USCG Hurricane Response & HMS BOUNTY SAR Case. North Carolina 2013 All-Hazards Conference 12 March 2013 CDR Tim Cummins– Deputy Sector Commander LT Kevin Sullivan – Sector NC Command Center Chief. Hurricane Response Overview. Command Structure Assets/Capabilities Missions Partners. - PowerPoint PPT Presentation
Popular Tags:
25
USCG Hurricane Response & HMS BOUNTY SAR Case North Carolina 2013 All-Hazards Conference 12 March 2013 CDR Tim Cummins– Deputy Sector Commander LT Kevin Sullivan – Sector NC Command Center Chief
Transcript

USCG Hurricane Response&

HMS BOUNTY SAR CaseNorth Carolina 2013 All-Hazards Conference

12 March 2013

CDR Tim Cummins– Deputy Sector Commander

LT Kevin Sullivan – Sector NC Command Center Chief

Hurricane Response OverviewCommand StructureAssets/CapabilitiesMissionsPartners

Command Structure ICS Structure

Decision PointScalabilityInteroperability

Assets/CapabilitiesSector AssetsSurge Capabilities

PersonnelReservistsAssets

AviationCuttersATONStrike TeamsFacility Support

MissionsSAR

LimitationsInland/Coastal/Offshore Missions

Marine Transportation System Recovery (MTSR)Ferry SystemPorts (Disaster Recovery Supplies)Aids to Navigation (ATON)

Marine Environmental Protection (MEP)Law EnforcementPorts, Waterways and Coastal Security

(PWCS)

Missions: Inland SARHoist capable helos

MH-60MH-65

High Water RescueSwift Water RescueCommunications

(800 MHz)Tertiary

Cell PhoneARES

Missions: Marine Environmental Protection

Missions: MTSR/ATON

Stray Buoys

PartnersFederal

Army Corps of EngineersEnvironmental Protection Agency

State/County/LocalState/Eastern Branch/County EOC’s & 911

CentersCoastal Municipalities (Fire/Police/EMS)NCDOT Bridges/Ferry DivisionsNC Wildlife/Marine Patrol

IndustryState PortsPilots

Partnerships: ACOE/EPA

Emergency Ferry Routes

Questions?

HMS BOUNTY SAR Case Challenges

Timeline (all times local)

Sunday 28 OCT 2130: SCC receives email via agent that HMS BOUNTY w/ 16POB is disabled and T.O.W. 90NM SE of Cape Hatteras.

SCC is unable to establish direct comms with vessel

SCC Requests C-130 from A/S E-City to investigate.

~2330: C-130 on-scene, establishes comms.Overnight the C-130 remains on-scene,

provides comms link as situation worsens. SCC coordinated plan to abandon ship after

sunrise.

87NM

Timeline ContinuedMonday: 0426: Vessel capsizes crew forced to

abandon ship0430: SCC requests A/S E-City launch 2 MH-

60’s0641: CG-6012 on-scene, hoisting one

survivor0756: CG-6012 BINGO, 5 survivors o/b0856: CG-6031 BINGO, 9 survivors o/b~0900: SCC determines 2 crewmembers

remain missing, begins search planning.1638: CG-6043 recovers 1 unresponsive PIW

in search area.Tuesday 1632: Transferred SMC to D5Friday 1830: D5 grants ACTSUS

87NM

Debris

30NM

SAR EFFORT STAT SHEETCASE TOTALS: Total area (SQNM): 10877.21Total track miles: 6214.11Searches Conducted - 22

H-60 – 5C-130 – 7 C-144 - 2ELM – 3GALLATIN - 5

Total Sorties 19 Investigation and Hearing Pending

ContactsSCC 24x7: 910-343-3880LT Sullivan

[email protected]

Questions?