+ All Categories
Home > Documents > Utility Trailer Log Loading Arch - Scholar@UC

Utility Trailer Log Loading Arch - Scholar@UC

Date post: 23-Nov-2021
Category:
Upload: others
View: 3 times
Download: 0 times
Share this document with a friend
44
Utility Trailer Log Loading Arch A Baccalaureate thesis submitted to the Department of Mechanical and Materials Engineering College of Engineering and Applied Science University of Cincinnati In partial fulfillment of the Requirements for the degree of Bachelor of Science In Mechanical Engineering Technology By Thomas Sutherland April 2017 Thesis Advisor: Professor Ahmed Elgafy, Ph.D.
Transcript
Page 1: Utility Trailer Log Loading Arch - Scholar@UC

Utility Trailer Log Loading Arch

A Baccalaureate thesis submitted to the Department of Mechanical and Materials Engineering

College of Engineering and Applied Science University of Cincinnati

In partial fulfillment of the

Requirements for the degree of

Bachelor of Science

In Mechanical Engineering Technology

By

Thomas Sutherland

April 2017

Thesis Advisor: Professor Ahmed Elgafy, Ph.D.

Page 2: Utility Trailer Log Loading Arch - Scholar@UC

ii

TABLE OF CONTENTS

TABLE OF CONTENTS .......................................................................................................... II

LIST OF FIGURES ................................................................................................................ III

LIST OF TABLES .................................................................................................................. III

ABSTRACT ............................................................................................................................ IV

BACKGROUND ...................................................................................................................... 1

PROBLEM STATEMENT........................................................................................................................................ 1

RESEARCH .............................................................................................................................. 1

EXISTING PRODUCTS .......................................................................................................................................... 1 SURVEY SUMMARY ............................................................................................................................................ 1 CUSTOMER NEEDS .............................................................................................................................................. 2 PRODUCT FEATURES & ENGINEERING CHARACTERISTICS .................................................................................. 2

DESIGN GENERATION AND CALCULATION .................................................................. 3

LIFTING ARCH .................................................................................................................................................... 3 HINGE PINS ...................................................................................................................................................... 10 HINGE PLATES .................................................................................................................................................. 11 WINCH MOUNT ................................................................................................................................................ 12 DESIGN SUMMARY ........................................................................................................................................... 13

MANUFACTURING AND ASSEMBLY ............................................................................. 14

PLAN FOR MANUFACTURE ................................................................................................................................ 14 LIFTING ARCH .................................................................................................................................................. 14 HINGE PLATES .................................................................................................................................................. 17 WINCH MOUNT ................................................................................................................................................ 20

PROJECT TESTING .............................................................................................................. 21

PLAN FOR TESTING ........................................................................................................................................... 21 TEST RESULTS .................................................................................................................................................. 22

PROJECT MANAGEMENT .................................................................................................. 23

PROJECT SCHEDULE ......................................................................................................................................... 23 PROJECT BUDGET ............................................................................................................................................. 23

WORKS CITED ..................................................................................................................... 25

APPENDIX A ......................................................................................................................... 26

CUSTOMER SURVEY ......................................................................................................................................... 26

APPENDIX B ......................................................................................................................... 27

QFD ................................................................................................................................................................. 27

APPENDIX C ......................................................................................................................... 28

DRAWINGS ........................................................................................................................... 28

LIFTING ARCH .................................................................................................................................................. 28 HINGE PLATE ................................................................................................................................................... 39 WINCH MOUNT ................................................................................................................................................ 40

Page 3: Utility Trailer Log Loading Arch - Scholar@UC

iii

LIST OF FIGURES Figure 1: Effect of Input Angle of Required Force................................................................... 4

Figure 2: Lifting Arch as modeled in Solidworks .................................................................... 8

Figure 3: Detail of the end cap and mounting tab configuration. ............................................. 8

Figure 4: Results of FEA analysis ............................................................................................ 9

Figure 5: Maximum stress experienced by the tubing .............................................................. 9

Figure 6: Maximum stress experienced by the mounting tabs ................................................. 9

Figure 7: Hinge Plate modeled in Solidworks ........................................................................ 11

Figure 8: Hinge Plate FEA results .......................................................................................... 12

Figure 9: Winch mount modeled in Solidworks ..................................................................... 13

Figure 10: FEA results for the winch mount .......................................................................... 13

Figure 11: Cutting tubing to length using the band saw ......................................................... 14

Figure 12: Sanding tubing accurately to dimension ............................................................... 15

Figure 13: Fixturing the end cap for welding ......................................................................... 15

Figure 14: Locating the mounting tabs for welding................................................................ 16

Figure 15: Mounting tabs fully welded on .............................................................................. 16

Figure 16: Drilling the holes in the mounting tabs simultaneously ........................................ 17

Figure 17: The completed lifting arch .................................................................................... 17

Figure 18: Hinge blocks midway through machining ............................................................. 18

Figure 19: Hinge blocks test fitted for hinge pin and grease fitting ....................................... 18

Figure 20: Hinge plate during drilling process ....................................................................... 19

Figure 21: Hinge block welded to the plate ............................................................................ 19

Figure 22: Test fitting the hinge joint ..................................................................................... 20

Figure 23: Installing the hinge plates to the trailer framing.................................................... 20

Figure 24: Drilling the access holes ........................................................................................ 21

Figure 25: Complete winch installation on the trailer ............................................................ 21

Figure 26: Test log after fully loaded ..................................................................................... 22

LIST OF TABLES Table 1: Summary of Feature Importance 2

Table 2: Summary of Current Satisfaction 2

Table 3: Calculated Forces 6

Table 4: Calculated Stress Values *Values for A500 Shaped Grade B Tubing 7

Table 5: Stress seen in the pin based on diameter 10

Table 6: Design factors of the pin based on diameter 10

Table 7: Summary of the project schedule 23

Table 8: Summary of the project budget 24

Page 4: Utility Trailer Log Loading Arch - Scholar@UC

iv

ABSTRACT

In recent years the popularity and availability of personal lumber mills has increased greatly.

These small, affordable, and portable lumber mills have offered a way for the hobbyist and

amateur sawyer to supply lumber for their personal use or begin to run a small business. The

growth of this activity has created a need for a simple system that will allow logs to be

collected easily and that won’t break the bank of the amateur operator. This project is an

answer to this by developing a system that is affordable, easy to use, and effective.

This paper will follow the design process of the utility trailer log loading arch beginning with

market research. Conclusions from this research are used to determine the main design

characteristics. The paper will take a thorough look at the design process and material

selection, ending with manufacturing, testing, and schedule and budget summary.

Upon testing of the completed prototype, it is found that the developed system is successful

in loading large logs onto a trailer in three steps, taking less than five minutes.

Page 5: Utility Trailer Log Loading Arch - Scholar@UC

Utility Trailer Loading Arch Thomas Sutherland

1

BACKGROUND

In recent years, the market for home lumber mills has grown substantially due to the

increasing availability of portable and hobby lumber mills. These lumber mills are

completely self-sufficient and do not require any support equipment, such as tractor, to

operate. This allows sawyers to operate their mill even if they do not have other equipment.

This leaves a problem, however, because large logs are very heavy and cumbersome to

move. There still exists the problem of getting your logs to your work site, in the absence of

heavy equipment. Most lumber mills offer a method of loading the log onto the cutting area,

but the log must still be brought to it.

PROBLEM STATEMENT The proposal is a loading system that is affordable, safe, and easy to use for the hobbyist and

amateur sawyer. The system is intended to be designed so that it can be added onto an

existing flatbed utility trailer and offer a way to load logs onto the trailer without the

requirement of any other equipment. This will offer hobbyist and amateur sawyers to

continue to operate their mills and collect materials without purchasing additional, expensive

equipment.

RESEARCH

EXISTING PRODUCTS Log loader trailers are already available on the market, but have several downfalls for the

sub-professional user. Hydraulic units, in the form of small cranes with a grappler at the end,

offer the most options in the market, but they come at a high price. Even then they fall short

of the operating capacity that matches that of the mill they will be supplying. An entry level

sawmill can still handle logs of significant size. Hardwoods, being very dense, come with a

large weight. For example, a hickory log of 24 inches in diameter and twelve feet in length

can be estimated to have a weight of 2851 lbs. (1). It would require a hydraulic loading unit

of professional size to handle such a load. This has left a hole in the market for inexpensive

loading systems that can still handle the necessary weight.

SURVEY SUMMARY In an attempt to understand the needs and satisfaction of the customer, a survey was used to

collect relevant data. The goal was to determine which parameters impact the systems’

effectiveness the most. Twenty surveys were sent out to various woodworkers, sawyers, and

enthusiasts. Six of the surveys were received back completed. The results of the survey are

broken into two sections; feature importance, and current satisfaction. Table 1 contains a

summary of the customer feature importance section. Table 2 contains a summary of

customer satisfaction with their current log loading technology.

Page 6: Utility Trailer Log Loading Arch - Scholar@UC

Utility Trailer Loading Arch Thomas Sutherland

2

Table 1: Summary of Feature Importance

Table 2: Summary of Current Satisfaction

To summarize the results from the surveys, the most important features will be durability and

effective load movement. All of the listed features will be taken into consideration though.

According to the summary of customers’ current satisfaction, their current method of loading

and transporting logs is adequately durable and effective but not easily transported. This will

push transportability to be an important aspect of design. From the surveys, the following

conclusions were also made:

On average, customers are willing to pay $1000-$2000 for the equipment

Average estimated log weight customers’ use is roughly 1000 lbs.

Maximum estimated log weight customers’ use is roughly 2000 lbs.

A sample of the survey sent to customers can be found in appendix A. All conclusions from

the surveys are used in choosing the importance weights for the quality function deployment

analysis.

CUSTOMER NEEDS Customers require a product that is affordable, safe, easy to use, and effective in its purpose.

This system is intended to be a less expensive option to other equipment. In addition to its

affordability, it is imperative that the system will operate safely and effectively in order to

satisfy the customer. Over the course of the system’s operation, it must be easy to maintain.

PRODUCT FEATURES & ENGINEERING CHARACTERISTICS Easy to operate

Moves load effectively

Easy to maintain

Easy to transport

Robust/ Sturdy

In order to design a product that will satisfy the needs of the customer, these product features

will be a main focus during the design stage. These features were determined based on input

Features Average

Ease of Operation 4.17

Ease of Maintenance 3.83

Durability 4.50

Transportability 3.33

Effective Load Movement 4.50

Features Average

Ease of Operation 3.17

Ease of Maintenance 3.00

Durability 4.00

Transportability 2.50

Effective Load Movement 4.17

Page 7: Utility Trailer Log Loading Arch - Scholar@UC

Utility Trailer Loading Arch Thomas Sutherland

3

from the customer surveys and research that were conducted. Potential customers identified

these points as key focuses in this product.

In order to design the product to be easy to operate, the steps of operation will have to be

forecasted. To satisfy the demand for a system that is easy to operate, the steps of operation

will be minimized and simplified. This ultimately will result in a product that works

efficiently and uses the customer’s time to its fullest potential. Playing part in this goal is

designing the system to move the load effectively. This meaning that the load is moved in a

way that results in constant progress without any hiccups in operation. Designing the product

to be adequately robust will help with how effectively the load is moved. Each component

will be designed so that it will handle its input forces repeatedly without failure or

deformation. A design factor implemented into all calculations will ensure this. Finally, the

product must be easy to transport. This simply means it can have very little effect on how the

trailer it is added to will tow. Additionally, all moving components must be locked stationary

for safe transportation.

DESIGN GENERATION AND CALCULATION

To start design generation, two overall concepts were considered for this system. The

concepts were in regard to the method of force application into the system. A hydraulic

system and a cable winch system were considered. Both have advantages and disadvantages.

After reviewing these, a cable winch drive was selected based on the following conclusions:

Lower maintenance

Lower cost

Lower weight

Smaller space requirement

This design is intended for use with any flat-bed utility trailer of roughly 75 inches of inside

width. Length of the trailer is not a concern for the operation or fit of the system, but does

become a factor in force calculations. The calculations displayed in this overview are for a

trailer of twelve feet in length. Some modification to the framing of the trailer is necessary

for installation. This will be covered in the section outlining the winch mount. A 5000 lb.

capacity electric cable winch was selected to supply the input force into the system. This

creates another design constraint when calculating forces required to move the load. The

system is designed to move a maximum load of 2000 lbs.

LIFTING ARCH The lifting arch is the component of this system that does all of the heavy lifting. This

component must be designed to span the width of the trailer, be able to pass the load beneath

it, and handle the entirety of the calculated resulting force that is created by the load and

input forces. Configuration of the lifting arch must facilitate adequate movement of the load

onto the trailer surface.

Lifting Arch Force Calculations

The force calculations for the lifting arch reference many variables. In order to design the

Page 8: Utility Trailer Log Loading Arch - Scholar@UC

Utility Trailer Loading Arch Thomas Sutherland

4

component to operate well in all situations, the worst-case scenario is the condition

considered in all force calculations. The starting point was to consider the coefficient of

friction between the log and the surface in which it’s in contact with. Concrete, with a

coefficient of friction with wood of 0.62, was selected as the worst case scenario (3). Using

this coefficient of friction, the worst case scenario force to break static friction is calculated.

To do this, an application of ∑ 𝐹 = 𝑚𝑎𝑠𝑠 ∗ 𝑎𝑐𝑐𝑒𝑙𝑒𝑟𝑎𝑡𝑖𝑜𝑛 is used where an estimated

acceleration of 0.81 ft./s2 is used and the angle of input, σ, ranges from 0 to 90 degrees

measured from vertical. This estimated acceleration comes from assuming the winch reaches

full line speed in one second, again intended to be a worst case scenario situation. The

equation becomes:

𝐹𝐿 =𝑀 ∗ 𝑎 + 𝜇 ∗ 𝑊

sin 𝜎 + 𝜇 cos 𝜎

Where:

M= mass

a= acceleration (ft./s2)

μ= coefficient of friction

W= weight, 2000 (lbs.)

σ= input angle (degrees)

Figure 1: Effect of Input Angle of Required Force

Figure 1 shows that the force required to break static friction is affected by the angle of force

input. The worst case scenario is to lift the log vertically, which in turn, eliminates the effect

that friction has on the movement. For design purposes, an input angle to the load of zero

degrees and a resulting load force of 2050.3 lbs. is used.

Next, the input force required from the winch to move the load in this manner is calculated.

To do this, an application of ∑ 𝑀𝑜 = 𝐼𝑜𝛼 is applied where “O” is the point where the arch is

Page 9: Utility Trailer Log Loading Arch - Scholar@UC

Utility Trailer Loading Arch Thomas Sutherland

5

connected to the trailer via the hinge plates. Some assumptions are made: the weight of the

component is estimated as 200 lbs., and the moment of inertia is modeled as a uniform rod

fixed at one end. The equation becomes:

𝐹𝑖𝑛 =𝐼𝑜𝛼 − 𝐴𝐿 cos 𝜎 sin 𝜃 − 𝐴𝐿 sin 𝜎 cos 𝜃 − 𝑊(

𝐴2) sin 𝜃

𝐴(cos 𝛽 sin 𝜃 − sin 𝛽 cos 𝜃)

Where:

A= Height of arch

L= 2050.3 lbs., calculated above

𝐼𝑜 = (1

3) 𝑀𝐿2

𝛼 =𝑎 cos(90−𝛽)

𝑎 cos 𝜃

𝛽 = tan−1 𝑇𝑟𝑎𝑖𝑙𝑒𝑟 𝐿𝑒𝑛𝑔𝑡ℎ+𝐴 sin 𝜃

cos 𝜃−𝑊𝑖𝑛𝑐ℎ 𝐻𝑒𝑖𝑔ℎ𝑡 𝑎𝑏𝑜𝑣𝑒 𝑑𝑒𝑐𝑘

Using the newly calculated input force along with the load force, the reaction forces can be

calculated. This is done in two components; reaction normal to the point of rotation, and

reaction tangential to the point of rotation. The equations are as follows:

𝐹𝑛 = −𝑚𝜔2𝑟 + 𝐿 cos(𝜃 + 𝜎) + 𝐹𝑖𝑛 cos(𝛽 − 𝜃)

𝐹𝑡 = 𝑚𝛼𝑟 + 𝐿 sin(𝜃 + 𝜎) − 𝐹𝑖𝑛 sin(𝛽 − 𝜃) Where

r= Arch height/2

L= 2050.3 lbs.

ω= angular velocity of arch as result of winch input at top.

All other variables are same as previous equations. The resultant force is calculated by:

𝐹𝑅 = √𝐹𝑛2 + 𝐹𝑡

2

The variables of arch height, and start angle are the remaining entities under examination.

Table 3 shows the effects arch height and start angle have on the calculated forces. The input

forces shown in red are outside the capability of a 5000 lb. winch, so an arch height of 5ft

and start angle of 55 degrees was selected as the design parameters. The resulting required

input from the winch is 4144.4 lbs. This combined with the load force cause the resultant

force of 4914.3 lbs. This is the force that the lifting arch must safely carry. Only the forces

required to get the load moving are under consideration since the forces will drop once the

acceleration period ends and the input from the winch becomes more perpendicular with the

arch.

Page 10: Utility Trailer Log Loading Arch - Scholar@UC

Utility Trailer Loading Arch Thomas Sutherland

6

Table 3: Calculated Forces

Lifting Arch Material Selection

The selected reaction magnitude is now used in material selection. Two features are under

consideration for this; material type and geometry. Since shaped structural tubing is most

commonly offered as A500 Grade B, the geometry is the main aspect in question. To select a

tubing size, the estimated combined stresses in tubing sections were calculated. In the

horizontal section, the combined stress is a sum of bending stress and shear stress. In the

vertical sections, the combined stress is a sum of compressive stress and bending stress. The

equations used to calculate the combined stress estimates use an arch centerline width of 68

inches and horizontal section length of 24 inches. Stress due to bending in the horizontal

section is increased with length of the section. It is for this reason that the horizontal section

is reduced to 24 inches from the overall width of the arch. The equations are as follows:

𝑀𝑎𝑥 𝐵𝑒𝑛𝑑𝑖𝑛𝑔 𝑀𝑜𝑚𝑒𝑛𝑡, 𝑀 =𝐹𝐿

4

𝐵𝑒𝑛𝑑𝑖𝑛𝑔 𝑆𝑡𝑟𝑒𝑠𝑠, 𝜎𝑏 =𝑀

𝑆

𝐶𝑜𝑚𝑝𝑟𝑒𝑠𝑠𝑖𝑣𝑒 𝑠𝑡𝑟𝑒𝑠𝑠 & 𝑠ℎ𝑒𝑎𝑟 𝑠𝑡𝑟𝑒𝑠𝑠, 𝜎𝑛 & 𝜎𝑠 =. 5 ∗ 𝐹

𝐴

𝑀𝑜𝑚𝑒𝑛𝑡 𝑟𝑒𝑓𝑙𝑒𝑐𝑡𝑒𝑑 𝑜𝑛𝑡𝑜 𝑣𝑒𝑟𝑡𝑖𝑐𝑎𝑙 𝑠𝑒𝑐𝑡𝑖𝑜𝑛 = (1

2) (

𝐹𝑊

4)

Where:

F= Reaction force, 4914 lbs.

L= length of horizontal section, 24 inches

S= section modulus of the tubing

W= centerline width of arch, 68 inches.

Arch length, A (ft) 5 5 5 5 6 6 6 6

Start Angle, θ (degrees) 45 50 55 60 45 50 55 60

Input Angle, β (degrees) 77.6 78.9 80.2 81.6 75.8 77.3 78.8 80.4

Height Difference (ft) 1.5 1.8 2.1 2.5 1.8 2.1 2.6 3.0

Reach (ft) 3.54 3.83 4.10 4.33 4.24 4.60 4.91 5.20

Estimated Arch Weight (lbs) 200 200 200 200 200 200 200 200

Moment of Inertia of A, Io (lb. ft2) 51.8 51.8 51.8 51.8 74.5 74.5 74.5 74.5

Angular Acceleration of A, α (rad/s2) 0.224 0.247 0.278 0.320 0.185 0.205 0.231 0.266

Angular Velocity of A, ω (rad/s) 0.224 0.247 0.278 0.320 0.185 0.205 0.231 0.266

Calculated Input Force, Fin (lbs) 2829.1 3417.4 4144.4 5078.7 2975.7 3598.6 4368.3 5357.4

Reaction Normal to Member, Rn (lbs) 3826.3 4301.2 4914.1 5732.9 3999.9 4508.2 5162.2 6034.1

Reaction Tangential to Member, Rt (lbs) 38.3 40.8 41.6 40.2 38.5 41.0 41.8 40.3

Magnitude of Reaction (lbs) 3826.5 4301.4 4914.3 5733.0 4000.1 4508.4 5162.4 6034.2

Reaction Angle (degrees) 45.6 50.5 55.5 60.4 45.6 50.5 55.5 60.4

Page 11: Utility Trailer Log Loading Arch - Scholar@UC

Utility Trailer Loading Arch Thomas Sutherland

7

Table 4: Calculated Stress Values *Values for A500 Shaped Grade B Tubing

Table 4 contains all the stress analysis results for three different tubing geometries. These

tubing selections were made based on their availability and affordability at local suppliers,

they are very common and therefore easy to obtain. The 3 in. sq. by ¼ in. tubing yields the

highest design factor of 2.66, so this tubing is selected to continue the design.

Lifting Arch Design

The design of the lifting arch was done in Solidworks using the selected tubing. To add

rigidity to the component, large gussets made from 1/4” 1018 low carbon steel are added to

the four major welded joints. To attach the arch to the trailer, mounting tabs made from ½”

1018 low carbon steel are added to the end of the vertical legs of the arch. These tabs will be

half of the hinge that the arch will rotate on. End caps are added to the end of the vertical legs

to create a surface for the mounting tabs to attach. At the top the arch, a load plate is added.

This is simply a plate of ½” 1018 steel that creates the attachment points for winch input and

load input. Figure 2 shows the design as modeled in Solidworks. Figure 3 shows a detail of

the end cap and mounting tab configuration.

X dimension (in) 3 3 3

Y dimension (in) 2 3 3

Wall Thickness (in) 0.25 0.125 0.25

Area (in2) 1.97 1.3 2.44

*Yeild Strength, Su (PSI) 46000 46000 46000

*Ultimate Strength, Su (PSI) 58000 58000 58000

Selected Maximum Reaction Force, F (lbs) 4914 4914 4914

Maximum Expected Compressive Stress, σmax, comp (PSI) 1247.2 1890.0 1007.0

Section Modulus, S (in3) 1.42 1.19 2.01

Arch Centerline Width (in) 68 68 68

Length of Horizontal Section (in) 24 24 24

Maiximun Bending Moment in Horizontal Section, M (in-lbs) 29484.0 29484.0 29484.0

Bending Stress in Horizontal Section, σmax, bend (PSI) 20763.4 24776.5 14668.7

Combined Stess Seen in Horizontal Section (PSI) 22010.6 26666.5 15675.6

Moment Reflected Onto Vertical Section (in-lbs) 41769 41769 41769

Bending Stress in Vertical Sections (PSI) 29414.79 35100 20780.6

Combined Stess Seen in Vertical Sections (PSI) 30662.0 36990.0 21787.6

Calculated Design Factor 1.891592 1.567991 2.662069

Page 12: Utility Trailer Log Loading Arch - Scholar@UC

Utility Trailer Loading Arch Thomas Sutherland

8

Figure 2: Lifting Arch as modeled in Solidworks

Figure 3: Detail of the end cap and mounting tab configuration.

Running an FEA simulation, shown in figure 4, yields similar results to the previously

estimated stress amounts and shows the location of maximum stresses. For the analysis, the

arch is by the holes of the mounting tabs and the reaction force of 4914 lbs. is applied to the

flat face at the top of the load plate. Since the arch is made of two different grades of steel,

the stress will be analyzed in two parts. The maximum stress experienced by the structural

tubing is 20.47 ksi, shown in figure 5. This yields a design factor of 2.25 when compared to

its yield strength of 46 ksi. The mounting tabs experience to maximum stress of 21.56 ksi, as

shown in figure 6. This yields as design factor of 2.49 when compared to its yield strength of

53.7 ksi.

Page 13: Utility Trailer Log Loading Arch - Scholar@UC

Utility Trailer Loading Arch Thomas Sutherland

9

Figure 4: Results of FEA analysis

Figure 5: Maximum stress experienced by the tubing

Figure 6: Maximum stress experienced by the mounting tabs

Page 14: Utility Trailer Log Loading Arch - Scholar@UC

Utility Trailer Loading Arch Thomas Sutherland

10

HINGE PINS The hinge pins will connect the lifting arch to the trailer via the hinge plates. The force

exerted on each pin will be modeled as half of the reaction force of 4914 lbs. applied to the

arch, since there are two hinge pins. The pins must be robust enough to handle the load

repeatedly, have a smooth enough surface to facilitate rotation, and hard enough to resist

galling.

Hinge Pin Material Selection

Since the pins will be in contact with two mounting tabs per side, the pins will be in double

shear. To calculate the shear stress seen in the pin, force applied to the pin will be divided by

twice the area of the pin. The equation is as follows:

𝜏 =0.5𝐹𝑟

2𝐴

Where:

Fr= reaction force seen by the arch, 4914 lbs.

A= area of the pin, in2

Table 5 shows the stress seen by the pin depending on several pin diameters

Table 5: Stress seen in the pin based on diameter

Yield strength in shear, Sys, is estimated as:

𝑆𝑦𝑠 = 0.5𝑆𝑦

Where:

Sy= is the yield strength of the material

The use of Grade 8 bolts is examined for use as this hinge pins because they offer a very high

yield strength, adequate surface finish, and adequate hardness. A grade 8 bolt has yield

strength of 130 ksi. Half of this value leaves yield strength in shear of 65 ksi. Table 6 shows

the calculated design factor of the two examined diameters. Although both are acceptable, a

¾” diameter is chosen to reduce the bearing load and to improve the wear conditions within

the joint.

Table 6: Design factors of the pin based on diameter

In conclusion, the hinge pins will be 3/4” grade 8 bolts. The unthreaded shank of the bolts

must have a length of 3 inches so that a smooth surface in contact with all hinge surfaces. A 5

inch bolt with 2 inches of thread achieves this. Nylock nuts will be used to secure the bolts

and prevent backing out.

Expected Force Seen in Each, Fr/2 (lbs) 2457 2457

Pin Diameter (in) 0.75 0.5

Stress in Double Shear (PSI) 2781 6257

Pin Diameter (in) 0.75 0.5

Yeild Strength in shear of Grade 8 Bolt(PSI) 65000 65000

Calculated Design Factor 23.37 10.39

Page 15: Utility Trailer Log Loading Arch - Scholar@UC

Utility Trailer Loading Arch Thomas Sutherland

11

HINGE PLATES The hinge plates are the components that will attach the lifting arch to trailer and serve as the

second half of the hinge. They must be able to handle the forces applied to them from the

lifting arch via the hinge pins and facilitate smooth rotation of the arch. The hinge plates will

consist of a plate that will attach to the framing of the trailer by bolts and a block that will

serve as the second half of the hinge. The hinge block needs to be high enough so that the

arch will have adequate swing in and out of the trailer and to allow the arch to lay flat in the

trailer during transportation. The design was modeled in Solidworks and is shown in figure 7.

Figure 7: Hinge Plate modeled in Solidworks

Hinge Plate Material Selection

An FEA analysis was run to determine the stressed in this component. To run this analysis,

the bottom side of the plate is given roller/ slider fixture and the bolt holes are fixed as they

will be when installed on the trailer framing. A force of 2457 lbs. is applied to the hinge

block at the start angle of 55 degrees. Figure 8 shows results of the analysis. A maximum

stress of 8.318 ksi occurs where the hinge block is attached to the plate. If the hinge plate is

constructed out of 1018 low carbon steel with yield strength of 53.7 ksi, the minimum design

factor will be 6.46.

Page 16: Utility Trailer Log Loading Arch - Scholar@UC

Utility Trailer Loading Arch Thomas Sutherland

12

Figure 8: Hinge Plate FEA results

To determine which section of the hinge will facilitate the rotation, the bearing stress is

examined. It is estimated that the rotation will happen in the section of the hinge that sees the

lower bearing stress. The equation for bearing stress is as follows:

𝜎𝑏 = 𝐹/𝐴𝑏 Where:

F= half of the reaction force seen in the arch, 2457 lbs.

Ab= projected area of pin, D*L

D= diameter of pin, inches

L= length of contact, inches

Calculated bearing area in the mounting tab portion of the hinge is 0.75𝑖𝑛.∗ 0.5𝑖𝑛 = 0.375𝑖𝑛2 resulting in a bearing stress of 3276 psi. The bearing area in the hinge block on the

hinge plate is 0.75𝑖𝑛 ∗ 1.75𝑖𝑛 = 1.3125 𝑖𝑛2 resulting in a bearing stress of 1872 psi. Since

the bearing stress is lower in the hinge block than the mounting tabs, the rotation will occur

in the hinge block. To help aid smooth rotation, a grease fitting has been added to the hinge

block to allow an easy way to supply grease to the joint.

WINCH MOUNT The winch mount is the component that will attach the electric cable winch to the trailer

framing. This component must facilitate the attachment of the winch, be able to carry to full

force exerted by the winch during operation, and be able to attach to the tongue section of the

trailer. According the force calculations, the maximum force expected to be exerted by the

winch is 4144.4 lbs. The winch mount was modeled in Solidworks, shown in figure 9.

Page 17: Utility Trailer Log Loading Arch - Scholar@UC

Utility Trailer Loading Arch Thomas Sutherland

13

Figure 9: Winch mount modeled in Solidworks

To determine the stresses seen in this component, an FEA simulation was run in Solidworks.

The results of this simulation are shown in figure 10. To run the simulation, the ends of the

tube are fixed as if they are welded, as is the intended installation method. The force of

4144.4 was applied to the plate where the winch will mount at a calculated angle of 10

degrees. This is the angle that the cable will have when the lifting arch has a starting angle of

55 degrees.

Figure 10: FEA results for the winch mount

Winch Mount Material Selection

The maximum stress result for FEA is found to be 20.33 ksi. If the tubing the sees this stress

is A500 Grade B, same as the lifting arch, the yield strength is 46 ksi. This results in a design

factor of 2.26. The plate that makes up the surface the winch will sit on and the gussets that

brace it will be 1018 low carbon steel.

DESIGN SUMMARY Throughout all calculations and design, the forces under consideration were a result of the

worst case scenario operation situation. This comes from lifting a maximum capacity log

Page 18: Utility Trailer Log Loading Arch - Scholar@UC

Utility Trailer Loading Arch Thomas Sutherland

14

(2000 lbs.) directly vertically. Operating this system under this worst case scenario results in

design factors being around 2.25 for several of the components. According to the customer

survey, the average log weight this system will be used for is 1000 lbs. By lifting a 1000 lb.

log at 20 degrees from vertical and using an estimated coefficient of friction for wood on

grass of 0.4 the reaction force experienced by the lifting arch lowers to 1989 lbs., less than

half of the force resulting from maximum capacity. Running the same FEA analysis for the

lifting arch using this new reaction force results in a maximum stress of 8.725 ksi.

Comparing this stress to the yield strength of 46 ksi, yields a higher design factor of 5.27. A

similar result will be seen in all the components of the system when lifting the average

expected load and rigging it in this way. Keeping the design factors on the low side allows

the project remain affordable and easy to use, as required by the customers.

MANUFACTURING AND ASSEMBLY

PLAN FOR MANUFACTURE To manufacture this design, a number of tools and equipment will be needed. The main items

used will be band saw, belt sander, milling machine, drill press, grinder, and welder. Several

types of welding would be acceptable for this application; I am choosing to use GMAW, or

MIG, welding since it offers greater usability and less cleanup operation. The facility I will

be completing the manufacture of this at is my family’s private shop, located in Morrow,

Ohio. I will have access to all of the tools, equipment, and consumables necessary. This will

also be the location of testing.

LIFTING ARCH The lifting arch is constructed from 3 in. square tubing with a wall thickness of .25 in. The

tubing is cut to a rough length with an angle grinder so that it can then be cut more accurately

on the band saw. After the final cut, each tube section is accurately sanded to the mark on a

belt sander.

Figure 11: Cutting tubing to length using the band saw

Page 19: Utility Trailer Log Loading Arch - Scholar@UC

Utility Trailer Loading Arch Thomas Sutherland

15

Figure 12: Sanding tubing accurately to dimension

The mounting tabs and load plate are constructed from half inch plate steel and were plasma

cut to general shape, without the holes which are added in a later process. The end caps and

gussets are cut from ¼ in plate using a band saw and sanded into final shape.

The ends of the vertical arch sections are beveled about 1/8 inch in preparation for the end

caps to be welded on. After the end caps have been welded, the sides that will have the

mounting tabs are ground flat again so the center can be accurately marked. The centers of

the mounting tabs are also marked and the joint beveled for welding. The center marks are

lined up and the tabs are welded on. After the two mounting tabs are fully welded, a 13/16 in.

hole is drilled through both at once to ensure that the holes are in line.

Figure 13: Fixturing the end cap for welding

Page 20: Utility Trailer Log Loading Arch - Scholar@UC

Utility Trailer Loading Arch Thomas Sutherland

16

Figure 14: Locating the mounting tabs for welding

Figure 15: Mounting tabs fully welded on

Page 21: Utility Trailer Log Loading Arch - Scholar@UC

Utility Trailer Loading Arch Thomas Sutherland

17

Figure 16: Drilling the holes in the mounting tabs simultaneously

After the mounting tabs are completed on the vertical sections of the arch, each joint is

beveled, fixture and tack welded. Once the overall width is verified, the joints are final

welded together using a MIG welder. The final Step is welding on the load plate at the very

top of the arch and the gussets into the internal corners of each welded joint.

Figure 17: The completed lifting arch

HINGE PLATES The hinge plates are constructed from partially from ¼ in plate and 2.5 in square billet. The

hinge blocks are cut from the billet and roughed into shape using the band saw. They are then

milled to final dimension on the milling machine.

Page 22: Utility Trailer Log Loading Arch - Scholar@UC

Utility Trailer Loading Arch Thomas Sutherland

18

Figure 18: Hinge blocks midway through machining

After final dimension is achieved, the hinge blocks are then drilled for the ¾ in diameter

hinge pins and drilled and tapped for the grease fittings.

Figure 19: Hinge blocks test fitted for hinge pin and grease fitting

Next, the plate is cut using the band saw and bolt holes are drilled using the milling machine.

The blocks are beveled and welded to the plates using the MIG welder. A test of the joint is

the done before the arch was fully welded together.

Page 23: Utility Trailer Log Loading Arch - Scholar@UC

Utility Trailer Loading Arch Thomas Sutherland

19

Figure 20: Hinge plate during drilling process

Figure 21: Hinge block welded to the plate

Page 24: Utility Trailer Log Loading Arch - Scholar@UC

Utility Trailer Loading Arch Thomas Sutherland

20

Figure 22: Test fitting the hinge joint

Figure 23: Installing the hinge plates to the trailer framing

The hinge plates are installed on the trailer with bolts. To get proper alignment, the arch is

attached to the hinge plates and then the assembly is centered on the trailer and the hole

centers are marked. The assembly is then removed for drilling and installed again once the

holes are complete.

WINCH MOUNT The winch mount is constructed from steel tubing and ¼ inch plate similarly to the lifting

arch. The tubing is cut on the band saw and sanded accurately on the belt sander. Large

access holes are drilled on the underside of the tube to allow for tool access to the screws that

will hold the winch.

Page 25: Utility Trailer Log Loading Arch - Scholar@UC

Utility Trailer Loading Arch Thomas Sutherland

21

Figure 24: Drilling the access holes

The plate and gussets are cut on the band saw and welded onto the tubing using the MIG

welder. The bolt holes are drilled using the milling machine after the welding is complete to

ensure an accurate hole pattern. The winch mount is finally welded directly into the tongue of

the trailer and the winch is bolted on.

Figure 25: Complete winch installation on the trailer

PROJECT TESTING

PLAN FOR TESTING Upon completion of manufacture, testing will be done to verify the design and manufacture

quality. The testing of this system will be rather simple. A logs weight will be estimated by

roughly calculating its volume and multiplying it by the density corresponding to the species.

In order to best verify the design condition, testing will be done with a log having a weight as

Page 26: Utility Trailer Log Loading Arch - Scholar@UC

Utility Trailer Loading Arch Thomas Sutherland

22

close to 2000 lbs. as can be found. This procedure will be video recorded so that it can be

displayed at a later time and place when a demonstration may not be realistic.

TEST RESULTS The test load selected was a silver maple log that was 28 inches in diameter and 7.5 feet in

length. By assuming a green density of 46 lbs/ft3 for silver maple and estimating the logs

shape as a simple cylinder, its weight is estimated to be 1,471 lbs.

The system was able to successfully and independently load this log onto the trailer in three

simple steps, in under 5 minutes. No noticeable deformation of any components occurred and

the electric cable winch was able to operate continuously and without issue. The steps of

operation during testing are as follow:

1. With arch beginning at roughly 55 degrees from vertical and the log roughly 6 feet

from the end of the trailer, attach the front of the log to the arch and draw it forward

until the log movement is maxed out for this step. The step places the front end of the

log on the trailer deck, leaving the rear end in contact with the ground.

2. Reset arch to roughly 55 degrees, attach log to the arch by its rear end and draw the

arch forward. This step lifts the log completely onto the trailer deck.

3. Lay the arch down to rest on the top of the log, attach winch cable directly to the log

and draw it forward until proper weight distribution for the trailer is achieved.

Figure 26: Test log after fully loaded

Page 27: Utility Trailer Log Loading Arch - Scholar@UC

Utility Trailer Loading Arch Thomas Sutherland

23

PROJECT MANAGEMENT

PROJECT SCHEDULE A preliminary schedule is shown below. This contains a rough estimate of the project

working through the design stage, manufacturing, and ending with project presentation and

the Tech Expo. The table shows the actual progress of the project on the far right. The project

was completed far ahead of the preliminary schedule.

Table 7: Summary of the project schedule

PROJECT BUDGET A summary of the estimated and actual budget is shown below. The project was estimated to

have a cost of $926 including all items that were in question. The actual project budget was

$124. The cost was kept low by using materials from personal stock wherever possible and

through the donation of the 5000 lb. winch.

Task Duration Start Finish Start Finish

Design II 15 Weeks 10/10/2016 1/27/2017 10/10/2016 12/5/2017

Determine Load Requirements1 Week 10/10/2016 10/17/2016 10/10/2016 10/17/2016

Determine Input force, drive

force, and reaction forces2 Weeks 10/17/2016 10/31/2016 10/17/2016 10/31/2016

Design Lifting arch 2 Weeks 10/31/2016 11/14/2016 10/31/2016 11/14/2016

Design Mounts/ Hinge Plates 2 Weeks 11/14/2016 11/28/2016 11/14/2016 11/28/2016

Design Drive mount 1 Week 11/28/2016 12/5/2016 11/28/2016 12/5/2016

Design III 15 Weeks 1/9/2017 4/6/2017 12/5/2016 4/10/2017

Manufacture 12 Weeks 1/9/2017 3/31/2017 12/5/2016 1/9/2017

Test 3 Weeks 3/31/2017 4/14/2017 1/9/2017 3/16/2017

Tech Expo

Project Presentation 4/10/2017

Proposed Actual

4/6/2017

Page 28: Utility Trailer Log Loading Arch - Scholar@UC

Utility Trailer Loading Arch Thomas Sutherland

24

Table 8: Summary of the project budget

Classification Item Qty. Cost per unit Estimate Actual

System Drive Electric Winch 1 200.00$ 200.00$ Donated

Mounting/ Rigging Hardware 25.00$ 25.00$ 2.37$

Plate Steel 1 50.00$ 50.00$ Personal Stock

Steel tubing 2 ft. 10.00$ 20.00$

Battery? 1 100.00$ 100.00$ N/A

Mounting Plates Plate Steel 2 50.00$ 100.00$ Personal Stock

Steel Blocks 2 15.00$ 30.00$ Personal Stock

Bearings/bushings? 4 10.00$ 40.00$ N/A

Mounting Hardware 25.00$ 25.00$ 8.28$

Lifting Arch Steel tubing 20 ft. 10.00$ 200.00$ 85.27$

Torsion springs? 2 8.00$ 16.00$ N/A

Plate Steel 1 50.00$ 50.00$ Personal Stock

Mounting/ Rigging Hardware 25.00$ 25.00$ 12.43$

Miscellaneous Paint 20.00$ 20.00$ 15.68$

Consumables 25.00$ 25.00$ Personal Stock

Total: 926.00$ 124.03$

Page 29: Utility Trailer Log Loading Arch - Scholar@UC

Utility Trailer Loading Arch Thomas Sutherland

25

WORKS CITED

1. MERCKER, David and TAYLOR, Adam. Estimating Weight of Logs and Standing

Timber. [online]. [Accessed 28 September 2016]. Available from:

https://extension.tennessee.edu/publications/documents/sp748.pdf

2. Wood-Mizer LT15 Sawmill. Wood-Mizer LT15 Sawmill [online]. 2015.

[Accessed 28 September 2016]. Available from:

http://woodmizer.com/store/product/index/4

3. Friction and Friction Coefficients. The Engineering Toolbox [online].

[Accessed 25 October 2016]. Available from:

http://www.engineeringtoolbox.com/friction-coefficients-d_778.html

4. AISC 13th Edition Structural Shapes Properties Viewer - Engineers Edge. AISC 13th

Edition Structural Shapes Properties Viewer - Engineers Edge [online]. 2016.

[Accessed 6 November 2016]. Available from:

http://www.engineersedge.com/materials/aisc_structural_shapes/aisc_structural_shap

es_viewer.htm

5. Technical Reference Guide. [online]. 13 September 2005.

[Accessed 6 December 2016]. Available from:

http://www.fastenal.com/content/documents/FastenalTechnicalReferenceGuide.pdf

6. AISI 1018 Steel, cold drawn. Matweb Material Property Data [online].

[Accessed 6 December 2016]. Available from:

http://www.matweb.com/search/DataSheet.aspx?MatGUID=3a9cc570fbb24d119f08d

b22a53e2421

Page 30: Utility Trailer Log Loading Arch - Scholar@UC

26

APPENDIX A

CUSTOMER SURVEY

In an attempt to understand the needs and satisfaction of the customer, this survey is used to

collect relevant data. The goal is to determine which parameters will impact the systems’

effectiveness the most.

How important is each feature to you for the design of a loading/transportation system?

Please circle the appropriate answer.

1 = low importance 5 = high importance

Ease of Operation 1 2 3 4 5 N/A

Ease of Maintenance 1 2 3 4 5 N/A

Durability 1 2 3 4 5 N/A

Transportability 1 2 3 4 5 N/A

Effectiveness of Load Movement 1 2 3 4 5 N/A

How satisfied are you with the current method of loading/transportation? Please circle the

appropriate answer.

1 = very unsatisfied 5 = very satisfied

Ease of Operation 1 2 3 4 5 N/A

Ease of Maintenance 1 2 3 4 5 N/A

Durability 1 2 3 4 5 N/A

Transportability 1 2 3 4 5 N/A

Effectiveness of Load Movement 1 2 3 4 5 N/A

How much would you be willing to pay for a loading system?

$500-$1000 $1000-$2000 $2000-$3000 $3000-$4000

What is the estimated average log weight you work with?

100-500 lbs. 500-1000 lbs. 1000-1500 lbs. 1500-2000 lbs. 2000lbs+

What is the estimated maximum log weight you work with?

100-500 lbs. 500-1000 lbs. 1000-1500 lbs. 1500-2000 lbs. 2000lbs+

Page 31: Utility Trailer Log Loading Arch - Scholar@UC

27

APPENDIX B

QFD

Ste

ps t

o O

pera

te (

#)

Cost

($)

Maxim

um

Paylo

ad (

Ibs)

Com

ple

x D

esig

n (

low

/med/h

i)

Weig

ht

(low

/ m

ed /

hig

h)

Customer Requirements 1 2 3 4 5 CP A

1 Affordable 0.20 9 3 3 0.2

2 Easy to Operate 0.15 9 1 3 0.9

3 Durable 0.20 3 3 0.8

4 Easy to Maintain 0.10 3 0.3

5 Moves Load Effectively 0.15 3 9 1 0.7

6 Easy to Transport 0.20 1 3 9 0.5

Total Importance 1.00 1.80 1.80 2.30 1.5 3.6

Performance Current Product

Hydraulic Unit 1 10000 1200 high high

New Product Targets 5 1500 2000 low low

Engineering Requirements (units)

Customer

Satisfaction

Rating

(0.00 - 1.00)

I

mp

ort

an

ce w

t.

Page 32: Utility Trailer Log Loading Arch - Scholar@UC

28

APPENDIX C

DRAWINGS

LIFTING ARCH

Page 33: Utility Trailer Log Loading Arch - Scholar@UC

29

Page 34: Utility Trailer Log Loading Arch - Scholar@UC

30

Page 35: Utility Trailer Log Loading Arch - Scholar@UC

31

Page 36: Utility Trailer Log Loading Arch - Scholar@UC

32

Page 37: Utility Trailer Log Loading Arch - Scholar@UC

33

Page 38: Utility Trailer Log Loading Arch - Scholar@UC

34

Page 39: Utility Trailer Log Loading Arch - Scholar@UC

35

Page 40: Utility Trailer Log Loading Arch - Scholar@UC

36

Page 41: Utility Trailer Log Loading Arch - Scholar@UC

37

Page 42: Utility Trailer Log Loading Arch - Scholar@UC

38

Page 43: Utility Trailer Log Loading Arch - Scholar@UC

39

HINGE PLATE

Page 44: Utility Trailer Log Loading Arch - Scholar@UC

40

WINCH MOUNT


Recommended