USAID and JBIC Collaboration in the Water Sector
Megumi MUTO
Planning Division
Development Assistance Strategy Department
October 1, 2004
2
Outline of the Presentation
1. What is JBIC?2. What are JBIC ODA Loans?3. JBIC ODA for the Water Sector4. USAID-JBIC Water Collaboration
in the Philippines
3
What is JBIC? (1)
Result of Merger between JEXIM & OECF
JBIC: Japan Bank for International Cooperation-Established on October 1, 1999, as a result of merger between JEXIM and OECF
Two Kinds of Operations: International Financial Operations (former JEXIM Operations) Overseas Economic Cooperation
Operations (former OECF Operations)
4
What is JBIC?(2)
Two Types of Operations
International Financial Operations Export Loans Import Loans Overseas Investment Loans Untied Loans, Etc
Overseas Economic Cooperation Operations Official Development Assistance (ODA) Loans
to/through Sovereign Governments Private Sector Investment Finance
5
What are JBIC ODA Loans?(1)
Priority Areas for ODA Loans
1. Poverty Reduction2. Infrastructure for Economic Growth3. Anti-Pollution Measures4. Global Issues5. Human Resource Development6. IT7. Regional Development
6
What are JBIC ODA Loans?(2)
Characteristics of ODA Loans To support projects with low returns but
high development significance To finance large investments with less
burden on the Japanese tax payers by leveraging
To transfer technology and knowledge with financial assistance
⇒ Revolving Fund for Development
7
What are JBIC ODA Loans?(3)
Types of ODA Loans
Project Loans
Engineering Services (E/S)
Loans
Financial-Intermediary Loans (Two-Step Loans)
BudgetSupport Loans
Project-type Loans Non-project-type LoansODA Loans
Structural Adjustment Loans (SAL)
Sector Program
LoansSector Loans
(Yen)
*
* Tapped for initial collaboration with USAID
8
What are JBIC ODA Loans?(4)
Volume of Commitments
From FY 97 to 99, JBIC increased the commitments to assist restoration from Asian currency crisis. In FY2003, 89.9% of commitments were for Asia.
1028.61111.6
1053.7
667.4 687.8553.6 587.7
0
200
400
600
800
1000
1200
FY 1997 1998 1999 2000 2001 2002 2003
Billion Yen
9
What is JBIC’s ODA Loan?(5)
Terms and Conditions (i)
Interest rate: 0.75% - 2.00% per annum based on
Per Capita GNP of the borrowing country Repayment period:
30 - 15 years (including 10 - 5 years grace period)
< General Terms>
10
What are ODA Loans? (6)
Terms & Conditions (ii)
Interest rate: 0.50% - 1.20% per annum based on Per
Capita GNP of the borrowing country Repayment period:
40 - 15 years (including 10 - 5 years grace period)
<Preferential Terms>(For Forest Conservation, Pollution Prevention, Human Resource Development, SMEs, among others)
11
What are ODA Loans? (7)
Terms & Conditions (iii)
< Special Terms for Economic Partnership>
Interest rate: 0.30% - 0.40% per annum based upon
Per Capita GNP of the borrowing country Repayment period:
40 - 30 years (including 10 years grace period)
12
JBIC ODA Loans in the Water Sector (1)Cumulative Commitments & Policy
Cumulative commitments in the world
Water Supply : 80 billion Yen 130 projects
50 billion yen 50 projects
Sewerage :
Long time experience of assistance in Asian Countries (China, Thailand, Indonesia, Philippines, etc.)
Water supply and sewerage have been considered as the priority sector in both poverty reduction and infrastructure development. JBIC will steadily increase its assistance in the water sector.
13
JBIC ODA Loans in the Water Sector (2)
Assistance In the PhilippinesJBIC assistance to water sector in PH started in 1978. To date, total commitment amount is 58.7 billion yen (29.4 billion pesos). The total number of projects is fifteen (15). Ten(10) projects are completed and five(5) are on-going.
JBIC-funded water supply facilities constructed and repaired nationwide benefit 13 million people or 21% of Philippines population.
The purposes and types of JBIC assistance in water sector in PH >water supply and sanitation in rural areas>water supply in provincial cities>Water Supply in Metro Manila>Water supply in other areas (Boracay Tourism area, Subic Bay Free Port, Special Economic Zones, Cebu Reclamation Area)Future strategy: (1) Enhancement of water supply in poor areas and provincial LGUs (2) Promotion of private financing
14
USAID-JBIC Water Collaboration (1) Background History
Sep. 2002 Powell-Kawaguchi announcement of US-JAPAN Water Initiative at WSSD
Nov. 2002 First Discussion between USAID & JBIC in Washington & Tokyo Jan. 2003 JBIC joined USAID’s Workshop in Bangkok Mar. 2003 Pilot Countries Approach Agreed for
Philippines, Indonesia & Jamaica June 2003 Meeting between USAID’s Deputy Administrator & JBIC’s Deputy Governor July 2003 Evian Summit/G8 Water Action Plan Oct. 2003 1st Outreach Monitoring Meeting in Washington Mar. 2004 Consultation on Cofinancing Operation in PH Apr. 2004 2nd Outreach Monitoring Meeting in Tokyo
15
USAID-JBIC Water Collaboration (2)
Basic Agreements between USAID & JBIC
To continue to discuss promotion of cofinancing in 3 pilot countries
USAID initiates the ideas/concepts of the Project JBIC assists the Project formation
What to do in PH (start with existing mechanisms) To promote project collaboration in the water sector through frequent consultation and exchange of information on aid
policies and operations To study the feasibility of Pilot Municipal Water Loans and a
Water Revolving Fund (WRF) in collaboration with PH side To strengthen institutions/regulatory & policy frameworks
16
USAID-JBIC Water Collaboration (3)
JBIC Projects - a typical case
Implementing Agency(Local Government)
ODA Loan
Local Cost
JBICODA Loan finances 60-70% of the total project costs
Usually 30-40% of the total cost
・ Borrower needs to be a government・G-G basis sovereign loan
National Budget
Private Financial Institution
Issuing Bond. etc.
17
USAID-JBIC Water Collaboration (4)
Co-Financing model I: Local Government /Public Corporation
Implementing Agency(Local Government), Public Corporation
ODA Loan
Local Cost
JBIC
Private Bank
Issuing Bond. etc.
USAID
DCA
70%: JBIC ODA Loan30%: Private Bank with DCA guarantee
18
USAID-JBIC Water Collaboration (5) Co-Financing model II: Two Step Loans /Microfinance
Government (Ministry of Finance)
Private / Public Bank
Sub-Projects
Guarantee
ODA Loan
Farmers/ Ventures
Farmers /Ventures
Farmers/Ventures
USAID
DCA
LoanLoan
JBIC
DCA Guarantee could be limited for the poorest beneficiaries.
19
USAID-JBIC Water Collaboration (6) Co-Financing model III: Up streaming- Down streaming co-financing
JBIC
Implementing Agency
Infrastructure Project
e.g. Water Resource Development (Dams, Pipelines etc.)
Private sector
Guarantee
Private Projects e.g. treatment facilities, distribution systems
JBIC USAID
ODA Loan
Loan
20
Simple Prototype of WRF
Private Sector WRF GOP JBIC
LGU LGU LGU
USAID-JBIC Water Collaboration (7)
DCA
21
Why are we aiming at cofinancing with USAIDFor WRF?
The significance: frontier of sustainable water financing, mobilizing private funds for water infrastructure in developing countries. ODA funds cannot meet the vast needs for water infrastructure. Private funds less able to shape regulatory/policy environment. Need both. Complement strengths of each institution – USAID: extensive knowledge of WRF based upon US State Funds. JBIC: long time experience and knowledge of water sector in PH. Key: how to strike balance between private-led financing VS sovereign hook.
USAID-JBIC Water Collaboration (8)
Megumi MUTODeputy DirectorPlanning Division, Development Strategy De
partment, JBIC Head Office [email protected]
Thank you for your attention!
Any comments and any questions are welcomed anytime!