OP-Navigation.ppt 1
U.S Army Corps of U.S Army Corps of EngineersEngineers
Savannah DistrictSavannah District
OP-Navigation.ppt 2
SCSC
GAGA
ATLANTIC O
CEAN
Savannah R
.
St. Mary’s R.St. Mary’s R.
Savannah HarborSavannah Harbor
Brunswick Brunswick HarborHarbor
AIWWAIWW
Civil Works & NavigationCivil Works & Navigation BoundariesBoundaries
OP-Navigation.ppt 3
Sav’h HarborSav’h Harbor 32.5 Miles32.5 Miles
AIWWAIWW 161 Miles161 Miles
Brunswick Brunswick 24 Miles24 Miles
TotalTotal 217.5 Miles217.5 Miles
Navigation ProjectsNavigation Projects
OP-Navigation.ppt 4
ScheduledScheduled FY07 Dredging Work in FY07 Dredging Work in Savannah District Savannah District
South Atlantic DivisionSouth Atlantic Division
Savannah & Brunswick Savannah & Brunswick Inner HarborInner Harbor
FY07 Savannah &FY07 Savannah &Brunswick Entrance ChlBrunswick Entrance Chl
Brunswick Deepening Brunswick Deepening Sta 20 to 46, E. River to 36 ft. Sta 20 to 46, E. River to 36 ft.
OCTOCT NOVNOV DECDEC JANJAN FEBFEB MARMAR APRAPR MAYMAY JUNJUN JULJUL AUGAUG SEPSEP
Sea Turtles-screens & observersSea Turtles-screens & observers
Striped bass spawningStriped bass spawning
Hopper DredgeHopper DredgeMaintenance DredgingMaintenance Dredging
Hydraulic Pipeline DredgeHydraulic Pipeline DredgeMaintenance DredgingMaintenance Dredging
Est. 5,180K CYEst. 5,180K CY
Hydraulic Pipeline DredgeHydraulic Pipeline DredgeNew Work DredgingNew Work Dredging
BOBO10/1510/15Est. 2,000K CYEst. 2,000K CY
Est. 5,063K CYEst. 5,063K CY
BOBO99
BOBO1515
OP-Navigation.ppt 5
Savannah DistrictSavannah District
FY 07 Hopper Dredge ProgramFY 07 Hopper Dredge Program
OP-Navigation.ppt 6
ScheduledScheduled FY07 Dredging Work in FY07 Dredging Work in Savannah District Savannah District
South Atlantic DivisionSouth Atlantic Division
FY07 Savannah &FY07 Savannah &Brunswick Entrance ChlBrunswick Entrance Chl
OCTOCT NOVNOV DECDEC JANJAN FEBFEB MARMAR APRAPR MAYMAY JUNJUN JULJUL AUGAUG SEPSEP
Sea Turtles-screens & observersSea Turtles-screens & observers
Hopper DredgeHopper DredgeMaintenance DredgingMaintenance Dredging
BOBO10/1510/15Est. 2,000K CYEst. 2,000K CY
BOBO99
OP-Navigation.ppt 7
Savannah DistrictSavannah District
Project: Savannah Entrance ChannelProject: Savannah Entrance Channel Type of work: MaintenanceType of work: Maintenance Depth: 42/44 ftDepth: 42/44 ft Width: 600 ftWidth: 600 ft Length: 11.4 milesLength: 11.4 miles Quantity: 1.0 MCYQuantity: 1.0 MCY Type of Material: sand/silt/clayType of Material: sand/silt/clay Placement Areas: EPA approved ocean Placement Areas: EPA approved ocean
site and near shore sitessite and near shore sites Distance to Placement Area: up to 11.5 Distance to Placement Area: up to 11.5
milesmiles Type of Equipment: HopperType of Equipment: Hopper Small Business Set Aside: NoSmall Business Set Aside: No Last Dredged: FY06Last Dredged: FY06 Environmental Window: Dec 15- March Environmental Window: Dec 15- March
3131 Reason for Window: Right Whales and Reason for Window: Right Whales and
Sea TurtlesSea Turtles
OP-Navigation.ppt 8
Savannah DistrictSavannah District
Project: Brunswick Entrance ChannelProject: Brunswick Entrance Channel Type Work: MaintenanceType Work: Maintenance Depth: 32/36/38 feetDepth: 32/36/38 feet Width: 500 feetWidth: 500 feet Length: 16.8 milesLength: 16.8 miles Quantity: 1.0 MCYQuantity: 1.0 MCY Type of Material: Sand/silt/clayType of Material: Sand/silt/clay Placement Areas: EPA approved ocean Placement Areas: EPA approved ocean
site and near shore sitessite and near shore sites Distance to Placement Area: up to 19 Distance to Placement Area: up to 19
milesmiles Type of Equipment: HopperType of Equipment: Hopper Small Business Set Aside: NoSmall Business Set Aside: No Last Dredged: FY06Last Dredged: FY06 Environmental Window: 15 Dec-13 Environmental Window: 15 Dec-13
MarchMarch Reason for Window: Right Whales and Reason for Window: Right Whales and
Sea TurtlesSea Turtles
OP-Navigation.ppt 9
Savannah DistrictSavannah District
FY07 Hydraulic Cutter Head FY07 Hydraulic Cutter Head Dredge ProgramDredge Program
OP-Navigation.ppt 10
ScheduledScheduled FY07 Dredging Work in FY07 Dredging Work in Savannah District Savannah District
South Atlantic DivisionSouth Atlantic Division
Savannah & Brunswick Savannah & Brunswick Inner HarborInner Harbor
Brunswick Deepening Brunswick Deepening Sta 20 to 46, E. River to 36 ft. Sta 20 to 46, E. River to 36 ft.
OCTOCT NOVNOV DECDEC JANJAN FEBFEB MARMAR APRAPR MAYMAY JUNJUN JULJUL AUGAUG SEPSEP
Striped bass spawningStriped bass spawning
Hydraulic Pipeline DredgeHydraulic Pipeline DredgeMaintenance DredgingMaintenance Dredging
Est. 5,180K CYEst. 5,180K CY
Hydraulic Pipeline DredgeHydraulic Pipeline DredgeNew Work DredgingNew Work Dredging
Est. 5,063K CYEst. 5,063K CY
BOBO1515
OP-Navigation.ppt 11
Savannah DistrictSavannah District Project: Savannah & Brunswick Inner Project: Savannah & Brunswick Inner
HarborsHarbors Type of work: MaintenanceType of work: Maintenance Depth: (SH)40/46 ft, (BH)30/36 ftDepth: (SH)40/46 ft, (BH)30/36 ft Width: (SH)500 ft, (BH)350/400 ftWidth: (SH)500 ft, (BH)350/400 ft Length: (SH)21.3 miles, (BH)3 milesLength: (SH)21.3 miles, (BH)3 miles Quantity: 5.2 mcyQuantity: 5.2 mcy Type of Material: sand/silt/mudType of Material: sand/silt/mud Placement Area: Upland placement Placement Area: Upland placement
sitessites Distance to Placement Area: up to 2 Distance to Placement Area: up to 2
milesmiles Type of Equipment: Hydraulic Type of Equipment: Hydraulic
cutterhead pipelinecutterhead pipeline Small Business Set Aside: YesSmall Business Set Aside: Yes Last Dredged: FY06Last Dredged: FY06 Environmental Window: (SH) March 15-Environmental Window: (SH) March 15-
May 30 (above Station 63+000) (BH)April May 30 (above Station 63+000) (BH)April 1-August 11-August 1
Reason for Window: (SH)Striped Bass Reason for Window: (SH)Striped Bass Spawning (BH) Least tern nestingSpawning (BH) Least tern nesting
OP-Navigation.ppt 12
Savannah DistrictSavannah District
Project: Brunswick Deepening Inner Project: Brunswick Deepening Inner HarborHarbor
Type Work: UnclassifiedType Work: Unclassified Depth: 36 feetDepth: 36 feet Width: 400 feetWidth: 400 feet Length: 12.3 milesLength: 12.3 miles Quantity: 8.0 MCYQuantity: 8.0 MCY Type of Material: Sand/silt/clayType of Material: Sand/silt/clay Placement Areas: New Bird Island & Placement Areas: New Bird Island &
Andrews IslandAndrews Island Distance to Placement Area: up to 5 Distance to Placement Area: up to 5
milesmiles Type of Equipment: Hydraulic Type of Equipment: Hydraulic
cutterhead pipeline cutterhead pipeline Small Business Set Aside: NoSmall Business Set Aside: No Last Dredged: N/ALast Dredged: N/A Environmental Window: NoneEnvironmental Window: None Reason for Window: N/AReason for Window: N/A