US Government Open Systems Specifications: Understanding the bidding process and vision 1 U.S. Army Corps of Engineers Dave Schwenk Engineer Research Development Center Construction Engineering Research Laboratory (ERDC/CERL) [email protected] phone: 217-373-7241 Will White Huntsville Engineering Support Center [email protected] phone: 256-895-1739 ConnectivityWeek 2010
Transcript
Page 1: US Government Open Systems Specifications: … · • Fort Hood, Texas ... • Basewide System, MILCON funded (ECIP), Johnson Controls UMCS • Fort Bliss, Texas 29 ... Whole Building

US Government Open Systems Specifications:

Understanding the bidding process and vision

1

U.S. Army Corps of Engineers

Dave SchwenkEngineer Research Development Center Construction Engineering Research Laboratory

(ERDC/CERL) [email protected]

phone: 217-373-7241Will White

Huntsville Engineering Support Center [email protected]

phone: 256-895-1739

ConnectivityWeek 2010

Page 2: US Government Open Systems Specifications: … · • Fort Hood, Texas ... • Basewide System, MILCON funded (ECIP), Johnson Controls UMCS • Fort Bliss, Texas 29 ... Whole Building

US Government Open SystemsSpecifications

Outline

How we got to LON

Military funding

Doing business with the bureaucrats

2

Doing business with the bureaucrats

The good, the bad and the ugly

Getting better all the time

Some current Corps LON projects

ConnectivityWeek 2010

Page 3: US Government Open Systems Specifications: … · • Fort Hood, Texas ... • Basewide System, MILCON funded (ECIP), Johnson Controls UMCS • Fort Bliss, Texas 29 ... Whole Building

The U.S. Army Corps of Engineers is the Design and Construction Agent for Army and Air Force military facilities and many other government agencies

US Government Open Systems Specifications

3

U.S. government procurement regulations dictate that we obtain competitive bids and avoid sole source procurement

ConnectivityWeek 2010

Page 4: US Government Open Systems Specifications: … · • Fort Hood, Texas ... • Basewide System, MILCON funded (ECIP), Johnson Controls UMCS • Fort Bliss, Texas 29 ... Whole Building

So what’s the problem?

Multi-vendor DDC results in multiple software tools, laptops, & interface hardware

Proprietary supervisory architecture

Multi-vendor DDC is inevitable due to the Government’s competitive procurement rules.

Varied & incompatible building systems

Non-interoperable systems

Overall… a great deal of complexity and significant challenges for O&M staff, construction inspectors, and end users

12 O&M laptops (and counting) at one Army garrison ConnectivityWeek 2010

Page 5: US Government Open Systems Specifications: … · • Fort Hood, Texas ... • Basewide System, MILCON funded (ECIP), Johnson Controls UMCS • Fort Bliss, Texas 29 ... Whole Building

Open System Goals

1. One system. Multiple buildings with controls installed by multiple vendors are integrated into one system.

2. One common front-end providing users with interface to all buildings (monitoring, supervisory control, etc.).

5

3. One common tool for network management & device configuration. One tool for device programming would be great!

4. No future need for the original (installing) contractor or any particular device manufacturer.

ConnectivityWeek 2010

Page 6: US Government Open Systems Specifications: … · • Fort Hood, Texas ... • Basewide System, MILCON funded (ECIP), Johnson Controls UMCS • Fort Bliss, Texas 29 ... Whole Building

Open System Goal

The one-line version…

“One (integrated, multi-vendor) system

6

“One (integrated, multi-vendor) system

with no future dependence on any one

contractor or controls vendor.”

ConnectivityWeek 2010

Page 7: US Government Open Systems Specifications: … · • Fort Hood, Texas ... • Basewide System, MILCON funded (ECIP), Johnson Controls UMCS • Fort Bliss, Texas 29 ... Whole Building

Open System Options

A standard communications protocol is a critical component. While BACnet® is a viable option…

We identified CEA/ANSI-709 and LONWORKS® as the best solution:

7

best solution:

– Easier to get Open system

– End system more Open

– End system easier to use & maintain

ConnectivityWeek 2010

Page 8: US Government Open Systems Specifications: … · • Fort Hood, Texas ... • Basewide System, MILCON funded (ECIP), Johnson Controls UMCS • Fort Bliss, Texas 29 ... Whole Building

Building Automation Systems Criteria

MILCON RFP: Building Automation System

UFGS 23 09 23: DDC for HVAC & Other Local Building SystemsUFGS 25 10 10: Utility Monitoring & Control SystemUFGS 25 08 10: Utility Monitoring and Control System TestingECB 2004-11: UMCS and DDC Criteria UpdateECB 2005-17: LONWORKS, BACnet, and Building Automation Systems PlanningECB 2007-08: LONWORKS, BACnet, and Building Automation Systems PlanningUFC 3-401-01: Utility Monitoring & Control System (draft) (wbdg.org version is old)

8

UFC 3-401-01: Utility Monitoring & Control System (draft) (wbdg.org version is old)UFC 3-410-02: DDC for HVAC & Other Local Building Systems (draft) (wbdg.org version is old)

Proponent Sponsored Corps of Engineer Training (PROSPECT) courses

Crs 340: HVAC Control Systems: Design and Quality VerificationCrs 246: HVAC Control Systems: O&M

Notes: MILCON RFP : Military Construction Request For Proposal UFGS : unified Facilities Guide SpecificationsUFC : Unified Facilities Criteria (design guidance)ECB : Engineering and Construction Bulletin

ConnectivityWeek 2010

Page 9: US Government Open Systems Specifications: … · • Fort Hood, Texas ... • Basewide System, MILCON funded (ECIP), Johnson Controls UMCS • Fort Bliss, Texas 29 ... Whole Building

Building Automation Systems Criteria

--Unified Facilities Guide Specifications (UFGS)--

UFGS 25 10 10: LonWorks Utility Monitoring and Control System

UFGS 23 09 23: LonWorks DDC For HVAC & Other

9

UFGS 23 09 23: LonWorks DDC For HVAC & Other Building Control Systems

We need both the UMCS specification and building-level DDC specification for a complete system

ConnectivityWeek 2010

Page 10: US Government Open Systems Specifications: … · • Fort Hood, Texas ... • Basewide System, MILCON funded (ECIP), Johnson Controls UMCS • Fort Bliss, Texas 29 ... Whole Building

Basewide ANSI 709.1B over IP Network (EIA-852) >=100Mbps

BPOCRouter

RTRMore devices. No more RTRs

or RPTRs709

.3)

One or more workstation running: -GUI Clients -Network Management Tool Clients -Web Clients (optional)

One or more servers running: -LNS Server -Network Management Tool -Graphical User Interface (GUI) -Monitoring and Control Software -Web Server (optional)

UFGS 25 10 10

RTRnon-ANSI 709.1

BPOCGateway

RTR

RTRMore devices

and/or ‘subnets’

RTR

More devices. No more RTRs or

RPTRs

RTR

or RPTRs

AN

SI

709

.1B

ov

erT

P/F

T-1

0(I

AW

AN

SI7

UF

GS

2309

23

non-ANSI 709.1legacy system

RTR=RouterBPOC=Building Point Of ConnectionCircle = node (ANSI-709.1 device)

LONWORKS®

UMCS/DDC“Building Automation

System” ConnectivityWeek 2010

Page 11: US Government Open Systems Specifications: … · • Fort Hood, Texas ... • Basewide System, MILCON funded (ECIP), Johnson Controls UMCS • Fort Bliss, Texas 29 ... Whole Building

LON Specifications

LonWorks Utility Monitoring and Control System (UMCS)

UFGS 25 10 10

Central supervisory monitoring and control system

11

Central supervisory monitoring and control system

Interface to one or more multi-vendor building-level DDC systems

Does not specify/include the building-level controls (unlike the old UMCS specification)

ConnectivityWeek 2010

Page 12: US Government Open Systems Specifications: … · • Fort Hood, Texas ... • Basewide System, MILCON funded (ECIP), Johnson Controls UMCS • Fort Bliss, Texas 29 ... Whole Building

LON Specifications

LonWorks Direct Digital Control (DDC) For HVAC & Other Building Control Systems

UFGS 23 09 23

Building-level control systems and communications

12

Building-level control systems and communications network (based on CEA/ANSI-709.1 communications protocol)

Focus is on HVAC controls but supports other technologies (lighting, metering, etc.)

ConnectivityWeek 2010

Page 13: US Government Open Systems Specifications: … · • Fort Hood, Texas ... • Basewide System, MILCON funded (ECIP), Johnson Controls UMCS • Fort Bliss, Texas 29 ... Whole Building

Why 2 Specs?

Unbundle DDC bldg systems from the UMCS front-end:

• Buildings can run “stand-alone” with little/no user interface

• Provides clear demarcation of responsibility

• Helps keep the “fox out of the henhouse”

* * * * * * * * * * * *

13

* * * * * * * * * * * *

1- Competitive procurement for (DDC) building systems

-- AND --

2- Single base-wide (UMCS) front-end operator interface with consistent ‘look and feel’ for monitoring, control, & mgmt across vendors -- can be multiple workstations/clients.

ConnectivityWeek 2010

Page 14: US Government Open Systems Specifications: … · • Fort Hood, Texas ... • Basewide System, MILCON funded (ECIP), Johnson Controls UMCS • Fort Bliss, Texas 29 ... Whole Building

DDC (building-level)Requirements Summary

Standard protocol: ANSI/CEA-709.1B

Standard Network Variable Types (SNVTs)

CEA-852 router (providing for flat architecture)

Building Control Network: TP/FT-10 with backbone

LonWorks® Network Services (LNS®) database for the building

LNS Plug-ins for ASCs

14

LNS Plug-ins for ASCs

LONMARK® certification for ASCs

Few/no gateways

Configurable using standard means: SCPT, UCPT, SNVT

System Scheduler (on/off Occupancy) as prescriptively specified

Points Schedule submittal – very important documentation

Software and licenses submittals

ConnectivityWeek 2010

Page 15: US Government Open Systems Specifications: … · • Fort Hood, Texas ... • Basewide System, MILCON funded (ECIP), Johnson Controls UMCS • Fort Bliss, Texas 29 ... Whole Building

Types of Project Funding for Military Facilities

MILCON (Military Construction)

– New construction and major renovations

O&M (Operations and Maintenance)

15

O&M (Operations and Maintenance)

– Ongoing maintenance/upgrades

ConnectivityWeek 2010

Page 16: US Government Open Systems Specifications: … · • Fort Hood, Texas ... • Basewide System, MILCON funded (ECIP), Johnson Controls UMCS • Fort Bliss, Texas 29 ... Whole Building

MILCON Projects

Corps of Engineers District provides design & specification services/oversight to Garrison

– Specs: UFGS or MILCON RFP

Most projects include controls. Usually low bidder as a

16

Most projects include controls. Usually low bidder as a sub to the prime gets the work.

Can include UMCS with award to a controls manufacturer or systems integrator

ConnectivityWeek 2010

Page 17: US Government Open Systems Specifications: … · • Fort Hood, Texas ... • Basewide System, MILCON funded (ECIP), Johnson Controls UMCS • Fort Bliss, Texas 29 ... Whole Building

O&M Projects

Local garrison usually provides design & specification services/oversight but can be relegated to Corps District

– Specs: Usually in-house SOW. Not UFGS or MILCON RFP.

17

Need to educate garrisons on value of Open and how to get UMCS and System Integration

ConnectivityWeek 2010

Page 18: US Government Open Systems Specifications: … · • Fort Hood, Texas ... • Basewide System, MILCON funded (ECIP), Johnson Controls UMCS • Fort Bliss, Texas 29 ... Whole Building

LONWORKS UMCS (front-end)- Some possible scenarios -

1. New UMCS with no DDC system:– Design UMCS using Corps criteria

2. New UMCS with new DDC system: – Design UMCS using Corps criteria. Award 2 separate contracts.

3. New UMCS with existing proprietary DDC system:

18

3. New UMCS with existing proprietary DDC system:– Sole source procurement to DDC system supplier or use

gateways (bad options). Do this on exception basis only.

4. New UMCS with existing LonWorks DDC system(s)– Design UMCS to Corps criteria. Require integration.

5. Existing UMCS with interface to new DDC system(s)– Design UMCS to Corps criteria. Various integration options…

ConnectivityWeek 2010

Page 19: US Government Open Systems Specifications: … · • Fort Hood, Texas ... • Basewide System, MILCON funded (ECIP), Johnson Controls UMCS • Fort Bliss, Texas 29 ... Whole Building

UMCS System Integration Approaches

• “In-House” System Integrator (SI)– Government employee

– Contractor - through an existing or new services contract

– Contractor - through other mechanism such as ESPC

• Long Term Contract – Cost by task– Local ID/IQ (may not exist)

19

– Local ID/IQ (may not exist)

– HNC ID/IQ (popular method)

• Case-by-Case – single SOW/contract for DDC and integration

– This approach is strongly discouraged

• Case-by-Case – separate SOW/contract for DDC and integration

Note: Garrison/designer needs to define SI approach in advance.

ConnectivityWeek 2010

Page 20: US Government Open Systems Specifications: … · • Fort Hood, Texas ... • Basewide System, MILCON funded (ECIP), Johnson Controls UMCS • Fort Bliss, Texas 29 ... Whole Building

Doing Business with the Bureaucrats

Proposals / Bids

Be thorough w/ proposals, look at keywords

Be honest, no sales bragging

Minimize/avoid fluff about your company

20

Answer RFP points. And be succinct.

Say you “will do”, not “consider doing”

Alternate solutions must be separate and priced accordingly as an option

ConnectivityWeek 2010

Page 21: US Government Open Systems Specifications: … · • Fort Hood, Texas ... • Basewide System, MILCON funded (ECIP), Johnson Controls UMCS • Fort Bliss, Texas 29 ... Whole Building

Doing Business with the Bureaucrats

Be patient. Develop relationships at the installations and Army Corps Districts

Partner with another that has a contract Be a sub to the prime Be aware of funding from major programs

21

Be aware of funding from major programs– Energy Policy Act of 2005: Mandate for installation metering – American Recovery and Reinvestment Act – Energy Conservation Investment Program (ECIP) funding for

UMCS projects

Installation Management Command (IMCOM) funding for energy projects

ConnectivityWeek 2010

Page 22: US Government Open Systems Specifications: … · • Fort Hood, Texas ... • Basewide System, MILCON funded (ECIP), Johnson Controls UMCS • Fort Bliss, Texas 29 ... Whole Building

Doing Business with the Installations

Establish a relationship with garrison Energy Engineers/Managers and Directorate of Public Works (DPW) personnel.

Recognize, accept, and communicate the need for Open systems. Be an Open systems advocate.

22

Open systems. Be an Open systems advocate.

Assist with statements of work. Include applications and engineering.

– No (sole source) hooks or gotchas

ConnectivityWeek 2010

Page 23: US Government Open Systems Specifications: … · • Fort Hood, Texas ... • Basewide System, MILCON funded (ECIP), Johnson Controls UMCS • Fort Bliss, Texas 29 ... Whole Building

Doing Business with the Installations

Provide competitive proposal to local contracting or…

Take advantage of contracting vehicles

– ID/IQ (Indefinite delivery indefinite quantity)

23

– GSA (General Services Administration)

– ESPC (Energy Savings Performance Contract)

Every Installation needs a good Systems Integrator – be one. Understand your customer.

ConnectivityWeek 2010

Page 24: US Government Open Systems Specifications: … · • Fort Hood, Texas ... • Basewide System, MILCON funded (ECIP), Johnson Controls UMCS • Fort Bliss, Texas 29 ... Whole Building

Traits of a Good System Integrator (SI)

Formally trained on the UMCS and related tools/software Experience with LonWorks and Corps specs Experience with UFGS 25 10 10 and UFGS 23 09 23 Creates/facilitates LNS database management Checks/verifies LNS databases from DDC contractors Helps with handoff of documentation from DDC contractors Points Schedules – Critically important drawing/documentation

24

Points Schedules – Critically important drawing/documentation Understands Scheduler device/functionality and UFGS prescriptive

requirements Experience with proprietary protocols and legacy systems if these

will be integrated into the UMCS Familiarity with Garrison IT and network security requirements.

Prior experience is beneficial but few integrators have this experience.

ConnectivityWeek 2010

Page 25: US Government Open Systems Specifications: … · • Fort Hood, Texas ... • Basewide System, MILCON funded (ECIP), Johnson Controls UMCS • Fort Bliss, Texas 29 ... Whole Building

The Good, the Bad, and the Ugly

Good: Support from LonMark, Vendors/Manufacturers, Army Corps Headquarters, Installation management Command Headquarters, multiple army garrisons, Huntsville, Savannah District, CERL

Bad: Open is not easy. Garrisons are under funded,

25

Bad: Open is not easy. Garrisons are under funded, under staffed, under trained.

Ugly: FUD (Fear Uncertainty Doubt)

ConnectivityWeek 2010

Page 26: US Government Open Systems Specifications: … · • Fort Hood, Texas ... • Basewide System, MILCON funded (ECIP), Johnson Controls UMCS • Fort Bliss, Texas 29 ... Whole Building

Getting Better All the Time- The ToDo List -

1. Set a goal for a single basewide UMCS

– See: Forts Hood, Bragg, Bliss, Lee, others

2. Make a plan

– ERDC/CERL TR-08-12: “IMCOM LONWORKS®

Building Automation Systems Implementation

26

Building Automation Systems Implementation Strategy”

– Staffing (BAS manager, SI, operators, technicians, etc.)

3. Define a strategy for system integration

– Funding and contracting

– Do the two-step: 1. Get an SI 2. Integrate DDC systems

ConnectivityWeek 2010

Page 27: US Government Open Systems Specifications: … · • Fort Hood, Texas ... • Basewide System, MILCON funded (ECIP), Johnson Controls UMCS • Fort Bliss, Texas 29 ... Whole Building

Getting Better All the Time- The ToDo List -

4. Work with the IT folks (NEC/DOIM) early and often

– Recognize DIACAP and Networthiness

– No drive-by fielding

5. Pay attention to and enforce the specs open system requirements

27

requirements

6. Handoff documentation. Drawings, LNS database, etc.

– Points Schedule drawing is critical

7. Training

NEC: Network Enterprise Center DOIM: Directorate of Information ManagementDIACAP: Defense Information Assurance Certification and Accreditation Program

ConnectivityWeek 2010

Page 28: US Government Open Systems Specifications: … · • Fort Hood, Texas ... • Basewide System, MILCON funded (ECIP), Johnson Controls UMCS • Fort Bliss, Texas 29 ... Whole Building

UMCS Staffing, Growth & Maintenance

A successful BAS must be managed

– Including proper staffing, use, growth, maintenance

– Historically not well accomplished

– Army / IMCOM / USACE working on a solution

Staffing is big challenge. Roles include:

28

Staffing is big challenge. Roles include:– BAS Manager– UMCS Administrator – Technical Expert – System Integrator– UMCS Operator(s)– Controls Technician(s)

ConnectivityWeek 2010

Page 29: US Government Open Systems Specifications: … · • Fort Hood, Texas ... • Basewide System, MILCON funded (ECIP), Johnson Controls UMCS • Fort Bliss, Texas 29 ... Whole Building

Some Corps LON Projects

• Fort Hood, Texas• Energy Savings Performance Contract (ESPC), Have integrated

Circon, Distech and TAC buildings, w/Johnson Controls UMCS• 2007 LONMARK Multi-Vendor Project award. Other Govt. awards.

• Fort Bragg, North Carolina• Basewide System, MILCON funded (ECIP), Johnson Controls UMCS

• Fort Bliss, Texas

29

• Fort Bliss, Texas• Basewide System, O&M Funded, Johnson Controls UMCS

• Fort Sill, Oklahoma• Multi-building UMCS, MILCON Funded, TAC UMCS

• Fort Lee, VA• Energy Savings Performance Contract (ESPC), Johnson Controls

UMCS• NAVY Mechanicsburg, Pennsylvania

• Basewide UMCS, MILCON Funded, TAC UMCS

ConnectivityWeek 2010

Page 30: US Government Open Systems Specifications: … · • Fort Hood, Texas ... • Basewide System, MILCON funded (ECIP), Johnson Controls UMCS • Fort Bliss, Texas 29 ... Whole Building

National Defense Authorization Act for FY 2010 (NDAA 2010) Section 2841 ConnectivityWeek 2010

Page 31: US Government Open Systems Specifications: … · • Fort Hood, Texas ... • Basewide System, MILCON funded (ECIP), Johnson Controls UMCS • Fort Bliss, Texas 29 ... Whole Building

Useful WEB Sites

Whole Building Design Guide Websitehttp://www.wbdg.org/

(documents library, Army/COE criteria, UFGS, ECBs etc.)

Huntsville UMCS MCX site

http://www.hnd.usace.army.mil/umcs/

31

http://www.hnd.usace.army.mil/umcs/

CERL - Building automation systems and controls site

https://eko.usace.army.mil/fa/bas/

(Technical Reports, drawings, draft UFCs, etc.)

ConnectivityWeek 2010

Page 32: US Government Open Systems Specifications: … · • Fort Hood, Texas ... • Basewide System, MILCON funded (ECIP), Johnson Controls UMCS • Fort Bliss, Texas 29 ... Whole Building

Summary

We need open systems

Challenges are ongoing

We’ve had successes

32

We continue to make progress

ConnectivityWeek 2010

Page 33: US Government Open Systems Specifications: … · • Fort Hood, Texas ... • Basewide System, MILCON funded (ECIP), Johnson Controls UMCS • Fort Bliss, Texas 29 ... Whole Building