Using NERC’s SAFNRv2 Application to Maintain Situational Awareness Sam Chanoski, Manager of BPS Awareness 12 th International Workshop on Electric Power Control Centers June 4, 2013
Transcript
Page 1: Using NERC’s SAFNRv2 - EPCC Workshop 2019 · 12th International Workshop on Electric Power Control Centers . June 4, 2013 . 2 . RELIABILITY | ACCOUNTABILITY . Agenda • NER’s

Using NERC’s SAFNRv2

Application to Maintain

Situational Awareness

Sam Chanoski, Manager of BPS Awareness

12th International Workshop on Electric Power Control Centers

June 4, 2013

Page 2: Using NERC’s SAFNRv2 - EPCC Workshop 2019 · 12th International Workshop on Electric Power Control Centers . June 4, 2013 . 2 . RELIABILITY | ACCOUNTABILITY . Agenda • NER’s

2 RELIABILITY | ACCOUNTABILITY

Agenda

• NERC’s Bulk Power System Awareness Group

• What We Do

• What We DON’T Do

• How We Do It

• SAFNRv2 – About

• SAFNRv2 – Capabilities

Page 3: Using NERC’s SAFNRv2 - EPCC Workshop 2019 · 12th International Workshop on Electric Power Control Centers . June 4, 2013 . 2 . RELIABILITY | ACCOUNTABILITY . Agenda • NER’s

3 RELIABILITY | ACCOUNTABILITY

BPSA - What We Do

• Monitor conditions affecting the bulk power system • Operational • Weather • Other (droughts, space weather, cyber and physical

security, wildfires, fuel supply, labor issues, industry trends, policy)

• Identify and communicate possible near term threats to the continued reliable operation of the BPS

• During crisis events, facilitate communications • Common Operational Picture with the Regions and RCs • Inform government agencies • Work with ES-ISAC to support their government sector

coordination

Page 4: Using NERC’s SAFNRv2 - EPCC Workshop 2019 · 12th International Workshop on Electric Power Control Centers . June 4, 2013 . 2 . RELIABILITY | ACCOUNTABILITY . Agenda • NER’s

4 RELIABILITY | ACCOUNTABILITY

BPSA - What We DON’T Do

• Operate

• Control

• Intervene in anyone’s real-time operations

• Anything involving compliance

• 24/7 shift work

• Stare at screens waiting for something to happen

Page 5: Using NERC’s SAFNRv2 - EPCC Workshop 2019 · 12th International Workshop on Electric Power Control Centers . June 4, 2013 . 2 . RELIABILITY | ACCOUNTABILITY . Agenda • NER’s

5 RELIABILITY | ACCOUNTABILITY

BPSA - How We Do It

• Analysis of a high volume of disparate and sometimes conflicting information

• Human SMEs provide the “so what?” from the tools’ data • Inherently an art and a science

• Learn something from every report and every event to build organizational memory

• Lots of automated tools…

Page 6: Using NERC’s SAFNRv2 - EPCC Workshop 2019 · 12th International Workshop on Electric Power Control Centers . June 4, 2013 . 2 . RELIABILITY | ACCOUNTABILITY . Agenda • NER’s

6 RELIABILITY | ACCOUNTABILITY

SAFNRv2: About

• Three distinct components

• Sharepoint-based home page

• PowerWorld Retriever-based Visualization Client

• eDNA Trending Client

• >200kV transmission facilities, >500 MW generators

• MW, MVAR, bus voltages (maintains 7-day history)

• ICCP data streams from Reliability Coordinators

• Not a conventional power system model

• No individual substation topologies

• No state estimation or contingency analysis capability

Page 7: Using NERC’s SAFNRv2 - EPCC Workshop 2019 · 12th International Workshop on Electric Power Control Centers . June 4, 2013 . 2 . RELIABILITY | ACCOUNTABILITY . Agenda • NER’s

7 RELIABILITY | ACCOUNTABILITY

SAFNRv2: Voltage Contour

US voltage contour (200kV+), May 29, 2013, 1116 EDT

Page 8: Using NERC’s SAFNRv2 - EPCC Workshop 2019 · 12th International Workshop on Electric Power Control Centers . June 4, 2013 . 2 . RELIABILITY | ACCOUNTABILITY . Agenda • NER’s

8 RELIABILITY | ACCOUNTABILITY

SAFNRv2: Details

Pittsburgh, PA - May 29, 2013, 1119 EDT

Page 9: Using NERC’s SAFNRv2 - EPCC Workshop 2019 · 12th International Workshop on Electric Power Control Centers . June 4, 2013 . 2 . RELIABILITY | ACCOUNTABILITY . Agenda • NER’s

9 RELIABILITY | ACCOUNTABILITY

SAFNRv2: Line Trending

Jacksons Ferry-Broadford 765kV line outage, May 27, 2013

Page 10: Using NERC’s SAFNRv2 - EPCC Workshop 2019 · 12th International Workshop on Electric Power Control Centers . June 4, 2013 . 2 . RELIABILITY | ACCOUNTABILITY . Agenda • NER’s

10 RELIABILITY | ACCOUNTABILITY

SAFNRv2: Voltage Trending

Chief Joseph Power Station 500kV Bus Voltage, May 29, 2013

Page 11: Using NERC’s SAFNRv2 - EPCC Workshop 2019 · 12th International Workshop on Electric Power Control Centers . June 4, 2013 . 2 . RELIABILITY | ACCOUNTABILITY . Agenda • NER’s

11 RELIABILITY | ACCOUNTABILITY

SAFNRv2: WECC Paths

WECC Rated Paths (200kV+), May 29, 2013, 1330 EDT

Page 12: Using NERC’s SAFNRv2 - EPCC Workshop 2019 · 12th International Workshop on Electric Power Control Centers . June 4, 2013 . 2 . RELIABILITY | ACCOUNTABILITY . Agenda • NER’s

12 RELIABILITY | ACCOUNTABILITY

Questions

Sam Chanoski

Manager, BPS Awareness

[email protected]

w: 404-446-9706

c: 404-904-2480