GSM/UTRAN Network Single Site Verification Report
Transcript
Page 1: UT8196X - 3G SSV .xlsx

GSM/UTRAN Network Single Site Verification Report

Page 2: UT8196X - 3G SSV .xlsx

Single Site UT8196X Verification Report

Approved by

Sign

Date

Page 3: UT8196X - 3G SSV .xlsx

General Information

Engineer name: Ali Sanei Longtitude 57.06141

Site ID T8196 latitude 30.24865

City name Kerman # of cells (GSM) 3

BSC Name KPBSCE3 # of cells (UMTS) 6

RNC Name SHRNCE2 Test Start Time 24-Jan-15

Phase 1 Test End Time 24-Jan-15

Site map

Single Site Verification Report

Page 4: UT8196X - 3G SSV .xlsx

General Information57.06141

30.24865

3

6

24-Jan-15

24-Jan-15

Site map

Page 5: UT8196X - 3G SSV .xlsx

Physical Cell Information

Activity / Process Sector1 Sector2 Sector3

Azimuth 80 240 330

Electrical Tilt 8 8 8

Mechanical tilt 0 0 0

Antenna height 28 28 28

RET Information (S/N) Enabled Enabled Enabled

Test No./Name Activity / Process Cell 1 Cell 2 Cell 3 Remark

T01- Alarms 01 VSWR alarm No No No ok

Test No./Name Activity / ProcessCell 1 Cell 2 Cell 3

Planned Found Planned Found Planned Found

01 Cell ID correctly defined 41964 Yes 41965 Yes 41966 Yes

02 LAC correctly defined 22484 Yes 22484 Yes 22484 Yes

03 RAC correctly defined 1 Yes 1 Yes 1 Yes

04 Frequency correctly defined Yes Yes Yes

05 Scrambling code correctly defined 435 Yes 432 Yes 451 Yes

06 Parameter Baseline correctly defined Ok Yes Ok Yes Ok Yes

Test No./Name Activity / ProcessCell 1 Cell 2 Cell 3

Att. Succ. Att. Succ. Att. Succ.

T03- Connection

01 Voice call performs successfuly 5 5 5 5 5 5

02 Video call performs successfuly 5 0 5 0 2 0

03 PS (R99) call performs successfuly 1 1 1 1 1 1

04 Multi-RAB call (if enabled) performs successfully 1 1 1 1 1 1

05 SMS performs successfuly 3 3 3 3 3 3

06 MMS performs successfully 1 0 1 0 1 0

Test No./Name Activity / Process Cell 1 Cell 2 Cell 3

T04- Throughput

01 Maximum HSDPA throughput 10497 10893 11571

02 Maximum HSUPA throughput 1448 1448 1448

03 HSPA PDP context activation

Test No./Name Activity / Process Cell 1 Cell 2 Cell 3 Remark

01 CPICH_RSCP is acceptable OK

02 CPICH_EcNo is acceptable OK

Test No./Name Activity / Process Cell 1 Cell 2 Cell 3 Remark

01 Intra NodeB 3G Softer handover OK

02 Inter NodeB 3G soft handover OK

03 3G to 2G IRAT Handover OK

04 3G to 2G HS Cell Change N/A

Test No./Name Activity / Process Result Swapping between

T07- Antenna Swapping 01 Antenna swapping existance OK OK

Test No./Name Activity / Process Cell 1 Cell 2 Cell 3 Remark

T01-RET with MCU 01 RET works with MCU Yes/No Yes/No Yes/No okT01-RET with RRU 02 RET works with RRU YES Yes Yes ok

Log File Names

Static tests

Drive tests

SITE PHOTOSRET

Cell A Cell B Cell C

Test Sub No.

Test Sub No.

T02- Cell Information 10687

1066210687 10662

10687 10662

Test Sub No.

Test Sub No.

Test Sub No.

T05- Radio verification

Test Sub No.

T06- Handover and cell re-selection

Test Sub No.

Test Sub No.

http://uplod.ir/fs8zyssrerjn/SSV_T8196.zip.htm

Single Site Verification Report

Single Site Verification Report

AcceptAccept

Accept

Accept

AcceptAcceptAcc

eptAccept

Accept

Accept

AcceptAccept

AcceptAccept

Accept

Accept

AcceptAcceptAcc

eptAccept

Accept

Accept

AcceptAccept

AcceptAcceptAcceptAccept

AcceptAccept

AcceptAccept

AcceptAccept

AcceptAccept

AcceptAccept

Accept

Accept

AcceptAccept

Accept

Accept

AcceptAcceptAcc

eptAccept

Accept

Accept

AcceptAcceptAcceptAccept

Page 6: UT8196X - 3G SSV .xlsx

Antenna ViewCell A Cell B Cell C

Mecanichal TiltCell A Cell B Cell C

Tower Site View

Page 7: UT8196X - 3G SSV .xlsx

ACTIVE SET SC

Single Site Verification Report

Page 8: UT8196X - 3G SSV .xlsx

ACTIVE SET SC

Page 9: UT8196X - 3G SSV .xlsx
Page 10: UT8196X - 3G SSV .xlsx

CPICH RSCP per SC

Single Site Verification Report

Page 11: UT8196X - 3G SSV .xlsx

CPICH RSCP per SC

Page 12: UT8196X - 3G SSV .xlsx
Page 13: UT8196X - 3G SSV .xlsx

CPICH Ec/Io per SC

Single Site Verification Report

Page 14: UT8196X - 3G SSV .xlsx

CPICH Ec/Io per SC

Page 15: UT8196X - 3G SSV .xlsx

HSPA Cell Change (3G-3G) with Events

Single Site Verification Report

Page 16: UT8196X - 3G SSV .xlsx

CS HO (3G->2G) per Sector with Events

PS Cell Change (3G<->2G) per Sector with Events

Page 17: UT8196X - 3G SSV .xlsx
Page 18: UT8196X - 3G SSV .xlsx

HSPA Cell Change (3G-3G) with Events

Page 19: UT8196X - 3G SSV .xlsx

CS HO (3G->2G) per Sector with Events

PS Cell Change (3G<->2G) per Sector with Events

Page 20: UT8196X - 3G SSV .xlsx
Page 21: UT8196X - 3G SSV .xlsx
Page 22: UT8196X - 3G SSV .xlsx
Page 23: UT8196X - 3G SSV .xlsx

3G PAT

Checklist proposed by Ericsson

Checklist approved by Irancell

DT Data Collection

Start End

Date 24/1/2015 24/1/2015

Time

OSS KPIs DateAccessibility KPIs Acceptable Value

RRC Conn. Suc (CS) % 95.0%

RRC Conn. Suc (PS) % 95.0%

RRC Drop Rate % 1.8%

RAB Est. Suc Rate - Speech % 95.0%

RAB Est. Suc Rate - HSDPA % 95.0%

RAB Est. Suc Rate - HSUPA % 95.0%

Retainability KPIs Acceptable Value

Drop Rate Speech % 1.5%

Drop Rate PS HS % 3.0%

Mobility KPIs Acceptable Value

Soft HO Success Rate (CS+R99) % 95.0%

Inter RAT HO Success Voice % 90.0%

HSPA Cell Change Success % 95.0%

Integrity Acceptable Value

Average HSDPA Throughput 500 kbps

Average HSUPA Throughput 200 kbps

Page 24: UT8196X - 3G SSV .xlsx

3G PAT

Name Date

OSS Data Collection

Start End

Date

Time

Date

Page 25: UT8196X - 3G SSV .xlsx

3G PAT

Date Signature


Recommended