31
LARP Collaboration Meeting 11 October 27-28, 2008 2.4 Materials – Conductor R&D and Procurement Arup K. Ghosh (BNL) bnl - fnal- lbnl - slac US LHC Accelerator Research Program Dan Dietderich (LBNL) Emanuela Barzi (FNAL)
Transcript
Page 1: US LHC Accelerator Research Program bnl -fnal-lbnl-slaclarpdocs.fnal.gov/LARP/DocDB/0008/000840/001/Collab-MTG11-10-2… · bnl -fnal-lbnl-slac US LHC Accelerator Research Program

LARP Collaboration Meeting 11October 27-28, 2008

2.4 Materials – Conductor R&Dand Procurement

Arup K. Ghosh (BNL)

bnl - fnal- lbnl - slac

US LHC Accelerator Research Program

Dan Dietderich (LBNL)

Emanuela Barzi (FNAL)

Page 2: US LHC Accelerator Research Program bnl -fnal-lbnl-slaclarpdocs.fnal.gov/LARP/DocDB/0008/000840/001/Collab-MTG11-10-2… · bnl -fnal-lbnl-slac US LHC Accelerator Research Program

Oct 27-28, 2008 CM11 @ FNAL Arup Ghosh 2

Outline

• Conductor Procurement and Inventory

• Cabling Activity

• Strand R&D

• Cable Test - Update

Page 3: US LHC Accelerator Research Program bnl -fnal-lbnl-slaclarpdocs.fnal.gov/LARP/DocDB/0008/000840/001/Collab-MTG11-10-2… · bnl -fnal-lbnl-slac US LHC Accelerator Research Program

Oct 27-28, 2008 CM11 @ FNAL Arup Ghosh 3

Conductor Procurement

• In FY08• Took delivery of 180 kg of RRP 108/127 (increased spacing)

– 37 kg at 0.7 mm

– 30 kg at 0.8 mm

– 114 kg at 1.07 mm

• 85 kg has been ordered in FY08

– 54/61 at 0.8 – 1.0 mm

– Delivery in Dec’08

• A second 75 kg order placed in Sep’08

– Strand design 54/61

– Delivery in July-Aug ’08

• In FY09

– Plan to order 100 kg of wire

Page 4: US LHC Accelerator Research Program bnl -fnal-lbnl-slaclarpdocs.fnal.gov/LARP/DocDB/0008/000840/001/Collab-MTG11-10-2… · bnl -fnal-lbnl-slac US LHC Accelerator Research Program

Oct 27-28, 2008 CM11 @ FNAL Arup Ghosh 4

Nb3Sn Strand Specification LARP-MAG-M-8002 Rev-B

s/d ratio increased from 0.09 to 0.13

Process Ternary RRP Nb3Sn

Strand Diameter, mm 0.8 – 1.0 ± .003

Jc(12 T) at 4.2 K, A/mm2 ≥ 2650

Jc(15 T) at 4.2 K, A/mm2 >1400

Ds, µm (subelement diameter) < 100

Js, A/mm2 >3000

Cu-fraction, % 53 ± 3

RRR (after full reaction) ≥ 60

Twist Pitch, mm 14 ± 2

Twist Direction right-hand screw

Minimum Piece length, m 350

High temperature HT duration, h ≥ 48

Page 5: US LHC Accelerator Research Program bnl -fnal-lbnl-slaclarpdocs.fnal.gov/LARP/DocDB/0008/000840/001/Collab-MTG11-10-2… · bnl -fnal-lbnl-slac US LHC Accelerator Research Program

Oct 27-28, 2008 CM11 @ FNAL Arup Ghosh 5

LARP Procurements

Order

Date

Ship

Date

Adjusted

Ship Date

Quantity,

kg

Actual

Completed, kgPO Program Billet No. Cables

11/7/05 7/2/06 at LBNL 30 13.6 6803608 LARP 8817

" " at LBNL 30 38.2 6803608 LARP 8879 953R TQ+LQ

" " at LBNL 30 38.4 6803608 LARP 8904 973R LQ

1/20/06 9/6/06 at LBNL 30 10.2, 4.6,15.8 6804489 LARP 9151 9318 9271 Quarantined

" " at LBNL 30 27.1, 3.0 6804489 LARP 9152 9385 Quarantined

" " at LBNL 30 7.5, 22.5 6804489 LARP 8817 9420 975R LQ

2/23/06 10/25/06 at LBNL 30 16.1 6805346 LARP 9420

" " at LBNL 30 37.7 6805346 LARP 9532 979R LQ

" " at LBNL 30 36.4 6805346 LARP 9533 978R LQ

5/23/06 1/15/07 at LBNL 30 2.4, 28.2 6807116 LARP 9533 9534 983R LQ

11/1/06 5/30/07 at LBNL 50 10.6, 38.7 6813112 LARP 9534, 9560 984R LQ

9/30/06

at LBNL

150

13.1, 24.7,

,37.6, 38.9,

38.6 " LARP

10045, 10046,

10067, 10068

8/30/07 2/28/08 at LBNL 180

37.1, 30.2,

36.6, 38.9, 39.2 6826007 LARP

10400,10425,

10428, 10429,

10433

982R TQ

4/15/08 12/1/08 85 6846777 LARP

9/8/08 7/31/09 75 582020 LARP

840

Page 6: US LHC Accelerator Research Program bnl -fnal-lbnl-slaclarpdocs.fnal.gov/LARP/DocDB/0008/000840/001/Collab-MTG11-10-2… · bnl -fnal-lbnl-slac US LHC Accelerator Research Program

Oct 27-28, 2008 CM11 @ FNAL Arup Ghosh 6

Conductor Inventory Summary

• 26 kg required for UL of LQ

– 6 UL’s have been made

– Present 54/61 strand inventory is 232 kg

– Plans are to fabricate 6 more UL’s in FY09

– That will leave about 82 kg of wire for 3 UL’s

• 60 kg of 54/61- 0.7 mm wire from five billets available for practice coils

• 180 kg of RRP 108/127 (increased spacing)

– 30 kg at 0.8 mm

– 114 kg at 1.07 mm

Page 7: US LHC Accelerator Research Program bnl -fnal-lbnl-slaclarpdocs.fnal.gov/LARP/DocDB/0008/000840/001/Collab-MTG11-10-2… · bnl -fnal-lbnl-slac US LHC Accelerator Research Program

Oct 27-28, 2008 CM11 @ FNAL Arup Ghosh 7

Strand Production54/61

kg

108/127

kg MAGNET

Strand

Req. kg

Inventory of

54/61 kg

Inventory of

108/127 kg

Oct-07 386 0

Nov-07 LQ01-C03-PC 28 359 0

Dec-07 359 0

Jan-08 LQ01-C04 26 333 0

Feb-08 180 LQ01-C06/C07 51 282 180

Mar-08 282 180

Apr-08 282 180

May-08 LQ01-C08/C09 51 231 180

Jun-08 TQS03 35 231 145

Jul-08 231 145

Aug-08 231 145

Sep-08 231 145

Oct-08 LQ-C10/C11 51 180 145

Nov-08 LQ-C12/C13 51 129 145

Dec-08 85 HQ-C01/C02 36 178 145

Jan-09 LQ-C14/C15 51 127 145

Feb-09 HQ-C03/C04 36 91 145

Mar-09 HQ-C05/C06 36 55 145

Apr-09 55 145

May-09 55 145

Jun-09 55 145

Jul-09 75 130 145

Aug-09 130 145

Sep-09 130 145

Oct-09 130 145

Page 8: US LHC Accelerator Research Program bnl -fnal-lbnl-slaclarpdocs.fnal.gov/LARP/DocDB/0008/000840/001/Collab-MTG11-10-2… · bnl -fnal-lbnl-slac US LHC Accelerator Research Program

Oct 27-28, 2008 CM11 @ FNAL Arup Ghosh 8

LARP Cable Plan FY-09

• 6 UL of LQ

– 2 UL Oct. 2008

– 2 UL Nov. 2008

– 2UL Jan. 2009

• 6 UL of HQ

– 2 UL Dec. 2008

– 2 UL Feb. 2009

– 2 UL Mar. 2009

• Time window for possible relocation of cabling facility

– April-June 2009

• Ready to fabricate cable contingency

– July or August 2009

Page 9: US LHC Accelerator Research Program bnl -fnal-lbnl-slaclarpdocs.fnal.gov/LARP/DocDB/0008/000840/001/Collab-MTG11-10-2… · bnl -fnal-lbnl-slac US LHC Accelerator Research Program

Oct 27-28, 2008 CM11 @ FNAL Arup Ghosh 9

HQ prototype Cable B0986R

HQ second prototype cable fabricated July-7, 2008

– Strand diameter: 0.80 mm

– No. strands: 35

– Thickness: 1.445 mm

– Width: 15.143 mm

– Keystone angle: 0.74 degrees

HT needs to be optimized for 15T, target 665C/72-96hrs.

Using 665C/60hrs gives a Jc of 3000A/mm2 at 12T, RRR ~ 200

Extracted strands from this cable showed no Jc degradation with RRR ~ 155-190.

Stability Current Density is in the range of 3100 -4100 A/mm2

Page 10: US LHC Accelerator Research Program bnl -fnal-lbnl-slaclarpdocs.fnal.gov/LARP/DocDB/0008/000840/001/Collab-MTG11-10-2… · bnl -fnal-lbnl-slac US LHC Accelerator Research Program

Oct 27-28, 2008 CM11 @ FNAL Arup Ghosh 10

Strand R&D

Self-Field Instability

V-I Measurements

Instability more pronounced in superfluid helium at 2K than at 4.2K

Additional measurements on RRP 54/61 and 108/127 strand

Page 11: US LHC Accelerator Research Program bnl -fnal-lbnl-slaclarpdocs.fnal.gov/LARP/DocDB/0008/000840/001/Collab-MTG11-10-2… · bnl -fnal-lbnl-slac US LHC Accelerator Research Program

Oct 27-28, 2008 CM11 @ FNAL Arup Ghosh 11

RRP 108/127 640C/48h RRR~ 310

0

200

400

600

800

1000

1200

1400

1600

0.0 2.0 4.0 6.0 8.0 10.0 12.0

H (T)

Ic (

A)

Ic

Iq

Kramer-FIT

PS. LIMIT

2.05 K

Page 12: US LHC Accelerator Research Program bnl -fnal-lbnl-slaclarpdocs.fnal.gov/LARP/DocDB/0008/000840/001/Collab-MTG11-10-2… · bnl -fnal-lbnl-slac US LHC Accelerator Research Program

Oct 27-28, 2008 CM11 @ FNAL Arup Ghosh 12

RRP 108/127 vs. 54/61 RRR~ 310

0

200

400

600

800

1000

1200

1400

1600

0.0 2.0 4.0 6.0 8.0 10.0 12.0

H (T)

Ic (

A)

PS. LIMIT

2.05 K

Page 13: US LHC Accelerator Research Program bnl -fnal-lbnl-slaclarpdocs.fnal.gov/LARP/DocDB/0008/000840/001/Collab-MTG11-10-2… · bnl -fnal-lbnl-slac US LHC Accelerator Research Program

Oct 27-28, 2008 CM11 @ FNAL Arup Ghosh 13

RRP 108/127, RRR of 310 vs. 80

0

200

400

600

800

1000

1200

1400

1600

0.0 2.0 4.0 6.0 8.0 10.0 12.0

H (T)

Ic (

A)

PS. LIMIT

2.05 K

Page 14: US LHC Accelerator Research Program bnl -fnal-lbnl-slaclarpdocs.fnal.gov/LARP/DocDB/0008/000840/001/Collab-MTG11-10-2… · bnl -fnal-lbnl-slac US LHC Accelerator Research Program

Oct 27-28, 2008 CM11 @ FNAL Arup Ghosh 14

In high field strand follows predicted trend with T

500

550

600

650

700

750

800

850

1.5 2.0 2.5 3.0 3.5 4.0 4.5

T, K

Ic (

11

.5T

), A

Ic

Iq

Ic-FIT

Page 15: US LHC Accelerator Research Program bnl -fnal-lbnl-slaclarpdocs.fnal.gov/LARP/DocDB/0008/000840/001/Collab-MTG11-10-2… · bnl -fnal-lbnl-slac US LHC Accelerator Research Program

Oct 27-28, 2008 CM11 @ FNAL Arup Ghosh 15

At low temperature strand instability in mid-field ~ 6T

0

200

400

600

800

1000

1200

1400

1600

0.0 2.0 4.0 6.0 8.0 10.0 12.0

H (T)

Ic (

A)

Ic

2.09 K FIT

Iq

V-H Quench

V-H No Quench

PS. LIMIT

Page 16: US LHC Accelerator Research Program bnl -fnal-lbnl-slaclarpdocs.fnal.gov/LARP/DocDB/0008/000840/001/Collab-MTG11-10-2… · bnl -fnal-lbnl-slac US LHC Accelerator Research Program

Oct 27-28, 2008 CM11 @ FNAL Arup Ghosh 16

6T quench current on cool-downRRP 54/61

0

200

400

600

800

1000

1200

1400

1600

1.5 2.0 2.5 3.0 3.5 4.0 4.5T, K

I Qu

en

ch,

A

6 T

Page 17: US LHC Accelerator Research Program bnl -fnal-lbnl-slaclarpdocs.fnal.gov/LARP/DocDB/0008/000840/001/Collab-MTG11-10-2… · bnl -fnal-lbnl-slac US LHC Accelerator Research Program

Oct 27-28, 2008 CM11 @ FNAL Arup Ghosh 17

Warm-up at 6T from 2 K to 2.4KRRP-54/61 Extracted Strand

800

850

900

950

1000

1050

1100

1150

2.00 2.05 2.10 2.15 2.20 2.25 2.30 2.35

T, K

I Qu

en

ch,

A

6T

Page 18: US LHC Accelerator Research Program bnl -fnal-lbnl-slaclarpdocs.fnal.gov/LARP/DocDB/0008/000840/001/Collab-MTG11-10-2… · bnl -fnal-lbnl-slac US LHC Accelerator Research Program

RRP 127 Strand Studies

E. Barzi

Page 19: US LHC Accelerator Research Program bnl -fnal-lbnl-slaclarpdocs.fnal.gov/LARP/DocDB/0008/000840/001/Collab-MTG11-10-2… · bnl -fnal-lbnl-slac US LHC Accelerator Research Program

Oct 27-28, 2008 CM11 @ FNAL Arup Ghosh 19

RRP 127 Restack Designs

Remove inner row Remove inner row and

add back corners

102/127 restack with spaced SE’sJcmax~3000 A/mm2

108/127 restack with spaced SE’sJcmax~3000 A/mm2

114/127 restack with spaced SE’sJcmax~3000 A/mm2

First R&D billet

Page 20: US LHC Accelerator Research Program bnl -fnal-lbnl-slaclarpdocs.fnal.gov/LARP/DocDB/0008/000840/001/Collab-MTG11-10-2… · bnl -fnal-lbnl-slac US LHC Accelerator Research Program

Oct 27-28, 2008 CM11 @ FNAL Arup Ghosh 20

Jc(12 T) in the Deformation Study

0

500

1000

1500

2000

2500

3000

0 0.1 0.2 0.3 0.4 0.5 0.6

Deformation

Jc (

12 T

), A

/mm

2

114_127

108_127

102_127

1 mm

0

500

1000

1500

2000

2500

3000

0 0.1 0.2 0.3 0.4 0.5 0.6

Deformation

Jc

(1

2 T

), A

/mm

2

114_127

108_127

102_127

0.7 mm

Page 21: US LHC Accelerator Research Program bnl -fnal-lbnl-slaclarpdocs.fnal.gov/LARP/DocDB/0008/000840/001/Collab-MTG11-10-2… · bnl -fnal-lbnl-slac US LHC Accelerator Research Program

Oct 27-28, 2008 CM11 @ FNAL Arup Ghosh 21

JS in the Deformation Study

0

1000

2000

3000

4000

5000

6000

0 0.1 0.2 0.3 0.4 0.5 0.6

Deformation

Js

, A

/mm

2

114_127

108_127

102_127

1 mm

0

1000

2000

3000

4000

5000

6000

7000

8000

9000

10000

0 0.1 0.2 0.3 0.4 0.5 0.6

Deformation

Js,

A/m

m2

114_127

108_127

102_127

0.7 mm

Page 22: US LHC Accelerator Research Program bnl -fnal-lbnl-slaclarpdocs.fnal.gov/LARP/DocDB/0008/000840/001/Collab-MTG11-10-2… · bnl -fnal-lbnl-slac US LHC Accelerator Research Program

Oct 27-28, 2008 CM11 @ FNAL Arup Ghosh 22

RRR in the Deformation Study

0

50

100

150

200

250

300

350

400

0 0.1 0.2 0.3 0.4 0.5 0.6

Deformation

RR

R

114_127

108_127

102_127

1 mm0

50

100

150

200

250

0 0.1 0.2 0.3 0.4 0.5 0.6

Deformation

RR

R

114_127

108_127

102_127

0.7 mm

Page 23: US LHC Accelerator Research Program bnl -fnal-lbnl-slaclarpdocs.fnal.gov/LARP/DocDB/0008/000840/001/Collab-MTG11-10-2… · bnl -fnal-lbnl-slac US LHC Accelerator Research Program

Oct 27-28, 2008 CM11 @ FNAL Arup Ghosh 23

Cable Test

• Cable tests are essential in understanding the behaviour and limitations of the TQ magnets

– Need to establish the compressive strain tolerance (NHMFL Tests)

– Need to understand the instability at superfluid temperatures (CERN Tests)

• At FNAL, cable samples will be prepared in Dec’08 for test at CERN towards the end of second quarter of FY09

• At LBNL, samples have been reacted and present plans are to complete sample assembly in Nov’08. Testing is likely in Jan’09

Page 24: US LHC Accelerator Research Program bnl -fnal-lbnl-slaclarpdocs.fnal.gov/LARP/DocDB/0008/000840/001/Collab-MTG11-10-2… · bnl -fnal-lbnl-slac US LHC Accelerator Research Program

Oct 27-28, 2008 CM11 @ FNAL Arup Ghosh 24

LBNL Developments

• LBNL is developing a 50,000 A transformer to power the cable samples

– Reduced signal noise

– Testing flexibility

– Reduce LHe costs by ~$20k

– Would be useful for future LARP measurements

• Designing superconducting coils system to replace He gas bellows for loading the samples

– Significantly improves system reliability

Page 25: US LHC Accelerator Research Program bnl -fnal-lbnl-slaclarpdocs.fnal.gov/LARP/DocDB/0008/000840/001/Collab-MTG11-10-2… · bnl -fnal-lbnl-slac US LHC Accelerator Research Program

Oct 27-28, 2008 CM11 @ FNAL Arup Ghosh 25

LARP Cable Preparations for NHMFL

• New cover plates and backing plates for testing 3 cables

– Samples ready by Nov. 30

• Developing displacement gauge to measure strain on cable during transverse loading.

– Gauges ready by Nov. 30

• Have requested testing time at NHMFL for Dec. or Jan.

Cables are underLoading Beam

Deflection gaugeWith strain gauges

Page 26: US LHC Accelerator Research Program bnl -fnal-lbnl-slaclarpdocs.fnal.gov/LARP/DocDB/0008/000840/001/Collab-MTG11-10-2… · bnl -fnal-lbnl-slac US LHC Accelerator Research Program

Oct 27-28, 2008 CM11 @ FNAL Arup Ghosh 26

Summary• Present Procurement Plan

– There is sufficient conductor for 9 additional UL’s of LQ cable– For HQ magnets we have enough strand for 5UL’s till the 75 kg order

is delivered in July-Aug’09 – There is 114 kg of 108/127 not assigned to any magnet – Additional 100 kg will be ordered when we have a better understanding

of the program beyond FY09

• Cable R&D– 15 mm wide cable with 0.8 mm strand is nearly optimized– Cable B0987R, made recently is being checked for any cabling

damage– Reaction parameter chosen so far is 665C/72h ���� 3000 A/mm2 at 12T– This need to be optimized for high Jc at 14 -15T for the 0.8mm strand

• Strand Stability– At 4.2 K strand instability caused by magnetization flux-jumps at low

fields < 3T• Mitigated by high RRR or going to smaller filament size RRP 108/127

– At 1.9-2.1 K , instability is dominated by self-field instability at intermediate fields of 5T – 6T. Stability threshold is lower than at 4.2K• How do we mitigate this ?

Page 27: US LHC Accelerator Research Program bnl -fnal-lbnl-slaclarpdocs.fnal.gov/LARP/DocDB/0008/000840/001/Collab-MTG11-10-2… · bnl -fnal-lbnl-slac US LHC Accelerator Research Program

Oct 27-28, 2008 CM11 @ FNAL Arup Ghosh 27

End of Presentation

Page 28: US LHC Accelerator Research Program bnl -fnal-lbnl-slaclarpdocs.fnal.gov/LARP/DocDB/0008/000840/001/Collab-MTG11-10-2… · bnl -fnal-lbnl-slac US LHC Accelerator Research Program

Oct 27-28, 2008 CM11 @ FNAL Arup Ghosh 28

Roll Strand Expt.

• Strands of RRP 108/127 (Billet 10400 used for TQ03)

– Rolled to 0.60, 0.55, 0.50, 0.45 mm

– Ic, Is and RRR measured

– Comparison with RRP 54/61 billet 8857

– Jc behaviour with roll-strain is very similar

– Js at low RRR is higher for 108/127 as compared to 54/61

– At higher RRR Js is comparable

Page 29: US LHC Accelerator Research Program bnl -fnal-lbnl-slaclarpdocs.fnal.gov/LARP/DocDB/0008/000840/001/Collab-MTG11-10-2… · bnl -fnal-lbnl-slac US LHC Accelerator Research Program

Oct 27-28, 2008 CM11 @ FNAL Arup Ghosh 29

Jc trend with roll-strainRRP 54/61 and 108/127 behave similarly

0.5

0.6

0.7

0.8

0.9

1.0

1.1

0.00 0.05 0.10 0.15 0.20 0.25 0.30 0.35 0.40

Roll Strain

Jc (

12

T)/

Jc0(1

2T

)

10400 108/127 Jc0(12T)=3100 A/mm2

8817 54/61 Jc0(12T)=2750 A/mm2

Page 30: US LHC Accelerator Research Program bnl -fnal-lbnl-slaclarpdocs.fnal.gov/LARP/DocDB/0008/000840/001/Collab-MTG11-10-2… · bnl -fnal-lbnl-slac US LHC Accelerator Research Program

Oct 27-28, 2008 CM11 @ FNAL Arup Ghosh 30

Stability Current Density vs. RRR

0

1000

2000

3000

4000

5000

6000

7000

10 100 1000RRR

Sta

bil

ity

Cu

rren

t D

ensi

ty,

Js,

A/m

m2

10400 - 108/127

8817- 54/61

10440 samples reacted at 665C/72hrs hence starting RRR is low.

However, at low RRR Js for 108/127 is higher than for 54/61 because of smaller filament diameter

Page 31: US LHC Accelerator Research Program bnl -fnal-lbnl-slaclarpdocs.fnal.gov/LARP/DocDB/0008/000840/001/Collab-MTG11-10-2… · bnl -fnal-lbnl-slac US LHC Accelerator Research Program

Oct 27-28, 2008 CM11 @ FNAL Arup Ghosh 31

Ic-Strain Measurements at NISTNajib Cheggour

0.0

0.2

0.4

0.6

0.8

1.0

-0.4 -0.3 -0.2 -0.1 0.0 0.1 0.2 0.3 0.4

Strain, %

Ic/I

c0

RRP 108/127

RRP-54/61


Recommended