9X9 FL TL
5
7
YES
YES
Asbestos content presented for layered samples represents the highest concentration layer.
N3hO
o>ON
!LO
Quadrant Codes System Codes Asbestos Types
C = Center STH = Steam CH = ChrysotileN = North CHW = Chilled Water AM = Amosite
E = East HHW = Heating Hot Water OT = Other
S = South DOM = Domestic Water
W = West OTH = Other
NE = Northeast UNK = Unknown
NW = Northwest
SE = Southeast
SW = Southwest
TABLE 2266.2
ASBESTOS-CONTAINING MATERIALS - BUILDING 2266, FAMILY HOUSING
PIPE FITTINGS (EA) PIPE RUNS (LF) SPRAY/TROWELED FLOOR TILE BOILERS/ AIR HANDLINGarea <4" 4-8" 9-14" >14" <4" 4-8" 9-U" >14" CEILINGS (MSF) (HSF) TANKS (HSF) EQUIPMENT (HSF) OTHER
UNIT 26 (S) . . . . . . . . . 0.08UNIT 28 (S> . . . . . . . . . 0.08
UNIT 30 (S) . . . . . . . . . 0.08UNIT 32 (S) . . . . . . . . . 0.08
UNIT 34 (S) . . . . . . . . . 0.08UNIT 36 (S) . . . . . . . . . 0.08UNIT 38 (S) . . . . . . . . . 0.08Unit 40 (CD - - - - - - - - - 0.08 - -
TOTALS :: : : : : : : : 0.64totoCTi *
(T>
I
w
(T> Other Material Present In Various Units Of MeasureI
EA - Each
LF - Linear Feet
MSF - Thousand Square Feet
Table 2266.3
Other Asbestos-Containing Material - Building 2266, Family Housingl^pe Occupancy: Adults (Public)
Area Material Type Quantity (Unit)
No Other Asbestos-Containing Material Found in this Building
hONi
ON
ILn
EA - Bach
LF - Linear Feet
MSF - Thousand Square Feet
1374WG 6/6/91
TABLE 2266.4
EXPOSURE ASSESSMENTS (PRIORITY ORDER) - BUILDING 2266, FAMILY HOUSING
PRIOR. PRIORITY AVG.
SAMPLE MATERIAL INDEX INDEX EXPOSURE FACTORS EXP. X
NO. AREA TYPE CODE NUMBER 1 2 3 4 5 HOURS ASB.
hoho
C7NOH
I Only Non-Friable Material Was Detected In This BuildingExposure Assessments Are Not Available
Priority Index Codes
A [=] Long Term Corrective MeasureB [s] Review Management Special Considerations/RemarksC [s] Arm/ Asbestos Deficiency Abatement Project
Priority Index Numbers Are In Scientific Notation
Exposure Factors
1 [=] Material Friability2 [=] Occupant Accessability3 t=] Material Condition4 t=l Level Of Activity5 t=] Number Of Assigned Occupants
TABLE 2266.5
COST ESTIMATE* - BUILDING 2266, FAMILY HOUSING
DESCmPTlOWAKt AREI AREA AREA ARE ARE^ ARE AREg
TOTAL
toto
o>
Pipe Fittings (EA)<4"
Pipe Runs (IF)<4"
>14"
I:
9.60
Floor Tile (SF) 5.60 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 3.6
Boilers/Tanks (SF) 37.90 ■ - - - - - - - .
Air HandlingEquipaient (SF) 20.00 . . . . - . . . .
Other ■ - - - • • - • -
SUBTOTAL 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 3.6
Difficulty Allowance - - ■ - - - - - -
SUBTOTAL 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 3.6
pecQntamfoation UnitsnoDilization
Op
8;^ 8:1 8:^ 8:1 8:^ 8:^ 1:8SUBTOTAL 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 8.6
Contingency 8 15.BOX 0.2 0.2 0.2: 0.2 0.2 0.2 0.2 0.2 1.3
SUBTOTAL 1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2 9.9
Design Fee 8 10.00X 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 1.0
SUBTOTAL 1.4 1.4 1.4 1.4 1.4 1.4 1.4 1.4 10.9
Air Monitoring 8 10.00X*** 0.1 0.1 0.1 0.1 0.1 0,1 Otl 0.1 1.1
TOTAL 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 11.9
Amounts Are In Thousands Of Dollars
**Less Than ilOO For The Area; Amount Hot Printed But ItKluded In TotaUs)***The Hinifflum Air Monitoring Fee is tSOO.OO Per Building
AR|
ARi
|i»HAREA 6: UNAREA 8: Un Cl)
horo
ONON
500
FH299 FH300
KITCHEN
•rx
UNIT 40
LIVING ROOM
BLDG. 2266
LEGEND
POSltlVE SAMPLE
|FKnnn| NEGATIVE SAMPLE
MAMAOem 0EXVCR5XXMU.TAMrj
2276
FAMILY HOUSING
2276.1 GENERAL
Building 2276 was surveyed by WESTON technicians on 5 December 1990. A complete
inspection (CI) for ACM was performed in Unit 5 of this building. The rest of the units in
Building 2276, Units 1, 3, and 7, were assumed to have type and quantity of ACM similar
to that found in Unit 5 and are designated as similar rmits (S).
No actual inspection or sampling for ACM was performed in the similar units. Refer to the
guide document for further discussions on complete inspections (CI) and similar units (S).
The first three portions of this facility report summarize the results of this inspection.
Polarized Light Microscopy (PLM) with dispersion staining was used to analyze 2 samples
of suspect material collected from the building. Of these samples, one was found to be
asbestos-containing materials (ACM). Table 2276.1 lists the analytical results for the bulk
samples.
2276.2 ACM AND EXPOSURE ASSESSMENT
The location, description, and analytical results for each bulk sample from Building 2276 are
presented in Table 2276.1. An area-by-area inventory of ACM is provided in Tables 2276.2
and 2276.3. "Other Asbestos-Containing Materials," listed in Table 2276.3, are materials that
do not correspond to the standard caption categories listed in Table 2276.2. A prioritized
listing of exposure assessments is presented in Table 2276.4. An itemized area-by-area cost
estimate for removal and replacement is provided in Table 2276.5. The method by which
removal/replacement costs are calculated is described in the ISSUES COMMON TO ALL
1374WG 2276-1 6/10/91
BUILDINGS Section of this report. Building floor plans (see attachment) indicate sample
locations and building area names as they are listed in Tables 2276.2 and 2276.5.
22763 RECOMMENDATIONS/CONCLUSIONS
WESTON recommends:
• Asbestos-containing floor tile should be labeled under the O&M Program.
1374WG 2276-2 6/6/91
TABLE 2276.1
BULK SAMPLE ANALYSIS RESULTS - BUILDING 2276, FAMILY HOUSING
SAMPLE
NO. LOCATION ITEM DESCRIPTION
PERCENT ASBESTOS
CH AM OT LAYERED®
FH297
FH298
UNIT 5-KITCHEN,BELOW CEILINGUNIT 5-ISTFLR CLOSET,BELOW CEILING
FLOOR
FLOOR
TILE
TILE
BROWN,OTH,12X12 FLBROWN,0TH,9X9 FL TL 5
YES
YES
Asbestos content presented for layered samples represents the highest concentration layer.
N5ro
ICO
Quadrant Codes System Codes Asbestos Tvoes
C = Center STH = steam CH - ChrysotileN = North CHW = Chilled Water AH = Amosite
E = East HHW = Heating Hot.Water OT = Other
S = South DOM = Domestic Water
W = West OTH = Other
NE = Northeast UNK = Unknown
NW = Northwest
SE = Southeast
SW = Southwest
TABLE 2276.2
ASBESTOS-CONTAINING MATERIALS - BUILDING 2276, FAMILY HOUSING
PIPE FITTINGS (EA) PIPE RUNS (LF) SPRAY/TROWELED FLOOR TILE BOILERS/ AIR HANDLINGAEEA <4" A-8" 9-14" >14" <4" 4-8" 9-14" >14" CEILINGS (HSF) (MSF) TANKS (HSF) EQUIPMENT (MSF) OTHER
UNIT 1 <S) . . . . . . . . . 0.01UNIT 3 <S) . . . . . . . . . 0.01UNIT 7 <S) . . . . . . . . . 0.01Unit 5 (CD - - - - - - - i - 0.01 - ■ -
TOTALS : : : : : :: :: : 0.04
*
other Material Present In Various Units Of Measure
EA - Each
LF - Linear Feet
^ MSF - Thousand Square FeetON
Table 2276.3
Other Asbestos-Containing Material - Building 2276, Family HousingType Occupancy: Adults (Public)
Area Material Type Quantity (Unit)
No Other Asbestos-Containing Material Found in this Building
N3ho
ONILn
EA - Each
LF - Linear Feet
MSF - Thousand Square Feet
1374WG 5/10/91
TABLE 2276.4
EXPOSURE ASSESSMENTS (PRIORITY ORDER) - BUILDING 2276, FAMILY HOUSING
PRIOR. PRIORITY AVG.
SAMPLE MATERIAL INDEX INDEX EXPOSURE FACTORS EXP. %
NO. AREA TYPE CODE NUMBER 1 2 3 4 5 HOURS ASB.
roN5
ON
ON
Only Non-Friable Material Was Detected In,This BuildingExposure Assessments Are Not Available
Priority Index Codes
A [=] Long Term Corrective MeasureB [=] Review Management Special Considerations/RemarksC [=] Army Asbestos Deficiency Abatement Project
Priority Index Numbers Are In Scientific Notation
Exposure Factors
1 t=] Material Friability2 t=] Occupant Accessability3 [=i Material Condition4 [=] Level Of Activity5 [=] Number Of Assigned Occupants
table 2276.5
COST ESTIMATE* - BUILDING 2276, FAMILY HOUSING
DESCRIPTIONUNIT^
COST ($)ARE^ AREg ARE^ AREA
4 TOTAL
hoho
ONI
Pipe^Fittings (EA)
>14"
Pipe Runs (LF><4"
m,>14"
Sprayed/TroweledCeilings (SF) 9.60
Floor Tile (SF) 5.60 ** ** ** 0.2
Boilers/Tanks (SF) 37.90 - - - - -
Air HandlingEquipment (SF) 20.00 - - - - -
Other - - - - -
SUBTOTAL ** ** ** 0.2
Difficulty Allowance - - - - -
SUBTOTAL ** ** ** ** 0.2
Decontamination UnitsMobilization 8:f 8:1 8:1 8:f 1:8
SUBTOTAL 1.3 1.3 1.3 1.3 5.2
Contingency a 15.00% 0.2 0.2 0.2' 0.2 0.8
SUBTOTAL 1.5 1.5 1.5 1.5 6.0
Design Fee a 10^00% 0.2 0.2 0.2 0.2 0.6
SUBTOTAL 1.7 1.7 1.7 1.7 6.6
Air Monitoring a 10.00%*** 0.2 0.2 0.2 0.2 0.7
TOTAL 1.8 1.8 1.8 1.8 7.3
Amounts Are In Thousands Of DollarsWA
Less Than $100 For The Area; Amount Not Printed But Included In Total(s)hitit
The Minimum Air Monitoring Fee is $500.00 Per Building
Ills ilfflliiili II ffll! i ill)
horo
ONI00
FH298
V
|fH297{
KITCHEN
Ol .
B
UNIT 5
LIVING ROOM
0
BLDG. 2276
LEGEND
^Hnn^ POSITIVE SAMPLE|FKnnn| NEGATIVE SAMPLE
WWAGERS OtSn^CRS«ONSULTANT3
2462
FAMILY HOUSING
2462.1 GENERAL
Building 2462 was surveyed by WESTON technicians on 5 December 1990. A complete
inspection (CI) for ACM was performed in Unit 14 of this building. The rest of the units
in Building 2462, Units 2, 4, 6, 8, 10, 12, and 16, were assumed to have type and quantity
of ACM similar to that found in Unit 14 and are designated as similar units (S).
No actual inspection or sampling for ACM was performed in the similar units. Refer to the
guide document for further discussions on complete inspections (CI) and similar units (S).
The first three portions of this facility report smnmarize the results of this inspection.
Photographs of some sample locations are provided in Section 2462.4.
Polarized Light Microscopy (PLM) with dispersion staining was used to analyze 2 samples
of suspect material collected from the building. Both of these samples were found to be
asbestos-containing materials (ACM). Table 2462.1 lists the analytical results for the bulk
samples.
2462.2 ACM AND EXPOSURE ASSESSMENT
The location, description, and analytical results for each bulk sample from Building 2462 are
presented in Table 2462.1. An area-by-area inventory of ACM is provided in Tables 2462.2
and 2462.3. "Other Asbestos-Containing Materials," listed in Table 24623, are materials that
do not correspond to the standard caption categories listed in Table 2462.2. A prioritized
listing of exposure assessments is presented in Table 2462.4. An itemized area-by-area cost
estimate for removal and replacement is provided in Table 2462.5. The method by which
removal/replacement costs are calculated is described in the ISSUES COMMON TO ALL
1374WG 2462-1 6/10/91
BUILDINGS Section of this report. Building floor plans (see attachment) indicate sample
locations and building area names as they are listed in Tables 2462.2 and 2462.5.
2462J RECOMMENDATIONS/CONCLUSIONS
WESTON recommends:
• Asbestos-containing floor tile should be labeled under the O&M Program.
1374WG 2462-2 6/6/91
TABLE 2462.1
BULK SAMPLE ANALYSIS RESULTS - BUILDING 2462, FAMILY HOUSING
SAMPLE
NO. LOCATION ITEM DESCRIPTION
PERCENT ASBESTOS
CH AM OT LAYERED®
FH279FH280
UNIT 14- KITCHEN,BELOW CEILINGUNIT 14-ISTFLR CLSET,BELOW CEILING
FLOOR
FLOOR
TILE
TILE
GRAY,OTH,9X9 FL TLBR0WN,0TH,9X9 FL TL
3
2
YES
NO
Asbestos content presented for layered samples represents the highest concentration layer.
to
4^-a>lo
ICO
Quadrant Codes Svstem Codes Asbestos Tvoes
C = Center STM = Steam CH s ChrysotileN = North CHW = Chilled Water AM = Amosite
E = East HHW = Heating Hot Water OT = Other
S = South DOM = Domestic Water
W = West OTH = Other
NE = Northeast UNK = Unknown
NW = Northwest
SE = Southeast
SW = Southwest
TABLE 2462.2
ASBESTOS-CONTAINING MATERIALS - BUILDING 2462, FAMILY HOUSING
AREA <4"PIPE FITTINGS (EA)
4-8" 9-14" >U" <4"
PIPE RUNS (LF)
4-8" 9-14" >14"
SPRAY/TROWELED FLOOR TILE BOILERS/ AIR HANDLING
CEILINGS (HSF) (HSF) TANKS (HSF) EQUIPMENT (HSF) OTHER
UNIT 10 (S)UNIT 12 (S)UNIT 16 (S)
UNIT 2 (S)
UNIT 4 <S)UNIT 6 (S)
UNIT 8 (S)Unit 14 (CD
0.08
0.08
0.08
0.08
0.08
0.08
0.08
0.08
to
■P-ONto
TOTALS 0.64
Other Material Present In Various Units Of Measure
EA - EachLF - Linear FeetMSF - Thousand Square Feet
Table 2462.3
Other Asbestos-Containing Material - Building 2462, Family HousingType Occupancy: Adults (Public)
Area Material Type Quantity (Unit)
No Other Asbestos-Containing Material Found in this Building
ro
OS
ro
EA - Each
LF - Linear Feet
MSF - Thousand Square Feet
1374WG 5/10/91
TA^LE 2462.4
EXPOSURE ASSESSMENTS (PRIORITY ORDER) - BUILDING 2462, FAMILY HOUSING
PRIOR. PRIORITY AVG.SAMPLE MATERIAL INDEX INDEX EXPOSURE FACTORS EXP. %
NO. AREA TYPE CODE NUMBER 1 2 3 4 5 HOURS ASB.
ho
4:-ONhO
ON
Only Non-Friable Material Was Detected In This BuildingExposure Assessments Are Not Available
Priority Index Codes
A [s] Long Term Corrective MeasureB [■>] Review Management Special Considerations/RemarksC [s] Army Asbestos Deficiency Abatement Project
Priority Index Numbers Are In Scientific Notation
Exposure Factors1 [s] Material Friability2 [s] Occupant Accessablllty3 M Material Condition4 t=l Level Of Activity5 ts] Number Of Assigned Occupants
TABLE 2462.5
COST ESTIMATE* - BUILDING 2462, FAMILY HOUSING
DESCRIPTIONUMIT^
COST ($)ARE^ ARE| ARE| AREA
4ARE^ AREg ARE^ AREg
TOTAL
Pipe,Fittings (EA)
i-?4">14" -
-
.
-
• _
-
Pipe Runs (LF)<4" _ _ _ . .
>14"-
• _
-
.
- -
Sprayod/TroueledCeilings (SF) 9.60 - - - - _ _
• _ .
Floor Tile (SF) 5.60 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 3.6
Boilers/Tanks (SF) 37.90 - - - - - - - - -
Air HandlingEquipment (SF) 20.00 - - - - - - _ •
Other - - - - - - - - -
SUBTOTAL 0.4 0.4 0.4 0;4 0.4 0.4 0.4 0.4 3.6
Difficulty Allowance - - - - - - - - -
SUBTOTAL 0.4 0.4 0.4 6.4 0.4 0.4 0.4 0.4 3.6
Decontamination UnitsMobilization 8:^ 8:^ H 8:^ 8:^ 8;^ 8:^ 8;^ 1:8
SUBTOTAL 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 8.6
Contingency a 15.00% 0.2 0.2 0.2 1 0.2 0.2 0.2 0.2 0.2 1.3
SUBTOTAL 1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2 9.9
Design Fee a 10.00% 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 1.0
SUBTOTAL 1.4 1.4 1.4 1.4 1.4 1.4 1.4 1.4 10.9
Air Monitoring a 10.00%*'r* 0.1 0.1 0.1 0.1 0.1 0.1 0.1 o.i 1.1
TOTAL 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 11.9
NJ
4>-
to
I•o
Amounts Are In Thousands Of Dollars
**Less Than $100 For The Area; Amount Not Printed But Included in Total(s)***The Minimum Air Monitoring Fee Is $500.00 Per Building
m 4 <
•t.
2F 7 9
4 06
T
iriT
X
'.'SP
idr
Bldg. 2462 Unit 14, Kitchen: (Sample FH279) (9 In. x 9 In.)Gray Floor Tile Tested Positive.
tKfoo
4=CSJ
CO JiirCOU_m-
CO
LBldg. 2462 Unit 14, Closet: (Sample FH280) (9 In. x 9 In.)
Brown Floor Tile Tested Positive.
2462-8
ho
•p-
ho
IVD
BLDG. 2462
=Q r FH280
7NJ^
%UNIT 14
KITCH
FH279
EN BBI
LIVING ROOM
1
LEGEND
^Hfw^ POSITIVE SAMPLE|FKnnn| NEGATIVE SAMPLE
MMWXnS 0ESIQNERS«O)«ULTANn
#2463
FAMILY HOUSING
2463.1 GENERAL
Building 2463, Unit 27 was surveyed by WESTON technicians on 5 December 1990. A
complete inspection (CI) for ACM was performed in Unit 27 of this building. The rest of
the units in Building 2463, Units 17, 19, 21, 23, 25, 29, and 31, were assumed to have type
and quantity of ACM similar to that found in Unit 27 and are designated as similar imits
(S).
No actual inspection or sampling for ACM was performed in the similar units. Refer to the
guide document for further discussions on complete inspections (Q) and similar units (S).
The first three portions of this facility report summarize the results of this inspection.
Photographs of some sample locations are provided in Section 2463.4.
Polarized Light Microscopy (PLM) with dispersion staining was used to analyze 2 samples
of suspect material collected from the building. Both of these samples were found to be
asbestos-containing materials (ACM). Table 2463.1 lists the analytical results for the bulk
samples.
2463.2 ACM AND EXPOSURE ASSESSMENT
The location, description, and analytical results for each bulk sample from Building 2463 are
presented in Table 2463.1. An area-by-area inventory of ACM is provided in Tables 2463.2
and 2463.3. "Other Asbestos-Containing Materials," listed in Table 2463.3, are materials that
do not correspond to the standard caption categories listed in Table 2463.2. A prioritized
listing of exposure assessments is presented in Table 2463.4. An itemized area-by-area cost
estimate for removal and replacement is provided in Table 2463.5. The method by which
1374WG 2463-1 6/10/91
removal/replacement costs are calculated is described in the ISSUES COMMON TO ALL
BUILDINGS Section of this report. Building floor plans (see attachment) indicate sample
locations and building area names as they are listed in Tables 2463.2 and 2463.5.
2463.3 RECOMMENDATIONS/CONCLUSIONS
WESTON recommends:
• Asbestos-containing floor tile should be labeled under the O&M Program.
1374WG 2463-2 6/10/91
TABLE 2463.1
BULK SAMPLE ANALYSIS RESULTS - BUILDING 2463, FAMILY HOUSING
SAMPLE
NO. LOCATION ITEM DESCRIPTION
PERCENT ASBESTOS
CH AM OT LAYERED®
FH281FH282
UNIT 27-ICITCHEN,BELOW CEILINGUNIT 27-1STFLR CLSET,BELOW CEILING
FLOOR
FLOOR
TILE
TILE
GREEN,OTH,9X9 FL TLBROWN,OTH,9X9 FL TL
10
5
YES
YES
Asbestos content presented for layered samples represents the highest concentration layer.
Quadrant Codes System Codes Asbestos Tvoes
N>C = Center STM = Steam CH = ChrysotileN = North CHW = Chilled Water AM = Amosite
CTi
to
1
E = East HHW = Heating Hot Water OT = Other
S = South DOM = Domestic Waterto W = West OTH = Other
NE = Northeast UNK = UnknownNW = Northwest
SE = Southeast
SW = Southwest
TABLE 2463.2
ASBESTOS-CONTAINING MATERIALS - BUILDING 2463, FAMILY HOUSING
PIPE FITTIWGS (EA) PIPE RUNS (IF) SPRAY/TROWELED FLOOR TILE BOILERS/ AIR HANDLING<4" 4-8" 9-14" >U" <4" 4-8" 9-14" >14" CEILINGS (HSF) YHSF) TANKS (HSF) EQUIPMENT (HSF) OTHER
0.08
0.08
0.080.08
0.08
0.08
0.08
0.08
AREA
UNIT 17(S)UNIT 19(S)
UNIT 21 (S)
UNIT 23 <S)
UNIT 25 (S)
UNIT 29(S)
UNIT 31 <S)
Unit 27(CD
TOTALS
■P-
^ *'f' Other Material Present In Various Units Of Measure4>-
EA - EachLF - Linear FeetMSF - Thousand Square Feet
0.64
Table 2463.3
Other Asbestos-Containing Material - Building 2463, Family Housingl^pe Occupancy: Adults (Public)
Area Material Type Quantity (Unit)
No Other Asbestos-Containing Material Found in this Building
ho
•P-a>COILn
EA - Each
LF - Linear Feet
MSF - Thousand Square Feet
1374WO 5/10/91
TABLE 2463.4
EXPOSURE ASSESSMENTS (PRIORITY ORDER) - BUILDING 2463, FAMILY HOUSING
materialPRIOR. PRIORITY AVG.
SAMPLE INDEX INDEX EXPOSURE FACTORS EXP. X
NO. AREA TYPE CODE NUMBER 1 2 3 4 5 HOURS ASB.
ro
ONLO Only Non-Friable Matiarial Was Detected In This Building
Exposure Assessments Are Not Available
Priority Index Codes
A t=] Long Term Corrective MeasureB [=] Review Management Special Considerations/RemarksC [=] Army Asbestos Deficiency Abatement Project
Priority Index Nunbers Are In Scientific Notation
Exposure Factors
1 [=] Material Friability2 [=] Occupant AccessabiIity3 [=] Material Condition4 t=] Level Of Activity5 [=] Number Of Assigned Occupants
TABLE 2463.5
COST ESTIMATE* - BUILDING 2463, FAMILY HOUSING
DESCRIPTIONUNIT^
COST ($)ARE^ AREg ARE^ AREA
4ARE^ AREg ARE^ AREg
TOTAL
to
(jj
I
Pipe Fittings (EA)<4"
>14"
Pipe Runs (LF)<4"
>i4"
Sprayed/T roweI edCeiTings (SF)
Floor Tile (SF)
Boilers/Tanks (SF)
Air HandlingEquipment (SF)
Other
9.60
5.60
37.90
20.00
0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 3.6
SUBTOTAL 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 3.6
Difficulty Allowance - - - - - - - - -
SUBTOTAL 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 3.6
Depontamination UnitsMobilization 8:i 8:^ 8:^ 8:^ 8;^ 8:^
oo
1:8SUBTOTAL 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 8.6
Contingency a 15.00% 0.2 0.2 0.2 1 0.2 0.2 0.2 0.2 0.2 1.3
SUBTOTAL 1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2 9.9
Design Fee a 10.00% 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 1.0
SUBTOTAL 1.4 1.4 1.4 1.4 1.4 1.4 1.4 1.4 10.9
Air Monitoring a 10.00%*** 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 1.1
TOTAL 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 11.9
Amounts Are In Thousands Of Dollars
^''less Than $100 For The Area; Amount Not Printed But Included In Total(s)The Minimum Air Monitoring Fee is $500.00 Per Building
ii AlEA
h28
\
Bldg. 2463 Unit 21, Kitchen: (Sample FH281) (9 In. x 9 In.)Green Floor Tile Tested Positive. Floor Tile IsExtremely (Water) Damaged.
Vm.
•V
J CO
It*
Bldg. 2463 Unit 27, Closet: (Sample FH282) (9 In. x 9 In.)Brown Floor Tile Tested Positive.
2463-8
—
N
Bldg. 2463 Unit 27
Green F
Extreme:
(Sample FH281) (9 In. x 9 In.)ested Positive. Floor Tile Isdamaged.
V|
ho
(TsCO
IVD
FH281 FH282J D
(B B KITCHEN
□UNIT 27
LIVING ROOM
BLDG. 2463LEGEND
(pHnrj) POSITIVE SAMPLE|FHnnn| NEGATIVE SAMPLE
UUMEIB ^ OESnrCR&aMULTMnS
m2466
FAMILY HOUSING
2466.1 GENERAL
Building 2466 was surveyed by WESTON technicians on 5 December 1990. Complete
inspections (CI) for ACM were performed in Units 36,38, and 42 of this building. The rest
of the units in Building 2463, Units 34, 40, 44, 46, and 48, were assumed to have type and
quantity of ACM similar to that found in Units 36,38, and 42 and are designated as similar
units (S).
No actual inspection or sampling for ACM was performed in the similar units. Refer to the
guide document for. further discussions on complete inspections (CI) and similar units (S).
The first three portions of this facility report summarize the results of this inspection.
Photographs of some sample locations are provided in Section 2466A.
Polarized Light Microscopy (PLM) with dispersion staining was used to analyze 6 samples
of suspect material collected from the building. Of these samples, all were found to be
asbestos-containing materials (ACM). Table 2466.1 lists the analytical results for the bulk
samples.
2466.2 ACM AND EXPOSURE ASSESSMENT
The location, description, and analytical results for each bulk sample from Building 2466 are
presented in Table 2466.1. An area-by-area inventory of ACM is provided in Tables 2466.2
and 2466.3. "Other Asbestos-Containing Materials," listed in Table 2466.3, are materials that
do not correspond to the standard caption categories listed in Table 2466.2. A prioritized
listing of exposure assessments is presented in Table 2466.4. An itemized area-by-area cost
estimate for removal and replacement is provided in Table 2466.5. The method by which
1374WG 2466-1 6/10/91
removal/replacement costs are calculated is described in .the ISSUES COMMON TO ALL
BUILDINGS Section of this report. Building floor plans (see attachment) indicate sample
locations and building area names as they are listed in Tables 2466.2 and 2466.5.
2466.3 RECOMMENDATIONS/CONCLUSIONS
WESTON recommends:
• Asbestos-containing floor tile should be labeled under the O&M Program.
1374WG 2466-2 6/10/91
TABLE 2466.1
BULK SAMPLE ANALYSIS RESULTS - BUILDING 2466, FAMILY HOUSING
SAMPLE
NO. LOCATION ITEM . DESCRIPTION
PERCENT ASBESTOS
CH AM OT LAYERED
FH283 UNIT 36 - KITCHEN,BELOW CEILING FLOOR TILE BROWN,OTH,9X9 FL TL 10 YES
FH284 UNIT 36 - CLOSET,BELOW CEILING FLOOR TILE BROWN,OTH,9X9 FL TL 7 NO
FH285 UNIT 38 - KITCHEN,BELOW CEILING FLOOR TILE TAN,OTH,12X12 FL 7 YES
FH286 UNIT 38 - CLOSET,BELOW CEILING FLOOR TILE BROWN,OTH,9X9 FL TL 7 NO
FH287 UNIT 42 - KITCHEN,BELOW CEILING FLOOR TILE GREEN,OTH,9X9 FL TL 5 YES
FH288 UNIT 42 - CLOSET,BELOW CEILING FLOOR TILE GRAY,0TH,9X9 FL TL 10 YES
ho
4NONON
ILO
Asbestos content presented for layered samples represents the highest concentration layer.
Quadrant Codes System Codes Asbestos TvDes
C = Center STM = Steam CH = ChrysotileN = North CHW = Chilled Water AM = Amosite
E = East HHW = Heating Hot Water OT = Other
S = South DOM = Domestic Water
W = West OTH = Other
NE = Northeast UNK = Unknown
NW = Northwest
SE = Southeast
SW = Southwest
# «
TABLE 2466.2
ASBESTOS-CONTAINING MATERIALS - BUILDING 2466, FAMILY HOUSING
AREA <4"
PIPE FITTIMGS (EA)
4-8" 9-14" >14"
PIPE RUMS (LF)
<4" 4-8" 9-14" >14"
SPRAY/TROUELED FLOOR TILE BOILERS/ AIR HANDLING
CEILINGS (HSF) fHSF) TANKS (HSF) EQUIPMENT (MSF) OTHER
ro
■p-a\o^Ip-
UNIT 34 (S)UNIT 40 (S)UNIT 44 (S)UNIT 46 (S)UNIT 48 (S)Unit 36 (CDUnit 38 (CDUnit 42 (CD
TOTALS
0.080.080.080.080.080.080.080.08
0.64
Other Material Present In Various Units Of Measure
EA - EachLF - Linear FeetMSF - Thousand Square Feet
• •Table 2466.3
Other Asbestos-Contaming Material - Building 2466, Family HousingT^e Occupancy: Adults (Public)
Area Material Type Quantity (Unit)
No Other Asbestos-Containing Material Found in this Building
EA - Bach
LF - Linear Feet
MSF - Thousand Square Feet
ro
ONON
Ln
1374WO 5/10/91
#
TABLE 2466.4
EXPOSURE ASSESSMENTS (PRIORITY ORDER) - BUILDING 2466, FAMILY HOUSING
PRIOR. PRIORITY AVG.
SAMPLE MATERIAL INDEX INDEX EXPOSURE FACTORS EXP. XNO. AREA TYPE CODE NUMBER 1 2 3 4 5 HOURS ASB.
■><TiON
Only Non-Friable Material Was Detected In This BuildingExposure Assessments Are Not Available
Priority Index CodesA [=] Long Term Corrective MeasureB [=] Review Management Special Considerations/RemarksC [=] Army Asbestos Deficiency Abatement Project
Priority Index Nuniiers Are In Scientific Notation
Exposure Factors1 [=] Material Friability2 C=] Occupant Accessability3 [=] Material Condition4 t=] Leyel Of Activity5 [=] Number Of Assigned Occupants
TABLE 2466.5
COST ESTIMATE* - BUILDING 2466, FAMILY HOUSING
DESCRIPTIOH
Pipe Fittings (EA)
§:?4ii>14"
Pipe^ljuns (LF)
>14"
Sprays/Troweled
Floor Tile (SF)
Boilers/Tanks (SF)
Air HandlingEquipment (SF)
Other
SUBTOTAL
Difficulty Allowance
SUBTOTAL
Decontamination UnitsModi 11zatIon
SUBTOTAL
Contingency a 15.00%
SUBTOTAL
Design Fee a 10.00%
SUBTOTAL
Air Monitoring a 10.00%*TOTAL
UNIT^COST (S)
ARE^ ARE| AREA AREA4
AREA AREA AREA AREATOTAL
to
■P>CXia>I-j
9.60
5.60
37.90
20.00
0.4
0.4
0.4
0.4
0.4
0.4
0.4
0.4
0.4
0.4
0.4
0.4
0.4
0.4
0.4
0.4
3.6
3.6
0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 3.6
8:S 8.1 81 81 81 81 81 811.4 1.4 1.4 1.4 1.4 1.4 1.4 1.4 11.6
0.2 0.2 0.2| 0.2 0.2 0.2 0.2 0.2 1.71.7 1.7 1.7 1.7 1.7 1.7 1.7 1.7 13.3
0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 1.31.8 1.8 1.8 1.8 1.8 1.8 1.8 1.8 14.70.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 1.52.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 16.1
Amounts Are In Thousands Of Dollars
**Less Than $100 For The Area; Amount Not Printed But Included In Total(s)ifhir
The Minimum Air Monitoring Fee is $500.00 Per Building
iareA
mAREA
\mUnitUnit
rrii; 0 j
41 06
-A S
9^
t' i '
r •■
■r-
='--f:I. _
■ ■ *»
:Tf - ^ V -
Bldg. 2466 Unit 36, Kitchen: (Sample FH283)Brown Floor Tile Tested Positive.The Closet Is Also Tested Positive
(9 In. X 9 In.)Floor Tile In
(Sample FH284) .
2466-8
m41 06
Tl'
rs?;
Li
Bldg. 2466 Unit 38, Closet; (Sample FH286) (9 in. x 9 In.)Brown Floor Tile Tested Positive. Tan Floor Tile(12 In. X 12 In.) In The Kitchen Also TestedPositive (Sample FH285).
2466-9
miwweeeewt
iFH2883886-41-06
4'
4 ;
r. «-«!
Bldg. 2466 Unit 42, Closet: (Sample FH288) (9 In. x 9 In.)Mixed-Color Floor Tile Tested Positive. GreenFloor Tile (9 In. x 9 In.) In The Kitchen AlsoTested Positive. (Sample FH287).
2466-10
□ CFH284 FH283 FH285 FH286
BBX KITCHEN KITCHEN
UMT36 UMT38
LIVNQ ROOM UVtlQ ROOM
BLDQ. 2466
LEGEND
(mw) POSITIVE SAMPLE|FHnnn| NEGATIVE SAMPLE
KsntKxamiMMn