USAID N IGERIA R ENEWABLE E NERGY AND E NERGY E FFICIENCY P ROJECT ( REEEP ) CONTRACT NUMBER: AID-OAA-L-11-00002 ANNUAL PROGRAM PERFORMANCE REPORT APRIL 1, 2014 SEPTEMBER 30, 2014 Submitted to United States Agency for International Development Submitted by Winrock International October 31, 2014.
Transcript
Page 1: USAID NIGERIA RENEWABLE ENERGYpdf.usaid.gov/pdf_docs/PA00M36D.pdf · PROGRAM DESCRIPTION ... including medical facilities, retrofitted ... Facility approved is working capital to

USAID N IGERIA RENEWABLE ENERGY AND ENERGY

EFFICIENCY PROJECT (REEEP) CONTRACT NUMBER: AID-OAA-L-11-00002

ANNUAL PROGRAM PERFORMANCE REPORT

APRIL 1, 2014 – SEPTEMBER 30, 2014

Submitted to

United States Agency for International Development

Submitted by

Winrock International

October 31, 2014.

Page 2: USAID NIGERIA RENEWABLE ENERGYpdf.usaid.gov/pdf_docs/PA00M36D.pdf · PROGRAM DESCRIPTION ... including medical facilities, retrofitted ... Facility approved is working capital to

REEEP YEAR 1 ANNUAL PROGRAM PERFORMANCE REPORT- FY 2014 2

PURPOSE OF DOCUMENT

This document reports the accomplishments of the Nigeria Renewable Energy and Energy

Efficiency Project on its first year of implementation, covering the period April 1, 2014 to

September 30, 2014.

REEEP is being implemented under the United States for International Development by

Winrock International, Contract Agreement No. AID-OAA-L-11-00002.

Page 3: USAID NIGERIA RENEWABLE ENERGYpdf.usaid.gov/pdf_docs/PA00M36D.pdf · PROGRAM DESCRIPTION ... including medical facilities, retrofitted ... Facility approved is working capital to

REEEP YEAR 1 ANNUAL PROGRAM PERFORMANCE REPORT- FY 2014 3

TABLE OF CONTENTS PURPOSE OF DOCUMENT ------------------------------------------------------------------2

TABLE OF CONTENTS -----------------------------------------------------------------------3

LIST OF ACRONYMS -------------------------------------------------------------------------4

EXECUTIVE SUMMARY:---------------------------------------------------------------------5

PROGRAM DESCRIPTION ------------------------------------------------------------------6

MAJOR ACCOMPLISHMENTS FOR YEAR 1 ---------------------------------------------7

TECHNICAL ACTIVITIES AND ACCOMPLISHMENTS -------------------------------------------------------------------- 9

Component 1: Access to clean energy financing----------------------------------------------------------------------- 9

Component 2: Technical assistance to financial institution ------------------------------------------------------- 11

Component 3: Trainings and awareness creation -------------------------------------------------------------------- 12

Component 4: Governance ------------------------------------------------------------------------------------------------- 14

ADMINISTRATIVE ACTIVITIES ----------------------------------------------------------------------------------------------- 15

Setting Up of Physical Offices -------------------------------------------------------------------------------------------- 15

Management Structure and Staffing ---------------------------------------------------------------------------------- 15

Staff Computers and Other Office Equipment ----------------------------------------------------------------------- 16

Official/ Project Vehicle --------------------------------------------------------------------------------------------------- 16

Partnership Meetings ------------------------------------------------------------------------------------------------------ 16

CHALLENGES ENCOUNTERED & LESSONS LEARNED ----------------------------------------------------------------- 16

FINANCIAL STATUS ------------------------------------------------------------------------------------------------------------ 17

PLANS FOR YEAR 2 TECHNICAL ACTIVITIES: --------------------------------------- 18

Component 1: Increase access to Clean Energy Financing --------------------------------------------------------- 18

Component 2: Provide technical Assistance to Financial Institutions ------------------------------------------ 18

Component 3: Provide vocational training and awareness creation ------------------------------------------- 19

Component 4: Enhance governance to enact enabling policies for RE/EE project development ------ 19

APPENDIXES -------------------------------------------------------------------------------- 20

APPENDIX 1: REEEP Project Pipeline FY2014 -------------------------------------------------------------------------- 21

APPENDIX 2: SUCCESS STORY ---------------------------------------------------------------------------------------------- 27

APPENDIX 3: REEEP Project Launch Notes and Media -------------------------------------------------------------- 28

APPENDIX 4: Fortis Microfinance Bank Training ---------------------------------------------------------------------- 34

Appendix 5: Ecobank Training---------------------------------------------------------------------------------------------- 47

Page 4: USAID NIGERIA RENEWABLE ENERGYpdf.usaid.gov/pdf_docs/PA00M36D.pdf · PROGRAM DESCRIPTION ... including medical facilities, retrofitted ... Facility approved is working capital to

REEEP YEAR 1 ANNUAL PROGRAM PERFORMANCE REPORT- FY 2014 4

LIST OF ACRONYMS

AMORE Alliance for Mindanao Off-Grid Renewable Energy

AtRE Access to Renewable Energy Program

BOI Bank of Industry Nigeria

CDM Clean Development Mechanism

CE Clean energy

CHAI Clinton Health Access Initiative

CO2 Carbon dioxide

COP Chief of party

COREN Council for the Regulation of Engineering of

Nigeria

CREN Council for Renewable Energy of Nigeria

DCA Development Credit Authority

ECN Energy Commission of Nigeria

ECREEE Ecowas Centre for RE & Energy Efficiency

GDA Global Development Alliance

GHG Greenhouse gas

GIZ Gesellschaft für Internationale Zusammenarbeit

GON Government of Nigeria

IEC Information, education, and communications

IPP Independent power producer

IRENA International renewable energy agency

KWh Kilowatt hour

LASMI Lagos State Microfinance Institution Initiative

LPG DCA loan portfolio guarantee program

MARD Ministry of Agriculture and Rural Development

MDA Ministries Departments and Agencies

M&E Monitoring and evaluation

MFI Microfinance institution

MT Metric Ton

MW Megawatt

NAEE Nigeria Alternative Energy Expo

NAPTIN National Power Training Institute of Nigeria

NBTS National Blood Transfusion Service

NCS Nigeria Customs Service

NPHCDA National Primary Health Care Development Agency

NTT Nayo Tropical Technology

O&M Operations and maintenance

PEPFAR Presidential Emergency Plan for AIDS Relief

PFAN Private Financing Advisory Network

PV Solar photovoltaic

RE/ EE Renewable energy/ Energy Efficiency

REEEP Renewable Energy and Energy Efficiency Program

REMP Renewable Energy Master Plan

RUWES Rural Women Empowerment Scheme

SHP Small hydro power

SME Small and medium enterprise

STTA Short-term technical assistance

SON Standards Organization of Nigeria

Page 5: USAID NIGERIA RENEWABLE ENERGYpdf.usaid.gov/pdf_docs/PA00M36D.pdf · PROGRAM DESCRIPTION ... including medical facilities, retrofitted ... Facility approved is working capital to

REEEP YEAR 1 ANNUAL PROGRAM PERFORMANCE REPORT- FY 2014 5

EXECUTIVE SUMMARY

The USAID Nigeria Renewable Energy and Energy Efficiency Project (REEEP) is a four-year effort (March 2014 – March 2018) to facilitate the development and financing of renewable energy and energy efficiency market in Nigeria. The project provides technical assistance and contributes to USAID’s goal of developing Renewable Energy (RE) and Energy Efficiency (EE) markets in Nigeria.

A Winrock International lead Abuja based team is implementing the project to meet 4 component areas that are critical to helping increase access to renewable energy and energy efficiency technologies in Nigeria.

Component 1: To increase access to clean energy financing for project developers. Component 2: To provide technical assistance to financial institutions. Component 3: To provide vocational training and creating awareness of RE/EE benefits. Component 4: To enhance governance to enact enabling policies for RE/EE project development.

In FY2014, Winrock undertook a number of activities to build the capacity of financial institutions, develop and cultivate a pipeline of potentially bankable project activities for assistance (both financial and technical), create relationships with governmental officials, NGOs, and other international donors, and to forge partnerships with technical training institutions. Winrock was able to lay the groundwork for important action in years 2-4, as well as accomplish meaningful results in year 1.

Throughout year 1, Winrock’s REEEP team embarked on series of advocacy visits to USAID funded projects like MARKETS II and FHI 360, a USAID HIV/AIDS funded project. Other places visited included Government of Nigeria Ministry of Environment, Energy Commission of Nigeria, University of Nigeria Nsukka Energy Research Centre and Sokoto State Energy Centre other funding partners like UNDP, GIZ and RE and EE project developers and actors and engendered partnerships to support project implementations.

To help promote the project and USAID, as well as engage a wide variety of stakeholders, Winrock officially launched the Renewable Energy and Energy Efficiency Project (REEEP) in Nigeria at an event at the Hilton in Abuja. Winrock was also able to reach a large number of project developers through a collaboration with CTI PFAN for the West Africa Forum for Clean Energy Financing (WAFCEF II). Winrock worked with CTI PFAN to organize a 2-day Roadshow in Abuja and Lagos to share the successes of WAFCEF I and to promote WAFCEF II and increasing access to clean energy financing through both REEEP and CTI PFAN.

Winrock spent considerable time and effort engaging Ecobank and Fortis Micro Finance Bank in an effort to help engender long term transformation in the banks and willingness to lend to the RE sector. Both banks were recipients of significant technical assistance and trainings on RE/EE technologies and financing. Winrock is currently working with these banks to help them build their pipelines and provide private sector finance to a wide variety of project recipients.

The activities in FY2014 have set the stage for rapid action in the coming years of the project by building relationship across the county and across component activities. The following report details FY2014 activities, results, and lessons learned.

Page 6: USAID NIGERIA RENEWABLE ENERGYpdf.usaid.gov/pdf_docs/PA00M36D.pdf · PROGRAM DESCRIPTION ... including medical facilities, retrofitted ... Facility approved is working capital to

REEEP YEAR 1 ANNUAL PROGRAM PERFORMANCE REPORT- FY 2014 6

PROGRAM DESCRIPTION The overall goal of USAID's Renewable Energy and Energy Efficiency Program in Nigeria (REEEP) is to improve Nigeria's access to renewable energy technologies, improve the financing of renewable energy technologies, use renewable energy technologies to improve various sectors like the Agricultural and Health sectors, mitigate climate change, reduce carbon emissions, increase economic opportunities, improve employment and sustain development. To achieve this goal, USAID's Renewable Energy and Energy Efficiency Program in Nigeria aims to achieve the following Tasks:

Task 1: To increase access to clean energy financing for project developers.

This component focuses on developing the capacity of companies in the clean energy sector and other selected sectors that would benefit from using RE through targeted training and capacity-building activities. Winrock will focus on small and medium-scale SMEs private sector investments in clean energy to increase their access to finance for RE/ EE Projects.

Task 2: To provide technical assistance to financial institutions.

Most Nigerian banks are highly conservative in their lending to businesses, often requiring in excess of 200 percent collateral in relation to loan value. As a result, the majority of Nigerian businesses have little or no access to commercial credit. RE/EE lending is generally seen as presenting additional risk, as most financial institutions do not know how to calculate credit-risk analysis for RE/EE projects. Many lenders are skeptical that meaningful cash flow can be generated from RE/EE projects or doubt that the cash flow can be relied on to repay loans. In this Component, Winrock will provide technical assistance to financial institutions to encourage lending on more favorable terms to RE/EE project developers and for RE/EE technology.

Task 3: To provide vocational training and creating awareness of RE/EE benefits.

A major challenge encountered in RE and EE project development in Nigeria is the lack of qualified and competent technical support staff to install and maintain systems and low awareness of technology and the benefits. Winrock in this component intends to use the following series of activities to increase awareness and technical capacity in Nigeria:

Task 4: To enhance governance to enact enabling policies for RE/EE project development.

The lack of progress to enact and enforce energy policy reforms stems from policy makers’ and implementers’ limited understanding of the enabling environment needed to incentivize greater private sector participation among other reasons. In this component, Winrock will strengthen the technical capacity of government officials, private sector actors, and national policy regimes that directly influence and catalyze investment in clean energy technologies, practices, and policies.

Through these interventions, the program shall result in tangible reductions in greenhouse gas emissions over the short and long term by creating a facilitative investment, decision-making, and operational climate for private and public sector participation in the clean energy sector as well as poverty reduction, private sector-led growth, energy security and energy access.

Page 7: USAID NIGERIA RENEWABLE ENERGYpdf.usaid.gov/pdf_docs/PA00M36D.pdf · PROGRAM DESCRIPTION ... including medical facilities, retrofitted ... Facility approved is working capital to

REEEP YEAR 1 ANNUAL PROGRAM PERFORMANCE REPORT- FY 2014 7

MAJOR ACCOMPLISHMENTS FOR YEAR 1 During the First Year which only included two quarters of project implementation, Winrock made modest progress against performance indicators, even as the REEEP Monitoring and Evaluation Plan is still under review (the plan was approved early in FY 2015 Q1). Below is a summary of the indicators being considered in the Monitoring and Evaluation Plan and the results recorded;

Table 1. Targets vs. Accomplishments

IR 1: Access to RE/ EE financing by social and economic businesses improved

USG Indicator 4.8-7

Indicator: Greenhouse gas (GHG) emissions, estimated in metric tons of CO2e, reduced,

sequestered and/ or avoided as a result of USG assistance

Target year 1: 186 Metric tons of CO2

Actual year 1: 3.484 Metric tons of CO2

Remarks: The result was gotten from the

installation of solar at the REEEP office.

USG Indicator 4.4.1-31

Indicator: Number of beneficiaries with improved energy services due to USG assistance

Target year 1: 800

Actual year 1: 10

Remarks: These are number of Staff benefitting from the Winrock International Nigeria field

office solar installation

USG Indicator 4.8.2-32

Indicator: Clean energy generation capacity installed or rehabilitated as a result of USG

assistance

Target year 1: 0.075 Megawatts

Actual year 1: 0.0048 Megawatts

Remarks: This is the unit installed in our office

USG Indicator 4.8.2-31

Indicator: Expected lifetime energy savings from EE or energy conservation as a result of USG

assistance

Target year 1: 5,256 Gigajoules

Actual year 1: 38.016 Gigajoules

Remarks: This is lifetime energy savings from the office installation

Custom Indicator N/A (custom)

Indicator: Number of public and private buildings, including medical facilities, retrofitted with

clean energy

Target year 1: 1

Actual year 1: 1

Remarks: The result here is for the Winrock office that was retrofitted

IR 2: Capacity of financial institutions and DCA Banks developed

USG Indicator 4.3.2-6

Page 8: USAID NIGERIA RENEWABLE ENERGYpdf.usaid.gov/pdf_docs/PA00M36D.pdf · PROGRAM DESCRIPTION ... including medical facilities, retrofitted ... Facility approved is working capital to

REEEP YEAR 1 ANNUAL PROGRAM PERFORMANCE REPORT- FY 2014 8

Indicator: Amount of leveraged private sector financing mobilized with DCA guarantees

Target year 1: $300,000

Actual year 1: $112,500

Remarks: One DCA loan was provided under REEEP by Ecobank. More will be given out in year

2. The beneficiary is SME Funds, one of the winners of the UNDP/BOI Access to Renewable

Energy Project pipeline. Facility approved is working capital to produce gel from waste

materials (such as saw dust, water hyacinth etc) for cooking energy.

IR 3: Capacity of RE/ EE vocational institutions enhanced

USG Indicator 4.8.2-14

Indicator: Number of institutions with improved capacity to address climate change issues as

a result of USG assistance

Target year 1: 2

Actual year 1: 2

Remarks: The capacity of Ecobank Plc and Fortis MFB were built

USG Indicator N/A (custom)

Indicator: Number of clean energy jobs created disaggregated by gender and age

Target year 1: 20

Actual year 1: Zero

Remarks: We have not recorded jobs created as result of our interventions

USG Indicator 4.8.2-6

Indicator: Person hours of training completed in technical energy fields supported by USG

assistance

Target year 1: 600 person hours

Actual year 1: 1,104 person hours

Remarks: We have target of 3 trainings for 10 trainees each at the average of 20 hours of

training. We conducted 2 trainings with 46 persons in attendance for on the average of 8

hours daily.

Custom Indicator N/A (custom)

Indicator: Number of people reached with increased information on EE and conservative

measures

Target year 1: 50,000

Actual year 1: 232

Remark: These figures include attendance from

REEEP Launch, CTI/ PFAN Roadshow, and

Meetings from UNN Energy Centre, Sokoto Energy

Centre and Afe Babalola University Ado Ekiti. It

excludes events, conferences and seminars where

the COP made presentations. A survey will be

carried out by the M&E specialist to ascertain the

numbers reached through these media.

IR 4: RE and EE policy environment strengthened

Page 9: USAID NIGERIA RENEWABLE ENERGYpdf.usaid.gov/pdf_docs/PA00M36D.pdf · PROGRAM DESCRIPTION ... including medical facilities, retrofitted ... Facility approved is working capital to

REEEP YEAR 1 ANNUAL PROGRAM PERFORMANCE REPORT- FY 2014 9

USG Indicator 4.8.2-28

Indicator: Number of laws, policies, strategies, plans, or regulations addressing climate

change(mitigation or adaptation) and/or biodiversity conservation officially proposed, or

adopted as a result of USG assistance

Target year 1: Zero

Actual year 1: Zero

Remarks: There is no target for this indicator in year 1. We report on this indicator in year 2

and year 3.

TECHNICAL ACTIVITIES AND ACCOMPLISHMENTS Winrock was able to build strong relationships in country during the first year of implementation. The focus of the project activities was on forging relationships with financial institutions, private sector partners, NGOS, government officials, and other donors to help lay the groundwork for successful project implementation in years 2-4 of the project. Winrock built strong relationships with other USAID funded projects, most notably the MARKETS II project and spent considerable time and effort working with agricultural processors to help identify energy opportunities to help improve business competitiveness. Winrock also worked extensively with Ecobank and Fortis Microfinance Bank, providing training and capacity building activities through our partners Crimson Capital LLC and Deva Access. Winrock also has built a pipeline of 23 potential projects for financing through the DCA mechanisms through our meetings and outreach activities—these project activities range from solar panels to power petrol filling stations to retrofitting hospitals with clean energy. Winrock has also collaborated with the Private-Financing Advisory Network (P-FAN) through the West Africa Forums for Clean Energy Financing (WAFCEF II) in Lagos and Abuja, helping to build the project pipeline and expand the notoriety of the program in the country.

Component 1: Access to clean energy financing Component 1 focuses on developing the capacity of companies in the clean energy sector and other sectors

that would benefit from increased energy access and use of RE through targeted training and assistance.

In Year 1, Winrock focused on identifying small and medium-scale SMEs and building private sector opportunities in clean energy to increase access to finance for RE/ EE Projects that will help to reduce SME costs and increase competitiveness. To deliver results in the component, the following task were performed:

Development of REEEP pipeline of potential project developers;

Assessment of opportunities in areas/sectors that support USAID/Nigeria’s portfolio, notably the MARKETS II and HIV/AIDS programs;

Identification of financing options and training of potential borrowers to access private finance.

Winrock is working with existing stakeholders, GON, project developers, international donors, and others to assess and build on the pipeline of renewable energy projects that may be eligible for debt or equity financing in Nigeria. Companies and stakeholders in the pipeline are at various stages of development in terms of how close their projects are to ‘financial closure’ and private sector financing. Some companies are highly advanced, while others are in the nascent stages business development—but most companies require some level of assistance in order to create a ‘bankable’ project. Winrock works with companies in our pipeline to assess their needs and provide targeted assistance and advisory services to help the projects move closer to receiving private sector finance. The pipeline currently includes a variety of opportunities such as the NNPC Mega Stations, the General Hospital Abuja, Afebabalola University, and many others. The current and complete pipeline of projects is attached as an appendix.

Energy is a constraining factor in many areas of economic and social development. Recognizing that, Winrock has engaged with other USAID projects to coordinate with companies whose existing cash flow

Page 10: USAID NIGERIA RENEWABLE ENERGYpdf.usaid.gov/pdf_docs/PA00M36D.pdf · PROGRAM DESCRIPTION ... including medical facilities, retrofitted ... Facility approved is working capital to

REEEP YEAR 1 ANNUAL PROGRAM PERFORMANCE REPORT- FY 2014 10

will stabilize or increase with a more reliable renewable energy source. Winrock is in active discussions with the USAID MARKETS II, who work with pools of rice processors and have helped in build the project pipeline to address energy constraints. Winrock has visited Agribusinesses including small and Integrated Rice Millers and rice farmers in Bida in Niger State, Abakaliki and Ikwo in Ebonyi State, Omor in Anambra State and Adani in Enugu State to assess energy needs and opportunities. A consultant from EUCORD visited Nigeria to meet with rice processors in late in Q4 and is expected to provide direction on the way forward of the assessment—a full report will be provided in the FY 2015 Q1 progress report.

The REEEP Team visited the Afe Babalola University to explore the possibility of developing an alternative energy facility through Small hydro power to help reduce long term costs and improve the sustainability of the university. The University, in collaboration with a team of special consultants (Red 5 resources), is exploring the possibility of using the stream near the university for the purpose of hydro power generation. Currently, the University spends an average of N300,000,000 ($1,820,000) annually on fuel for diesel generators and maintenance costs. A tripartite team consisting of the University staff, Red 5 resources, and REEEP was formed to develop a bankable business plan that can help source for funds with credible investors. An MOU has been developed to help guide REEEP participation and activities in the project.

Winrock is also engaged with the USAID HIV/AIDS team to provide renewable energy technologies support for cold chain storage. Winrock met with Tunji Odelola, USAID’s HIV/AIDS-TB Team Pharmaceutical Commodities Logistic Manager, to specifically discuss opportunities for the use of renewable energy for warehouses, medicines, and cold chain storage. Mr. Odelola helped the project identify opportunities with USAID’s 6 major warehouses, and among other donors including the Gates Foundation and the Clinton Health and Aid Initiate.

In an effort to identify additional potential recipients of technical assistance to expand the program impact, Winrock has reviewed Ecobank’s lending portfolio in the agricultural sector and the bank’s portfolio of loans to other businesses located outside of urban areas. This review has led to the identification of a number of opportunities that Winrock will pursue in FY 2015.

Winrock identified other target sectors, projects, and project developers that can qualify for financing using DCA guarantees or from Ecobank and other private sector financial institutions. These sectors included mobile phone charging, shopping malls, estates and individuals who have shown interest in retrofitting their homes and businesses with RE technologies. REEEP has provided technical support to one of the project developers – Rubycom Technologies Ltd – to develop a business model as proof of concept for powering filling stations of the Nigerian National Petroleum Corporation with renewable energy. REEEP has also provided technical assistance to support the financing of renewable energy technologies to Abaji General Hospital in collaboration with Nayo Tropical technology (NTT).

Winrock also met with several key project developers like NTT, GVE, Creeds Energy, Blue Camel Limited, Rubycom Tech Ltd and other projects developers around the country to learn more about their needs and support them to access to private finance to improve project implementation.

Identification of financing options and training of potential borrowers to access these opportunities will be carried out in the subsequent year. As a result we engaged a consultant in Nigeria who carried out an energy opportunity assessment with the aim of creating opportunities for renewable energy

development and finance in various sectors of the economy (report to be made available in FY2015).

Figure 1: REEEP COP Segun Adaju at Afe Babalola University

Figure 2: Training on Solar PV Systems at Nayo Tropical Technologies

Page 11: USAID NIGERIA RENEWABLE ENERGYpdf.usaid.gov/pdf_docs/PA00M36D.pdf · PROGRAM DESCRIPTION ... including medical facilities, retrofitted ... Facility approved is working capital to

REEEP YEAR 1 ANNUAL PROGRAM PERFORMANCE REPORT- FY 2014 11

The deliverables recorded in this component for FY2014 under review include:

Nigeria RE project pipeline template has been developed;

A list of potential rice processors and other facilities under MARKETS II has been developed;

A list of potential agricultural producers with the potential to generate energy from agricultural waste under MARKETS II.

FHI 360, a USAID funded HIV/AIDS IP has been listed and engaged for collaboration in the health sector.

Component 2: Technical assistance to financial institution Most Nigerian banks are highly conservative in their lending to businesses, often requiring in excess of 200 percent collateral in relation to loan value and short payback periods. As a result, the majority of Nigerian businesses have little or no viable access to commercial credit. RE/EE lending is generally seen as presenting additional risk, as most financial institutions do not know how to calculate credit-risk analysis for RE/EE projects. Many lenders are skeptical that meaningful cash flow can be generated from RE/EE projects or doubt that the cash flow can be relied on to repay loans.

During FY 2014 Winrock provided technical assistance to financial institutions to encourage lending on more favorable terms to RE/EE project developers and for RE/EE technology. Our work with Ecobank and Fortis Microfinance Bank built strong inroads to RE lending by developing relationships with bank staff and management. While these banks have been historically conservative, a long term education and support program is a strong approach to helping increase lending to the sector. In year 1, Winrock did the following to provide technical assistance for financial institutions:

Secured bank management buy-in and select capacity building/ training beneficiaries;

Delivered training and develop materials and guidelines for RE/EE lending for Ecobank and Fortis Microfinance bank;

Supported marketing efforts to increase demand for RE/EE loans;

Built relationships and coordinate regularly with a number of banks.

A primary beneficiary in year one of technical assistance was Ecobank – the first Nigerian Bank to secure a DCA backed loan guarantee program for RE/EE with USAID. Winrock and Crimson Capital engaged with Ecobank on June 12, 2014 to secure senior management buy-in. Crimson was able to review Ecobank’s current credit policies and procedures, loan agreements, contracts, and collateral requirements, and is developing a detailed multiyear workplan to increase capacity within the Bank to lend to RE project developers.

REEEP conducted a gaps/needs assessment with Ecobank to identify project areas where technical assistance will be needed, such as capacity building for staff in RE and EE financing, development of communication and marketing plan, product development and setup and selection of desk core group. These activities are expected to support the bank in to fully utilize the DCA and also improve staff understanding of RE/ EE technologies. Crimson is working with senior bank management to modify policies and structures as needed to support maximize utilization of the DCA. The staff understanding of RE/EE technologies and their ability to assess project opportunities and risk, and increase lending to the RE/EE sector was also reviewed. One (1) DCA facility in the amount of $112,500 US Dollars amounting to N18,000,000 only in local currency was awarded to a customer in the fiscal year. The customer is a beneficiary of SME funds--a winner of the UNDP/BOI Access to Renewable Energy project—the facility produces gel from waste materials such as saw dust for cooking energy.

Page 12: USAID NIGERIA RENEWABLE ENERGYpdf.usaid.gov/pdf_docs/PA00M36D.pdf · PROGRAM DESCRIPTION ... including medical facilities, retrofitted ... Facility approved is working capital to

REEEP YEAR 1 ANNUAL PROGRAM PERFORMANCE REPORT- FY 2014 12

A 5-day training module was developed in collaboration with Crimson capital and capacity building program for Ecobank was held between July 21st and 24th 2014. 21 staff (Male= 12, Female= 9) were trained. The training included a study tour of RE installations in Lagos area to show the Bank staff the viability of the technology. The training included a technical workshop to show international best practices using case studies from Slovakia, Serbia, Eastern Europe, and India. It also provided technical trainings on energy efficiency, energy auditing, RE/EE technical interventions, and risk factors of RE/EE technologies.

The REEEP team in partnership with local partner Deva Access conducted a 5-day training for the staff of Fortis Micro Finance Bank Ltd. The training which was titled ‘’Creating Access to Clean Energy through Micro- financing’’ was held at Fortis MFB Ltd Training Hall located at Plot 2135 Herbert Macaulay Way, Wuse Zone 5, Abuja and took place from Monday September 15 to Friday September 19, 2014. The training was witnessed by USAID Nigeria and other Implementing Partners working in the energy and environmental related projects. A total number of 25 Staff (m=17, f=8) participated in the training which lasted between 8am to 4pm recording 936 person hours of training completed during the exercise. The

training also included a study tour of RE installations in Abuja area. This activity will also be replicated to other financial institutions like Zenith bank, Diamond Bank and other partner bank in the subsequent years.

Winrock also engaged with the senior management of Diamond Bank and Zenith Bank, with Diamond Bank accepting in principle our proposal for technical assistance, while Zenith Bank will be considered at a later stage.

REEEP project also provided capacity building opportunity for the head, SME of Ecobank and the group head, micro credit of Fortis micro finance bank by recommending them for a four day workshop on financing solar energy technology in West Africa

organized by IRENA and ECREEE in Lome, Togo from July 13th – 16th, 2014 which they fully attended alongside Winrock COP Segun Adaju.

During FY2014, the following deliverables were recorded under component 2:

Winrock held engagement meetings with senior management staff of Ecobank and Fortis MFB. MOU is expected to be signed with the two banks and other banks like Diamond bank and Zenith bank we are still in talks.

A consolidated trainings and capacity building program in collaboration with Crimson Capital and Deva Access were delivered to Ecobank between July 21st and 24th 2014, and Fortis Micro Finance Bank between September 15th and 19th 2014 respectively. The trainings included study tours of RE installations in Lagos and Abuja area.

Winrock recommended key senior management staff of Ecobank and Fortis who attended the workshop on financing solar technology in West Africa organized by IRENA and ECREEE.

Crimson Capital initial assessment of Ecobank (attached as appendix)

Training report for Ecobank and Fortis MFB (attached as appendix)

Component 3: Trainings and awareness creation A challenge of increasing the prevalence of renewable energy and energy efficiency solutions in Nigeria is the lack of qualified technical staff to install and maintain systems. There are few technical staff with awareness and specific training of international standards. And there is a low public understanding of the

During the July training it was discovered that Ecobank and its 600 branches in Nigeria each have two large diesel generators to ensure consistent power supply. These generators require $10,000-$20,000 per month just for diesel fuel per bank. Significant financial savings and reductions in CO2 can be achieved just from energy efficiency and renewable energy measures taken at the bank itself!

Figure 3: Participants receiving certificates at the completion of the Fortis Training. USAID's Imeh Okun pictured.

Page 13: USAID NIGERIA RENEWABLE ENERGYpdf.usaid.gov/pdf_docs/PA00M36D.pdf · PROGRAM DESCRIPTION ... including medical facilities, retrofitted ... Facility approved is working capital to

REEEP YEAR 1 ANNUAL PROGRAM PERFORMANCE REPORT- FY 2014 13

benefits financial and environmental benefits of the use of clean energy. In Component 3, Winrock seeks to help increase the technical capacity of RE/EE installers in country, as well as increase the awareness of RE/EE technologies among the public. In this component, Winrock implemented the following set of activities to increase awareness and technical capacity in Nigeria:

Educational center training for RE and EE technologies;

Promoted installer and project assessor professional certifications;

Analyzed gender equality in training programs;

Fostered awareness of RE and EE technologies and benefits.

Winrock is working to increase the technical capacity to install, maintain, and service RE/EE systems in Nigeria. Winrock in collaboration with University research and training centers, as well as private sector participants, is helping to build necessary capacity to expand clean energy systems.

Winrock has engaged with Energy Research Centers in Nsukka and Sokoto. On the 12th of August 2014, the team went to National Centre for Energy Research and Development situated at University of Nigeria Nsukka. It was a partnership/ joint visit of REEEP and GIZ to the centre to assess the capacity of the centre and to discuss partnership and collaboration. The centre has faculty of 35 research fellows and currently offering training courses in three areas; installation and maintenance of solar photovoltaic system, fabrication of solar thermal devices and design and construction of biogas digesters. The centre identified funding as a limitation to their performance as ECN on only provide funds for overhead cost and not for research and trainings. The REEEP team was taken around the centres’ laboratory and workshop where the research and fabrications takes place.

On the 5th of September, the REEEP team met with the Management of Sokoto Energy Centre for proper engagement and collaboration. The centre has 5 main component areas such as; Solar PV units, Solar Thermal units, Meteorology and wind, Bio mass and Small Hydro. These are the areas that REEEP in collaboration with NESP (GIZ funded) will be providing capacity to the centre.

Winrock is in collaboration with GIZ to implement a training program in partnership with identified training institutes in Nigeria. GIZ had previously conducted a mapping exercise of available RE training programs in Nigeria. These collaboration

will help to save costs as well as avoid duplication of efforts. Winrock and GIZ is working out modalities for successful delivery of these training programs to all stakeholders.

To ensure full and meaningful participation of women through the life of the project, Winrock is working with Ministry of Environment through its RUWES (Rural Women Energy Security). Winrock will deliver trainings to the scheme that will be modeled after the USAID-funded Alliance for Mindanao Off-Grid RE (AMORE) project in the Philippines. The training module is being finalized to be implemented in FY2015.

Awareness of REEEP and the project objectives was created through the project launch. The importance of renewable energy and energy efficiency and USAID’s presence in country were disseminated to the public through several newspaper publication of the events and television broadcast as indicated in the appendix.

Also in the area of awareness, REEEP in collaboration with the West Africa Forum for Clean Energy Financing (WAFCEF II), CTI PFAN organized a 2 day Roadshow in Abuja and Lagos. The half day Roadshow event was designed to share the successes of WAFCEF I and to promote

Figure 4: Roof of Genesis International School, Solar PV

Figure 5: Paul Burman of Winrock and Stella Obot of Shell Petroleum at the REEEP Launch

Page 14: USAID NIGERIA RENEWABLE ENERGYpdf.usaid.gov/pdf_docs/PA00M36D.pdf · PROGRAM DESCRIPTION ... including medical facilities, retrofitted ... Facility approved is working capital to

REEEP YEAR 1 ANNUAL PROGRAM PERFORMANCE REPORT- FY 2014 14

WAFCEF II, with the objective of increasing the pool and quality of applications for WAFCEF II. The event provided guidance on the essentials of project proposals and applications as well as to highlight the benefits of the WAFCEF program to prospective applicants. A total of 68 participants (Abuja= 37, Lagos=31) were sensitized on the activities of REEEP.

The deliverables on component 3 for FY2014 were the following:

Winrock obtained the GIZ assessment report of RE/EE training programs in Nigeria;

RE/EE training and materials to engage women participation is near completion;

Winrock in collaboration with USAID organized REEEP Project launch.

Winrock created awareness during the REEEP project launch, meetings with the Energy Research Centres and during the West Africa Forum for Clean Energy Financing (WAFCEF II), CTI PFAN Roadshow in Abuja and Lagos as well as the participants to our various training.

Table 1: List of Conferences attended by REEEP Staff FY2014

S/NO List of Conferences Name of Staff in attendance Relevance to REEEP

1. REEEP Post- Award Conference with USAID- Abuja

Paul Burman, Segun Adaju, Hyginus Eze & Tinyan Ogiehor

Clear and mutual understanding of the Winrock and USAID Agreement requirements.

2. Alternative Power exhibition in association with Lagos TV- Lagos

Segun Adaju Publicity, Education

3. MEMS II DQA Training, Abuja

Hyginus Eze Capacity Building, Education

4. IRENA Training, Togo Segun Adaju Capacity Building, Education

5. West Africa Forum for Clean Energy Financing (WAFCEF II)- Abuja

Segun Adaju, Hyginus Eze & Tinyan Ogiehor

Publicity of REEEP, Access to clean energy financing

6. West Africa Forum for Clean Energy Financing (WAFCEF II)- Lagos

Segun Adaju Publicity of REEEP, Access to clean energy financing

7. National Stakeholders Workshop on the Draft National Policy on Renewable Energy and Energy Efficiency- Abuja

Hyginus Eze Publicity, Collaboration for Component 4- Governance.

Component 4: Governance The enactment and enforcement of energy policy that creates a favorable environment for private sector investment in renewable energy and energy efficiency technologies is critical for the adoption and diffusion of critical technologies. This component is designed to help identify policy reforms that can be enacted and/or enforced that will help to increase private sector participation in the RE/EE markets. Winrock will create the much needed RE/EE policy framework and has embarked on the following activities:

Support policies that encourage the clean energy investment;

Support implementation of Government of Nigeria zero import duty for RE goods; Establishment of a Clean Energy Coalition.

Winrock has commenced the design of series of targeted training and learning opportunities for policy makers and implementers at the national and state levels to enhance their knowledge of the financial environment and policies needed to promote RE. High level advocacy to key decision makers in

Page 15: USAID NIGERIA RENEWABLE ENERGYpdf.usaid.gov/pdf_docs/PA00M36D.pdf · PROGRAM DESCRIPTION ... including medical facilities, retrofitted ... Facility approved is working capital to

REEEP YEAR 1 ANNUAL PROGRAM PERFORMANCE REPORT- FY 2014 15

government entities including the Ministry of Environment, Ministry of Power, Energy Commission of Nigeria, Ministry of Science and Technology, and the legislature in is progress in this regard on raising awareness of best practices and current clean energy initiatives and opportunities in Nigeria.

Winrock held several meetings with the Ministry of Environment for the purpose of engaging the Nigeria Custom Service (NCS) and the Standards Organization of Nigeria (SON), to conduct the knowledge gap assessment and as well, ascertain the current structure as regards RE products and help to reform the import process for RE/EE products to reduce tariffs, time in transit, and encourage use of RE/EE technologies.

Winrock is working with the World Bank and Federal Ministry of Environment to engage with the Ministries of Finance, Trade and Investments in supporting the NCS to setup dedicated RE task force. The World Bank will provide technical assistance to the Nigeria Customs Service to set up a task force on renewable energy and build capacity of the staff. The Winrock and World Bank collaboration will help to create awareness of RE and EE technologies, reform import duties and processes, and enhance speedy clearance of consignment of project developers applying the relevant customs duty rates, waivers and concessions. The activities will result in a small NCS RE/EE task force designed to oversee the speedy importation of necessary renewable energy technologies, and will thereafter serve as the Train the Trainers to replicate the process throughout NCS.

As part of the collaboration with the GON, the REEEP team attended a 2 day National Stakeholders Workshop on the Draft National Policy on Renewable Energy and Energy Efficiency organized by the Federal Ministry of Power. The event which took place at the Rock View Hotel, Abuja was aimed at reviewing the drafted National Energy Policy on Renewable Energy and Energy Efficiency. The workshop was attended by top government functionaries and dignitaries from international development organizations, civil society organization and the private sectors. The reviewed draft policy is still being awaited for finalization—REEEP will provide comments on the policy as appropriate.

Winrock has also commenced collaborating meetings with green advocates and the legislature for the purpose of establishing a Clean Energy Coalition to ensure greater accountability on the part of policy implementers and counter vested interests within the energy sector. The initial meeting of the proposed coalition will hold early in the next quarter. Some potential members of the coalition are GIZ, Henrich Boll Foundation, project developers such as Creeds Energy, Rubicon Technologies, Blue Camel Energry, Renewable Energy Programme of the Ministry of Environment, Association of Nigerian Solar Energy Promoters, Solar Sister, and others.

ADMINISTRATIVE ACTIVITIES

Setting Up of Physical Offices The USAID Nigeria Renewable Energy and Energy Efficiency Program office moved into its permanent facilities on April 8, 2014 at Flat 3, Block 51, E close, OAU Quarters, Maitama, Abuja, Nigeria. After the signing of the cooperative agreement, the Nigeria REEEP Home office Manager, Mr. Paul Burman was in Abuja in the week April 7th to 16th to support the project startup and guided the process of project mobilization and met with the project personnel. He formed the project implementation team nominated in the project proposal. The project team met with relevant project stakeholders and USAID staff on Tuesday the 8th of April, 2014 got the project started. Mr. Burman returned to Abuja for the project launch in June. The Office was also partitioned to create spaces for the project staff as well as provide a space for mini conference room.

Management Structure and Staffing. Winrock’s management team for the Program is composed of: a Chief of Party (COP) and component managers which include the Renewable Energy Technical Specialist and the Monitoring and Evaluation Specialist. All project technical personnel were hired and began work in early April. Other relevant

Page 16: USAID NIGERIA RENEWABLE ENERGYpdf.usaid.gov/pdf_docs/PA00M36D.pdf · PROGRAM DESCRIPTION ... including medical facilities, retrofitted ... Facility approved is working capital to

REEEP YEAR 1 ANNUAL PROGRAM PERFORMANCE REPORT- FY 2014 16

personnel to the project include accounts/ admin manager, administrative assistant, and driver and will be hired in next quarter. Short term technical experts were also hired during the fiscal year.

Staff Computers and Other Office Equipment. Winrock International procured 3 Computers for the project staff. We also procured one color printer, one water dispenser, projector and projector screen, digital camera and office furniture to be used in the course of the project implementation.

Official/ Project Vehicle. There were delays in the process of procurement of the project vehicle. A waiver was requested to procure the vehicle from a US vendor, but the vehicle was to be manufactured and shipped from South Africa. The vehicle waiver was provided and the vehicle was purchased early in the first quarter of FY2015.

Partnership Meetings. Initial coordination meetings were scheduled during the first two quarters of the year for the purpose of defining and assigning roles of Subcontractors and Program Partners. Winrock has been coordinating regularly with main sub-contractors Crimson Capital and EUCORD and soliciting their input on first year activities for the project. Both Crimson Capital and EUCORD have signed contracts to begin work, and both have started activities under the project. Local partner, Deva Access, has also been contracted to provide capacity building activities in country. Winrock has also been coordinating with Butler Law Offices LLC, Council for Renewable Energy, Energy Commission of Nigeria, Nayo Tropical Technology, and Solar Sister to discuss first year implementation plans and areas of collaboration.

M&E Work Plan Development.

The Monitoring and Evaluation (M&E) Work Plan has been reviewed by USAID. The corrections and final approval is expected to take place within the first quarter of year 2.

Installing Office Solar.

The USAID Nigeria Renewable Energy and Energy Efficiency Program office moved into its permanent facilities on April 8, 2014 at Flat 3, Block 51, E close, OAU Quarters, Maitama, Abuja, Nigeria. After a long procurement and vetting process, Winrock selected vendor Creeds Energy to install a solar power system at the office to provide basic energy services for business operations. The installation was completed on the 17th of September, 2014 and done in accordance with international best practices and is presently serving as a model for future installations.

CHALLENGES ENCOUNTERED & LESSONS LEARNED The major challenge in year 1 was the short period that was available to carry out activities as the project effectively started in April giving the project staff just 6 months to set up the office and achieve deliverables. This time constraint made it difficult to meet year one deliverables, but the project focused on building relationships across many sectors to lay the groundwork for success for years 2-4 of project implementation. The outreach and activities in year 1 have helped to forge many strong relationships and build a pipeline of potentially bankable projects that will come to fruition within the project timeline.

Interest in the project and the technical services that the project can provide was very high in year one. While this certainly is a benefit, it also provides challenges for project staff as they seek the best opportunities for partnership and collaboration. The staff is carefully tracking all opportunities that come their way and are working locally and with home office staff to manage the project pipeline to prioritize high value, high likelihood, and high impact projects.

Nigeria is presently approaching general elections which commence in February of 2015 hence most government organizations that the REEEP project is in collaboration with have undergone one form of reshuffling or the other of key players in the industry. This particularly affected component 4 on governance. We will continue to engage government officials, but are preparing for potentially slowed

Page 17: USAID NIGERIA RENEWABLE ENERGYpdf.usaid.gov/pdf_docs/PA00M36D.pdf · PROGRAM DESCRIPTION ... including medical facilities, retrofitted ... Facility approved is working capital to

REEEP YEAR 1 ANNUAL PROGRAM PERFORMANCE REPORT- FY 2014 17

progress until after the election. Winrock is committed to working independently of government officials to progress on this component should material delays be encountered.

Also, the security situation in the country, especially in the northern part of Nigeria has had a negative impact on the ability to reach out some potential beneficiaries such as rice farmers and agricultural processors. Winrock will continue to monitor the security situation in the North and will respond accordingly.

FINANCIAL STATUS EXPENDITURES PER CATEGORY

As of September 30, 2014, the Program has spent a total of $361,378.59 or 9% of the total 4-year budget stated in the contract. EXPENDITURES PER MAJOR LINE ITEM The following table shows total cumulative spending per major line item, followed by a graphical representation of the percentage breakdown.

Line Item Budget Cumulative spending as of Sept 2014 Amount Remaining

Salaries $757,723 $82,360 $675,362

Fringe Benefits 537,019 44,064 492,955

Consultants 236,481 3,670 232,810

Travel 166,168 34,748 131,419

Allowances 19,174 3,126 16,047

Procurement 120,043 5,709 108,323

Other Direct Costs 618,315 50,186 568,128

Sub-Contracts 303,868 23,815 280,053

Indirect Costs 1,240,765 107,688 1,133,076

TOTAL $3,999,556 $361,378 $3,638,177

Page 18: USAID NIGERIA RENEWABLE ENERGYpdf.usaid.gov/pdf_docs/PA00M36D.pdf · PROGRAM DESCRIPTION ... including medical facilities, retrofitted ... Facility approved is working capital to

REEEP YEAR 1 ANNUAL PROGRAM PERFORMANCE REPORT- FY 2014 18

PLANS FOR YEAR 2 TECHNICAL ACTIVITIES:

Component 1: Increase access to Clean Energy Financing Winrock will work with existing stakeholders, project developers, international donors, and others to assess and build on the pipeline of renewable energy projects that may be eligible for debt or equity financing.

Specific tasks

Work with private sector project developers affiliated with the USAID MARKETS II and HIV/AIDS programs to provide technical feasibility studies and cost-benefit analyses of implementing RE technologies in project activities

Work with MARKETS II team to identify rice processing facilities with sufficient agricultural waste product for bio-power. Conduct feasibility studies, cost benefit analysis, and provide recommendations. (implemented in partnership with EUCORD)

Visit health facilities in and around Abuja to acquire information regarding energy needs, usage, and current energy mix and costs. Create cost analysis for health facility managers to promote the life cycle benefits and reduced operating costs associated with renewable energy

Work with USAID HIV/AIDS program, IHS and SCMS to help encourage adoption of RE for the development of new cold storage warehouses in Abuja and Lagos. Identify RE companies that can submit competitive bids to install and maintain RE technologies.

Work with GE to conduct feasibility study for proposed waste bio-digester in partnership with Nigerian state government as well as identify beneficial financing opportunities for RE to be bundled with medical equipment to reduce long term operating costs of health facilities.

Develop the pipeline to fund a minimum of 8 projects to the capacity of $1,900,000

Work with BOI to identify existing SMEs in their portfolio that will require retro-fitting their businesses with RE technologies.

Work with Coca-Cola on cold storage refrigeration for health care facilities.

Liaise with PFAN to identify project developers for finance (debt and equity) through Roadshows and other collaboration.

Component 2: Provide technical Assistance to Financial Institutions The following tasks will be undertaken in the next quarter; Work with senior management of Ecobank to form a dedicated core group of approximately 10 staff to develop sustainable, in-house RE/EE lending and train-the-trainer capacity.

Work with Ecobank to build capacity for RE project financial analysis and assess current utilization of the mechanism (implemented by subcontractor Crimson Capital)

Develop framework for engaging additional banks to participate in DCA mechanism

Engage a connection with Fortis Micro Finance Bank and Solar Sister to increase access to financial mechanisms for small solar energy products for rural communities

Improve the linkage between Ecobank and project developers seeking finance. Which we intend to achieve by facilitating bankers with adequate RE technologies trainings to understand the life cycle of RE projects, take bankers on site visits to understand and carry out meetings where bankers can meet with developers to fill in all possible gaps required.

Page 19: USAID NIGERIA RENEWABLE ENERGYpdf.usaid.gov/pdf_docs/PA00M36D.pdf · PROGRAM DESCRIPTION ... including medical facilities, retrofitted ... Facility approved is working capital to

REEEP YEAR 1 ANNUAL PROGRAM PERFORMANCE REPORT- FY 2014 19

Work with Zenith bank to identify existing SMEs in their portfolio that will benefit from retro-fitting their businesses with RE technologies.

Extending the DCA to other banks like Diamond Bank, Zenith Bank, Fortis MFB etc.

Component 3: Provide vocational training and awareness creation Winrock intends to use the following series of activities to increase awareness and technical capacity on RE and EE technologies in Nigeria:

Work with the Nigerian Energy Commission Energy Research Centers and private sector companies such as Nayo Tropical Technologies to develop a needs assessment, action plan, and target stakeholders for technical trainings and training curricula.

Develop capacity building training for project developers that will encompass access to finance, energy as a service, business plan development, cost benefit analysis etc.

Develop an IEC strategy using social media and newsletters in collaboration with CREN.

Component 4: Enhance governance to enact enabling policies for RE/EE project development Winrock intends to create the much needed framework to breach this gap existing in the RE and EE sector in Nigeria due to lack of enactment and poor RE policy implementation of by embarking on the following:

Coordinate NGOs, donor funded programs, and private stakeholders for a quarterly Renewable Energy Coalition. The group will be led by Winrock and the Council for Renewable Energy Nigeria.

Work with the Ministry of Environment, the Ministry of Finance, and the Nigeria Customs Service to support a decree or legislation that reduces or eliminates import tariffs on renewable energy technology on a pilot scale. Work to be coordinated with similar World Bank activities.

Engaging with the Standards Organization of Nigeria (SON) and relevant international authorities to develop international standards for RE/ EE technologies.

Page 20: USAID NIGERIA RENEWABLE ENERGYpdf.usaid.gov/pdf_docs/PA00M36D.pdf · PROGRAM DESCRIPTION ... including medical facilities, retrofitted ... Facility approved is working capital to

REEEP YEAR 1 ANNUAL PROGRAM PERFORMANCE REPORT- FY 2014 20

Appendixes

Page 21: USAID NIGERIA RENEWABLE ENERGYpdf.usaid.gov/pdf_docs/PA00M36D.pdf · PROGRAM DESCRIPTION ... including medical facilities, retrofitted ... Facility approved is working capital to

REEEP YEAR 1 ANNUAL PROGRAM PERFORMANCE REPORT- FY 2014 21

APPENDIX 1: REEEP Project Pipeline FY2014

#

Project/ Community Name

Lead Implementing Facilitator

Company/ Community size - number

Industry

Location

Renewable Energy availa-bilty

Present energy sources

Proposed project

Expected output/ impact

Any other details/ needs

Organizations with technical expertise

Contact Name, email, phone

Estimated Project Size (NGN/$)

Type of Assiss-tance

Winrock/ Sub Lead?

Proba-bility?

Additional info/ notes

1

NNPC Mega Stations

NNPC Retail dept.

37 Mega stations in various states of the federation

Oil & Gas

Country wide Solar

Diesel powered generator and Electricity

To power the equipment of all Mega stations with solar power

Improved efficiency, increased savings

Meeting held with Rubycom, Winrock and NNPC

Rubycom Tech Ltd

08029921118

RE Finance, Feasibilty study and Technical assistance

Winrock HQ, Segun Adaju 30%

Discussions with MD in progress

2

General Hospital, Abaji

FCT Health Management Board

Health service to over 100,000 people Health Abaji Solar

Epileptic electricity supply and short daily use of diesel generator

To power the light points and critical hospital equipment

Incresed access to health services

Visit in progress

Nayo tropical Technology

08097875304

N5,915,000/ $36000 Finance

Segun Adaju 20%

3

Oyorokoto community

GVE Projects Ltd

Over 2000 houses

Fish farming

Andoni LGA, Rivers State. Solar

Off grid community - sporadic uses of generators

To create a solar mini-grid that will power a remote community

Access to electricity

Visit in progress

GVE Limited

08064075280 Finance

Segun Adaju 10%

Discussions with project developer in progress

Page 22: USAID NIGERIA RENEWABLE ENERGYpdf.usaid.gov/pdf_docs/PA00M36D.pdf · PROGRAM DESCRIPTION ... including medical facilities, retrofitted ... Facility approved is working capital to

REEEP YEAR 1 ANNUAL PROGRAM PERFORMANCE REPORT- FY 2014 22

#

Project/ Community Name

Lead Implementing Facilitator

Company/ Community size - number

Industry

Location

Renewable Energy availa-bilty

Present energy sources

Proposed project

Expected output/ impact

Any other details/ needs

Organizations with technical expertise

Contact Name, email, phone

Estimated Project Size (NGN/$)

Type of Assiss-tance

Winrock/ Sub Lead?

Proba-bility?

Additional info/ notes

4

Afebabalola University, Ondo State.

The Chancellor

Over 5000 students annually

Education Ado Ekiti

1 MW Small Hydro Power

Diesel powered generator and Electricity

To power laboratories and LTs with small hydro

Improved efficiency, increased savings, Visited

Afebabalola University, Ondo State.

Red 5 Resources, Frank Sheen

N1,800,000,000

Technical assistance and finance.

Winrock HQ, Segun Adaju 30%

TA for business plan in progress.

5

Niger State

Tsoede Rice farming cooperative

Over 200 rice farmers

Agriculture USAID – MARKETS project

Doko, Bida, Lavun

Solar Lack of water

Solar powered borehole

Increase in yield

Visit carried out

Onyx Rice mill

Alhaji Musa Ndache

RE Finanace

Segun Adaju, Niels Hanssens

20%

To identify a project developer - NTT preferably

6

Oyo State college of Agriculture

The provost

Over 3000 students annually

Education

Igboora, Oyo State. Solar

Diesel powered generator and Electricity

To power laboratories and LTs with solar power

Improved efficiency, increased savings,

Not yet visited

Oyo State college of Agriculture

08033786712 Finance

Segun Adaju 5%

Talks in progress

Page 23: USAID NIGERIA RENEWABLE ENERGYpdf.usaid.gov/pdf_docs/PA00M36D.pdf · PROGRAM DESCRIPTION ... including medical facilities, retrofitted ... Facility approved is working capital to

REEEP YEAR 1 ANNUAL PROGRAM PERFORMANCE REPORT- FY 2014 23

#

Project/ Community Name

Lead Implementing Facilitator

Company/ Community size - number

Industry

Location

Renewable Energy availa-bilty

Present energy sources

Proposed project

Expected output/ impact

Any other details/ needs

Organizations with technical expertise

Contact Name, email, phone

Estimated Project Size (NGN/$)

Type of Assiss-tance

Winrock/ Sub Lead?

Proba-bility?

Additional info/ notes

7

Solar Roof Tops/Lease Ecobank

Homes and offices

All sectors

Nationwide

Solar and Inverter backup systems

Diesel powered generator and Electricity

Consumer finance for RE products

Improved efficiency, increased savings,

Meeting with the bank in progress, toolkit to select Proj developers in making

Nayo tropical Technology, Blue Camel and Rubycom, Creeds, Folub, Blue Ocean,

Ecobank/ REEEP

Dependent on each request Finance

Segun Adaju 40%

Interest rates issued - Terms and conditions in progress, amortization being developed

8 Ebonyi

ICEED Enterprises

Rice millers

Agriculture USAID – MARKETS project Abakaliki Biomass

Use of firewood

Rice husk briquettes

increase in production Visited

ICEED/ UNN Nsukka

Patrick Mbam

Segun Adaju, Niels Hanssens 5%

9

Ebonyi ICEED Enterprises

Over 200 rice farmers

Agriculture USAID – MARKETS project

Abakaliki

Solar

Lack of water

Solar Bubble dryer

Increase in yield

Visit carried out

Interlinear Limited

Patrick Mbam

5,280,000NGN

RE Finanace

Segun Adaju, Niels Hanssens

5%

4 units of the Solar Bubble dryer

Page 24: USAID NIGERIA RENEWABLE ENERGYpdf.usaid.gov/pdf_docs/PA00M36D.pdf · PROGRAM DESCRIPTION ... including medical facilities, retrofitted ... Facility approved is working capital to

REEEP YEAR 1 ANNUAL PROGRAM PERFORMANCE REPORT- FY 2014 24

#

Project/ Community Name

Lead Implementing Facilitator

Company/ Community size - number

Industry

Location

Renewable Energy availa-bilty

Present energy sources

Proposed project

Expected output/ impact

Any other details/ needs

Organizations with technical expertise

Contact Name, email, phone

Estimated Project Size (NGN/$)

Type of Assiss-tance

Winrock/ Sub Lead?

Proba-bility?

Additional info/ notes

10

Anambra

Integrated rice millers - Anambra

Over 200 rice farmers

Agriculture USAID – MARKETS project

Omor, Anambra State

Bio mass

Fire wood

Use of Rice husk to make briquettes

Increase in yield

ICEED/ UNN Nsukka

Paul Eguatu

Segun Adaju, Niels Hanssens

11

Anambra

Integrated rice millers - Anambra

Over 200 rice farmers

Agriculture USAID – MARKETS project

Omor, Anambra State

Solar Lack of water

Solar Bubble dryer

Increase in yield

Visit carried out

Interlinear Limited

Paul Eguatu

5,280,000NGN

RE Finanace

Segun Adaju, Niels Hanssens

5%

4 units of the Solar Bubble dryer

12

Ondo State Cocoa farmers

Red 5 resources

over 200 farmers

Agriculture

Aponmu, Wasimi, Bolorunduro Ile Oluji, Idanre Solar

Lack of drying technologies

Solar Bubble dryer increas

e in yield

Visit carried out

Interlinear Limited

Frank Sheen N6,600,000

Finance and TA

Segun Adaju 10%

5 units of 1 MT - SBD.

13 Forte Oil

14 Oando Blue Camel

15

Rice millers - Kebbi

Agriculture USAID – MARKETS project

16

Rice millers - Kano

Agriculture USAID – MARKE

Page 25: USAID NIGERIA RENEWABLE ENERGYpdf.usaid.gov/pdf_docs/PA00M36D.pdf · PROGRAM DESCRIPTION ... including medical facilities, retrofitted ... Facility approved is working capital to

REEEP YEAR 1 ANNUAL PROGRAM PERFORMANCE REPORT- FY 2014 25

#

Project/ Community Name

Lead Implementing Facilitator

Company/ Community size - number

Industry

Location

Renewable Energy availa-bilty

Present energy sources

Proposed project

Expected output/ impact

Any other details/ needs

Organizations with technical expertise

Contact Name, email, phone

Estimated Project Size (NGN/$)

Type of Assiss-tance

Winrock/ Sub Lead?

Proba-bility?

Additional info/ notes

TS project

17

Rice millers - Sokoto

Agriculture USAID – MARKETS project

18

Ecobank ATM Pavillion

Blue Camel

19 Unity bank

20 Health centers

Coca-Cola/ USAID 0 Health TBD TBD

Epileptic power supply

Improved health services

James Lycos - USAID & Clement Ugorji - Coca Cola 1%

21 Health centers

22 BOI 5 SMEs

23 USADF

Winners and runners up Several

Page 26: USAID NIGERIA RENEWABLE ENERGYpdf.usaid.gov/pdf_docs/PA00M36D.pdf · PROGRAM DESCRIPTION ... including medical facilities, retrofitted ... Facility approved is working capital to

REEEP YEAR 1 ANNUAL PROGRAM PERFORMANCE REPORT- FY 2014 26

Page 27: USAID NIGERIA RENEWABLE ENERGYpdf.usaid.gov/pdf_docs/PA00M36D.pdf · PROGRAM DESCRIPTION ... including medical facilities, retrofitted ... Facility approved is working capital to

27

APPENDIX 2: SUCCESS STORY Fortis Microfinance Bank Received Technical Training on Lending to the RE/EE Microfinance Sector

In Mid-September, 2014, Winrock International (REEEP team) organized a technical training for key staff of Fortis Microfinance Bank on lending to the RE/EE sectors. This training has proven to be one of the most effective trainings the bank has received in recent times. The import of the training led to the setting up of a functional dedicated RE/EE lending desk. The 5-day intensive training sought to help increase the Bank’s knowledge of the RE/EE sectors and provided practical and real life examples of how to develop and implement loan products that helped to improve customers’ economic well-being through the use of renewable energy.

Fortis Microfinance Bank staff and management were well engaged in the training, with full attendance among participants for the duration of the 5-days. Bank participants reflected the knowledge that was gained during the training at the conclusion of the event by designing various products and packages to promote RE and EE technologies amongst existing and new bank customers. The recently designed clean energy products have been showcased to management and select loan products are expected to obtain Board approval and inclusion into the Bank’s next 5-year strategic master plan.

An important result of the training is the setup of an RE/ EE desk with trained staff. The staff for this task have been selected and will soon assume the new responsibility of implementing the product designs for the RE/ EE packages that are approved by management. As a result of the training, the Bank will do the following activities:

Improve access to credit lines for customers to access

RE/ EE products.

Increase access to more affordable sources of funds

at reduced interest rates for RE/EE products. To meet

this commitment, the Bank is already in talks with

multiple partners to increase access to capital.

The Bank, through this training, has strengthened its

communication with USAID for better collaboration

with regards DCA facility and access to funds to

finance agricultural activities.

Looking ahead, the Bank to further collaboration with Winrock as it establishes and expands RE desks across all branches. Technical assistance from Winrock will be necessary in areas of monitoring and evaluation in regards to the impact of the RE products as they are rolled out among their branches. Fortis appreciates the training and hopes to surpass the expectations of Winrock with regards RE/ EE product financing, helping to expand their customer base and increase access to affordable options for renewable energy solutions to many SMEs.

Figure 6: REEEP Renewable Energy Technical Specialist Tinyan Ogiehor facilitating a session.

Figure 7: Fortis MFB Staff Touring a Solar PV Installation

Page 28: USAID NIGERIA RENEWABLE ENERGYpdf.usaid.gov/pdf_docs/PA00M36D.pdf · PROGRAM DESCRIPTION ... including medical facilities, retrofitted ... Facility approved is working capital to

28

APPENDIX 3: REEEP Project Launch Notes and Media REEEP PROJECT LAUNCH REPORT OF THE USAID/NIGERIA RENEWABLE ENERGY/ENERGY EFFICIENCY PROJECT (REEEP) LAUNCH

EVENT ORGANISED BY WINROCK INTERNATIONAL.

Date: WEDNESDAY, JUNE 25TH

Time: 3:10pm

Venue: Cross River Hall, Transcorp Hilton, Abuja NOTABLE ATTENDEES:

SHARON PAULING - DIRECTOR, ECONOMIC GROWTH AND ENVIRONMENT USAID

IMEH OKON – AGREEMENT OFFICER REPRESENTATIVE, USAID

PAUL BURMAN - SENIOR PROGRAM ASSOCIATE, CLEAN ENERGY GROUP, WINROCK INTERNATIONAL

SEGUN ADAJU - CHIEF OF PARTY, RENEWABLE ENERGY AND ENERGY EFFICIENCY PROJECT, WINROCK INTERNATIONAL

MR SUKANMI OLOWO (ECOBANK)

EWA ELERI – DIRECTOR, INTERNATIONAL CENTRE FOR ENERGY ENVIRONMENT (ICEED)

AMINU SULEIMAN TAKUMA (NIGERIA INVESTMENT PROMOTION COMMISSION)

TALBA IMANUDEEN- (RENEWABLE RESEARCH AND DEVELOPMENT, NIGERIA ELECTRICITY REGULATORY COMMISSION)

BECCA SHWARTZ (SOLAR SISTER)

ERICK (WORLD BANK)

FELIX NITZ (GIZ)

ENGR. BAHIJJATU AHMAD (NATIONAL CORDINATOR OF THE RENEWABLE ENERGY PROGRAMME

FORTIS MICROFINANCE BANK

MERCY AKEREDOLU – WINROCK REPRESENTATIVE, NIGERIA .

MEDIA ( GUARDIAN, PUNCH, NTA, AIT, AHEMDOO MEDIA CONSULT.

The event was held under the theme ‘Renewable energy and energy efficiency project’ where stakeholders in the power sector converged to chat a way forward towards an improved policy that would encourage the development and marketing of renewable energy in Nigeria. 1.0 WELCOME/ INTRODUCTION

Paul Burman, Senior Program Associate, Clean Energy Group, Winrock International presented the welcome speech. He gave a brief overview of Winrock International - its Mission, programme Scope, Achievements etc. He stated that Winrock has been working on energy projects globally for over 30 years, noting that a great percentage of Nigerians have No access to quality electricity, hence the need for renewable energy. Winrock intends to achieve this by working with government to provide incentives for all Nigerians 2.0 OPENING ADDRESS

Page 29: USAID NIGERIA RENEWABLE ENERGYpdf.usaid.gov/pdf_docs/PA00M36D.pdf · PROGRAM DESCRIPTION ... including medical facilities, retrofitted ... Facility approved is working capital to

29

The Director of Economic Growth, United States Agency for International Development, Ms. Sharon

Pauling, while declaring the workshop open, said that USAID’s renewable energy project would among

other benefits facilitate the development and financing of the project, as well as promote energy efficiency

market.

She emphasised that REEEP is in line with the Federal Governments strive for rural electrification and

renewable energy. In the light of challenges being faced by the country, she opined that it is critical for

energy sources to be diversified. She concluded by thanking all stakeholders in attendance as well as

adding that REEEP is a part of United State Power Initiative for Africa.

Pauling noted that Winrock would through the project provide technical assistance that would contribute

to its broader goal of developing renewable energy in the Nigerian market.

3.0 OVERVIEW OF REEEP

A representative of Winrock international, Mr. Segun Adaju, who gave an overview of the project, said apart from providing technical support to stakeholders, it (the project) would also benefit the agricultural sector, banks as well as providing alternative sources for the fight against HIV AIDS. Adaju also urged banks to key into the project by doing business with the clean energy sector. He said, “With our 75 per cent target for the use of renewable energy in Nigeria, a well improved government policy would be required to actualise this project. “There is a need to have policies that would help to develop the sector and promote the efforts of renewable energy in the country as it is done in countries like Kenya and South Africa where duties on technology has been abolished.” He said the team was currently discussing with the General Hospital at Abaji in the Federal Capital Territory to introduce solar energy.

COMPONENTS OF REEEP

(I) Access to clean energy financing: this is aimed at developing the capacity of companies in the clean energy sector and other selected sectors to access financing through training on accessing finances, technical support and RE solutions, supporting and monitoring. (II) Technical assistance to financial institution through capacity building and exposure to credible technology and partners. (III) Training and Awareness Creation: promoting gender inclusive vocational training, partnership with other organisations etc. (IV) Self Governance: implementing legislation that enables RE development and supporting Government implementation of zero import duty (NCS)

BENEFICIARIES

(i) Banks and Financial Institutions (ii) Companies that deploy and maintain clean energy projects (iii) Vocational training institutes (iv) Other USA/Nigerian projects

Page 30: USAID NIGERIA RENEWABLE ENERGYpdf.usaid.gov/pdf_docs/PA00M36D.pdf · PROGRAM DESCRIPTION ... including medical facilities, retrofitted ... Facility approved is working capital to

30

4.0 GOODWILL MESSAGES

Mr Sukanmi Olowo (ECOBANK): ECOBANK takes RE as a very serious issue as the Bank is into sustainability Finance. The bank has a focus but faces challenges of unqualified entrepreneurs who lack focus. In his words, most of them are mere ‘dreamers’.

EWA ELERI (ICEED): About a hundred (100) million Nigerians live literarily in the dark and this increases annually. He pledged his organisations (ICEED) readiness to partner Winrock international in the struggle for renewable energy. He said only about 18% of Nigerians have access to power, stressed that Renewable Energy was to actualise government’s 75% connection target by 2020 .

AMINU SULEIMAN TAKUMA (NIGERIA INVESTMENT PROMOTION COMMISSION): he noted with dismay that financial institutions make it almost impossible a task for investors to gain access to finance in Nigeria and this has posed a major challenge for RE. In the course of the launch, NIPC gave the project a lifeline, urging entrepreneurs seeking custom duty wavers to apply through the commission.

TALBA IMANUDEEN- (RENEWABLE RESEARCH AND DEVELOPMENT, NIGERIA ELECTRICITY REGULATORY COMMISSION): in his view, most entrepreneurs do not have the knowhow to carry out projects and this poses a major challenge to RE drive. He further stated the commission is doing its best towards Renewable Energy and as such, all arrangements have been concluded for the kick off of the Renewable Energy policy in Nigeria by July.

BECCA SHWARTZ (SOLAR SISTER): emphasised the fact that moneys can be saved in the long run if Renewable Energy is adopted and people no longer spend on firewood, kerosene etc.

ERICK (WORLD BANK): RE is about empowering Nigerians and the World Bank is committed to this cause by trying to make the national grid work/enlarging it and mobilizing efforts to finance projects.

FELIX NITZ (GIZ): stressed the need for private financing in renewable energy

5.0 KEYNOTE ADDRESS BY ENGR. BAHIJJATU AHMAD (NATIONAL CORDINATOR OF THE RENEWABLE ENERGY PROGRAMME In her address, she noted these points:

(i) The reason for the RE program has to do with more than just lighting, it also involves cooking and transportation. (ii) Renewable Energy does not need government financial support, rather it needs enabling policies and enlightenment. (iii) Renewable Energy is a business of saving lives as well as making money. (iv) Nigeria is the biggest home for green energy, as such all stakeholders must collaborate.

6.0 CLOSING REMARKS Dr Mercy Akeredolu gave the closing remark. In her words ‘A baby is born (REEEP) and networking is the key factor needed for it to succeed. For any business to thrive, there must be Energy and that buttresses the need for RE’.

7.0 CONCLUSION Vote of thanks was delivered by Segun Adaju, Chief of party, Renewable Energy and Energy Efficiency Project, Winrock International, after which participants and guests converged for light refreshment and photo shoot.

Page 31: USAID NIGERIA RENEWABLE ENERGYpdf.usaid.gov/pdf_docs/PA00M36D.pdf · PROGRAM DESCRIPTION ... including medical facilities, retrofitted ... Facility approved is working capital to

31

8.0 RAPPORTEURS SUMMARY Overall, launch was very successful regardless of time constraint. REEEP is an initiative that must be developed if Nigeria must be at par with her foreign counterparts as well as African neighbours, i.e. Kenya and South Africa. Policies must also be put in place to facilitate actualisation of Nigeria’s 75% target on use of renewable energy.

Page 32: USAID NIGERIA RENEWABLE ENERGYpdf.usaid.gov/pdf_docs/PA00M36D.pdf · PROGRAM DESCRIPTION ... including medical facilities, retrofitted ... Facility approved is working capital to

32

Page 33: USAID NIGERIA RENEWABLE ENERGYpdf.usaid.gov/pdf_docs/PA00M36D.pdf · PROGRAM DESCRIPTION ... including medical facilities, retrofitted ... Facility approved is working capital to

33

Page 34: USAID NIGERIA RENEWABLE ENERGYpdf.usaid.gov/pdf_docs/PA00M36D.pdf · PROGRAM DESCRIPTION ... including medical facilities, retrofitted ... Facility approved is working capital to

34

APPENDIX 4: Fortis Microfinance Bank Training

Evaluation of Training Programme

Creating Access to Clean Energy Through Micro-

Financing

Held on September 15 – 19,

2014

Page 35: USAID NIGERIA RENEWABLE ENERGYpdf.usaid.gov/pdf_docs/PA00M36D.pdf · PROGRAM DESCRIPTION ... including medical facilities, retrofitted ... Facility approved is working capital to

35

Evaluation of Training

Programme on

Creating Access to Clean Energy Through Micro-

Finance

Held on September 15 – 19,

2014

For Officers of Fortis Microfinance Bank Limited,

Abuja

Under the

Auspices of

RENEWABLE ENERGY AND ENERGY EFFICIENCY

PROGRAM (REEEP)

OF USAID/WINROCK

INTERNATIONAL

Training and Evaluation by:

Page 36: USAID NIGERIA RENEWABLE ENERGYpdf.usaid.gov/pdf_docs/PA00M36D.pdf · PROGRAM DESCRIPTION ... including medical facilities, retrofitted ... Facility approved is working capital to

36

RE Training Evaluation Report

Executive Summary

The five day training with the theme: Creating Access to Clean Energy Through Micro-

Financing - proved to be very successful and all the set objectives were met. Factors responsible

for this include the thorough commitment of the project sponsors – USAID, WINROCK and

FORTIS, the participants’ selection, and the design and delivery of the training modules. Members

of executive management of these sponsoring organizations made regular visits and participated in

the trainings. Fortis sent two members of the management team as participants while officials of

REEEP at Winrock International were always there on each day from 8am to 4pm.

The training was made very interactive and explorative thus keeping the interests of the

participants high through the five days. A significant aspect of the training that added thrust was

the invitation of five different professionals and experts in the field who shared their knowledge

and experience with the professionals. This was facilitated by the Chief of Party, Mr. Segun Adaju.

Amongst those that came were the Renewable Energy Manager at USAID, the Country Director

of Farmer-To-Farmer Program and the Renewable Energy Technology Specialist at Winrock

International.

The participants were taken through 13 modules including financing examples and case studies on

renewable energy financing and credit. Some of these included those of Aryavat Gramin Bank,

Grameen Shakti, Bank of Punjab, M-Kopa, Grameen Ghana and Mega Bank.

They became convinced of the viability of renewable energy technology especially in

Nigeria

They also became very much convinced of the future of renewable energy and the viability

of renewable energy financing in Nigeria

Participants became more and better informed of the different opportunities available in

renewable energy financing for their bank

They became aware of how to package and fund renewable energy projects

The participants commenced right from the training on developing three different renewable

energy finance products for their microfinance bank.

Discussion has commenced between Fortis Microfinance Bank and Winrock on a working

relationship and on signing an MOU for the development of the renewable energy finance

sector of the bank.

Page 37: USAID NIGERIA RENEWABLE ENERGYpdf.usaid.gov/pdf_docs/PA00M36D.pdf · PROGRAM DESCRIPTION ... including medical facilities, retrofitted ... Facility approved is working capital to

37

Fortis MFB Limited is already planning (with the support of Winrock International) on

setting up a team of ten core staffs to drive the renewable energy financing business.

The participants have muted the plan of selling the idea of using renewable energy products

for their usual end of year gifts and awards to their clients. It may be pertinent to point out

that annually, Fortis hosts about 5,000 of its clients – all women – to a business forum in

Abuja.

Introduction

The training on creating access to renewable energy through micro-financing was held from

September 15 to 19, 2014 at the Fortis MFB head Office in Wuse 5, Abuja and was sponsored by

Winrock International under the USAID funded Renewable Energy and Energy Efficiency

Program (REEEP).

The training sought to build the capacity of officers of Fortis Microfinance Bank Limited on

effective ways of packaging, managing and marketing renewable energy products like solar and

biogas systems to households, rural and off grid communities, micro businesses, industry, SMEs

hospitals, infrastructural projects, agricultural products, building projects, and educational

institutions.

The seminar format was adopted for the training to make for effective coverage of the subject

while engendering participants’ involvement in the various presentations. To achieve drill down

effect, case studies, brainstorming sessions, breakout sessions and field visits were incorporated

into the training. The third day of the training was devoted to field visits.

The training lasted for a total of 8 hours per day from 8am to 4pm and was limited to 25 participants

who were selected from various departments of Fortis MFB Limited. An 87 page training manual

(Training Manual For Senior and Middle Level Managers in Energy Financing) complete with

exercises was handed to each participant on the opening day of the training while training slides

for all the modules (13 modules in all) was given to each participant at the end of the training. The

contents of the training manual was developed by USAID (United States Agency for International

Development) and GVEP (Global Village Energy Partnership) and was adopted to suit the

Nigerian local situation by Deva Access and Empowerment Int’l Ltd/Gtee.

The resource persons/presenters were drawn from the renewable energy industry and hence made

practical application of the training material. They made good use of multimedia projectors, power-

point slide presentations and video clips and case studies.

The objectives of the training were set out and highlighted as follows:

i. To educate participants and create awareness on benefits and features of the different

renewable energy technology and products;

Page 38: USAID NIGERIA RENEWABLE ENERGYpdf.usaid.gov/pdf_docs/PA00M36D.pdf · PROGRAM DESCRIPTION ... including medical facilities, retrofitted ... Facility approved is working capital to

38

ii. To expose participants to the different renewable energy products, brands, dealers and

manufacturers.

iii. To educate participants on renewable energy business and the investment/financing

opportunities

iv. To equip participants with the requisite knowledge and skills required for packaging,

managing and funding renewable energy products and projects.

The program for the training was as follows:

DAY 1 – Monday September 15 Sept 15. Opening Ceremonies:

- Welcome / Introduction

- Opening Address by USAID

- Remarks by Fortis MFB Limited

- Overview of REEEP

- Goodwill Message by ICEED

Tea Break Introduction to Renewable Energy Forms and Features of Renewable Energy Lunch Applications and Benefits of Renewable Energy: Manufacturers, Dealers and Brands of Renewable Energy Products RECAP DAY 2 - Tuesday September 16 Sept 16 Renewable Energy Installations in Nigeria and Elsewhere

Ways of Financing Renewable Energy products and Projects Tea break Examples of Renewable Energy Credit: Lunch Case Studies in Renewable Energy Finance and Credit: RECAP DAY 3 - Wednesday September 17 Sept 17 Field Visits:

1. Renewable energy installation in a school - Genesis Christian Academy,

Kuje

2. Renewable energy dealer and installer - Nayo Tropical Technology,

Abuja

3. Renewable energy installation in a business office - Winrock

International Office, Abuja

DAY 4 – Thursday September 18 Sept 18 Renewable Energy Credit Considerations:

Tea Break Renewable Energy Loan Packaging, Structuring and Management

Page 39: USAID NIGERIA RENEWABLE ENERGYpdf.usaid.gov/pdf_docs/PA00M36D.pdf · PROGRAM DESCRIPTION ... including medical facilities, retrofitted ... Facility approved is working capital to

39

Lunch Risk Management in Renewable Energy Financing RECAP DAY 5 – Friday September 19 Sept 19 Developing Renewable Energy Loan Products:

Tea break Marketing Renewable Energy Loan Products COURSE REVIEW AND RECAP. Closing Remarks and Certificates. Lunch and Close

In addition to the modules as above, five different renewable energy experts/industry players

were brought in on various days to share knowledge and experiences with the participants. The

experts brought in were:

1. Mrs. Ime Okon – Project Manager, Energy & Climate Change, USAID Nigeria

2. Alhaji Lawal Gada – Renewable Expert and Former Project Manager AtRE

3. Mr. Mike Bassey – Country Director, Farmer-To-Farmer AET/Nigeria

4. Mr. Nehemiah Emmanuel – Executive Director, Nehemiah Foundation International

5. Mr. Tinyan Ogiehor, Renewable Energy Tech Specialist, Winrock International.

The Chief of Party, REEEP, Mr. Segun Adaju, was present on all days, from Monday to Friday,

taking active party in all the presentations and activities.

Product Demonstrations:

Participants were exposed to some product demonstrations, mainly:

1. Improved cookstove

2. Solar lanterns

3. Three lamp compact solar home system

4. Ethanol stove

Participants Selection

Participants were drawn from five functional departments of the bank with the highest number (11

or 44%) coming from business development and marketing arm in various branches of the branch

within the Abuja environ. This is considered good as they are the ones that interface more with

clients; market the bank’s products and services and package credit requests. The beauty of this

selection was seen too, in during the discussions, case studies and breakout sessions as the

participants easily matched the cases with their field experiences and spotted opportunities and

areas of the adoption and implementation.

Page 40: USAID NIGERIA RENEWABLE ENERGYpdf.usaid.gov/pdf_docs/PA00M36D.pdf · PROGRAM DESCRIPTION ... including medical facilities, retrofitted ... Facility approved is working capital to

40

Functional Area No of Participants

Business Development and Marketing

11 Credit Risk Management 4

Internal Audit

2

Accounts / Financial Control

3

Admin and Services

3

Operations

2

TOTAL 25

Management Commitment

A remarkable aspect of the participants is that two of them are members of the senior management

team, reflective of bank’s seriousness with the project and the management’s buy-in and

commitment. These two senior members of management are the Chief Operating Officer and the

Chief Human Capital Officer.

Gender Representation of Participants

Gender No of Participants

Males

17

Females

8 TOTAL 25

In terms of gender only 5 females (20%) took part in the training. This is reflective of the gender

imbalance in renewable energy business in Nigeria and of business and entrepreneurship generally.

Of the five ladies that took part in the training, one is a departmental head; one is in risk

management while three are in marketing. Increasing the number of women in future trainings is

strongly recommended as women in households are major decision influencers; are active players

in microenterprises and women can best reach these segments.

Age Representation

Page 41: USAID NIGERIA RENEWABLE ENERGYpdf.usaid.gov/pdf_docs/PA00M36D.pdf · PROGRAM DESCRIPTION ... including medical facilities, retrofitted ... Facility approved is working capital to

41

Age Bracket

No. of Participants

22 – 30

8

31 – 40

15

41 – 50

0

51 – 60

2

61+

0

Would not indicate

0

TOTAL 25

Participants were skewed to the age bracket of 31-40. This is attributable to the fact participants

were selected from experienced staff with a minimum of four years microbanking experience. We

consider this very good as it portends continuity of the scheme over a much longer period and the

potential for knowledge/experience transfer. Besides, this is an energetic age bracket that can

effectively market the finance products to clients. The two participants within the age bracket of

51 – 60 are the two senior officers of the bank including the chief Operating Officer who took part

in the training.

Case Studies:

The participants were taken through some renewable energy financing case studies. These

included:

1. Aryavart Gramin Bank India

2. Peregrine Finance

3. Kiwibank

4. Andra bank

5. Grameen Shakti – desco model

6. Grameen Ghana

7. The partner models

Page 42: USAID NIGERIA RENEWABLE ENERGYpdf.usaid.gov/pdf_docs/PA00M36D.pdf · PROGRAM DESCRIPTION ... including medical facilities, retrofitted ... Facility approved is working capital to

42

8. Admirals Bank – solar step down loan, pay as you go loan, save now pay later loan

9. Citizens Ban – Energy Efficiency Loan, Home Improvement Loan

10. AFC – Home Energy Loan Programe (HELP)

11. M-KOPA

12. Mega Bank Nepal

13. Bank of Punjab

14. Deva Access – Renta Scheme

15. Barefoot Linkage program

16. KUSCCOs

Field Visits

To have a first experience and

interactions with renewable energy

installations and operation, the

participants were taken to three

different installations within the Abuja

area. These are Genesis Christian

Academy in Kujea, Nayo tropical Technology and Winrock

Office.The Genesis Christian Academy is a private primary

and secondary educational centre operated by a Christian group.

The school is located in a completely off grid rural community

known as Rije in the Kuje area council of Abuja. The school is

therefore completely dependent on its solar installations for

the required energy to power its lighting system, classrooms, water

borehole and ICT. The solar energy is provided via an array of 24

solar panels mounted on the roof, a battery bank of

12 batteries and an inverter system. The school is

able to generate approximately 18KW of energy per

day to service its needs.

Nayo Tropical Technology Limited is one of the

major and foremost renewable energy companies in

Nigeria. Located in Abuja, the company has a show

room and mini workshop at its head office and a

major workshop in the Gwagwalada Area Council of

Abuja. The company sells and installs solar systems

Page 43: USAID NIGERIA RENEWABLE ENERGYpdf.usaid.gov/pdf_docs/PA00M36D.pdf · PROGRAM DESCRIPTION ... including medical facilities, retrofitted ... Facility approved is working capital to

43

and wind energy systems for rural communities,

businesses, hospitals, schools and homes. Amongst

its products were solar freezers and solar fans. Two

of the Company’s technicians, Chidiebere and

Chiazo took the participants round their products

and explained the operation of each. Besides, the

company powers its office via solar and has

disconnected itself from grid electricity.

Winrock International has installed a solar powered

system to provide energy for its office located in

Maitama, Abuja. The participants were taken

through how the office was sized for solar

installation, the installation process and the system

load including the battery bank and inverter.

Breakout Sessions and product Development

The participants were split into three breakout

sessions and each given the task of developing

a product together with the financing

mechanism and marketing options. The groups

were:

1. Improved Cook Stove Team

2. Solar Home System Team

3. DESCO Team. (Distributed Energy

Services Company Model)

The Improved Cookstove Team came up

with a product they called Fortis Beta

Stove targeted at Fortis women clients

and priced at N5,000 each.

The Solar Home System Team designed

the Fortis Lite – a solar powered energy

system financing scheme for households

and microenterprises and priced at

N30,000

The third group, the DESCO team, came up with Fortis Bio-Digester, a financing scheme for the

purchase of portable biogas system targeted at households and communities.

The participants were so motivated that after the closing ceremony on Friday, they sat back to

continue work on their products for presentation to Fortis Management for approval.

Page 44: USAID NIGERIA RENEWABLE ENERGYpdf.usaid.gov/pdf_docs/PA00M36D.pdf · PROGRAM DESCRIPTION ... including medical facilities, retrofitted ... Facility approved is working capital to

44

Poor

manageable Not so

good

Good

Excellent Overall Verdict 1 2 3 4 5

Training Structure 1 2 3 4 5 Training Content 1 2 3 4 5

Quality of Handouts 1 2 3 4 5

Session Length 1 2 3 4 5

Venue 1 2 3 4 5 Pace of Training 1 2 3 4 5

Exercises & Games 1 2 3 4 5 I learnt something useful 1 2 3 4 5

PARTICIPANTS EVALUATION OF THE TRAINING

The participants were grateful for the opportunity

to take part in the training. To many of them the

training afforded them the opportunity to learn,

improve their knowledge and skills and be in

position to finance renewable energy products.

A major fall-out of the training was the

consensus and resolution among the participants

to make presentations to their management on the

renewable energy financing schemes.

All the participants were asked to completed

evaluation forms on their personal

assessment of the training exercise:

1. Rating of Individual Modules

Participants were given evaluation sheets to rate

each of the modules presented and the presenters. The rating was based on a likert-type scale of 1

– 5; 1 being the lowest score and 5 being the highest score. The points on which the participants

were asked to evaluate the modules are as follows:

Please rate the trainer for each aspect below 5=very effective and 1 = poor

5 4 3 2 1 Knowledge of subject

Organization & preparation

Preparation

Style and delivery Responsiveness to the group’s needs

Creating a good learning environment

Rating of the modules on a score of 1 -5

Page 45: USAID NIGERIA RENEWABLE ENERGYpdf.usaid.gov/pdf_docs/PA00M36D.pdf · PROGRAM DESCRIPTION ... including medical facilities, retrofitted ... Facility approved is working capital to

45

Ratings by the participants showed an average score of 4.5 per on all on the rating

denominators. The only exception is rating point 6 – appropriate pace of class. Some of

the participants were of the view that more time should have been allocated to the

modules to allow for more drill down and more class involvement.

PARTICIPANTS SUGGESTIONS

Participants were asked about suggestions on follow-up to the training.

Suggestions made include:

Practical aspect of renewable energy training should be incorporated into the program

CRITICAL OBSERVATIONS

1. The level of management commitment from Fortis MFB Limited to the

program and scheme is very commendable and no doubt contributed to the

success of the training.

2. More women should be included on the list of participants in future programs.

This suggestion is based on the socio-cultural background of Nigeria. In some

communities, men are barred from interacting with women and in such

situations only th women can talk to those women in Purdah. Secondly,

women are the ones suffering the effects of open fire wood cooking and make

the purchases of candles and kerosene lanterns.

OUR CONCLUSION AND SUGGESTIONS:

1. More women inclusion in renewable energy training programs should be

deliberate and more inclusive for better impact and result.

2. Future trainings venues should be outside the banks’ premises to minimize training

interruptions and class distractions

3. Future training programs to include interactions with various users of

renewable energy products.

4. The training should be replicated with other microfinance banks, at least two more in

the

North, three in the South South and South East and two in the South West.

FOLLOW - UP:

To sustain the tempo of interest shown by both the management and staff of Fortis

microfinance

Bank Limited towards renewable energy financing, we strongly suggest that:

1. Winrock pursues the execution of the MOU with the Bank and the bank

assisted to launch its products within the next 90 days.

Page 46: USAID NIGERIA RENEWABLE ENERGYpdf.usaid.gov/pdf_docs/PA00M36D.pdf · PROGRAM DESCRIPTION ... including medical facilities, retrofitted ... Facility approved is working capital to

46

2. That the proposed team of ten core renewable energy product officials be set

up within the next two weeks for eventual launching of the bank’s renewable

energy products.

3. The bank should consider adopting the M-Kopa, Aryavat Gramin Bank of Punjab and

Deva Models

for a start. Signed:

Chimaobi James Agwu

Lead Facilitator/CEO, Deva Access and Empowerment Int’l Ltd/Gtee

Page 47: USAID NIGERIA RENEWABLE ENERGYpdf.usaid.gov/pdf_docs/PA00M36D.pdf · PROGRAM DESCRIPTION ... including medical facilities, retrofitted ... Facility approved is working capital to

47

Appendix 5: Ecobank Training

Crimson Capital Mission Report Lagos, Nigeria, July 2014

This short report summarizes preparation meetings and the introductory Renewable Energy and Energy

Efficiency (RE &EE) training program for Eco Bank, conducted July 21-25, 2014. The training program

was developed and implemented by Mr. Ilan Wolkov, a consultant from Crimson Capital, subcontractor

to Winrock on REEP.

Day 1: Eco Bank Introductory Meetings and Training Preparation

The first two days of the mission to Lagos was used to coordinate both on the workplan implementation and

also to setup the RE & EE introductory training program for Eco Bank. The training was originally planned to

take place over the course of three days, but was shortened to two days, at the request of the bank, due to

the demanding schedules of the participants, who were all middle to top management personnel. The first

day was spent in the SME head office with, amongst others: the SME Head Lagos Directorate and the Head

SME Island Region, both of whom are project point persons.

Day 2: Workplan Set Up Workshop

The second day consisted of an interactive workshop session with ten attendants from top management,

including amongst others, Head Local Corporates Lagos, Head SME Lagos Directorate, Country Head

Power, and Head SME Island Region. Discussions covered the following:

a) Core Team EE - RE setup

b) Product Definition and General Procedures setup

c) Marketing Plan setup

Some of the take away conclusions that were learned were that the bank is interested in the long run to set

up a Core Team EE-RE under the power desk – however the first step is to develop the business so as to

justify full time staff. The Core Team is envisioned as cross departmental in the sense that it will serve as the

bank’s internal core on EE-RE financing – serving Corporate, SME, Micro and Retail clients.

In terms of Products, it was agreed that it makes sense to set up different products for different target groups

and also special ones that would be specific to types of Renewables such as Solar Power, Mini Hydro Power

Stations, Wind Power Farms and Biomass related projects.

Lastly, Marketing Plan options were discussed and Mr. Wolkov presented lessons learned from

international best practices. The bank management debated what would be the most appropriate roll

out procedures for the products.

During Day 2, Mr. Wolkov also conducted a preliminary introduction on Energy Efficiency, as this is an area

that had not previously been focused on within the bank.

Day 3 & 4: EE - RE Technical Workshop

The EE-RE Technical workshop was conducted by Mr. Wolkov and attended by 20 top and middle

management staff from the bank (see attached list of participants). A brief summary of the training workshop

Page 48: USAID NIGERIA RENEWABLE ENERGYpdf.usaid.gov/pdf_docs/PA00M36D.pdf · PROGRAM DESCRIPTION ... including medical facilities, retrofitted ... Facility approved is working capital to

48

is provided below, and a draft agenda is attached. (Mr. Wolkov has already submitted the full set of training

materials for the program).

1) Energy Efficiency and international best practices from projects in Slovakia, Serbia, Eastern Europe

and India to give a wider perspective. To make the subject matter more relevant and lively, the trainer

included several video clips illustrating EBRD and KfW funded projects, helping to explain EE and

RE technologies and how these can benefit municipalities, businesses and private persons alike.

2) EE and RE Technical Interventions as well as Energy Audits were briefly described as well as various

EE and RE calculators such as Retscreen. Of particular interest was a Solar Project finance

calculator created by a German engineering company and implemented with South African

municipalities, which could be localized to Nigerian conditions.

3) A very successful group activity held was how Ecobank -- with its up to 600 branches in Nigeria --

can save energy, taking into consideration that each branch has two large generators. Every branch

uses between $10,000 - $20,000 PER MONTH for diesel. Added to this are electricity bills to the

distribution company, maintenance costs for the generators and regular capital investments every

couple of years for buying new generators. Multiplying this by 600 branches, the amounts spent on

energy become very significant and alternatives discussed could be a combination of Energy

Efficiency measures, Solar Panels and changing to gas to fuel the generators, which is cheaper in

the long run and also more sustainable in terms of money, energy spent and CO2 emitted. The

enthusiasm during this exercise was very heartening and gave hope that the management would try

to sponsor this on a pilot basis in the near future.

4) Risk factors of EE/RE technologies were presented for each type of project to enable the participants

to focus on the aspects that normally will make a successful implementation and financing of the

most common EE/RE interventions/projects. What might cause a project to fail was also discussed

extensively.

The feedback from top management was very positive.

A fifth day for field visits to see real projects was planned, but did not take place as the bank postponed

it for a later date, due to holidays.

Suggested Next Steps

Suggested areas of focus for future consultancies include:

Similar trainings rolled out to relevant staff both in risk and also front office / front line personnel,

such as Account Managers and Branch Manager

Site visits with bank staff to study EE/RE projects and support to bank staff on how to recognize

EE/RE sale opportunities and technological interventions.

Further support to the bank in developing the work plan implementation may also be

considered.

Page 49: USAID NIGERIA RENEWABLE ENERGYpdf.usaid.gov/pdf_docs/PA00M36D.pdf · PROGRAM DESCRIPTION ... including medical facilities, retrofitted ... Facility approved is working capital to

49

1) Consultant on site Work on Work Plan Deliveries Consultants Eco Bank

Day 1

Consultants will work in bank premises on Work Plan Development and Work Plan

Deliveries with intermittent low intensity meetings with bank staff where necessary. Meetings

will be kept at minimum to keep banks normal everyday work continuing.21st July

2) EcoBank Energy Efficiency - Renewable Energy Setup

Workshop

Day 2. 9:00 9:20 Course Introduction Agenda - Admin - Training Rules

22nd July 9:20 10:30 Core Team Setup & Conclusions & Decisions

10:30 10:45 Tea & Coffee Break

10:45 12:15 Product Definition and General Procedures Setup & Conclusions & Decisions

12:15 13:15 Lunch

13:15 14:45 Marketing Plan Setup & Conclusions & Decisions

10:30 10:45 Tea & Coffee Break

15:00 16:30 Marketing Plan Setup & General Work Plan Modification - Next Steps

3) EcoBank Energy Efficiency - Renewable Energy Energy

Technical and Project Finance - "How To Recognise and

Source Projects and How to Finance Them" In Class

TrainingDay 3. 9:00 9:20 Course Introduction Agenda - Admin - Training Rules

23rd July 9:20 10:30 Nigeria EE-RE Sector and Opportunities for funding

10:30 10:45 Tea & Coffee Break

10:45 12:15Introduction to Energy Efficiency Intervention Technologies + Energy Savings

Calculations - Examples + Exercises - Energy Audits

12:15 13:15 Lunch

13:15 14:00EE Intervention Technologies Continued. Introduction to Renewable Energy

Intervention Technologies + Examples + Exercises - Energy Audits

14:00 14:45 Introduction to Renewable Energy Intervention Technologies + Examples

14:45 15:00 Tea & Coffee Break

15:00 16:30 Introduction to Renewable Energy Intervention Technologies + Examples

Day 4. 9:00 10:30 Energy Efficiency Project Case Study - How to Source, Evaluate & Fund

24th July 10:30 10:45 Tea & Coffee Break

10:45 12:15 Solar Power Project Case Study - How to Source, Evaluate & Fund

12:15 13:15 Lunch

13:15 14:45 Biomass Power Project Case Study - How to Source, Evaluate & Fund

14:45 15:00 Tea & Coffee Break

15:00 16:30 Wind Power Project Case Study - How to Source, Evaluate & Fund

ECO Bank Agenda and Work Schedule for 21st - 24th July 2014 Lagos

Participants & Location

Relevant Department Heads,

SME Department and

proposed EE - RE Desk

Officers - EB Training

Facillities - 10 Participants

Relevant Branch Managers,

Account Managers, EE-RE

Desk Officers - EB Training

Facillities - 10-20 Particpants

Page 50: USAID NIGERIA RENEWABLE ENERGYpdf.usaid.gov/pdf_docs/PA00M36D.pdf · PROGRAM DESCRIPTION ... including medical facilities, retrofitted ... Facility approved is working capital to

50

ECOBANK ATTENDEES FOR USAID/RE TRAINING ON RENEWABLE ENERGY

S/NO STAFF NAME POSITION

1 Layi Oresanya HEAD LOCAL CORPORATES LAGSW DIRECTORATE

2 Sunkanmi Olowo HEAD SME LAGSW DIRECTORATE

3 Theresa Lawal HEAD SME ISLAND REGION

4 Sola Afolalu HEAD SME APAPA REGION

5 Joy Nwaezeapu HEAD SME MAINLAND REGION

6 Boye Elekuru HEAD SME SOUTHWEST REGION

7 Funke Jones COUNTRY HEAD POWER

8 Adesola Adewale TEAM LEAD POWER

9 Goke Ajibola HEAD RISK LAGSW DIRECTORATE

10 Tunde Awobutu RISK ANALYST LAGSW DIRECTORATE

11 Peter Erameh SME SS/SE DIRECTORATE

12 Ufuoma Akpeyabor HEAD LOCAL CORPORATE SS/SE DIRECTORATE

13 Ignatius Agboneni HEAD RISK SS/SE DIRECTORATE

14 Folake Aina HEAD PERSONAL BANKING LAGSW DIRECTORATE

15 Daberechi Effiong HEAD ASSET & LIABILTY PRODUCTS

16 Habeeb Lawal PRODUCT OFFICER CONSUMER FINANCE

17 Dammy Oruwari REGIONAL HEAD ISLAND

18 Funso Popoola REGIONAL HEAD APAPA

19 Nike Kolawole REGIONAL HEAD IKEJA

20 Godwin Eton AREA MGR UYO