8/17/2015 1 DeVon Miller Building Commissioning Specialist Jani Hart Coordinator CAD 1 WESTERN MICHIGAN UNIVERSITY Facilities Management Department Heritage Hall INTRODUCTION DeVon Miller is the Building Commissioning Specialist at Western Michigan University. DeVon is new to Facilities Management but has over 15 years of experience in project management including energy conservation, building automation systems, building commissioning and is a Commissioning Process Management Professional and LEED Accredited Professional with ASHRAE and Green Building Certification Institute (GBCI) respectively. He holds a BS in Mechanical Engineering from Michigan Technological University. DeVon C. Miller, CPMP, LEED ® AP Building Commissioning Specialist Engineering Division Facilities Management Western Michigan University Phone: (269) 387-8517 Email: [email protected] 2
Transcript

8/17/2015

1

DeVon MillerBuilding Commissioning Specialist

Jani Hart Coordinator CAD

1

WESTERN MICHIGAN UNIVERSITYFacilities Management Department

Heritage Hall

INTRODUCTION

DeVon Miller is the Building Commissioning Specialist at Western Michigan University. DeVon is new to Facilities Management but has over 15 years of experience in project management including energy conservation, building automation systems, building commissioning and is a Commissioning Process Management Professional and LEED Accredited Professional with ASHRAE and Green Building Certification Institute (GBCI) respectively. He holds a BS in Mechanical Engineering from Michigan Technological University.

DeVon C. Miller, CPMP, LEED® APBuilding Commissioning SpecialistEngineering DivisionFacilities ManagementWestern Michigan UniversityPhone: (269) 387-8517Email: [email protected]

2

8/17/2015

2

INTRODUCTION

Jani Hart is the Coordinator CAD at Western Michigan University. Jani is new to Facilities Management but has over 25 years of experience working in the architectural profession. Most of her professional architectural career was dedicated to historic preservation and adaptive reuse. She holds a Masters in Architecture from the University of Michigan and is a licensed residential builder.

Jani J. HartCoordinator CADEngineering DivisionFacilities ManagementWestern Michigan UniversityPhone: (269) 387-8562Email: [email protected]

3

Presentation Overview

WMU Fast Facts

WMU FM

BIM for new construction

BIM for existing buildings

AGENDA

4

8/17/2015

3

WMU FAST FACTS

Established in 1903

Enrollment 24,294

1,200 acres and 167 buildings

8 million square feet of University space

On-campus residence halls and apartments are able to house 6,400 students

39 miles of sidewalk and 26.5 lane miles of roadway

49 miles of utilities

5

467 employees

50,000 work orders in 2013

20,000 PM maintenance orders

Annual dispatch of 72 million KWh of electricity and 510 million pounds of steam

WMU FAST FACTS

6

8/17/2015

4

FM DEPARTMENT ORGANIZATIONAL CHART

7

BIM FOR NEW CONSTRUCTION

8

8/17/2015

5

CAPITAL CONSTRUCTION PROJECTS

East Hall$ 21 Million

Stryker School of Medicine$ 68 Million

Dining Facility$ 36 Million

Residence Halls

$ 48 Million

Sangren Hall$ 60 Million

Zhang Legacy Collections Center

$ 8 Million

9

BIM PROJECT EXECUTION PLAN: WHAT’S IN IT?

1. PROJECT GOALS / BIM USES

BIM PLANNINGSetting expectations

10

8/17/2015

6

X PLAN X DESIGN X CONSTRUCT X OPERATE

PROGRAMMING X DESIGN AUTHORINGSITE UTILIZATION

PLANNINGBUILDING MAINTENANCE

SCHEDULING

SITE ANALYSIS X DESIGN REVIEWS XCONSTRUCTION SYSTEM

DESIGNBUILDING SYSTEM

ANALYSIS

X 3D COORDINATION X 3D COORDINATION X ASSET MANAGEMENT

X STRUCTURAL ANALYSIS X DIGITAL FABRICATION XSPACE MANAGEMENT /

TRACKING

LIGHTING ANALYSIS3D CONTROL AND

PLANNINGDISASTER PLANNING

ENERGY ANALYSIS RECORD MODELING RECORD MODELING

MECHANICAL ANALYSIS

OTHER ENG. ANALYSIS

SUSTAINABLITY (LEED) EVALUATION

CODE VALIDATION

PHASE PLANNING(4D MODELING)

PHASE PLANNING(4D MODELING)

PHASE PLANNING(4D MODELING)

PHASE PLANNING(4D MODELING)

X COST ESTIMATION X COST ESTIMATION X COST ESTIMATION COST ESTIMATION

PRIORITY(HIGH/ MED/

LOW)GOAL DESCRIPTION PROJECT PHASE

H Provide WMU a LOD 300 model including Arch, MEP, and Structure for construction Construction

H Coordinate all disciplines through the design/construction process to reduce RFI’s Construction

M Reference all building components per the Western Michigan University BIM guideline Lifecycle

H Improve commissioning process by adding equipment information into BIM process Lifecycle

H Improve visualization of design intent using BIM design principles Design

BIM EXECUTION PLAN1. BIM Goals and uses

11

BIM PROJECT EXECUTION PLAN: WHAT’S IN IT?

1. PROJECT GOALS / BIM USES

2. COLLABORATION PROCEDURES: HOW OFTEN TO SHARE? HOW?

BIM PLANNINGSetting expectations

12

8/17/2015

7

• BIM Coordination Meeting Procedures

Meeting type Project stage Frequency Participants Location

BIM REQUIREMENTS KICK-OFF

PROGRAMMING ONCE WMU/AE/CONST WMU

BIM EXECUTION PLAN DEMONSTRATION

PROGRAMMING ONCE RESPONSIBLE PARTY WMU

DESIGN COORDINATION DD/SD/CD BI-WEEKLY RESPONSIBLE PARTY WMU

CONSTRUCTABILITY COORDINATION

CONSTRUCTION BI-WEEKLY RESPONSIBLE PARTY WMU

LIFECYCLE BIM PLANNING CONSTRUCTION AS-NEEDED RESPONSIBLE PARTY WMU

BIM EXECUTION PLAN2. Collaboration Procedures: how often to share? How?

13

BIM PROJECT EXECUTION PLAN: WHAT’S IN IT?

1. PROJECT GOALS / BIM USES

2. COLLABORATION PROCEDURES: HOW OFTEN TO SHARE? HOW?

3. FILE NAMING CONVENTION

BIM PLANNINGSetting expectations

14

8/17/2015

8

Field 1Location

Field 2Sub-Location

Field 3Project # . Description

Field 4Doc Revision

Field 5Date

Building #,Admin,

Concepts,Landscape,

Maps,Master plan,

Site,Study,

Utilities..

Bid, RFP, RFQProposal, Budget,

Transmittal,Memo,

System: ElectMechArchStructPlumb

Steam..

Sheet #,Rev #, Req #

Reviewed,Approved,

Approved as Noted,

Rejected,Addendum,

Owner redline,Review,

Owner review..

2009 11 092008

2006 10..

Und

ersc

ore

_

Und

ersc

ore

_

Und

ersc

ore

_

Und

ersc

ore

_

145_struct_03455.steel frame north elevation_approved_2010 11

68959-458489

..

Peri

od .

BIM EXECUTION PLAN3. File naming convention

15

CD, DD, SD,As built,Bid set,

Sheet title,Package

title,Subject,

Shop dwg title

BIM PROJECT EXECUTION PLAN: WHAT’S IN IT?

1. PROJECT GOALS / BIM USES

2. COLLABORATION PROCEDURES: HOW OFTEN TO SHARE? HOW?

3. FILE NAMING CONVENTION

4. TECHNOLOGY INFRASTRUCTURE

REQUIREMENTS

BIM PLANNINGSetting expectations

16

8/17/2015

9

Project participants must have certain software in order to participate in the BIMprocess.

Design Authoring

Coordination

ARCH Revit Architecture 2014

versionsoftwaredisciplineBIM use

MEP Revit MEP/AutoCAD MEP 2014

STRUCT Revit Structure 2014

CIVIL Civil 3D 2014

CONSTRUCTION Naviswork Manage 2014

Owner LIFECYCLE Naviswork Manage 2014

BIM EXECUTION PLAN4. Technology infrastructure requirements

17

BIM PROJECT EXECUTION PLAN: WHAT’S IN IT?

1. PROJECT GOALS / BIM USES

2. COLLABORATION PROCEDURES: HOW OFTEN TO SHARE? HOW?

3. FILE NAMING CONVENTION

4. TECHNOLOGY INFRASTRUCTURE

REQUIREMENTS

5. DELIVERY STRATEGY & LOD –LEVEL OF DEVELOPMENT

BIM PLANNINGSetting expectations

18

8/17/2015

10

LOD 100 Conceptual Modeling “Guesstimate”

LOD 200 General Modeling“Specify it”

LOD 300 Accurate Modeling

& Shop Drawings “Buy it”

LOD 400 Fabrication & Assembly

“Build or Install it”

LOD 500 M & O “Maintain it”

BIM EXECUTION PLAN5. Delivery Strategy & LOD – Level of Development

19

Revit Model

Architects

Engineers

Sub‐contractors

WMU

Level of Detail 500 

Revit Model(s)

General 

Contractor

Interaction with the Revit model

BIM EXECUTION PLAN5. Delivery Strategy & LOD – Level of Development

20

8/17/2015

11

Specific list of Information (parameters) required to be attached to the BIM model

AIR DISTRIBUTION SYSTEMS

WMU_TAG #WMU_TYPE DESC WMU_SUBTYPE DESC DESCRIPTION WMU_LOCATION WMU_MANUFACTURER WMU_MODEL # WMU_SERIAL # WMU_FILTER TYPE WMU_FILTER SIZE WMU_FILTER QUANTITY SEQUENCE OF OPERATION O&MSUBMITTAL

WMU_TAG #WMU_TYPE DESCWMU_SUBTYPE DESC DESCRIPTION WMU_LOCATION WMU_MANUFACTURER WMU_MODEL #WMU_SERIAL # WMU_BELT NAME WMU_BELT SIZE WMU_BELT QUANTITY FAN CURVE

WMU_TAG #WMU_TYPE DESC WMU_SUBTYPE DESC DESCRIPTION WMU_LOCATIONWMU_MANUFACTURER WMU_MODEL #WMU_SERIAL # WMU_BELT NAME WMU_BELT SIZE WMU_BELT QUANTITY FAN CURVE

WMU_MOTOR IDWMU_MOTOR DESCRIPTIONWMU_MOTOR RPMWMU_MOTOR HPWMU_MOTOR MODEL #WMU_MOTOR SERIAL #WMU_MOTOR MANUFACTURERWMU_MOTOR AMPERAGE WMU_MOTOR VOLTAGEWMU_MOTOR FRAMEWMU_MOTOR PHASEWMU_MOTOR BEARING/COUPLING SIZE

Supp

ly

fans

Ret

urn

fan

s

Mot

or

WMU_MOTOR IDWMU_MOTOR DESCRIPTIONWMU_MOTOR RPMWMU_MOTOR HPWMU_MOTOR MODEL #WMU_MOTOR SERIAL #WMU_MOTOR MANUFACTURERWMU_MOTOR AMPERAGE WMU_MOTOR VOLTAGEWMU_MOTOR FRAMEWMU_MOTOR PHASEWMU_MOTOR BEARING/COUPLING SIZE

Mot

or

PAC

KA

GE

AIR

HA

ND

LIN

G

UN

ITS

BIM EXECUTION PLANBuilding information model requirements Lifecycle BIM

21

WHAT IS NEW?The “BIG ROOM” process

22

8/17/2015

12

WHAT IS NEW?Bim for interferences “Clash detections”

23

TAKEAWAYS

Pic: www.pluspack.com

24

DETERMINE GATEKEEPER

BIM IS A LIVING DOCUMENT

CREATE BIM GUIDELINE

PSA AGREEMENT: GET IT IN THE CONTRACT!

KICKOFF MEETING: SET EXPECTATIONS FOR ALL THE PARTIES INVOLVED

8/17/2015

13

BIM FOR EXISTING BUILDING

25College of Health and Human Services

BRONCO BIM

1• Prints to 3D Model• Prints to 3D Model

2

• Adding Maintainable Mechanical Equipment In BIM

• Adding Maintainable Mechanical Equipment In BIM

3• Connecting the Model to

our CMMS-TMA• Connecting the Model to

our CMMS-TMA

College of Health and Human Services 26

8/17/2015

14

Original Blueprints

Existing buildingSprau Tower

From Existing AutoCAD floor plans to 3D Model using Autodesk Revit Platform

PRINTS TO 3D MODEL

3D ModelSprau Tower

Simple floor plan

3D Model

1995-2000

2011-2013

27

2D CAD Review and

Drafting

2D CAD Review and

Drafting

Standardized Simple Floor

Plans

Standardized Simple Floor

Plans

Blueprints DrawingsBlueprints Drawings

From Blueprints/2D CAD files to simple floor plans

PRINTS TO 3D MODEL

2D CAD drawings2D CAD

drawings

< 1995 Pre-CAD era

107 Existing Buildings6.19 million Square feet

1995-Present Post-CAD era 31 Buildings

2.64 million Square feet

Timeframe 1995-2000 About

520 Floor Plans

28

8/17/2015

15

From Simple floor plans to 3D: Field verification and Drawings Review

PRINTS TO 3D MODEL

Review

Survey

Measure

Timeframe 2011-2013

29

PRINTS TO 3D MODELFrom Simple floor plans to 3D: Revit Modeling Sprau Tower

Modeling levels and gridsLinking each simple floor plan with the

corresponding Revit 3D Model levels

Original elevations 3D Model Floor levels

30

8/17/2015

16

PRINTS TO 3D MODEL

Sprau Tower

Modeling slabs, columns and walls

From Simple floor plans to 3D: Revit Modeling

31

PRINTS TO 3D MODELFrom Simple floor plans to 3D: Revit Modeling

Modeling stairs, doors, and windows

32

8/17/2015

17

PRINTS TO 3D MODELFrom Simple floor plans to 3D: Revit Modeling

Modeling roof, mullions and exterior details

Exterior details: material textures

Mullions and curtain walls

33

PRINTS TO 3D MODEL

Sprau Tower

• White-box empty rooms• Windows & doors location• Generic library• Highly detailed exteriors • NO MEP

TIMELINE: 2011-2013138 Existing buildings modeled in 3D Revit

From Simple floor plans to 3D: Revit Modeling

Sprau Tower, 4th floor 3D view34

8/17/2015

18

CONNECTING THE DOTS FOR EXISTING BUILDINGS

College of Health and Human Services

2

• Adding Maintainable Mechanical Equipment In BIM2

• Adding Maintainable Mechanical Equipment In BIM

35

ADDING MAINTAINABLE MECHANICAL EQUIPMENT IN BIMTypes of equipment and parameter

MEP

Monthly/yearly Maintainable

Equipment based on User

Manuals

Air Conditioning Unit

Condensing Unit

Air Handler

Air Compressor

Chiller

Centrifugal Pump

Condensate Pump

Cooling Tower

Exhaust Fan

Supply Fan

Sump Pump

Return Fan

36

8/17/2015

19

ADDING MAINTAINABLE MECHANICAL EQUIPMENT IN BIMTypes of parameter

20 years of maintenance experience with 9 shops and

110 skilled tradespeople

CMMS TMA

WMU_SUBTYPE DESC

WMU_TYPE DESC

DESCRIPTION

WMU_TAG #

WMU_LOCATION

WMU_MANUFACTURER

WMU_MODEL #

WMU_SERIAL #

WMU_FILTER TYPE

WMU_FILTER SIZE

WMU_FILTER QUANTITY

WMU_MOTOR ID

WMU_MOTOR MODEL #

WMU_MOTOR SERIAL #

WMU_MOTOR HP

WMU_MOTOR FRAME

WMU_BEARING/COUPLING SIZE

WMU_BELT NAME

WMU_BELT SIZE

WMU_BELT QUANTITY

BIM PARAMETERS 20 parameters

CMMS-TMA DATABASE>100 parameters

37

ADDING MAINTAINABLE MECHANICAL EQUIPMENT IN BIMField Validation and TMA Data Update

Receive Building TMA Equipment Report

38

8/17/2015

20

Equipment Location

Mechanical Room, Schneider Hall

Tag #

ADDING MAINTAINABLE MECHANICAL EQUIPMENT IN BIMPosition BIM equipment model

39

Search for the Equipment 3D Models (Manufacturer’s websites, Revit Add-ins..)

Bell and gossett: http://www.catalogds.com

ADDING MAINTAINABLE MECHANICAL EQUIPMENT IN BIMCreation of the Equipment Library

40

8/17/2015

21

Model the Equipment that are Custom Made or not available

ADDING MAINTAINABLE MECHANICAL EQUIPMENT IN BIMCreation of the Equipment Library

Original construction drawings

3D Revit Model 41

Model the Equipment that are Custom Made or not available

Real Model

ADDING MAINTAINABLE MECHANICAL EQUIPMENT IN BIMCreation of the Equipment Library

42

8/17/2015

22

Load Revit Family Components from BIM/TMA Equipment Library

ADDING MAINTAINABLE MECHANICAL EQUIPMENT IN BIMPlugging equipment in the model

Equipment type

WMU

Custom Models sorted by building # and ID #

Manufacturers Downloaded Models

43

Create a Mechanical Equipment Schedule on Revit

ADDING MAINTAINABLE MECHANICAL EQUIPMENT IN BIMEquipment Parameters Schedule

Revit

44

8/17/2015

23

Insert Equipment Model into the Revit Model

ADDING MAINTAINABLE MECHANICAL EQUIPMENT IN BIMPlugging equipment in the model

45

ADDING MAINTAINABLE MECHANICAL EQUIPMENT IN BIMPlugging equipment in the model

Insert Equipment Model into the Revit Model

46

8/17/2015

24

BeforeAfter

ADDING MAINTAINABLE MECHANICAL EQUIPMENT IN BIMPlugging equipment in the model (Mechanical Room, Schneider Hall)

47

ADDING MAINTAINABLE MECHANICAL EQUIPMENT IN BIMEquipment Info

CMMS-BIM

Matching Parameter

48

8/17/2015

25

Reality

Revit Model

College of Health and Human Services

ADDING MAINTAINABLE MECHANICAL EQUIPMENT IN BIMSummary

TIMELINE: 2014 - 2016

2,694maintainable equipment

138existing buildings

49

CONNECTING THE DOTS FOR EXISTING BUILDINGS

College of Health and Human Services

3• Connecting the Model to

our CMMS-TMA3

50

8/17/2015

26

CONNECTING THE MODEL TO OUR CMMS-TMAOverall View – Moving Data Between Data Silos

BIM CMMS55000PIECES OF

INFORMATION

51

CONNECTING THE MODEL TO OUR CMMS-TMAConnecting to Revit and TMA: the Revit tool

Logging in from WebTMA

REVIT ADD-IN “WebTMA Interface”

Logging in from Revit

52

8/17/2015

27

CONNECTING THE MODEL TO OUR CMMS-TMAExchanging Data BIM/TMA- Importing and Exporting

Building Type of list

Maintainable equipment

53

CONNECTING THE MODEL TO OUR CMMS-TMAImporting from TMA to Revit The Results

From this… To this

54

8/17/2015

28

CONNECTING THE MODEL TO OUR CMMS-TMAImporting from TMA to RevitIndividualized Equipment Data

55

CONNECTING THE MODEL TO OUR CMMS-TMAExporting from Revit to TMA

Revit schedule

TMA schedule

56

8/17/2015

29

FIM IN FIELD

57

TAKEAWAYS

3D models for existing building do not need to be highly detailed, LOD 100-200

Audit your CMMS data in the field while locating your maintainable equipment

If equipment 3D models are not available on the web,create them using your construction documents or measurements

Connect CMMS and BIM models

Define maintainable equipment and its parameters: use tradespeople’s experience and operation manuals as reference

Define standards for BIM-TMA data management

Pic: www.pluspack.com

58

8/17/2015

30

PREVIOUS WORK ORDER FLOWCHART

59

NEW WORK ORDER FLOWCHART

60

8/17/2015

31

EFFICIENCY IMPROVEMENT

0

10000

20000

30000

40000

50000

60000

70000

80000

90000

Preventive Maintenance [PM]Service calls

80,300

57,500

85,400

67,600

Hours/year

Efficiency improvement with BIM for skilled trades [Mechanical Equipment]

New Process with BIM

Previous process

Labor efficiency improved by 7%  

($524,000/yr.)