GSM/UTRAN Network Single Site Verification Report
Single Site UT8196X Verification Report
Approved by
Sign
Date
General Information
Engineer name: Ali Sanei Longtitude 57.06141
Site ID T8196 latitude 30.24865
City name Kerman # of cells (GSM) 3
BSC Name KPBSCE3 # of cells (UMTS) 6
RNC Name SHRNCE2 Test Start Time 24-Jan-15
Phase 1 Test End Time 24-Jan-15
Site map
Single Site Verification Report
General Information57.06141
30.24865
3
6
24-Jan-15
24-Jan-15
Site map
Physical Cell Information
Activity / Process Sector1 Sector2 Sector3
Azimuth 80 240 330
Electrical Tilt 8 8 8
Mechanical tilt 0 0 0
Antenna height 28 28 28
RET Information (S/N) Enabled Enabled Enabled
Test No./Name Activity / Process Cell 1 Cell 2 Cell 3 Remark
T01- Alarms 01 VSWR alarm No No No ok
Test No./Name Activity / ProcessCell 1 Cell 2 Cell 3
Planned Found Planned Found Planned Found
01 Cell ID correctly defined 41964 Yes 41965 Yes 41966 Yes
02 LAC correctly defined 22484 Yes 22484 Yes 22484 Yes
03 RAC correctly defined 1 Yes 1 Yes 1 Yes
04 Frequency correctly defined Yes Yes Yes
05 Scrambling code correctly defined 435 Yes 432 Yes 451 Yes
06 Parameter Baseline correctly defined Ok Yes Ok Yes Ok Yes
Test No./Name Activity / ProcessCell 1 Cell 2 Cell 3
Att. Succ. Att. Succ. Att. Succ.
T03- Connection
01 Voice call performs successfuly 5 5 5 5 5 5
02 Video call performs successfuly 5 0 5 0 2 0
03 PS (R99) call performs successfuly 1 1 1 1 1 1
04 Multi-RAB call (if enabled) performs successfully 1 1 1 1 1 1
05 SMS performs successfuly 3 3 3 3 3 3
06 MMS performs successfully 1 0 1 0 1 0
Test No./Name Activity / Process Cell 1 Cell 2 Cell 3
T04- Throughput
01 Maximum HSDPA throughput 10497 10893 11571
02 Maximum HSUPA throughput 1448 1448 1448
03 HSPA PDP context activation
Test No./Name Activity / Process Cell 1 Cell 2 Cell 3 Remark
01 CPICH_RSCP is acceptable OK
02 CPICH_EcNo is acceptable OK
Test No./Name Activity / Process Cell 1 Cell 2 Cell 3 Remark
01 Intra NodeB 3G Softer handover OK
02 Inter NodeB 3G soft handover OK
03 3G to 2G IRAT Handover OK
04 3G to 2G HS Cell Change N/A
Test No./Name Activity / Process Result Swapping between
T07- Antenna Swapping 01 Antenna swapping existance OK OK
Test No./Name Activity / Process Cell 1 Cell 2 Cell 3 Remark
T01-RET with MCU 01 RET works with MCU Yes/No Yes/No Yes/No okT01-RET with RRU 02 RET works with RRU YES Yes Yes ok
Log File Names
Static tests
Drive tests
SITE PHOTOSRET
Cell A Cell B Cell C
Test Sub No.
Test Sub No.
T02- Cell Information 10687
1066210687 10662
10687 10662
Test Sub No.
Test Sub No.
Test Sub No.
T05- Radio verification
Test Sub No.
T06- Handover and cell re-selection
Test Sub No.
Test Sub No.
http://uplod.ir/fs8zyssrerjn/SSV_T8196.zip.htm
Single Site Verification Report
Single Site Verification Report
AcceptAccept
Accept
Accept
AcceptAcceptAcc
eptAccept
Accept
Accept
AcceptAccept
AcceptAccept
Accept
Accept
AcceptAcceptAcc
eptAccept
Accept
Accept
AcceptAccept
AcceptAcceptAcceptAccept
AcceptAccept
AcceptAccept
AcceptAccept
AcceptAccept
AcceptAccept
Accept
Accept
AcceptAccept
Accept
Accept
AcceptAcceptAcc
eptAccept
Accept
Accept
AcceptAcceptAcceptAccept
Antenna ViewCell A Cell B Cell C
Mecanichal TiltCell A Cell B Cell C
Tower Site View
ACTIVE SET SC
Single Site Verification Report
ACTIVE SET SC
CPICH RSCP per SC
Single Site Verification Report
CPICH RSCP per SC
CPICH Ec/Io per SC
Single Site Verification Report
CPICH Ec/Io per SC
HSPA Cell Change (3G-3G) with Events
Single Site Verification Report
CS HO (3G->2G) per Sector with Events
PS Cell Change (3G<->2G) per Sector with Events
HSPA Cell Change (3G-3G) with Events
CS HO (3G->2G) per Sector with Events
PS Cell Change (3G<->2G) per Sector with Events
3G PAT
Checklist proposed by Ericsson
Checklist approved by Irancell
DT Data Collection
Start End
Date 24/1/2015 24/1/2015
Time
OSS KPIs DateAccessibility KPIs Acceptable Value
RRC Conn. Suc (CS) % 95.0%
RRC Conn. Suc (PS) % 95.0%
RRC Drop Rate % 1.8%
RAB Est. Suc Rate - Speech % 95.0%
RAB Est. Suc Rate - HSDPA % 95.0%
RAB Est. Suc Rate - HSUPA % 95.0%
Retainability KPIs Acceptable Value
Drop Rate Speech % 1.5%
Drop Rate PS HS % 3.0%
Mobility KPIs Acceptable Value
Soft HO Success Rate (CS+R99) % 95.0%
Inter RAT HO Success Voice % 90.0%
HSPA Cell Change Success % 95.0%
Integrity Acceptable Value
Average HSDPA Throughput 500 kbps
Average HSUPA Throughput 200 kbps
3G PAT
Name Date
OSS Data Collection
Start End
Date
Time
Date
3G PAT
Date Signature