Environmental Monitoring Report Bi-annual Report January-June 2013 UZB: Water Supply and Sanitation Services Investment Program - Tranche 1 (Bukhara Region) Prepared by “Uzkommunhizmat” (UCSA) for the Government of Uzbekistan and the Asian Development Bank.
Transcript
  • Environmental Monitoring Report

    Bi-annual Report January-June 2013

    UZB: Water Supply and Sanitation Services

    Investment Program - Tranche 1 (Bukhara Region)

    Prepared by “Uzkommunhizmat” (UCSA) for the Government of Uzbekistan and the Asian Development

    Bank.

  • WATER SUPPLY AND SANITARY SERVICES THE INVESTMENT PROGRAM

    Tranche 1

    2564-UZB (SF)

    Environmental Monitoring Report

    according to the project «Modernization of an interregional Damkhodzhinsky water supply system with connection to it

    regional centers of Navoiysky and Bukhara areas. Reconstruction of system of the sewerage Termez"

    on Bukhara region

    June 2013

  • Content I section. The introduction……………………………………………………………………..3 1. Description of civil work and the volume finished within the limits of the project,

    for the past of 6 months…………………… ……… ……………………………………3 2. Changes in the organisation or as a part of Ecological department………..............7 3. Mutual relations with contractors, owners, creditors etc……………….......................8 II section. Ecological monitoring……………….…………………………………………..…8 1. Noise and vibration…………………………………………………………………….…9 2. Quality of water……………………………………………………………………………9 3. Quality of atmospheric air………………………………………………………………..9 4. Flora and fauna monitoring……………………………………………………………10 III section. Management of a state of environment………….…………………………….12 1. EMS, SEMP………………………………………………………………………………15 2. Inspections on a site and audits……………………………………………………….16 3. Notices on non-observance of requirements…………………………………………17 4. Plans of correcting actions……………………………………………….......................20 5. Consultations and complaints………………………………………………………….25 Appendices…………………………………………………………………...............................77 1. The monitoring data……………………………………………………………………...80 2. Photos……………………………………………………………………………………..95 3. The report on carrying out «Influence Estimations on Environment»……………..96

  • The semi-annual report on results to ecological monitoring

    The maintenance I Section. The introduction 1. The Romitan area is located in the centre of Bukhara area. The territory of Romitan area makes 1,29 soused км2. The area population makes 105,5 thousand persons. In area 2 cities (Ramiton, Gazli), 7 Descents of Rural Citizens (ССГ) are located. Ramiton - an administrative centre of Ramiton area. The city administratively shares on 6 mahalles. City building basically one-storied, According to committee on statistics for July, 1st, 2009 population density of Ramiton has made 353 foreheads/km2, the city population has made 13,0 thousand foreheads which live in 2 971 households. The number of families makes 3 600 units. The average size households - 4,8 people Ethnic structure is homogeneous - 97,5 % make Uzbeks.

    The city of Romitan is the regional centre of Ramiton area. The city is located in 13 km from a line of the Damhodzhiy water pipe. In a city lives 13 thousand persons, it is captured by drinking water supply of 5,6 thousand persons or 43,2 %.

    Besides, 1 rural settlement Tarnaut in which lives 1,15 thousand the persons which coverage of the population of 100 % is connected to system of water supply of a city.

    Operating source of water supply of a city is the local underground water fence the area of 6,5 hectares, located within a city. Quality of water mismatches standard requirements. The water fence is constructed in 1965-70

    Within the limits of the project the source of potable water of the city of Romitan accepts the Damhodzhi inter-regional water pipe.

    Giving of Damhodzhi water is provided by the pumps established in reconstructed pump station Galaasija. For giving in the city of Romitan of Damhodzhi water building water water-connection D315 mm of 13,5 km is provided by extent.

    On the existing knot of distribution of water of a city reconstruction of pump station of II lifting with installation modern энергосберегающих pumps with the frequency converter, reconstruction of technological communications, objects of power supply, a protection and illumination is provided. Building of one reservoir of clean water by capacity 1 000 м3 and hlorar on giphlorar calcium or sodium is provided.

    In a city reconstruction of 14,9 km and building of a water supply system of 6,55 km is provided.

    Table 1. Subject reconstruction and to building of water water and water supply systems in Ramitan

    Diameter of pipe line Extent, the m. item

    Reconstruction Construction Total

    315 450 450

    180 450 250 700

    160 175 175

    110 14 275 5 550 19 825

    Total 14 900 6 550 21 150

    With the account before the established water measured counters building of 2 208 water inputs in apartment houses with installation of devices of the account of water is provided.

    Course of performance of civil work

    Works in district Ramitan it is carried out by Open Company company «Obi hayot Engineering» since November, 14th, 2010.

  • Work on reconstruction of system of water supply district Ramitan is organised well and it is on ending process.

    Pipes which have been established in system of water supply of Ramitan: Pipes 50 dm - 1.44 km Pipes 110 dm - 16,81 km Pipes 160 dm - 1,85 km Pipes 225 dm - 0,35 km Pipes 250 dm - 1,56 km Pipes 315 dm - 13,9 km

    Object of the full it is finished.

    2. The city of Galaasija is the regional centre of Bukhara area, is located in 7 km from of Bukhara. 8 city lives 12,3 thousand persons, it is captured by drinking water supply of 12,3 thousand persons or 100 %.

    Besides, 6 rural settlements in which lives 2,94 thousand persons are connected to a city water supply system, from them is captured by water supply of 0,74 thousand persons.

    The source of drinking water supply accepts the Damhodzhinsky inter-regional waterpipe.

    Within the limits of the project reconstruction existing water water-connection to Damhodzhinsky inter-regional waterpipe Д400 mm by extent of 150 m, knot of distribution of water and a city water supply system is provided.

    On WDU building of two reservoir of clean water by capacity 1 000 м3 everyone, hlorar calcium or sodium and office-laboratory is provided.

    Reconstruction of pump station of II lifting includes installation of two groups modern energy saving pumps: one with the frequency converter - for giving in a distributive network of a city, another - for giving of the average settlement expense on district Romitan WDC . Reconstruction includes also replacement/building of technological communications and objects of power supply.

    In the city of Galaasija reconstruction of 29,15 km and building of a water supply system of 1,1 km is provided.

    Table 2. Subject reconstruction and to building of water water and water supply systems in Galassiya

    Diameter of pipe line Extent, the m. item

    Reconstruction Construction total

    Water line

    400 150 150

    280 1200 1200

    Water networks

    280 2 875 50 2 925

    225 1 800 1 800

    125 2 000 2 000

    110 21 000 1050 22 050

    total 29 150 1 100 30 250

    Water line 1 350 1 350

    Water networks 27 650 1 100 28 750

    With the account before the established water measured counters building of 2701 water inputs in apartment houses with installation of devices of the account of water is provided.

  • Course of performance of civil work

    According to confirmed the schedule diagramme civil and erection works in district of Bukhara area of the city of Galaasija are carried out by the company of Open Company "Kimyohimoyata’minot" since October, 26th, 2010. Workers and cars-mechanisms are concentrated in software «Vodokanals» Bukhara area. Before beginning BIV on all streets warrants have been made.

    For a half-year packing of pipes is executed on 87 %, installation of wells on 88 %, building АБК on 58 %, reconstruction pump on 62 %, buildings of 2 reservoir of clean water on 1000 м3 on 76,6 %, electric works on 76,6 %, a protection fence on 89 %.

    3. The city of Gizhduvan is the regional centre of Gizhduvan area of the Bukhara area located on border with Navoi area. In a city lives 41,7 thousand persons, it is captured by drinking water supply of 19,1 thousand persons or 45,8 %. Office «Vodokanal» receives water from the Damhodzha waterpipe and uses water from the local underground water fence which quality of water mismatches the standard. The underground water fence and WDC of 10 hectares is constructed by a total area in 1964 in a northeast part of a city. On a water fence platform there is a mine well and 4 chinks (2 chinks are drilled in 1978 and 2 chinks - in 1992). On Knot of distribution of water is available: 2 reservoir of clean water in capacity on 500 м3 and pump station of II th lifting, constructed in 1964 - are in an emergency condition; 2 reservoir of clean water in capacity on 1 000 м3, pump station of II the lifting and hlorar, constructed in 1991 - are required their reconstruction, from 5 pumps works only 1, the process equipment Chlorination ной is absent. Pump station of pumping in a connection point to the Damhodzha water pipe and water waters from WDU «Gijduvan» to a point of connection of 1,7 km (diameter 300мм-0,6 km and diameter 200мм - 2 threads of 1,1 km everyone) are constructed by extent agricultural ways in 1994 and their reconstruction is required. From 42,4 km of water supply systems of district of 16,3 km steel and Asbestos-cement the water supply systems constructed in 1964 - 87 are in an emergency condition and their rerun is required. Data about extent and diameters of an existing water supply system of district are more low cited.

    Diameter, мм Extent, м Material Years of building

    500 5 375 Steel, pig-iron 1978 -1988

    400 1 525 Steel 1991

    300 1 050 pig-iron, Asbestos-cement 1964 - 1989

    250 1 400 pig-iron 1964

    200 6 775 pig-iron, Asbestos-cement, Steel 1964 -1995

    150 8 000 pig-iron, Asbestos-cement, Steel 1964 -1989

    100 18 300 pig-iron, Asbestos-cement, Steel, Polyethylene

    1964 -2006

    total 42 425

  • Course of performance of civil work Works in district Gizhduvan it is carried out by Open Company company «Obi Hayat Engineering» since December, 19th, 2012. Work on reconstruction of system of water supply district Gizhduvan is organized well. Pipes which have been established in system of water supply Gizhduvan: Pipes 500 dm – 0,6 км Pipes 315 dm – 0,63 км Pipes 450 dm – 0,04 км a) building of Knot of pumping - work are conducted: it is finished a bricklaying of walls a checkpoint. There is begun excavations a protection from ж/б panels, is established the base and modular ж/б panels. b) reconstruction of Knot of distribution of water - are conducted: - the reservoir of clean water in capacity on 3000 м3. Work is executed 87 %. Remained falling and a hydra of test. - reservoir of clean water in capacity on 1000 м3 - 2 pieces Are finished isolation works, clearing of internal surfaces by scrapers (a wall, plates, колоны), clearing of a bottom of the tank of a deposit, clearing of external surfaces by scrapers (a wall, plates), clearing of mortgage details by brushes, торкрет plaster internal plates cement to solutions, обмазочная isolation of a vertical concrete surface by fiber glass fabric on bitumen mastic. - Pump station. Finished internal and external plaster. Are conducted internal finishing work. - ALK. It is finished walls, a partition, overlapping, a roof, metal construction, floors, apertures. Are conducted internal and external furnish. - A protection from Ж/Б panels work going. It is finished excavations, it is established national teams ferro-concrete the base it is finished. 4. The city of Vabkent of 0,6 km from the Damhodzha inter-regional waterpipe. In a city

    lives 16,7 thousand persons, it is captured by drinking water supply of 15,8 thousand

    persons or 94,7 %. Besides, 12 rural settlements in which lives 5,16 thousand persons are

    connected to a city water supply system, from them is captured by water supply of 3,1

    thousand persons.

    Office «Vodokanal» buys water from the Damhodzha waterpipe and uses water from the

    local underground water fence which quality of water mismatches the standard.

    Near to connection to the DamhodzhA waterpipe in 1999 the pump station has been

    constructed agroways. The building is not completed and mismatches modern requirements.

    In a building the pump which water water in a water supply system of Vabkent day because

    of shortage of DamhodzhA water swings 1-2 hours water directly from Damhodzha is

    established.

    As a local water fence it is used two underground water fences:

    The first water fence «Talkishmon» is constructed in 1974, the area of 10 hectares, located

    in 8 km from a city. On a water fence there are 3 chinks equipped with pumps ETSV 10-120-

    50 and ECV 12-160-65. From them 2 chinks, 1 chink without the pump and the transformer

    work. Chinks are not fenced, there is no zone of sanitary protection.

    In 6 km from a water fence the knot of distribution of water «Norchok» with two reservoir of

    clean water in capacity on 1 000 м3 everyone and pump station is located. WDU it is

    constructed in 1980г., hlorar it is not completed, the equipment is absent. In pump station of

    II lifting from 6 pumps there is no. Water from a water fence «Talkishmon», passing WDU «

    Norchok » moves directly in rural settlements of area and Babkent without disinfecting.

  • The second water fence «Markaz» is located within a city in northern part. The water fence

    is constructed in 1968-75, the area of a water fence of 4 hectares. On a water fence there

    are 6 chinks (from-them 5 - workers) and office building ПУ «Vodokanal». In territory of this

    water fence in 1996 there has been begun building of two reservoir of clean water in

    capacity on 2000 м3 and pump station of II lifting.

    The bottoms of tanks have been filled in and there is begun installation стеновых panels. In

    pump station of II lifting are constructed the base and walls. However, because of a lack of

    means building has been stopped in 1999.

    The bottoms of under construction tanks have cracked.

    From 37,3 km of water supply systems of district of the metal water supply systems

    constructed in 1966 of 27,13 km - 78 are in an emergency condition, their replacement is

    required.

    Data about extent and diameters of an existing water supply system of district are more low cited.

    diameter, мм

    extent, м

    Material Years of buildings

    600 2 400 Steel, pig-iron 1990

    300 1 025 Steel 1966

    250 4 025 pig-iron, Asbestos-cement 1966

    200 4 250 pig-iron 1966 -1978

    150 14 480 pig-iron, Asbestos-cement, Steel 1966 -1968, 1978

    100 9 300 pig-iron, Asbestos-cement, Steel 1966 -1978

    32-50 1 800 pig-iron, Asbestos-cement, Steel, Polyethylene

    1966

    total 37 280

    5. The settlement Jangibazar is the regional centre of Peshkunsky area.

    In settlement lives 6,5 thousand persons, it is captured by drinking water supply of 4,8 thousand persons or 73,8 %.

    Besides, 11 rural settlements in which lives 5,2 thousand persons are connected to system of water supply Jangibazar, from them is captured by water supply of 4 thousand persons.

    Source of water supply of district and adjoining settlements is the water fence «Dedaroz» the area of 10 hectares, constructed in 1980. The water fence is located in 3 km from a city. Quality of water mismatches standard requirements.

    On a water fence there are 3 chinks (all 3 work), reservoir of clean water in capacity 2 шт on 1 000 м3 everyone, pump station of II lifting and a building hlarator.

    In pump station of II lifting from 5 pumps - 1 pump the worker, the others - have failed.

    In a building Chlorination ной all process equipment has failed.

    Potable water without disinfecting moves in a city network.

    From 31,7км water supply systems of district of the metal water supply systems constructed in 1981 of 5,8 km - 87, are in an emergency condition, their replacement is required. Replacement of 6 km submitting water pipe from WDU to a ring network of district besides, is required.

    Data about extent and diameters of an existing water supply system of district are more low cited.

  • diameters, мм

    extent, м

    Materials Years of building

    400 800 Steel, pig-iron 1982

    300 2 800 Steel 1981 - 1989

    200 4 350 pig-iron, Asbestos-cement 1981 - 1982

    150 11 225 pig-iron 1981 - 1989

    100 12 000 pig-iron, Asbestos-cement, Steel 1981 - 1984

    76 550 pig-iron, Asbestos-cement, Steel 1982

    total 31 725

    Course of performance of civil work

    According to the confirmed schedule diagramme civil and erection works in district of Peshkunsky area settlement Jangibazar are carried out by Open Company company «Ob Finds fault with Engineering» since December, 12th, 2012.

    Workers and cars-mechanisms are concentrated in software «Vodokanal» Peshkunsky area. Before beginning BIV on all streets warrants have been made.

    Reconstruction existing reservoir of clean water by capacity 1000 м3 on 2 pieces is provided

    It is finished изоляционные works, clearing of internal surfaces by scrapers (a wall, plates, calone), clearing of a bottom of the tank of a deposit, clearing of external surfaces by scrapers (a wall, plates), clearing of mortgage details by brushes, обмазочная isolation of a vertical concrete surface by fiber glass fabric on bitumen mastic. It is finished uploads reservoir of clean water .

    6. Modernisation of the Inter-regional Damhodzhinsky waterpipe.

    Existing capacities of knots of distribution of water and pipelines of the Damhodzhinsky waterpipe are constructed in 1993 - 1994 and their capacities are calculated on the admission of 300 thousand m3/days of potable water.

    Pipelines and WDU are in a satisfactory condition.

    Reconstruction of chinks of water intaking constructions is necessary for increase in giving of potable water and two hlorar on WDU «Kurpa» and «Navoi» for districts and rural settlements of Navoijsky and Bukhara areas.

    The inter-regional waterpipe m3/days and extent pipe line in diameter 1400 mm of 294,4 km has been constructed by capacity of 215 thousand in 1993-94 for maintenance with qualitative potable water of districts and the rural settlements located along a line water water in the western areas Samarkand, and also in Navoijsky and Bukhara areas.

    On water intaking constructions there are 95 chinks in which power-intensive pumps of Soviet manufacture ЭЦВ 12-160-65 or ЭЦВ 10-120-60 are established.

    During operation since 1993, 21 chink has failed because of column or absence breakage дебита waters in chinks.

    Besides, the part of chinks is not maintained because of absence hole the pumps.

    Thus, now from 94 chinks on a water fence 66-68 chinks which provide giving 130 - 140 thousand m3/days of potable water work.

    Maintained pumps after numerous repairs work not reliably, spend a significant amount of the electric power and often fail.

    On a water fence there are groups of chinks of various productivity from 15 to 50 l/seconds Separate chinks are absolutely inefficient because of small дебита waters. For this reason

  • recommendations PO«Uzbekgidrogeologiya» about increase of efficiency and an intensification of work of a water fence are necessary.

    Because of numerous high waters on the river Karadarja separate sites dams, roads and protections from a barbed wire along a water fence are destroyed.

    Chinks are not equipped by hydrometers. The ultrasonic flowmeters established earlier on water waters have failed. Automation of objects of all complex of a waterpipe absolutely is absent.

    Modular lines from each chink to pipe line are executed from steel the pipes, many of them have practically failed,

    As a part of the Damhodzhinsky waterpipe is available two knots of distribution of water «Kurpa» (around Katakurgan) and «Navoi» (around Navoi) in which are available on 2 reservoir of clean water in capacity 5 000 м3 everyone, Chlorination on liquid chlorine, pump stations of own needs of knots and other subsidiary premises.

    Chlorination are equipped old Soviet Chlorination which also often fail.

    For these reasons, water delivery of an inter-regional waterpipe is not stable, the waterpipe works on 60 % from a designed capacity.

    Course of performance of civil work

    Civil and erection works of an inter-regional Damhodizhinsky waterpipe are carried out under the contract №2564/ICB/3-2 by Open Company company «Obi hayot Engineering» since December, 19th, 2012.

    On water fence Damhodizhinsky Work on modernisation of an inter-regional Damhodizhinsky waterpipe is organised well.

    Building experimental sites of water waste Gallery, it is executed excavations. Punching of the top part of a water reception pipe by a valley of 100 m, Д-1400 mm, a thickness of walls of 12 mm, quantity of apertures Д-10 mm-105 on 1 п/м. It is executed.

    Reconstruction chinks existing to operation extraction of the missed pump from depth-2 a piece-is executed.

    Pump stations 1 го lifting of 74 pieces from them 59 pieces are executed civil work the electric equipment in number of 83 complete set Is got.

    The camera joint venture-1, the joint venture-2, the joint venture-5, the joint venture-10, the joint venture-32, the joint venture-36, the joint venture-50, the joint venture-84-is executed a roof from metal crops, it is established window and door blocks, external and internal furnish it is performed plaster works.

  • II section. Ecological monitoring

    Measures on softening of ecological influence Romitansky area.

    In a small hall regional hokimiyat the seminar has been held where all interested organisations, including mahalles committees have been invited. To all participants of meetings the essence of planned works on reconstruction of system of water supply of district Ramitan has been finished. Representatives mahalles were interested by a question: Where will take out the remained dust, after excavation of tranches. Explanations have been made, that after packing of polyethylene pipes, surplus gravel, a ground by specially allocated car will be taken out on software territory «Vodokanal» as after reservoir of clean water in capacity on 1000 м3 for it засыпки (falls), round it a lot of ground is required.

    For full illumination of all spent BIV, including questions of preservation of the environment, the commissions on monitoring behind building in number of 10 persons and group of water users have been on public principles created at mahalle on 5 persons. Essential remarks from members of the created commissions on a course of conducting BIV was not.

    Workers and cars-mechanisms are concentrated in software «Vodokanal» Ramitansky area. Before beginning BIV on all streets warrants have been made.

    All experts and workers carrying out building are supplied by the special building form and helmets.

    Plastic waste which are formed after the soldering of pipes, are stored in the container which is in software territory «Vodokanals». Periodically after засыпки the tranches, special car the top part of tranches that was not slightly pours down drank. All works are supervised by employees SES, that. Supervision, members of the commissions on public principles at hakimiyat and members of groups of water users at mahalles.

    According to the project, after full end BIV those sites which have been dug up in time performance BIV will be asphalted. In time realisation BIV was not complaints from citizens, farms and others public.offices. Main water waters from software «Vodokanals» Galaasiya to software «Vodokanals» Ramitansky area has been mounted on a road roadside connecting Ramitan with Galaasiya.

    Measures on softening of ecological influence of Gijduvan

    In a small hall regional hakkimiyat the seminar has been held where all interested organisations, including mahalla committees have been invited. To all participants of meetings the essence of planned works on reconstruction of system of water supply of district Gizhduvan has been finished.

    Representatives mahalles were interested by a question: Where will take out the remained dust, after excavation of tranches. Explanations have been made, that after packing of polyethylene pipes, surplus gravel, a ground by specially allocated car will be taken out on software territory «Vodokanal» as after reservoir of clean water in capacity on 3000 м3 for it засыпки (falls), round it a lot of ground is required.

    Including questions of preservation of the environment, the commissions on monitoring behind building in number of 15 persons and group of water users have been on public principles created at mahalles on 5 persons. Essential remarks from members of the created commissions on a course of conducting BIV was not.

    Workers and cars-mechanisms are concentrated in software «Vodokanal» Gizhduvansky area. Before beginning BIV on all streets warrants have been made.

    All experts and workers carrying out building are supplied by the special building form and helmets.

    Plastic waste which are formed after the soldering of pipes, are stored in the container which

  • is in software territory «Vodokanal». Periodically after засыпки the tranches, special car the top part of tranches that was not slightly pours down drank. All works are supervised by employees SES, that. Supervision, members of the commissions on public principles at hakimiyat and members of groups of water users at mahalla.

    In time realisation BIV was not complaints from citizens, farms and others public offices. Water waters from knot pumping to WDU "Gijduvon" software «Vodokanal» Gizhduvansky area of a pipe which have been established.

    Measures on softening of ecological influence of Babkent

    In hokimiyat area the meeting with representatives of local administration, heads of rural descents of citizens, directors of schools, heads of preschool centres and citizens has been spent. The expert in preservation of the environment and the expert in social questions also have taken part in the given meeting. The meeting purposes was to give a brief information on influences on activity environment under the project, management on environment protection, and also to create ecological monitoring groups. Now all waste collected on a building site daily it is taken out by special lorries to specially taken away dumps.

    In territory WDU there is no building and household waste.

    Antidust measures are spent by a method daily полива water of places where works on building and reconstruction are spent. With a view of noise decrease in vicinities of kindergartens it is used without the noisy technics. At night works stop.

    Measures on softening of ecological influence of Peshkunsky area

    In January, 27th, 2013, the meeting in WDU with attraction of heads mahalles, rural descents of citizens and software management «Vodokanal» area has been held. Are shined a question of realization of the project including necessary measures on environment protection at carrying out of civil work.

    Directly on an input in WDC the special banner is established. On a banner it is possible to see the information on the project, including a date started and the terminations, the name of the contractor.

    Antidust measures are spent by a method daily полива water of places where works on building and reconstruction are spent. With a view of noise decrease in vicinities of kindergartens it is used without the noisy technics. At night works stop.

    At night all trenches and not mounted wells are protected for prevention casual проваливания in them people and livestock.

    Flood of combustive-lubricating materials it is not observed.

    Measures on softening of ecological influence Modernization of the Inter-regional Damhodizhinsky waterpipe

    In territories special places for washing of workers with maintenance with soap, washing-up liquids and towels with a view of maintenance of corresponding sanitary-and-hygienic conditions are taken away. It is very good for health and a life of workers.

    Workers live in the house belonging to special a carriage.

  • III section. Management an environment condition

    Creation of ecological group of monitoring on PIU is one of the basic conditions for full realisation of the planned actions for the project and realisation of measures on preservation of the environment and ecological monitoring. Responsible for questions of ecology and safety of environment on object «Reconstruction of system of water supply р/ц Galassiya». Гл.engineer Open Company "Kimyohimoyataminot" Kadirov Bahtier Ergashevich. On object «Reconstruction of system of water supply р/ц Ramitan, Babkent, the Pawn, Gikduvon and Modernization of the Inter-regional Damhodizhinsky waterpipe. The chief of a site of Open Company of Ob Finds fault with Engineering» Yusupov Kurdosh Within the limits of a plan of measures on 2011-2012-2013 the expert in preservation of the environment WDU of Bukhara 91 times has visited building sites «Reconstruction of system of water supply р/ц Ramitan» to check up realisations of measures on preservation of the environment. Within the limits of a plan of measures on 2011-2012-2013 the expert in preservation of the environment WDU of Bukhara 72 times has visited building sites «Reconstruction of system of water supply р/ц Галассия» to check up realisations of measures on preservation of the environment. Within the limits of a plan of measures on 2012-2013 the expert in preservation of the environment WDU of Bukhara 54 times has visited building sites «Reconstruction of system of water supply р/ц Гиждуван» to check up realisations of measures on preservation of the environment. Within the limits of a plan of measures on 2012-2013 the expert in preservation of the environment WDU of Bukhara 43 times has visited building sites «Reconstruction of system of water supply р/ц Вабкент» to check up realisations of measures on preservation of the environment. Within the limits of a plan of measures on 2012-2013 the expert in preservation of the environment WDU of Bukhara 39 times has visited building sites «Reconstruction of system of water supply р/ц the Pawn» to check up realisations of measures on preservation of the environment. Within the limits of a plan of measures on 2012-2013, the expert in preservation of the environment of 15 times has visited building sites, Modernization Inter-regional Damhodizhinsky water pipes to check up realisation of measures on softening of ecological consequences of building. The plan of management and monitoring of a condition of environment 1. In Table 1 PUMSOS in the Appendix 2 expected influences on the environment, the softening measures, demanded ecological monitoring, actions for maintenance of realisation of softening measures are generalised, and also the organisations responsible for performance of given actions are defined. Budget expenses for realisation of data PUMSOS which are not included yet in contracts of civil work within the limits of subprojects, also are specified. 2. It is important to mention again, that in addition to recommended softening measures, positions on protection of environment, safety and hygiene will be observed completely on all phases of civil work. Working (especially inspectors of works on sites) should be trained/are consulted about standard requirements after protection of environment and recommendations PEO.

  • 1. In the tender documentation and contracts on carrying out of civil work, participants of tenders and contractors will are responsible for following maintenance: The rational organisation of civil work and performance in conformity requirements to safety precautions and Schedules of works. •

    safe means of transportation, presence at all drivers of a driving licence, недопущения overloads of lorries;

    corresponding positions under safety precautions on workplaces and preventive maintenance of risks;

    carrying out экскаваторных works at night; ious

    value, and also near schools in school hours. 1. Contractors should follow corresponding Positions and standards RUzb, in particular specifications of the State Committee to Wildlife management RUzb for the subproject after representation of the report by it by the Preliminary ecological estimation. Conditions should include:

    -permissible emissions in atmospheric air -permissible dumps in water objects

    aste

    requirements.

  • Plans of ecological management and monitoring for the subproject of updating of system of water supply in Ramitan

    Table 1: Plan of ecological management

    -Project actions

    - Possible ecological influences - Offered measures on minimization of influences

    - The responsible organisations

    Stage prior to the beginning of building

    Failures during activity

    Risk of occurrence of failures after end which can lead to damage of buildings and a damage to workers, owing to unsatisfactory designing

    - Designing of a building for stability to seismic forces according to norms and positions of building 2.01.03-96"Civil work in seismic areas»; - Maintenance of an easy approach to buildings and availability of entrances to them in case of emergency necessity. - The project of a building of the second category of stability to ignition where all elements are made of fire-resistant and refractory materials; - Designing of a building for stability to seismic forces according to norms and building positions «Civil work in seismic areas»; - Maintenance of an easy approach to buildings and availability of entrances to them in case of emergency necessity.

    Advisers TSPP - Will present the conceptual

    project including measures on minimization of influences;

    Contractors on designing/building, at presence, - Represent the detailed project including measures on minimization of influences; PIU

    - Considers conceptual and detailed projects on conformity to measures of minimization of influences

    Arrangement of dangerous materials, storage of the noisy equipment and carrying out of noisy works.

    Threat to health and inconvenience for the people living in the neighborhood with buildings and for workers on a site.

    - The design scheme of buildings, which includes sufficient buffer distance (it agree SNiP) to the house economy located in the neighbourhood with buildings and buildings for workers;

    Advisers TSPP - Will present the conceptual project including measures on minimization of influences;

    Advisers ТСПП - to Include an acoustic estimation for definition of necessity of reduction of noise at a source (noise barriers) for inconvenience prevention to the next house economy or workers in a building; - If the predicted noise level in the next

    Contractors on designing/building, at presence, - Represent the detailed project including measures on minimization of influences; PIU - Considers conceptual and detailed

  • house economy exceeds managements AR/MFK, to include noise barriers in the project.

    projects on conformity to measures of minimization of influences

    Asbestos-cement pipe Harm to health at inhalation of fibres

    - If asbestos-cement pipelines remain in the earth, should be noted a corresponding plastic tape

    Advisers TSPP will present the conceptual project including measures on minimization of influences;

    - If asbestos-cement pipelines are removed and dismantled, then removal and dismantle should be made according to applicable rules of Government Ruz (SES and Hokimiyats)

    Contractors on designing/ building, at presence, represent the detailed project including measures on minimization;

    Lining of pipelines of a new network

    Resettlement is not expected, but if it will be necessary, and resettlement, for liquidation of negative influences the frame program of tap of the earths will be considered and changed to environment by resettlement

    - Resettlement is considered in the frame program of tap of the earths and resettlements

    Monitoring of realization RPOZP from party PIU, GEM and advisers TSPP;

    - A building stage

    The contractor or the workers who are not observing ecological requirements, described in the contract

    Insufficient realization of control measures behind an environment condition

    - To provide special contractual requirements, e.g. a delay of payments of wages or penal penalties, for a guarantee of realization from contractors of measures on minimization of ecological consequences. PIU - maintenance of monitoring of

    ecological requirements - by a transfer of function to the Expert concerning the environment, being contact person PIU concerning environment.

    - Basements should demand from the contractor of appointment of employees for supervision of questions of preservation of the environment and softening of influences.

    - Agreements should include the requirement to the contractor about granting of fact-finding ecological training for all personnel.

    Cars, the equipment and vehicles used for building and transportations

    Emissions of building cars and exhaust gases of the equipment;

    - The taken or reserve ground and sand should be watered by water before loading if the risk of education of a dust is had, e.g. if it is fine-grained materials or under windy conditions.

    Controllers behind a site of the contractor

  • Dust from use of cars, clearings, alignments and excavators works, etc.;

    - The soil, sand and other building materials on vehicles should be covered.

    - Provide conformity PEM

    - Speed of vehicles should be limited, in particular on minimized sites.

    - Visually inspect safe use of the equipment, observe of noise level of vehicles, etc.,

    - All heavy equipment and cars should answer established national and to local positions in the relation of emissions and noise.

    - Check the lorries driving on a site for an estimation of emissions and licensing;

    - For minimization of emissions should be involved fuel saving up and well served cargo cars-tractors.

    - Others.

    - Vehicles and the equipment, letting out a smoke are not admissible on design sites and should be removed from site territory.

    PIU - Contact body concerning environment

    - The plan of traffic control should be developed for influence minimisation on local conditions of movement during building.

    - Supervises conformity of the contractor to all positions PEM

    - The intensive movement connected with building should be limited by alternative access roads to СОСВ to avoid failures and inconvenience for the inhabitants living lengthways road;

    Restoration of a vegetative cover and gardening

    Erosion and adjournment of deposits in reservoirs, owing to excessive cleaning a vegetative cover or the long periods without vegetation

    - To any cleaning a vegetative cover, carrying out of the inventory of the area which is subject cleaning. Use of the inventory of a vegetative cover for definition of corresponding local kinds of plants for use in restoration of a vegetative cover.

    The controller behind a site of the contractor

    - To avoid liquidation of trees if it is not proved by the engineering reasons, safety issues and the ecological reasons.

    - Provide conformity PEM

    - Storage of the top layer of earth separately from another a layer and a reuse for restoration of a vegetative cover after end of works.

    PIU - Contact body concerning environment

    - Regular monitoring of a vegetative cover, especially in initial growth for maintenance of stable growth and long напочвенного a cover;

    - Supervises conformity of the contractor to all positions PEM

  • - After end of civil work on СОСВ, creation of a green belt from local trees and bushes on perimetre of station for maintenance of aesthetic comfort of territory and for the next inhabitants. Maintenance of a green belt to a full establishment.

    Use of roads for transportation of materials and the equipment

    The time termination of access to real estate;

    - To provide temporary access to building time, as required; - To receive the permission to use of roads from corresponding authorities and agreements on repair of damages directly after building.

    - Co-ordinates with PIU both corresponding authorities and agencies.

    The current condition of roads unsatisfactory, it can worsen because of use of building technics.

    - Receives and registers complaints from the public and resolves them

    PIU-contact not concerning environment

    Use of roads for transportation of materials and the equipment

    The current condition of roads unsatisfactory, it can worsen because of use of building technics

    .

    - The contractor and PIU guarantee carrying out of coordination meetings and reception of the agreement from Hokimiyat; prior to the beginning of civil work on a site (the Appendix 5 is the sample of the form of the agreement from Bukhara);

    - Receives and registers complaints from the public and resolves them

    Use of a manpower, from other areas

    Inappropriate living conditions for visitors of workers

    - Labour camp, at presence The controller behind a site of the contractor

    - Granting of corresponding sanitary constructions, portable water supply, gathering of a waste etc.

    - Co-ordinates with PIU both corresponding authorities and agencies.

    - Testing of portable water supply according to the Uzbek positions

    - Receives and registers complaints from the public and resolves them

    - Warranting of that all labour camp are confirmed PIU;

    PIU - Contact body concerning environment

    To maximize use of local work for minimization of requirement for time camps, and also for maintenance of social and economic benefit for local population.

    - Supervises procedures of the permission of complaints of the contractor and conformity to all positions PEM

    Use of a manpower from other areas

    Presence of building brigades can increase demand for the prostitution, the forbidden drugs, gamblings and e.t.

    - To maximize use of local workers which will live at home during building

    The controller behind a site of the contractor

    - Co-ordinates with PIU both corresponding authorities and agencies.

  • Safety of workers Measures of industrial safety inappropriate to requirements

    - To demand from the contractor use of corresponding stabilising technics during time excavators works, especially at works on trenches, depth more than 6 m, in order to avoid collapses.

    The controller behind a site of the contractor - Coordinates with PIU both corresponding authorities and agencies. - receives and registers complaints from the public and resolves them PIU - Contact body concerning environment - Supervises procedures of the permission of complaints of the contractor and conformity to all positions PEM

    - To organise trainings and training of workers under safety precautions of work and risk preventive maintenance, for the purpose of their observance

    - An operation phase and maintenance service

    The toxic materials which have got to environment

    Harm to environment and people because of the reference with chlorine

    - Storage of all dangerous materials in protected territories, with sufficient ventilation.

    Water canal Bukhara city - Provides safe handling and storage of dangerous materials - Develops procedure of reaction to flood and gives complete sets of reaction to floods - Provides reception by the personnel on operation and training maintenance service on procedures of safe chlorination from ARP –PIU - Contact body concerning environment - Supervises conformity of the head of station to all positions PEM

    - Working out of actions for reaction to flood of toxic materials and granting of complete sets to floods on all sites of storage of dangerous materials.

    Emergencies

    Risks concerning workers and the equipment, owing to dangers connected with fires and other emergencies

    - Working out complex instructions on safety; Training and equipment the personnel IT for observance of positions of safety of work and risk preventive maintenance; - Installation of corresponding systems of the alarm system; - Grounding of all electric equipment and granting of automatic switches; - Granting of reserve water supply for Suppression fire;

    Operating Water canal station - Provides reception by the personnel IT of training on safety of work from ARP - PIU - Contact body concerning environment - Supervises conformity of the head of station to all positions PEM

  • - Granting of fire extinguishers in strategic places and the control of their functionality.

    Planning of force majeure

    Emergency measures concerning what variants are accessible also what measures it is necessary to undertake, if quality of water from WDU mismatches requirements either the chlorinating equipment or pumps incorrectly work.

    - Group ARP should be accessible in the prompt time to definition of the suitable decision to correct a situation; When the problem is defined also the decision is co-ordinated, ARP will help to find the qualified experts who can solve a problem.

    Employees of department of operation and maintenance service and ARP (technical experts) together with the corresponding local authorities working in the field of public health services/science and technology

    The report on realisation of the Plan of Ecological Management at Reconstruction of system of water supply of Ramitan

    Table 2. Ramitan

    Project actions Possible ecological influences the Taken measures

    The taken measures for minimization

    Responsible organizations

    Stage prior to construction

    Accidents during activity Risks of emergence of accidents after completion of construction which can lead to damage of buildings and damage the worker, owing to unsatisfactory design

    All reconstructed buildings and constructions are designed according to standard requirements of the Republic of Uzbekistan for seismic stability and fire safety. Expertise of project documentation of Glavgosekspertiza of Gosarkhitektstroy of the Republic of Uzbekistan is carried out and the positive decision on them is received.

    "Loyiha Maslahat" state of emergency - the developer of the detailed project. Experts of state of emergency of "Loyha Maslahat" according to the approved Schedule leave on objects for the purpose of carrying out architectural supervision of compliance of construction works to requirements of project documentation

    Leaks from sewer system and a water distribution network

    Water pollution in a distributive network because of leakages of the

    The centralized system of the sewerage in the city is absent.

    "Loyiha Maslahat" state of emergency - experts carry out architectural supervision of

  • sewerage. At reconstruction of a water supply system in the project polyethylene pipes which are steady against corrosion are applied and are durable.

    compliance to the project of pipes applied in construction

    Laying of pipelines of a new network

    Resettlement isn't expected but if it is necessary, the framework programme of allocation of land and resettlement, for elimination of negative impacts will be considered and changed to environment by resettlement

    As a result of adoption of the optimum solution of laying of water pipes during detailed design the project doesn't affect the population, personal plots and gardens. Allocation of land and resettlement by the project isn't provided.

    Experts of technical supervision and PIU of Bukhara supervise that construction didn't mention personal plots

    Arrangement of dangerous materials, storage of the noisy equipment and carrying out noisy works.

    Threat to health and inconvenience for the people living in the neighbourhood with buildings and for workers on a site.

    Knot of distribution of water of. Pocket on which reconstruction of pump station and construction of pure tanks is carried out, it is located on the suburb of the city and it is removed from the densely populated territory on distance about 500 m

    PIU of Bukhara, PU "Suvokova" of Bukharaysky area, PU "Suvokova" of the Karmeninsky area

    Asbestos-cement Pipes (ACP) Harm to health at inhalation of fibers

    In the project it isn't provided uses of asbestos-cement pipes for the device of a water supply system, and earlier they also weren't used

    Construction stage

    The contractor or the workers who aren't observing ecological requirements, described in the contract

    Insufficient realization of control measures behind a state of environment

    The plan of Ecological Management is the annex to the contract. The general Terms of the contract are added with item 63 OSUK where it is provided that the Contractor has to (and) create a working control system of consequences of impact on environment and (b) to carry out the monitoring and softening measures stated in the Management plan of Environmental protection

    The contractor created a control system of environment and carries constantly out control for its performance. PIU of Bukhara and experts of technical supervision control this activity

  • The contractor has to delivers to the Customer Reports on performance of such measures

    Cars, the equipment and vehicles used for construction and transportations

    Emissions of construction cars and exhaust gases of the equipment;

    Dust from use of cars, clearing, alignment and excavator works, etc.;

    For prevention of formation of a dust when exporting excessive soil it is made it having watered.

    In transit excessive soil vehicles are covered with an awning

    Intensity of movement doesn't increase because the contractor uses not a large number of equipment (2 dump trucks, 2 excavators and 2 truck cranes)

    The contractor signed the contract with service station which makes small repair, filling with oil and fuels and lubricants and maintenance of mechanisms, including check of emissions in the atmosphere

    All used equipment well is served and conforms to national standards

    Works on construction sites are performed about the 8th o'clock in the morning to the 18th o'clock in the evening. All works on service of equipment are performed also at this time. Works aren't conducted at night

    Expert of technical supervision of construction

    The supervising foreman of the Contractor - provides compliance of PEM, visually inspects safe use of the equipment, noise level of vehicles and mechanisms. The mechanic of a site checks a technical condition of mechanisms. Experts of PIU of Bukhara supervises compliance to all provisions PEM, leaving on objects according to the Schedule

    Preparation of a construction site Erosion on a site because of clearing, alignment, and excavator works, as a result the leader to deposits of deposits in reservoirs;

    Construction works are carried out in strictly taken away places - WDU reconstruction - in the territory of existing WDU, reconstruction and construction of a water supply system - only in an earth right-of-way, without mentioning the excessive territory

    In venues of works in. The pocket isn't present need of use of a construction timbering against a

    The expert of technical supervision of construction exercises control that laying of pipes in the dug-out trenches and their the return засыпка Experts of PIU of were made by Bukhara quickly in order to avoid collapses of walls of a trench of prevention of inconveniences for inhabitants coordinate works according to the Schedule

  • soil collapse as all works are carried out quickly enough (after trench digging quickly pipes keep within and the return is made (засыпка)) and maximum Lubin trenches for the device of a water supply system are made by 1,6 m.

    Restoration of a vegetable cover and gardening

    Erosion and adjournment of deposits in reservoirs, owing to excessive cleaning of a vegetable cover or the long periods without vegetation

    The top vegetable layer of earth was removed only for the device of two tanks with a pure volume of 1 000 m3 everyone. Other constructions are reconstructed and the top vegetable layer of earth isn't removed

    The area of removal of a vegetable cover for these purposes is insignificant (450 sq.m). The top fertile layer acted and stored separately from other soil and will be used repeatedly at an crashing of tanks after completion of their construction.

    No trees or bushes were mentioned. Works are conducted within the fenced zone WDU.

    After completion of all construction works improvement and territory gardening as it is provided in detailed design and budget and tender documentation will be made

    The job foremaster provides compliance of PEM. The expert of technical supervision and PIU of Bukhara make control of these works

    Excavator works for laying of pipes;

    Use of roads for transportation of materials and equipment

    Damages of municipal constructions by excavator works;

    Temporary termination of access to real estate;

    Current state of roads unsatisfactory, it can worsen because of use of construction equipment.

    Detailed project documentation was coordinated with all interested services (municipal, road, the power supply network, communication, etc.)

    Prior to the beginning of a proivodstvo of works the Contractor got permission to carrying out excavator works and coordinated with all utility services of the

    The job foremaster coordinates work with PIU of Bukhara, Hokimiyatom and utility services and gets the corresponding permissions

  • location and crossing of pipelines.

    In case of need representatives of these services are present at work.

    Permission of local authorities (Hokimiyata) is got for use of roads which after completion of works will be restored and asphalted as it is provided in project documentation

    The sewage formed on a construction site

    Rain drains on a site can wash away waste, garbage, leaves, lubricant substances, etc. pollution of an adjacent surface water is thus possible

    All waste and construction garbage are stored in specially taken away territory of a building site in special containers and in due time taken out on the territories coordinated with Hokimiyats

    Dangerous materials (fuel, chemicals or waste) aren't used when performing construction works.

    The controller behind a site of the contractor

    Periodic visual supervision of drains of construction sites is supervised by the job foremaster of construction and experts of PIU of Bukhara

    The solid waste formed as a result of construction works

    Construction materials (a tree, steel fittings, cement, etc.), paper, packing materials, household waste/waste products of the person on a building site can cause environmental pollution and negative impact on a landscape which otherwise, is visually attractive.

    Prior to construction works the Contractor received from Hokimiyata and SES allowing documents and coordinated places of warehousing and export of waste

    On sites of construction works there are containers for collecting garbage and building wastes

    The fulfilled oils and fuel on reconstructed water constructions aren't stored. Replacement of oil and fuelling is made at service stations of of Bukhara

    The contractor in due time takes out and utilizes building wastes, paper and scrap metal

    After completion of construction works the platform will be cleared of construction garbage, pipes as it is provided by the contract

    The controller behind a site of the contractor

    Periodic visual supervision of a condition of construction sites is supervised by the job foremaster of construction and experts of PIU of Bukhara

  • Inconvenience from construction – complaints

    Inconvenience and impact of construction works on the next kinds of activity and house farms.

    On construction sites banners with the indication of the contract organization, ranking officers and contact phones for submission of complaints undergone to influence by people are established.

    WDU is located far of inhabited quarters, at distance about 500 m and carrying out construction works don't result in inconveniences of the population.

    Before performance of work on construction of networks on city streets, the Contractor together with PIU and Hokimiyatom carried out explanatory work in mahallya, having explained the purposes of the project and having specified terms of performance of work on each site.

    For elimination of the inconveniences created for inhabitants, at construction of a water supply system, the contractor establishes temporary transitions through trenches

    Understanding social importance and need of this project, inhabitants transfer temporary inconveniences and don't complain

    The controller behind a site of the Contractor keeps the magazine of registration of complaints, and also carries out explanatory work with makhallinsky committee and inhabitants of nearby houses

    Use of a manpower, from other areas

    Inappropriate living conditions for visitors of workers

    All builders working at platforms, live in Bukhara, the Pocket and nearby areas.

    The contractor обеспчена delivery of workers to building sites and upon termination of the working day they come back to the place of residence. For this reason weren't organized camp for

    The controller behind a site of the Contractor, Vodokanal of. Pocket

  • accommodation of workers

    Use of a manpower from other areas

    Presence of construction crews can increase demand for the prostitution, the forbidden drugs, gamblings, etc.

    All construction workers local also live houses

    The controller behind a site of the Contractor, Experts of Technical supervision and PIU of Bukhara Vodokanal of. Pocket

    Safety of workers Measures of production safety inappropriate to requirements

    Depth of trenches of construction doesn't exceed 1,6 m and there is no danger of collapses

    Once a month the Contractor in the presence of the Engineer of technical supervision trains all workers to equipment requirements безопасноти. Daily before the appearance at work, all workers are warned about obligatory observance of requirements of safety measures

    workers are provided with overalls and means of individual protection (a welding mask, points, etc.)

    The controller behind a site of the contractor

    Coordinates with PIU and appropriate authorities and agencies.

    Receives and registers complaints from the public and resolves them

  • Plans of ecological management and monitoring for the subproject of updating of system of water supply in Gallasiya

    Table 1: Plan of ecological management

    -Project actions

    - Possible ecological influences - Offered measures on minimization of influences

    - The responsible organisations

    Stage prior to the beginning of building

    Failures during activity

    Risk of occurrence of failures after end which can lead to damage of buildings and a damage to workers, owing to unsatisfactory designing

    - Designing of a building for stability to seismic forces according to norms and positions of building 2.01.03-96"Civil work in seismic areas»; - Maintenance of an easy approach to buildings and availability of entrances to them in case of emergency necessity. - The project of a building of the second category of stability to ignition where all elements are made of fire-resistant and refractory materials; - Designing of a building for stability to seismic forces according to norms and building positions «Civil work in seismic areas»; - Maintenance of an easy approach to buildings and availability of entrances to them in case of emergency necessity.

    Advisers TSPP - Will present the conceptual

    project including measures on minimization of influences;

    Contractors on designing/building, at presence, - Represent the detailed project including measures on minimization of influences; PIU

    - Considers conceptual and detailed projects on conformity to measures of minimization of influences

    Arrangement of dangerous materials, storage of the noisy equipment and carrying out of noisy works.

    Threat to health and inconvenience for the people living in the neighborhood with buildings and for workers on a site.

    - The design scheme of buildings, which includes sufficient buffer distance (it agree SNiP) to the house economy located in the neighbourhood with buildings and buildings for workers;

    Advisers TSPP - Will present the conceptual project including measures on minimization of influences;

    Advisers ТСПП - to Include an acoustic estimation for definition of necessity of reduction of noise at a source (noise barriers) for inconvenience prevention to the next house economy or workers in a building;

    Contractors on designing/building, at presence, - Represent the detailed project including measures on minimization of influences PIU

    - If the predicted noise level in the next house economy exceeds managements AR/MFK, to include noise barriers in the project.

    - Considers conceptual and detailed projects on conformity to measures of minimization of influences

  • Asbestos-cement pipe Harm to health at inhalation of fibres

    - If asbestos-cement pipelines remain in the earth, should be noted a corresponding plastic tape - If asbestos-cement pipelines are removed and dismantled, then removal and dismantle should be made according to applicable rules of Government Ruz (SES and Hokimiyats)

    Advisers TSPP will present the conceptual project including measures on minimization of influences; Contractors on designing/building, at presence, represent the detailed project including measures on minimization;

    Lining of pipelines of a new network

    Resettlement is not expected, but if it will be necessary, and resettlement, for liquidation of negative influences the frame program of tap of the earths will be considered and changed to environment by resettlement

    - Resettlement is considered in the frame program of tap of the earths and resettlements

    Monitoring of realization RPOZP from party PIU, GEM and advisers TSPP;

    - A building stage

    The contractor or the workers who are not observing ecological requirements, described in the contract

    Insufficient realization of control measures behind an environment condition

    - To provide special contractual requirements, e.g. a delay of payments of wages or penal penalties, for a guarantee of realization from contractors of measures on minimization of ecological consequences. PIU - maintenance of monitoring of

    ecological requirements - by a transfer of function to the Expert concerning the environment, being contact person PIU concerning environment.

    - Basements should demand from the contractor of appointment of employees for supervision of questions of preservation of the environment and softening of influences.

    - Agreements should include the requirement to the contractor about granting of fact-finding ecological training for all personnel.

    Cars, the equipment and vehicles used for building and transportations

    Emissions of building cars and exhaust gases of the equipment;

    - The taken or reserve ground and sand should be watered by water before loading if the risk of education of a dust is had, e.g. if it is fine-grained materials or under windy conditions.

    Controllers behind a site of the contractor - Provide conformity PEM - Visually inspect safe use of the equipment, observe of noise level of vehicles, etc., - Check the lorries driving on a site for an estimation of emissions and licensing;

    Dust from use of cars, clearings, alignments and excavators works, etc.;

    - The soil, sand and other building materials on vehicles should be covered.

    - Speed of vehicles should be limited, in particular on minimized sites. - All heavy equipment and cars should answer established national and to local positions in the relation of emissions and noise.

  • - For minimization of emissions should be involved fuel saving up and well served cargo cars-tractors.

    - Others.

    - Vehicles and the equipment, letting out a smoke are not admissible on design sites and should be removed from site territory.

    PIU - Contact body concerning environment

    - The plan of traffic control should be developed for influence minimisation on local conditions of movement during building.

    - Supervises conformity of the contractor to all positions PEM

    - The intensive movement connected with building should be limited by alternative access roads to СОСВ to avoid failures and inconvenience for the inhabitants living lengthways road;

    Restoration of a vegetative cover and gardening

    Erosion and adjournment of deposits in reservoirs, owing to excessive cleaning a vegetative cover or the long periods without vegetation

    To any cleaning a vegetative cover, carrying out of the inventory of the area which is subject cleaning. Use of the inventory of a vegetative cover for definition of corresponding local kinds of plants for use in restoration of a vegetative cover.

    The controller behind a site of the contractor

    - To avoid liquidation of trees if it is not proved by the engineering reasons, safety issues and the ecological reasons.

    - Provide conformity PEM

    - Storage of the top layer of earth separately from another a layer and a reuse for restoration of a vegetative cover after end of works.

    PIU - Contact body concerning environment

    - Regular monitoring of a vegetative cover, especially in initial growth for maintenance of stable growth and long напочвенного a cover;

    - Supervises conformity of the contractor to all positions PEM

    - After end of civil work on СОСВ, creation of a green belt from local trees and bushes on perimetre of station for maintenance of aesthetic comfort of territory and for the next inhabitants. Maintenance of a green belt to a full establishment.

    Use of roads for transportation of materials and the equipment

    The time termination of access to real estate; The current condition of roads unsatisfactory, it can worsen

    - To provide temporary access to building time, as required; - To receive the permission to use of roads from corresponding authorities and

    - Co-ordinates with PIU both corresponding authorities and agencies. - Receives and registers complaints

  • because of use of building technics.

    agreements on repair of damages directly after building.

    from the public and resolves them PIU-contact not concerning environment

    Use of roads for transportation of materials and the equipment

    The current condition of roads unsatisfactory, it can worsen because of use of building technics

    .

    - The contractor and PIU guarantee carrying out of coordination meetings and reception of the agreement from Hokimiyat; prior to the beginning of civil work on a site (the Appendix 5 is the sample of the form of the agreement from Bukhara);

    - Receives and registers complaints from the public and resolves them

    Use of a manpower, from other areas

    Inappropriate living conditions for visitors of workers

    - Labour camp, at presence The controller behind a site of the contractor

    - Granting of corresponding sanitary constructions, portable water supply, gathering of a waste etc.

    - Co-ordinates with PIU both corresponding authorities and agencies.

    - Testing of portable water supply according to the Uzbek positions

    - Receives and registers complaints from the public and resolves them

    - Warranting of that all labour camp are confirmed PIU;

    PIU - Contact body concerning environment

    To maximize use of local work for minimization of requirement for time camps, and also for maintenance of social and economic benefit for local population.

    - Supervises procedures of the permission of complaints of the contractor and conformity to all positions PEM

    Use of a manpower from other areas

    Presence of building brigades can increase demand for the prostitution, the forbidden drugs, gamblings and e.t.

    - To maximize use of local workers which will live at home during building

    The controller behind a site of the contractor

    - Co-ordinates with PIU both corresponding authorities and agencies.

    Safety of workers Measures of industrial safety inappropriate to requirements

    - To demand from the contractor use of corresponding stabilising technics during time excavators works, especially at works on trenches, depth more than 6 m, in order to avoid collapses. - To organise trainings and training of workers under safety precautions of work and risk preventive maintenance, for the purpose of their observance

    The controller behind a site of the contractor - Coordinates with PIU both corresponding authorities and agencies. - receives and registers complaints from the public and resolves them PIU - Contact body concerning environment - Supervises procedures of the permission of complaints of the contractor and conformity to all positions PEM

  • - An operation phase and maintenance service

    The toxic materials which have got to environment

    Harm to environment and people because of the reference with chlorine

    - Storage of all dangerous materials in protected territories, with sufficient ventilation. - Working out of actions for reaction to flood of toxic materials and granting of complete sets to floods on all sites of storage of dangerous materials

    Water canal Bukhara city - Provides safe handling and storage of dangerous materials - Develops procedure of reaction to flood and gives complete sets of reaction to floods - Provides reception by the personnel on operation and training maintenance service on procedures of safe chlorination from ARP –PIU - Contact body concerning environment - Supervises conformity of the head of station to all positions PEM

    Emergencies

    Risks concerning workers and the equipment, owing to dangers connected with fires and other emergencies

    - Working out complex instructions on safety; - Training and equipment the personnel IT for observance of positions of safety of work and risk preventive maintenance; - Installation of corresponding systems of the alarm system; - Grounding of all electric equipment and granting of automatic switches; - Granting of reserve water supply for suppression fire ; - Granting of fire extinguishers in strategic places and the control of their functionality.

    Operating Water canal station - Provides reception by the personnel IT of training on safety of work from ARP - PIU - Contact body concerning environment - Supervises conformity of the head of station to all positions PEM

    Planning of force Emergency measures concerning - Group ARP should be accessible in the Employees of department of operation

  • majeure

    what variants are accessible also what measures it is necessary to undertake, if quality of water from WDU mismatches requirements either the chlorinating equipment or pumps incorrectly work.

    prompt time to definition of the suitable decision to correct a situation; When the problem is defined also the decision is co-ordinated, ARP will help to find the qualified experts who can solve a problem.

    and maintenance service and ARP (technical experts) together with the corresponding local authorities working in the field of public health services/science and technology

    The report on realisation of the Plan of Ecological Management at Reconstruction of system of water supply of Gallasiya

    Table 2. Gallasiya

    Project actions Possible ecological influences the Taken measures

    The taken measures for minimization

    Responsible organizations

    Stage prior to construction

    Accidents during activity Risks of emergence of accidents after completion of construction which can lead to damage of buildings and damage the worker, owing to unsatisfactory design

    All reconstructed buildings and constructions are designed according to standard requirements of the Republic of Uzbekistan for seismic stability and fire safety. Expertise of project documentation of Glavgosekspertiza of Gosarkhitektstroy of the Republic of Uzbekistan is carried out and the positive decision on them is received.

    "Loyiha Maslahat" state of emergency - the developer of the detailed project. Experts of state of emergency of "Loyha Maslahat" according to the approved Schedule leave on objects for the purpose of carrying out architectural supervision of compliance of construction works to requirements of project documentation

    Leaks from sewer system and a water distribution network

    Water pollution in a distributive network because of leakages of the sewerage.

    The centralized system of the sewerage in the city is absent.

    At reconstruction of a water supply system in the project polyethylene pipes which are steady against corrosion are applied and are durable.

    "Loyiha Maslahat" state of emergency - experts carry out architectural supervision of compliance to the project of pipes applied in construction

    Laying of pipelines of a new network

    Resettlement isn't expected but if it is necessary, the framework programme of allocation of land and resettlement, for elimination of negative impacts will be considered and changed to environment by resettlement

    As a result of adoption of the optimum solution of laying of water pipes during detailed design the project doesn't affect the population, personal plots and gardens. Allocation of land and resettlement by the project isn't

    Experts of technical supervision and PIU of Bukhara supervise that construction didn't mention personal plots

  • provided.

    Arrangement of dangerous materials, storage of the noisy equipment and carrying out noisy works.

    Threat to health and inconvenience for the people living in the neighbourhood with buildings and for workers on a site.

    Knot of distribution of water of. Pocket on which reconstruction of pump station and construction of pure tanks is carried out, it is located on the suburb of the city and it is removed from the densely populated territory on distance about 500 m

    PIU of Bukhara, PU "Suvokova" of Bukharaysky area, PU "Suvokova" of the Karmeninsky area

    Asbestos-cement Pipes (ACP) Harm to health at inhalation of fibers

    In the project it isn't provided uses of asbestos-cement pipes for the device of a water supply system, and earlier they also weren't used

    Construction stage

    The contractor or the workers who aren't observing ecological requirements, described in the contract

    Insufficient realization of control measures behind a state of environment

    The plan of Ecological Management is the annex to the contract. The general Terms of the contract are added with item 63 OSUK where it is provided that the Contractor has to (and) create a working control system of consequences of impact on environment and (b) to carry out the monitoring and softening measures stated in the Management plan of Environmental protection

    The contractor has to delivers to the Customer Reports on performance of such measures

    The contractor created a control system of environment and carries constantly out control for its performance. PIU of Bukhara and experts of technical supervision control this activity

    Cars, the equipment and vehicles used for construction and transportations

    Emissions of construction cars and exhaust gases of the equipment;

    Dust from use of cars, clearing, alignment and excavator works, etc.;

    For prevention of formation of a dust when exporting excessive soil it is made it having watered.

    In transit excessive soil vehicles are covered with an awning

    Intensity of movement doesn't increase because the contractor uses not a large number of

    Expert of technical supervision of construction

    The supervising foreman of the Contractor - provides compliance of PEM, visually inspects safe use of the equipment, noise level of vehicles and mechanisms. The mechanic of a site checks a technical condition of mechanisms.

  • equipment (2 dump trucks, 2 excavators and 2 truck cranes)

    The contractor signed the contract with service station which makes small repair, filling with oil and fuels and lubricants and maintenance of mechanisms, including check of emissions in the atmosphere

    All used equipment well is served and conforms to national standards

    Works on construction sites are performed about the 8th o'clock in the morning to the 18th o'clock in the evening. All works on service of equipment are performed also at this time. Works aren't conducted at night

    Experts of PIU of Bukhara supervises compliance to all provisions PEM, leaving on objects according to the Schedule

    Preparation of a construction site Erosion on a site because of clearing, alignment, and excavator works, as a result the leader to deposits of deposits in reservoirs;

    Construction works are carried out in strictly taken away places - WDU reconstruction - in the territory of existing WDU, reconstruction and construction of a water supply system - only in an earth right-of-way, without mentioning the excessive territory

    In venues of works in. The pocket isn't present need of use of a construction timbering against a soil collapse as all works are carried out quickly enough (after trench digging quickly pipes keep within and the return is made (засыпка)) and maximum Lubin trenches for the device of a water supply system are made by 1,6 m.

    The expert of technical supervision of construction exercises control that laying of pipes in the dug-out trenches and their the return засыпка Experts of PIU of were made by Bukhara quickly in order to avoid collapses of walls of a trench of prevention of inconveniences for inhabitants coordinate works according to the Schedule

    Restoration of a vegetable cover and gardening

    Erosion and adjournment of deposits in reservoirs, owing to excessive cleaning of a vegetable cover or the long periods without

    The top vegetable layer of earth was removed only for the device of two tanks with a pure volume of 1 000 m3 everyone. Other constructions are reconstructed

    The job foremaster provides compliance of PEM. The expert of technical supervision and PIU of Bukhara make control of these

  • vegetation and the top vegetable layer of earth isn't removed

    The area of removal of a vegetable cover for these purposes is insignificant (450 sq.m). The top fertile layer acted and stored separately from other soil and will be used repeatedly at an crashing of tanks after completion of their construction.

    No trees or bushes were mentioned. Works are conducted within the fenced zone WDU.

    After completion of all construction works improvement and territory gardening as it is provided in detailed design and budget and tender documentation will be made

    works

    Excavator works for laying of pipes;

    Use of roads for transportation of materials and equipment

    Damages of municipal constructions by excavator works;

    Temporary termination of access to real estate;

    Current state of roads unsatisfactory, it can worsen because of use of construction equipment.

    Detailed project documentation was coordinated with all interested services (municipal, road, the power supply network, communication, etc.)

    Prior to the beginning of a proivodstvo of works the Contractor got permission to carrying out excavator works and coordinated with all utility services of the location and crossing of pipelines.

    In case of need representatives of these services are present at work.

    Permission of local authorities (Hokimiyata) is got for use of roads which after completion of works will be restored and asphalted as it is provided in project documentation

    The job foremaster coordinates work with PIU of Bukhara, Hokimiyatom and utility services and gets the corresponding permissions

    The sewage formed on a construction site

    Rain drains on a site can wash away waste, garbage, leaves, lubricant substances, etc. pollution

    All waste and construction garbage are stored in specially taken away territory of a building site in special

    The controller behind a site of the contractor

  • of an adjacent surface water is thus possible

    containers and in due time taken out on the territories coordinated with Hokimiyats

    Dangerous materials (fuel, chemicals or waste) aren't used when performing construction works.

    Periodic visual supervision of drains of construction sites is supervised by the job foremaster of construction and experts of PIU of Bukhara

    The solid waste formed as a result of construction works

    Construction materials (a tree, steel fittings, cement, etc.), paper, packing materials, household waste/waste products of the person on a building site can cause environmental pollution and negative impact on a landscape which otherwise, is visually attractive.

    Prior to construction works the Contractor received from Hokimiyata and SES allowing documents and coordinated places of warehousing and export of waste

    On sites of construction works there are containers for collecting garbage and building wastes

    The fulfilled oils and fuel on reconstructed water constructions aren't stored. Replacement of oil and fuelling is made at service stations of of Bukhara

    The contractor in due time takes out and utilizes building wastes, paper and scrap metal

    After completion of construction works the platform will be cleared of construction garbage, pipes as it is provided by the contract

    The controller behind a site of the contractor

    Periodic visual supervision of a condition of construction sites is supervised by the job foremaster of construction and experts of PIU of Bukhara

    Inconvenience from construction – complaints

    Inconvenience and impact of construction works on the next kinds of activity and house farms.

    On construction sites banners with the indication of the contract organization, ranking officers and contact phones for submission of complaints undergone to influence by people are established.

    WDU is located far of inhabited quarters, at distance about 500 m and carrying out construction works don't result in inconveniences of the population.

    The controller behind a site of the Contractor keeps the magazine of registration of complaints, and also carries out explanatory work with makhallinsky committee and inhabitants of nearby houses

  • Before performance of work on construction of networks on city streets, the Contractor together with PIU and Hokimiyatom carried out explanatory work in mahallya, having explained the purposes of the project and having specified terms of performance of work on each site.

    For elimination of the inconveniences created for inhabitants, at construction of a water supply system, the contractor establishes temporary transitions through trenches

    Understanding social importance and need of this project, inhabitants transfer temporary inconveniences and don't complain

    Use of a manpower, from other areas

    Inappropriate living conditions for visitors of workers

    All builders working at platforms, live in Bukhara, the Pocket and nearby areas.

    The contractor обеспчена delivery of workers to building sites and upon termination of the working day they come back to the place of residence. For this reason weren't organized camp for accommodation of workers

    The controller behind a site of the Contractor, Vodokanal of. Pocket

    Use of a manpower from other areas

    Presence of construction crews can increase demand for the prostitution, the forbidden drugs, gamblings, etc.

    All construction workers local also live houses

    The controller behind a site of the Contractor, Experts of Technical supervision and PIU of Bukhara Vodokanal of. Pocket

    Safety of workers Measures of production safety inappropriate to requirements

    Depth of trenches of construction doesn't exceed 1,6 m and there is no danger of collapses

    Once a month the Contractor in the presence of the Engineer of technical supervision trains all

    The controller behind a site of the contractor

    Coordinates with PIU and appropriate authorities and agencies.

    Receives and registers complaints

  • workers to equipment requirements безопасноти. Daily before the appearance at work, all workers are warned about obligatory observance of requirements of safety measures

    workers are provided with overalls and means of individual protection (a welding mask, points, etc.)

    from the public and resolves them

  • Plans of ecological management and monitoring for the subproject of updating of system of water supply in Gijduvan

    Table 1: Plan of ecological management

    -Project actions

    - Possible ecological influences - Offered measures on minimization of influences

    - The responsible organisations

    Stage prior to the beginning of building

    Failures during activity

    Risk of occurrence of failures after end which can lead to damage of buildings and a damage to workers, owing to unsatisfactory designing

    - Designing of a building for stability to seismic forces according to norms and positions of building 2.01.03-96"Civ


Recommended