+ All Categories
Home > Documents > USGS QUADRANGLE LOCATION SITE LOCUSs3.amazonaws.com/newbedford-ma/wp-content/uploads/...d ' existing...

USGS QUADRANGLE LOCATION SITE LOCUSs3.amazonaws.com/newbedford-ma/wp-content/uploads/...d ' existing...

Date post: 26-Apr-2020
Category:
Upload: others
View: 0 times
Download: 0 times
Share this document with a friend
4
PROJ. MGR.: MS DESIGNED BY: MF REVIEWED BY: MFC OPERATOR: EMD DATE: 01-22-2015 JOB NO. SOURCE : SCANNED USGS TOPOGRAPHIC QUADRANGLES SCANNED BY THE MASSACHUSETTS EXECUTIVE OFFICE OF ENVIRONMENTAL AFFAIRS, MASSGIS. DISTRIBUTED JUNE, 2001. Data Supplied by : 0 2,000 4,000 6,000 1,000 Feet USGS QUADRANGLE LOCATION © 2015 - GZA GeoEnvironmental, Inc., J:\170,000-179,999\172205\172205-00.SMS\FIGURES\GIS\MXDs\172205-00_SiteLocus_SmastBldg_UMASS_Dartmouth_FIG1.mxd, 1/22/2015, 8:37:58 AM, elaine.donohue SITE LOCUS SMAST BUILDING - UMASS DARTMOUTH 706 & 838 RODNEY FRENCH BOULEVARD NEW BEDFORD, MASSACHUSETTS FIGURE NO. 01.0172205.00 1 SITE
Transcript
Page 1: USGS QUADRANGLE LOCATION SITE LOCUSs3.amazonaws.com/newbedford-ma/wp-content/uploads/...d ' existing smast 1 building new seawater piping system surface water supply lines 0.57 acre

PROJ. MGR.: MSDESIGNED BY: MFREVIEWED BY: MFCOPERATOR: EMDDATE: 01-22-2015

JOB NO.

SOURCE : SCANNED USGS TOPOGRAPHIC QUADRANGLESSCANNED BY THE MASSACHUSETTS EXECUTIVE OFFICE OF

ENVIRONMENTAL AFFAIRS, MASSGIS. DISTRIBUTED JUNE, 2001.

Data Supplied by :

0 2,000 4,000 6,0001,000Feet

USGS QUADRANGLE LOCATION

© 20

15 - G

ZA G

eoEn

viron

menta

l, Inc

., J:\1

70,00

0-179

,999\1

7220

5\172

205-0

0.SMS

\FIGU

RES\G

IS\M

XDs\1

7220

5-00_

SiteL

ocus

_Sma

stBldg

_UMA

SS_D

artmo

uth_F

IG1.m

xd, 1

/22/20

15, 8

:37:58

AM, e

laine

.dono

hue

SITE LOCUSSMAST BUILDING - UMASS DARTMOUTH706 & 838 RODNEY FRENCH BOULEVARDNEW BEDFORD, MASSACHUSETTS

FIGURE NO.01.0172205.00

1

SITE

Page 2: USGS QUADRANGLE LOCATION SITE LOCUSs3.amazonaws.com/newbedford-ma/wp-content/uploads/...d ' existing smast 1 building new seawater piping system surface water supply lines 0.57 acre

[®[®

[®[®

[®[®

[®[®

[® [®

[®[®

[®[®

[®[®

[®[®

[®[®

[®[®

[® [®

[®[®

[®[®

[® [®

[®[®

[®[®

[®[®

[®[®

[® [®

[®[®

[®[®

[®[®

[®[®

[®[®

[®[®

[®[®

[® [®

[®[®

[® [®

[® [®

[® [®

[®[®

[®[®

[® [®

[® [® [®

[® [®

[®[®

[®[®

[®[®

[®[®

[®[®

[®[®

[® [® [®

[®[®

[®[®[®

[®[®

[® [®

[®[®

[®[®

[® [®

[® [®

[®[®

[®[®

[®[®

[® [®

[®[®

[®[®[®

[®[®

[® [®

[®[®

[®[®

[®[®

[®[®

[®[®

[® [®

[®[®

[®[®

[® [®

[®[®

[® [®

[®[®

[® [®

[® [®

[® [®

[® [®

[®[®

[®[®

[® [®

[®[®

[®[®

[® [®

[®[®

[®[®

[®[®

[®[®

[® [®

[®[®

[®[®

[®[®

[®[®

[®[®

[®[®

[®[®

[® [®

[®[®

[®[®

[® [®

[®[®

[®[®

[®[®

[®[®[®

[®[®

[®[®

[® [®

[®[®

[®[®

[®[®

[® [®

[®[®

[® [®

[®[®

[®[®

[®[®

[®[®

[®[®[®

[®[®

[®[®

[®[®

[® [®

[®[®

[®[®

[® [®

[® [®

[®[®

[® [®

[®[®

[®[®

[® [®

[®[®

[®[®

[® [®

[®[®

[®[®

[® [®

[®[®

[® [®

[®[®

[®[®

[®[®

[®[®

[®[®

[® [®

[®[®

[®[®

[®[®

[® [®

[®[®

[®[®

[®[®

[® [®

[® [®

[®[®

[®[®

[®[®

[®[®

[® [®

[® [®

[®[®

[®[®

[®[®

[®[®

[®[®

[®[®

[®[®

[® [®

[®[®

S. R O D N E Y F R E N C H B O U L E V A R D217

'

EXISTINGSMAST 1 BUILDING

NEW SEAWATERPIPING SYSTEM

SURFACE WATER SUPPLY LINES

0.57 ACRE PARCELBETWEEN SITES

EXISTING NRCBUILDING

CITY OF NEW BEDFORDPARCEL TO BE ACQUIRED

FORT RODMANHISTORIC DISTRICT

(NBE.F)

CITY OF NEW BEDFORDPARCEL TO BE ACQUIRED

SURFACE WATER EFFLUENT LINE

FORT TABERHISTORIC DISTRICT

(NBE.C)

PRIORITY HABITAT(PH15)

U.S. NAVALRESERVE CENTER

(NBE.AJ)

ESTIMATED HABITAT(EH79)

© 20

15 - G

ZA G

eoEn

viron

menta

l, Inc

. J:\1

70,00

0-179

,999\1

7220

5\172

205-0

0.SMS

\FIGU

RES\G

IS\MX

Ds\17

2205

-00_E

nviro

nmen

talCo

nstra

intsM

ap_v

2_FIG

-2.mx

d, 11

/17/20

15, 1

1:32:1

9 AM,

antho

ny.pu

ngito

re

4 PROJ. MGR:

DESIGNED BY:

REVIEWED BY:

DRAWN BY:

CHECKED BY:

SCALE:

REVISION NO.PROJECT NO.DATE:

MFC

11-17-2015 01.0172205.00

ENVIRONMENTAL CONTRAINTS MAP

SMAST IISMAST BUILDING - UMASS DARTMOUTHNEW BEDFORD, MASSACHUSETTS

PREPARED FOR:PREPARED BY:

2FIGUREMSMS

EMD / ADPMS

UNLESS SPECIFICALLY STATED BY WRITTEN AGREEMENT, THIS DRAWINGIS THE SOLE PROPERTY OF GZA GEOENVIRONMENTAL, INC. (GZA). THEINFORMATION SHOWN ON THE DRAWING IS SOLELY FOR USE BY GZA'SCLIENT OR THE CLIENT'S DESIGNATED REPRESENTATIVE FOR THE SPECIFICPROJECT AND LOCATION IDENTIFIED ON THE DRAWING. THE DRAWINGSHALL NOT BE TRANSFERRED, REUSED, COPIED, OR MODIFIED IN WHOLEOR IN PART FOR ANY OTHER PURPOSE OR PROJECT. ANY TRANSFER,REUSE, OR MODIFICATION TO THE DRAWING SHALL BE AT THE USER'S OROTHER SUCH PARTIES' SOLE RISK AND WITHOUT ANY RISK OR LIABILITY TO GZA.

LEGEND

1 INCH = 250 FEET

GeoEnvironmental, Inc.www.gza.comEngineers and ScientistsGZA

LEGEND[® NHESP CERTIFIED VERNAL POOLS

ELLENWEIGARCHITECTURE/PLANNING

DEP WETLAND - SALT MARSH

DEP WETLAND - WOODED SWAMP, MARSH

COASTAL BEACH

ZONE A (100 YR) - NO BASE FLOOD ELEVATIONDETERMINEDZONE AE (100 YR) - BASE FLOOD ELEVATIONDETERMINEDZONE VE - COASTAL FLOOD ZONE WITH VELOCITYHAZARD, ELEVATION DETERMINED

COASTAL BANK, BLUFF OR SEA CLIFF

SITE LEVEL-3 ASSESSORS' PARCEL BOUNDARY

LEVEL-3 ASSESSORS' PARCEL BOUNDARY

AREAS OF CRITICAL ENVIRONMENTAL CONCERN

NHESP PRIORITY HABITATS RARE SPECIES

NHESP ESTIMATED HABITATS OF RARE WILDLIFE

CHAPTER 91 JURISDICTION ANDHISTORIC MEAN HIGH WATER

0 250 500125SCALE IN FEET

SOURCE

3) THE NHESP CERTIFIED VERNAL POOLS, THE COASTAL BEACH, THE COASTAL BANK-BLUFF-SEACLIFF, THE FEMA FLOOD ZONE, THE NHESP ESTIMATED HABITATS OF RARE WILDLIFE, THE NHESP PRIORITY HABITATS OF RARE SPECIES, THE AREAS OF CRITICAL ENVIRONMENTAL CONCERN AND THE DEP WETLAND-MARSH DATALAYERS WERE PROVIDED BY MASSGIS (DATES VARY).

2) THE LEVEL 3 ASSESSORS' PARCEL MAPPING DATA SET WAS DEVELOPED THROUGH COMPETITVE PROCUREMENT FUNDED BY MASSGIS. THE SPECIFICATION FOR THIS WORK WAS LEVEL 3 OF THE MASSGIS DIGITAL PARCEL STANDARD. THE DATA WAS DISTRIBUTED BY MASSGIS IN AUGUST 2012.

1) THIS MAP CONTAINS THE ESRI ArcGIS ONLINE BING MAPS AERIAL LAYER PACKAGE, PUBLISHED DECEMBER 1, 2010 BY ESRI ARCIMS SERVICES AND UPDATED MONTHLY. THIS SERVICE USES UNIFORM NATIONALLY RECOGNIZED DATUM AND CARTOGRAPHY STANDARDS AND A VARIETY OF AVAILABLE SOURCES FROM SEVERAL DATA PROVIDERS.

4) THE CHAPTER 91 JURISDICTION LINE WAS DETERMINED USING THE TIDELAND JURISDICTION (M.G.L. c.91) DATALAYER PROVIDED BY MASS GIS AND DISTRIBUTED MARCH 2011.

Page 3: USGS QUADRANGLE LOCATION SITE LOCUSs3.amazonaws.com/newbedford-ma/wp-content/uploads/...d ' existing smast 1 building new seawater piping system surface water supply lines 0.57 acre
Page 4: USGS QUADRANGLE LOCATION SITE LOCUSs3.amazonaws.com/newbedford-ma/wp-content/uploads/...d ' existing smast 1 building new seawater piping system surface water supply lines 0.57 acre

SHEET NO.

PREPARED BY:PREPARED FOR:

PROJECT NO.DATE: REVISION NO.

DESIGNED BY:

PROJ MGR:

DRAWN BY:

REVIEWED BY: CHECKED BY:

SCALE:

GZAGeoEnvironmental, Inc.

Engineers and Scientists

www.gza.com

SCHOOL FOR MARINE SCIENCE AND TECHNOLOGY

RODNEY FRENCH BOULEVARD

NEW BEDFORD, MASSACHUSETTS

COASTAL BANK CROSS SECTIONS

UMASS DARTMOUTH

SCHOOL FOR MARINE SCIENCE

AND TECHNOLOGY

01.0172205.00

FIGURE

4

1 OF 1

MS

JJZ

MS

JJZ

MS

AS SHOWN

0 15' 30' 60'

SCALE IN FEET 1'' = 30'


Recommended