Total Sheet 28VENDOR's name : PT. DHARMA PRATAMA SEJATI
OWNER's name : PT. DONGGI SENORO LNG
PURCHASER's name : PT. JGC INDONESIA AND JGC CORPORATION CONSORTIUM
Project name Donggi Senoro LNG Project
Purchase Order No. : 0-5151-P-31A0-001-A
Equipment/Material name : PAINTING WORKS
Item number
Document title: Inspection and Test Plan
(Shop Painting)
VENDOR's document No.:
ISSUE PURPOSE FA
RESPONSIBLE DEPT. :
JOB NO.
ORIG. SERIAL REV.
V - 042 2
( )
N : Not Approved; F : Not Subject to Review
DSLNG Project
RESULT CODE : A, B, N, F ( )
NEXT STATUS : FA, FI, FC, AB ( )
RESUBMISSION DATE : ( )
REVIEWED BY :
Review Date:
A : Approved without Comment; B : Approved with Comment
( )
( )
( )
Approval or review hereunder shall not be construed to relieve Supplier / Subcontractor of his responsibilities and liability under the Contract.
0-5151-20
PURCHASER DOC. NO.
PURCHASE ORDER NO.
31A0-001-A
INDRA17-SEP-2012
Donggi Senoro LNG Project JGC Doc. No. : V-31A0-001-A-042 Rev. 2 Inspection and Tes Plan DPS Doc. No. : DPS-DSLNG-QCL-002 Rev. 2 External Painting Work Sheet No. 2 of 17
LIST OF CONTENTS 1. GENERAL ................................................................................................................ 3 1.1 Purpose ............................................................................................................. 3 1.2 Scope ................................................................................................................ 3 1.3 Reference .......................................................................................................... 3 1.4 Definition ........................................................................................................... 3 2. PLAN ....................................................................................................................... 4 3. LIST OF VERIFYING DOCUMENT FORMAT…….............................................................
4
ATTACHMENT Attachment-01 : Inspection & Test Plan
Appendix-1 Painting Inspection Record Sheet (FORM NO. 01 (JGC Register)) Appendix-2 Daily Progress Report (FORM NO. DPS-QCPF-PROG) Appendix-3 Repair Painting Daily Report (FORM NO. DPS-QCPF-PROG-R) Appendix-4 Temporary Facilities and Eqp Check List (FORM NO. DPS-QCPF-TFEC) Appendix-5 Equipment Inspection Report (FORM NO. DPS-QCPF-EQIR) Appendix-6 Master List Calibration (FORM NO. DPS-QCPF-MLCA) Appendix-7 Adhesion Test Certificate (FORM NO . DPS-QCPF-ADTC) Appendix-8 Material Inspection Acceptance (FORM NO. DPS-QCPF-MTIA-1) (Abrasive Material) Appendix-9 Material Inspection Acceptance (FORM NO. DPS-QCPF-MTIA-2) (Paint Material) Appendix-10 Surface Chloride Test Certificate (FORM NO. DPS-QCPF-SCTC) Appendix-11 Blotter Test (FORM NO. DPS-QCPF-BLTC)
INDRA17-SEP-2012
Donggi Senoro LNG Project JGC Doc. No. : V-31A0-001-A-042 Rev. 2 Inspection and Tes Plan DPS Doc. No. : DPS-DSLNG-QCL-002 Rev. 2 External Painting Work Sheet No. 3 of 17
1. GENERAL 1.1 Purpose This Inspection & Testing Plan (ITP) is a guide for Painting Work executors who assigned to
prepared and establish a quality for painting work and execute the plan to measure the workmanship compliance to the specified standard and criteria.
The purpoase of this ITP is to ensure that painting work are inspected and tested in accordance
with the relevant standard and codes and project specification. This ITP shall covers the inspection and testing activities during the external blasting and
painting activities at the Fabrication Shop (Cilegon), including the inspection that shall be done by each party involved in the project.
1.2 Scope This ITP was developed and made after review of JGC’s document related to Inspection and test
Plan, External Painting at Fabrication Shop ( Cilegon ). This ITP shall be covered for Painting Work for Piping, Flange and Fitting ( included Pipe
Support and Accessoriess). 1.3 References Specification for Painting, issued by JGC Doc. No. S-900-13A0-001. Specification for Piping material Identification, issued by JGC Doc. No. S-900-1360-003. 1.4 Definition
1.4.1. Hold Point (H)
The inspection and test activity is mandatory witness point to Contractor, Company, and Authority (if applicable) and the subsequent activity beyond this point must not proceed without the approval by these parties.
1.4.2. Witness (W)
Physically attend the inspection activity to check the correct execution. Witness must documented using the approval Inspection Form.
1.4.3. Review (R) Assess adequacy and completeness of Quality Control Document, such as the inspection and test record, other Quality Qontrol Records and Certificate. Review must be ducumented using the approved Inspection Form.
1.4.4. Inspection (I) Implementation of inspection and test activity such as measuring, surveying, examining, testing and comparing the results with specified requirements, inorder to establish whether conformity is achieved for ach caracteristic. Inspection and test must be documented using approved Inspection Form.
1.4.5. Spot Witness (SW) Witness by sampling ; subcontractor can proceed with the test/inspection when the JGC inspector is not present at the notified time.
INDRA17-SEP-2012
Donggi Senoro LNG Project JGC Doc. No. : V-31A0-001-A-042 Rev. 2 Inspection and Tes Plan DPS Doc. No. : DPS-DSLNG-QCL-002 Rev. 2 External Painting Work Sheet No. 4 of 17
1.4.6. Surveillance (S)
Monitoring of work in progress, test and inspections. 2. PLAN The Detail of Inspection & Testing Plan (ITP) shall be shown in Attachment-01 “Inspection &
Test Plan (ITP)”. 3.
LIST OF VERIFYING DOCUMENT FORMAT
Tabel for verifying document format which is applicable for this ITP as below:
Appendix No. Description DPS Form No.
Appendix-1 Painting Inspection Record Sheet FORM NO. 01 (JGC Register)
Appendix-2 Daily Progress Report FORM NO. DPS-QCPF-PROG
Appendix-3 Repair Painting Daily Report FORM NO. DPS-QCPF-PDR
Appendix-4 Temporary Facilities and Eqp Check List FORM NO. DPS-QCPF-TFEC
Appendix-5 Equipment Inspection Report FORM NO. DPS-QCPF-EQIR
Appendix-6 Master List Calibration FORM NO. DPS-QCPF-MLCA
Appendix-7 Adhesion Test Certificate Form No . DPS-QCPF-ADTC
Appendix-8 Material Inspection Acceptance (Abrasive Material) FORM NO. DPS-QCPF-MTIA-1
Appendix-9 Material Inspection Acceptance (Paint Material) FORM NO. DPS-QCPF-MTIA-2
Appendix-10 Surface Chloride Test Certificate FORM NO. DPS-QCPF-SCTC
Appendix-11 Blotter Test FORM NO. DPS-QCPF-BLTC
INDRA17-SEP-2012
DonggiSenoroLNG Project JGC Doc. No. V-31A0-001-A-042 Rev. 2 Inspection and Test Plan DPS Doc. No.DPS-DSLNG-QCL-002 Rev.2 External Painting Work Sheet No.5 of 17
INSPECTION AND TEST PLAN DPS Ref. No.*2 As above Rev.No. 2
Attachment 01 Rev.Date 10/04/12
Status For Construction
DESCRIPTION OF WORK / LOCATION 1 : EXTERNAL PAINTING AT FABRICATION SHOP
Item Activity Description *3
Extent *4
Controlling Document/ Method *5
Acceptance Criteria *6 [Applicable QC Work
Instruction No.] Frequency *7
Contractor Responsible Personnel *8
Verifying Documents/
QCR's *9
Responsibility Category 10 DPS JGC Owner
I : Inspection ; H : Hold Point ; R : Review ; W : Witness ; SW : Spot Witness ; S : Surveillance
0 All construction drawings are available at site
--- All documents required for earth work
Available on site with ‘Approved For Construction’ status
Before starting work --- --- H --- ---
0.1 Blasting and painting Equipments inacceptable condition.
--- Workshop, equipments, facilities and inspection tools shall be in accordance with project specification which describe in related JGC's documents
Inspection acceptance for workshop and facilities are available. Certificate of Compliance for construction equipment are available. Calibration certificates for inspection tools are available and maintained.
Before starting work.
QC Inspector,Supervisor, Mechanic
DPS-QCPF-TFECDPS-QCPF-EQIRDPS-QCPF-MLCA
H (*) ---
1. PAINT MATERIAL RECEIVING (Abrasive, Paint, Thinner, etc)
1.1 Check abrasive brand name and type
Random Sampling
Supplier's material data sheet, Visual check, Check by label indication
The material will be selected by Contractor in accordance with Specification for Painting, JGC Doc. No.S-900-13A0-001:
Aluminum oxide, garnet, steel grit or steel shot shall be used for blasting carbon steel. As per ISO 8504-2. [QWI-102].
Once/ Each batch at material receiving
Material Controller, QC Inspector
DPS-QCPF-MTIA-1
I W SW
(*) Initial stage of facility setting to be checked
INDRA17-SEP-2012
DonggiSenoroLNG Project JGC Doc. No. V-31A0-001-A-042 Rev. 2 Inspection and Test Plan DPS Doc. No.DPS-DSLNG-QCL-002 Rev.2 External Painting Work Sheet No.6 of 17
INSPECTION AND TEST PLAN DPS Ref. No.*2 As above Rev.No. 2
Attachment 01 Rev.Date 10/04/12
Status For Construction
DESCRIPTION OF WORK / LOCATION 1 : EXTERNAL PAINTING AT FABRICATION SHOP
Item Activity Description *3
Extent *4
Controlling Document/ Method *5
Acceptance Criteria *6 [Applicable QC Work
Instruction No.] Frequency *7
Contractor Responsible Personnel *8
Verifying Documents/
QCR's *9
Responsibility Category 10 DPS JGC Owner
I : Inspection ; H : Hold Point ; R : Review ; W : Witness ; SW : Spot Witness ; S : Surveillance
Aluminum oxide, garnetor other abrasives (free from any chloride of iron/steel contamination) shall be used for blasting stainless steel and aluminum. As per ISO 8504-2. [QWI-102].
1.2 Check correct size of abrasive
Random Sampling
Supplier's material data sheet, Visual check, Check by label indication
Depend on Supplier’s instruction to achieve a required surface cleanliness & surface roughness.[QWI-102], [QWI-104] [QWI-401]
Once/ Each batch at material receiving
Material Controller, QC Inspector
DPS-QCPF-
MTIA-1
I R R
1.3 Check paint (base and curing agent) brand name and color
All Paint Supplier's material data sheet, Visual check, Check by label indication
The material will be selected by Contractor in accordance with Specification for Painting, JGC Doc. No.S-900-13A0-001,[QWI-101], [QWI-504]
Once/ Each batch at material receiving
Material Controller, QC Inspector
DPS-QCPF-MTIA-2
I W R
1.4 Check thinner brand name
All Thinner PMF's material data sheet, Visual Check, Check by label indication
The material will be selected by Contractorin accordance with Specification for Painting, JGC Doc. No.S-900-13A0-001.[QWI-101], [QWI-504]
Once/ Each batch at material receiving
Material Controller, QC Inspector
DPS-QCPF-MTIA-2
I W R
1.5 Check paint shelf life All Paint Visual check, Check by PMF’s batch label indication, etc.
PMF 's material data sheet [QWI-101], [QWI-103], [QWI-504]
Once/ Each batch at material receiving
Material Controller, QC Inspector
DPS-QCPF-MTIA-2
I R R
INDRA17-SEP-2012
DonggiSenoroLNG Project JGC Doc. No. V-31A0-001-A-042 Rev. 2 Inspection and Test Plan DPS Doc. No.DPS-DSLNG-QCL-002 Rev.2 External Painting Work Sheet No.7 of 17
INSPECTION AND TEST PLAN DPS Ref. No.*2 As above Rev.No. 2
Attachment 01 Rev.Date 10/04/12
Status For Construction
DESCRIPTION OF WORK / LOCATION 1 : EXTERNAL PAINTING AT FABRICATION SHOP
Item Activity Description *3
Extent *4
Controlling Document/ Method *5
Acceptance Criteria *6 [Applicable QC Work
Instruction No.] Frequency *7
Contractor Responsible Personnel *8
Verifying Documents/
QCR's *9
Responsibility Category 10 DPS JGC Owner
I : Inspection ; H : Hold Point ; R : Review ; W : Witness ; SW : Spot Witness ; S : Surveillance
2. PAINTING CONDITION
2.1 Weather Random Sampling
Specified weather condition must be required for the application of Surface Preparation and Painting, check by visual
No rain, strong wind, fog or mist. [QWI-001]
Min. 4 times/Dayor once before surface preparation & paint application
Foreman, QC Inspector
Form-01. JGC Doc. No.S-900-13A0-001
I S/R R
2.2 Atmospheric Temperature
Random Sampling
Supplier's material data sheet,Checked and Measured by Thermometer
Supplier's material data sheet and Specification for Painting, JGC Doc. No.S-900-13A0-001, Sec. 14.6(1) [QWI-002]
Min. 4 times/Dayor once before surface preparation & paint application
Foreman, QC Inspector
Form-01. JGC Doc. No.S-900-13A0-001
I S/R R
2.3 Substrate Surface Temperature
Random Sampling of all surface
Supplier's material data sheet, Checked and Measured by Substrate Surface Thermometer
Surface shall be 3OC above dew point, Supplier's material data sheet and Specification for Painting, JGC Doc. No.S-900-13A0-001, Sec. 14.6(2) [QWI-003]
Min. 4 times/Dayor once before surface preparation & paint application
Foreman, QC Inspector
Form-01. JGC Doc. No.S-900-13A0-001
I S/R R
2.4 Relative Humidity Random Sampling
Supplier's material data sheet, Checked and Measured by hygrometer.
RH shall not exceed 85%, Supplier's material data sheet and Specification for Painting, JGC Doc. No.S-900-13A0-001, Sec. 14.6(3) [QWI-004]
Min. 4 times/Dayor once before surface preparation & paint application
Foreman, QC Inspector
Form-01. JGC Doc. No.S-900-13A0-001
I S/R R
INDRA17-SEP-2012
DonggiSenoroLNG Project JGC Doc. No. V-31A0-001-A-042 Rev. 2 Inspection and Test Plan DPS Doc. No.DPS-DSLNG-QCL-002 Rev.2 External Painting Work Sheet No.8 of 17
INSPECTION AND TEST PLAN DPS Ref. No.*2 As above Rev.No. 2
Attachment 01 Rev.Date 10/04/12
Status For Construction
DESCRIPTION OF WORK / LOCATION 1 : EXTERNAL PAINTING AT FABRICATION SHOP
Item Activity Description *3
Extent *4
Controlling Document/ Method *5
Acceptance Criteria *6 [Applicable QC Work
Instruction No.] Frequency *7
Contractor Responsible Personnel *8
Verifying Documents/
QCR's *9
Responsibility Category 10 DPS JGC Owner
I : Inspection ; H : Hold Point ; R : Review ; W : Witness ; SW : Spot Witness ; S : Surveillance
2.5 Surface Condition All Surface Supplier's material data sheet, Visual Check
No impurities [QWI-301], [QWI-401], [QWI-501], [QWI-502], [QWI-503]
Min. once before surf. preparation & painting work
Foreman, QC Inspector
- I W SW
3. COMPRESSED AIR/ABRASIVE
3.1 Dryness, Contamination of Compressed Air
Random Sampling
Supplier's material data sheet, Visual Check and/or White Cloth Test by “Blotter Test” correct terminology.
No impurities Min. 2 times/day or once prior to use
Foreman, Mechanic
DPS-QCPF-BLTC
I S/R R
3.2 Pressure of Compressed Air
Random Sampling
Supplier's material data sheet, Visual Check, measured byPressure Gauge(Hypodermic Needle Pressure Gauge)
Supplier's material data sheet
Min. 2 times/days or once prior to use
Foreman, QC Inspector
DPS-QCPF-EQIR
I S/R R
3.3 Contamination of Abrasive Material
Random Sampling
Supplier's material data sheet, Visual Check and/or Chloride Ion Test Kit
For Abrasive salt test: value of not more than 25mS/m2, as per PMF’s Recommendation.
Once/ Each batch at material receiving
QC Inspector
DPS-QCPF-SCTC
I W R
3.4 Dryness of Abrasive Material
Random Sampling
Supplier's material data sheet, Visual Check
No impurities Once/day or each batch prior to use
Foreman, QC Inspector
DPS-QCPF-SCTC
I SW R
4. SURFACE PREPARATION
4.1 Check abrasive brand name and type
Random Sampling
Supplier's material data sheet, Visual check, Check by label indication
Same as Item 1.1 of this ITP [QWI-102], [QWI-104], [QWI-401]
Once/ Each batch prior to use
Foreman, QC Inspector
DPS-QCPF-MTIA-1
I S/R R
INDRA17-SEP-2012
DonggiSenoroLNG Project JGC Doc. No. V-31A0-001-A-042 Rev. 2 Inspection and Test Plan DPS Doc. No.DPS-DSLNG-QCL-002 Rev.2 External Painting Work Sheet No.9 of 17
INSPECTION AND TEST PLAN DPS Ref. No.*2 As above Rev.No. 2
Attachment 01 Rev.Date 10/04/12
Status For Construction
DESCRIPTION OF WORK / LOCATION 1 : EXTERNAL PAINTING AT FABRICATION SHOP
Item Activity Description *3
Extent *4
Controlling Document/ Method *5
Acceptance Criteria *6 [Applicable QC Work
Instruction No.] Frequency *7
Contractor Responsible Personnel *8
Verifying Documents/
QCR's *9
Responsibility Category 10 DPS JGC Owner
I : Inspection ; H : Hold Point ; R : Review ; W : Witness ; SW : Spot Witness ; S : Surveillance
4.2 Check correct size of abrasive
Random Sampling
Supplier's material data sheet, Visual check, Check by label indication
Same as Item 1.2 of this ITP [QWI-102] [QWI-401], [QWI-406]
Once/ Each batch prior to use
Foreman , QC Inspector
DPS-QCPF-MTIA-1
I S/R R
4.3 Check surface condition before surface preparation (Degreased with solvent cleaning and/or washed with fresh water)
Random Sampling of all surface
Supplier's material data sheet, Visual checkinclude Sieve test. Washing water chloride content shall be in accordance with project specification.
Free from water/oil/mud/ welding splatter etc., Supplier's material data sheet and Specification for Painting, JGC Doc. No.S-900-13A0-001,[QWI-301]
Once/ Prior to surface preparation
Foreman, QC Inspector
DPS-QCPF-SCTC
I W R
4.4 Atmospheric Temperature
Random Sampling
Supplier's material data sheet,Checked and Measured by Thermometer
Same as Item 2.2 of this ITP [QWI-001], [QWI-002]
Min. 4 times/Dayor once before surface preparation & paint application
Foreman, QC Inspector
Form-01. JGC Doc. No.S-900-13A0-001
I S/R R
4.5 Substrate Surface (steel) Temperature
Random Sampling of all surface
Supplier's material data sheet, Checked and Measured by Substrate Surface Thermometer
Same as Item 2.3 of this ITP [QWI-001], [QWI-003]
Min. 4 times/Dayor once before surface preparation & paint application
Foreman, QC Inspector
Form-01. JGC Doc. No.S-900-13A0-001
I S/R R
4.6 Relative Humidity Random Sampling
Supplier's material data sheet, Checked and Measured by hygrometer.
Same as Item 2.4 of this ITP [QWI-001], [QWI-004]
Min. 4 times/Dayor once before surface preparation & paint application
Foreman, QC Inspector
Form-01. JGC Doc. No.S-900-13A0-001
I S/R R
INDRA17-SEP-2012
DonggiSenoroLNG Project JGC Doc. No. V-31A0-001-A-042 Rev. 2 Inspection and Test Plan DPS Doc. No.DPS-DSLNG-QCL-002 Rev.2 External Painting Work Sheet No.10 of 17
INSPECTION AND TEST PLAN DPS Ref. No.*2 As above Rev.No. 2
Attachment 01 Rev.Date 10/04/12
Status For Construction
DESCRIPTION OF WORK / LOCATION 1 : EXTERNAL PAINTING AT FABRICATION SHOP
Item Activity Description *3
Extent *4
Controlling Document/ Method *5
Acceptance Criteria *6 [Applicable QC Work
Instruction No.] Frequency *7
Contractor Responsible Personnel *8
Verifying Documents/
QCR's *9
Responsibility Category 10 DPS JGC Owner
I : Inspection ; H : Hold Point ; R : Review ; W : Witness ; SW : Spot Witness ; S : Surveillance
4.7 Check the removal of contaminants after abrasive blasting
Random Sampling
Supplier's material data sheet, Visual check
Free form water/oil/mud/ welding spatter etc., Supplier's material data sheet and Specification of Painting JGC Doc. No.S-900-13A0-001.[QWI-301] , [QWI-501]
Once/item prior to painting. Chloride contamination check for stainless steel, if necessary
Foreman, QC Inspector, Painting Supervisor
Form-01. JGC Doc. No.S-900-13A0-001
I W R
4.8 Check the surface cleanliness
All Surface Supplier's material data sheet, Visual check confirm with ISO 8501-1
In accordance with specifiedrequirements
Min. once/during & after surface preparation work
Foreman, QC Inspector,Painting Supervisor
Form-01. JGC Doc. No.S-900-13A0-001
I W SW
Random sampling
Checked using adhesive tape as ISO 8502-3:1992
Max dust quantity rating : 2 and sizeclass : 2
Min. once/during & after surface preparation work
Foreman, QC Inspector,
Form-01. JGC Doc. No.S-900-13A0-001
I W SW
4.9 Check Surface Roughness
All Surface
Supplier's material data sheet, Visual check: Confirm with magnifying glass.
Supplier's material data sheet and Specification of Painting JGC Doc. No.S-900-13A0-001.[QWI-406]
Min. once/during & after surface preparation work
Foreman, QC Inspector,Painting Supervisor
Form-01. JGC Doc. No.S-900-13A0-001
I W R
Random sampling: min. 1 spot/10m2 of all surface and/or min.3 spots for less than 100 m2 substrate
Supplier's material data sheet, Visual check & ISO 8503-1 surface profile comparator or equivalent.Testex tape is required as a permanent record.
Supplier's material data sheet and Specification of Painting JGC Doc. No.S-900-13A0-001.
Min. once/during & after surface preparation work
Foreman, QC Inspector,Painting Supervisor
Form-01. JGC Doc. No.S-900-13A0-001
I W R
INDRA17-SEP-2012
DonggiSenoroLNG Project JGC Doc. No. V-31A0-001-A-042 Rev. 2 Inspection and Test Plan DPS Doc. No.DPS-DSLNG-QCL-002 Rev.2 External Painting Work Sheet No.11 of 17
INSPECTION AND TEST PLAN DPS Ref. No.*2 As above Rev.No. 2
Attachment 01 Rev.Date 10/04/12
Status For Construction
DESCRIPTION OF WORK / LOCATION 1 : EXTERNAL PAINTING AT FABRICATION SHOP
Item Activity Description *3
Extent *4
Controlling Document/ Method *5
Acceptance Criteria *6 [Applicable QC Work
Instruction No.] Frequency *7
Contractor Responsible Personnel *8
Verifying Documents/
QCR's *9
Responsibility Category 10 DPS JGC Owner
I : Inspection ; H : Hold Point ; R : Review ; W : Witness ; SW : Spot Witness ; S : Surveillance
4.10 Salt Test Random Sampling
ISO 8502-6 and ISO 8502-9 or PMF’s Recommendation
As per PMF’s Recommendation Once prior to primer
QC Inspector,Painting Supervisor
Form No. DPS-QCPF-SCTC
I W R
5. PAINT APPLICATION (Primer)
5.1 Check interval between surface preparation and primer application
All paint application
Supplier's material data sheet or Technical data sheet.
Supplier's material data sheet and Specification of Painting JGC Doc. No.S-900-13A0-001, Sec. 13(9).Normally within 4 hours after blasting. [QWI-501], [QWI-502]
Confirmation by application time record sheet
Foreman, Painting Supervisor, QC Inspector
Form-01. JGC Doc. No.S-900-13A0-001
I S/R R
5.2 Check base paint and curing agent (Brand name, Generic type, Shelf life, Pot life, Batch No., Color)
Each paint prior to use
Supplier's material data sheet, Check by label indication, Check by color chart
Same as Item1.3 of this ITP [QWI-504]
Min. once/during & before paint application work
Foreman, QC Inspector
Form-01. JGC Doc. No.S-900-13A0-001
I S/R R
5.3 Check thinner (Brand name, Shelf life, thinner condition)
Each thinner prior to use
Supplier's material data sheet, Check by label indication
Same as Item 1.4 of this ITP [QWI-504]
Min. once/during & before paint application work
Foreman, QC Inspector
Form-01. JGC Doc. No.S-900-13A0-001
I S/R R
5.4 Check mixing ratio of base paint/ curing agent/ thinner
Each paint prior to use
Supplier's material data sheet
Supplier's material data sheet, Specification of Painting JGC Doc. No.S-900-13A0-001, Sec. 14.3 [QWI-505]
Min. once/during & before paint application work
Foreman, QC Inspector
Form-01. JGC Doc. No.S-900-13A0-001
I S/R R
INDRA17-SEP-2012
DonggiSenoroLNG Project JGC Doc. No. V-31A0-001-A-042 Rev. 2 Inspection and Test Plan DPS Doc. No.DPS-DSLNG-QCL-002 Rev.2 External Painting Work Sheet No.12 of 17
INSPECTION AND TEST PLAN DPS Ref. No.*2 As above Rev.No. 2
Attachment 01 Rev.Date 10/04/12
Status For Construction
DESCRIPTION OF WORK / LOCATION 1 : EXTERNAL PAINTING AT FABRICATION SHOP
Item Activity Description *3
Extent *4
Controlling Document/ Method *5
Acceptance Criteria *6 [Applicable QC Work
Instruction No.] Frequency *7
Contractor Responsible Personnel *8
Verifying Documents/
QCR's *9
Responsibility Category 10 DPS JGC Owner
I : Inspection ; H : Hold Point ; R : Review ; W : Witness ; SW : Spot Witness ; S : Surveillance
5.5 Paint material Condition
Each paint prior to use
Supplier's material data sheet, Visual check, Agitating by Stirrer
Supplier's material data sheet, No gelling, skinning, high viscosity, sedimentation, etc. to a large degree [QWI-505], [QWI-501], [QWI-502]
Min. once/during & before paint application work
ForemanQC Inspector
Form-01. JGC Doc. No.S-900-13A0-001
I S/R R
5.6 Atmospheric Temperature
Random Sampling
Supplier's material data sheet,Checked and Measured by Thermometer
Same as Item 2.2 of this ITP [QWI-001], [QWI-002]
Min. 4 times/Dayor once before paint application
Foreman, QC Inspector
Form-01. JGC Doc. No.S-900-13A0-001
I S/R R
5.7 Substrate Surface (steel) Temperature
Random Sampling of all surface
Supplier's material data sheet, Checked and Measured by Substrate Surface Thermometer
Same as Item 2.3 of this ITP [QWI-001], [QWI-003]
Min. 4 times/Dayor once before paint application
Foreman, QC Inspector
Form-01. JGC Doc. No.S-900-13A0-001
I S/R R
5.8 Relative Humidity Random Sampling
Supplier's material data sheet, Checked and Measured by hygrometer.
Same as Item 2.4 of this ITP [QWI-001], [QWI-004]
Min. 4 times/Dayor once before paint application
Foreman, QC Inspector
Form-01. JGC Doc. No.S-900-13A0-001
I S/R R
5.9 Check application of stripe coat for spray application
All Stripe Coat To all weld joints and sharp edges by visual check
Applied by brush prior to spray application in accordance with PMF’s Instruction[QWI-501]
every application work
Foreman --- I S/R R
5.10 Check wet film thickness for spray application
Random Sampling of all work surfaces
Supplier's material data sheet, Check and Measurement by WFT Comb or equivalent
Supplier's material data sheet and Specification of Painting JGC Doc. No.S-900-13A0-001, Sec. 14.5 (3) [QWI-510]
Min. once during paint application work
Spray painter, Foreman.
WFT Checkednot
record.
I S S
INDRA17-SEP-2012
DonggiSenoroLNG Project JGC Doc. No. V-31A0-001-A-042 Rev. 2 Inspection and Test Plan DPS Doc. No.DPS-DSLNG-QCL-002 Rev.2 External Painting Work Sheet No.13 of 17
INSPECTION AND TEST PLAN DPS Ref. No.*2 As above Rev.No. 2
Attachment 01 Rev.Date 10/04/12
Status For Construction
DESCRIPTION OF WORK / LOCATION 1 : EXTERNAL PAINTING AT FABRICATION SHOP
Item Activity Description *3
Extent *4
Controlling Document/ Method *5
Acceptance Criteria *6 [Applicable QC Work
Instruction No.] Frequency *7
Contractor Responsible Personnel *8
Verifying Documents/
QCR's *9
Responsibility Category 10 DPS JGC Owner
I : Inspection ; H : Hold Point ; R : Review ; W : Witness ; SW : Spot Witness ; S : Surveillance
5.11 Check dry film thickness
5 spots (1 spot = Ave. of 3 reading s)/10m2substrate and/or Min. 4spot for less than 10m2 substrate
Supplier's material data sheet, Check by SSPC-PA2 and measurement by DFT Magnetic Gauges
Supplier's material data sheet and Specification of Painting JGC Doc. No.S-900-13A0-001, Sec. 14.5 [QWI-511]
Min. once after drying or curing paint film of each paint application work phase
Foreman, QC Inspector,Painting Supervisor
Form-01 JGC Doc. No.S-900-13A0-001
I W SW
6. PAINT APPLICATION (Intermediate)
6.1 Check overcoat interval All paint application
Supplier's material data sheet
Supplier's material data sheet and. [QWI-503]
Confirmation by application time record
Foreman, Painting Supervisor, QC Inspector
--- I S/R R
6.2 Check base paint and curing agent (Brand name, Generic Name, Shelf life, Pot life, Batch No., Color)
Each paint prior to use
Supplier's material data sheet, Check by label indication, Check by color chart
Same as Item1.3 of this ITP [QWI-505]
Min. once/during & before paint application work
Foreman, QC Inspector
DPS-QCPF-MTIA-2
Form-01. JGC Doc. No.S-900-13A0-001
I S/R R
6.3 Check of thinner (Brand name, Shelf life, thinner condition)
Each thinner prior to use
Supplier's material data sheet, Check by label indication
Same as Item 1.4 of this ITP [QWI-504]
Min. once/during & before paint application work
Foreman, QC Inspector
DPS-QCPF-MTIA-2
Form-01. JGC Doc. No.S-900-13A0-001
I S/R R
INDRA17-SEP-2012
DonggiSenoroLNG Project JGC Doc. No. V-31A0-001-A-042 Rev. 2 Inspection and Test Plan DPS Doc. No.DPS-DSLNG-QCL-002 Rev.2 External Painting Work Sheet No.14 of 17
INSPECTION AND TEST PLAN DPS Ref. No.*2 As above Rev.No. 2
Attachment 01 Rev.Date 10/04/12
Status For Construction
DESCRIPTION OF WORK / LOCATION 1 : EXTERNAL PAINTING AT FABRICATION SHOP
Item Activity Description *3
Extent *4
Controlling Document/ Method *5
Acceptance Criteria *6 [Applicable QC Work
Instruction No.] Frequency *7
Contractor Responsible Personnel *8
Verifying Documents/
QCR's *9
Responsibility Category 10 DPS JGC Owner
I : Inspection ; H : Hold Point ; R : Review ; W : Witness ; SW : Spot Witness ; S : Surveillance
6.4 Check mixing ratio of base paint/ curing agent/ thinner
Each paint prior to use
Supplier's material data sheet
Supplier's material data sheet, Specification of Painting JGC Doc. No.S-900-13A0-001, Sec. 14.3 [QWI-505]
Min. once/during & before paint application work
Foreman QC Inspector
Form-01. JGC Doc. No.S-900-13A0-001
I S/R R
6.5
Check substrate condition (If existing paint film is damaged /contaminated, shall be repaired /cleaned )
Random Sampling of all surface
Supplier's material data sheet, Visual check
Free from paint damage/contamination, Supplier's material data sheet [QWI-503], [QWI-502] [QWI-501]
Once/ Each batch prior to succeeding paint application
Foreman, QC Inspector,Painting Supervisor
Form-01. JGC Doc. No.S-900-13A0-001
I S/R R
6.6 Atmospheric Temperature
Random Sampling
Supplier's material data sheet,Checked and Measured by Thermometer
Same as Item 2.2 of this ITP [QWI-001], [QWI-002]
Min. 4 times/Dayor once before paint application
Foreman, QC Inspector
Form-01. JGC Doc. No.S-900-13A0-001
I S/R R
6.7 Substrate Surface (steel) Temperature
Random Sampling of all surface
Supplier's material data sheet, Checked and Measured by Substrate Surface Thermometer
Same as Item 2.3 of this ITP [QWI-001], [QWI-003]
Min. 4 times/Dayor once before paint application
Foreman, QC Inspector
Form-01. JGC Doc. No.S-900-13A0-001
I S/R R
6.8 Relative Humidity Random Sampling
Supplier's material data sheet, Checked and Measured by hygrometer.
Same as Item 2.4 of this ITP [QWI-001], [QWI-004]
Min. 4 times/Dayor once before paint application
Foreman, QC Inspector
Form-01. JGC Doc. No.S-900-13A0-001
I S/R R
6.9 Check wet film thickness
Random Sampling of all work surfaces
Supplier's material data sheet, Check and Measurement by WFT Comb or equivalent
Supplier's material data sheet and Specification of Painting JGC Doc. No.S-900-13A0-001, Sec. 14.5 (3) [QWI-510]
Min. once during paint application work
Spray painter, Foreman
WFT Checked not record.
I S S
INDRA17-SEP-2012
DonggiSenoroLNG Project JGC Doc. No. V-31A0-001-A-042 Rev. 2 Inspection and Test Plan DPS Doc. No.DPS-DSLNG-QCL-002 Rev.2 External Painting Work Sheet No.15 of 17
INSPECTION AND TEST PLAN DPS Ref. No.*2 As above Rev.No. 2
Attachment 01 Rev.Date 10/04/12
Status For Construction
DESCRIPTION OF WORK / LOCATION 1 : EXTERNAL PAINTING AT FABRICATION SHOP
Item Activity Description *3
Extent *4
Controlling Document/ Method *5
Acceptance Criteria *6 [Applicable QC Work
Instruction No.] Frequency *7
Contractor Responsible Personnel *8
Verifying Documents/
QCR's *9
Responsibility Category 10 DPS JGC Owner
I : Inspection ; H : Hold Point ; R : Review ; W : Witness ; SW : Spot Witness ; S : Surveillance
6.10 Check dry film thickness
5 spots (1 spot = Ave. of 3 reading s)/10m2substrate and/or Min. 4 spot for less than 10m2 substrate
Supplier's material data sheet, Check by SSPC-PA2 and measurement by DFT Gauges
Supplier's material data sheet and Specification of Painting JGC Doc. No.S-900-13A0-001, Sec. 14.5 [QWI-511]
Min. once after drying or curing paint film of each paint application work phase
Foreman, QC Inspector,Painting Supervisor
Form-01. JGC Doc. No.S-900-13A0-001
I W SW
7. ADHESION TEST
7.1 Adhesion Test for sample panel test
Random Sampling
ASTM D4541 : Pull Off Strength of coating using Portable Adhesion Tester, when paint system are fullyCured
Min. 3 MPa. 3 times (initial, mid and last term
of painting schedule at shop/field)
QC Inspector,Painting Supervisor
DPS-QCPF-
ADTC
I
W
SW
Random Sampling
ASTM D3359 :Test Methodefor Measuring Adhesion by Tape Test.
Min. Classification 4A. 3 times (initial, mid and last term
of painting schedule at shop/field)
QC Inspector,Painting Supervisor
DPS-QCPF-
ADTC
I
W
SW
8. FINAL INSPECTION FOR TOTAL COAT
8.1 Check Color Difference Random sampling, min 30% of all surface
Visual check, compare with color sample, color specimen
Coloring shall be comply with Specification of Painting JGC Doc. No.S-900-13A0-001, Appendix-3.[QWI-701]
Min Once after paint application work
Foreman, QC Inspector
Form-01 & 02. JGC Doc. No.S-900-13A0-001
I W SW
INDRA17-SEP-2012
DonggiSenoroLNG Project JGC Doc. No. V-31A0-001-A-042 Rev. 2 Inspection and Test Plan DPS Doc. No.DPS-DSLNG-QCL-002 Rev.2 External Painting Work Sheet No.16 of 17
INSPECTION AND TEST PLAN DPS Ref. No.*2 As above Rev.No. 2
Attachment 01 Rev.Date 10/04/12
Status For Construction
DESCRIPTION OF WORK / LOCATION 1 : EXTERNAL PAINTING AT FABRICATION SHOP
Item Activity Description *3
Extent *4
Controlling Document/ Method *5
Acceptance Criteria *6 [Applicable QC Work
Instruction No.] Frequency *7
Contractor Responsible Personnel *8
Verifying Documents/
QCR's *9
Responsibility Category 10 DPS JGC Owner
I : Inspection ; H : Hold Point ; R : Review ; W : Witness ; SW : Spot Witness ; S : Surveillance
8.2 Check Appearance/Defect etc.
All surface Visual Check No Mottling, Sagging, Blistering, Cracking, Flaking, Peeling, Deposit Impurities, Porosity [QWI-701]
Min Once after paint application work
Foreman, QC Inspector
Form-01. JGC Doc. No.S-900-13A0-001
I W SW
8.3 Check Color Coding All Pipe/ Fitting
Visual Check Color Coding shall be comply with Specification for piping material identification JGC Doc. No.S-900-1360-003.
After finish painting work
Painting Supervisor, QC Inspector
--- I S/R R
8.4 Issue "CERTIFICATE OF COMPLIANCE"
All Painting Work Finished
Inspection summary report for Job description, Surface cleanliness, Surface profile, Dry film thickness, Appearance and Color
Supplier's material data sheet and project specification [QWI-704]
--- Painting Supervisor, QC Inspector (Issue/Order/ Item No.)
1. Form-01. JGC Doc. No.S-900-13A0-001
2. FORM NO. DPS-QCPF-PROG
I R R
9. INSPECTION FOR REPAIR PAINTING WORK (AFTER FABRICATION)
9.1 In General, same step
as Item No. 2, 3, 4, 5, 6 and 8 of this ITP. (Except 3.1, 3.2, 3.3, 4.9, 4.10 for unit testing are included on main painting work)
Damaged paint film surface
Inspection summary report for Job description, Surface cleanliness, Surface profile, Dry film thickness, Appearance and Color .
In accordance with specified requirements (Specification of Painting JGC Doc. No.S-900-13A0-001)
After finish repair painting work
Painting Supervisor, QC Inspector (Issue/Order/ Item No.)
1. Form-01. JGC Doc. No.S-900-13A0-001
2. FORM NO. DPS-QCPF-PDR
I W SW
INDRA17-SEP-2012
DonggiSenoroLNG Project JGC Doc. No. V-31A0-001-A-042 Rev. 2 Inspection and Test Plan DPS Doc. No.DPS-DSLNG-QCL-002 Rev.2 External Painting Work Sheet No.17 of 17
INSPECTION AND TEST PLAN DPS Ref. No.*2 As above Rev.No. 2
Attachment 01 Rev.Date 10/04/12
Status For Construction
DESCRIPTION OF WORK / LOCATION 1 : EXTERNAL PAINTING AT FABRICATION SHOP
Item Activity Description *3
Extent *4
Controlling Document/ Method *5
Acceptance Criteria *6 [Applicable QC Work
Instruction No.] Frequency *7
Contractor Responsible Personnel *8
Verifying Documents/
QCR's *9
Responsibility Category 10 DPS JGC Owner
I : Inspection ; H : Hold Point ; R : Review ; W : Witness ; SW : Spot Witness ; S : Surveillance
Note :
1. Description of Work/Location – The particular work and its general location on site. 2. DPS Ref. No. – The unique Document Registration Number of a specific ITP. 3. Activity Description – Specific and sequential activities or the detailed work elements leading to the completion of the work. 4. Extent –min. extent of the inspection shall complete in order to meet JGC requirement. 5. Controlling Documents – The document(s) applicable to or related to the specific activity, which are used as a reference for conducting of inspections and tests as
mentioned in Project Quality Plan (Doc. No. V-31A0-0010-A-041).The specifications, codes & standards, and local regulations, etc. with an identified section No. to be applied to the inspection and test shall be referred to in conjunction with Inspection and Test Methods.
6. Acceptance Criteria – The specific benchmark defined by the Project Document for acceptance of the work by Company, including the requirements and criteria associated with local regulations and codes and standards.
7. Frequency– The frequency of inspection, verification or testing that needs to be conducted for a particular activity. 8. Contractor Responsible Personnel – The Contractor’s personnel directly responsible for the conduct of verification for the particular activity. 9. Verification Documents / QCRs– This identify the QCR pro-forma inspection report form to be used to verify and record acceptance of the work activity. 10. Responsibility Category – Use to identify the extent of involvement of each organization per activity in terms of :
· Inspection – I; · Review – R ; · Hold Point – H; · Spot Witness – SW ; · Witness – W ; · Surveillance – S ;
INDRA17-SEP-2012
PAINTING INSPECTION RECORD SHEET
Document : Sheet No. :
Job No :Client :Project Name :Area of Unit :Name of Substrate :( Equipment No. or Line No. or Identification No.)
Start (Year, Month, Date, Time)Finish (Year, Month, Date, Time)
2 Painting System No. :3 Surface Preparation :
(1) Surface Preparation : Spec. /Result(2) Surface Roughness : Spec. Ry5 µm/Result Spec. Ry5 µm(3) Application Conditions : Atmospheric Temperature : oC
Substrate Surface Temperature : oCRelative Humidity : %Weather
(4) Salt Test : Criteria as per ResultPMF'sRecommendation
4 Paint Data Primer Coat Intermediate Coat Top Coat
Material : - Manufacture Name :- General Name/Type :- Product Name :- Color :- Shelf Life :- Batch No. :
5 Paint Application(1) Method ( spray, Roller, Brush, etc )(2) No. of Coat(3) Application Conditions
- Atmospheric Temperature :- Substrate Surface Temperature :- Relative Humidity : % % %
- Weather :6 Paint Film :
(1) Appearance of Paint Film- Color- Defect, etc :
(2) DFT ( Spec.) :(3) DFT (Min./Max.) :
7 Others :
- Memo
Signature : DS JGC PT DPSDate :Inspected by :
Witnessed/Reveiwed by :
Appendix-1FORM NO.-01
Top CoatIntermediate Coat 1 Inspection Date and Time : Primer CoatSurface Preparation
INDRA17-SEP-2012
PT. DHARMA PRATAMA SEJATI FORM NO. DPS-QCPF-PROGDS LNG ProjectCilegon Shop
Report No.:Date :
DIAL
Inch (m) Work V (M²) Date1234567891011121314151617181920
SUB TOTAL
Prepared byPT. Dharma Pratama Sejati
.
Work Step
T E
E
Flan
ge
Blin
d Fl
ange
DAILY PROGRESS REPORTBlasting & Painting Work for External Pipe
Painting System :
No Description
SCH
Redu
cer
Blin
d Fl
ange
Cap
Redu
cer
Oth
er
HEA
T N
O.
Elbo
w 4
5°
Elbo
w 4
5°
Pipe
Pipe
JGC
Oth
er
SIZE
Flan
ge
Item Quantity (ea)Pipe
Work Volume (M²)
T E
E
Appendix-2
Blasting ( SP )&
Primer Coat
Approved by
Elbo
w 9
0°
Elbo
w 9
0° Job Card. No.Ca
pINDRA
17-SEP-2012
PT. DHARMA PRATAMA SEJATI FORM NO. DPS-QCPF-PDRDS LNG ProjectCilegon Shop
Report No.:Date :
DIA
Inch1
234567891011121314151617181920
Prepared byPT. Dharma Pratama Sejati
. .
SIZE
HEAT NO.
JGC
Work Step
Job Card. No./ Spool clearance No.
REPAIR PAINTING DAILY REPORT(For Welding Portion and Damage by Handling)
Painting System :
NoDescription
(Spool no.,Weld joint no.)SCH
Approved by
Blasting ( SP )&
Primer Coat
Applied Date
Remarks
Appendix-3
INDRA17-SEP-2012
Donggi Senoro LNG ProjectPT Dharma Pratama Sejati
Job. No. :
Date :
Ref. No. :
System No. :
PCWBS :
FWBS :
Purpose : [ ] for Commencement of Work[ ] Demonstration/Test-run
Item Check Point Result
1. Permit [ ] Construction permit [ ] Accept
[ ] Reject
2. Plan [ ] Overall Execution Plan [ ] Accept
[ ] Work Method Statement [ ] Reject
[ ] Work Instruction Procedure
3. Workshop [ ] Enclosing of blasting/painting area [ ] Accept
[ ] Ventilation for blasting/painting [ ] Reject
[ ] Abrasive recycle
[ ] Lighting
[ ] Fire prevention/Fire extinguisher
[ ] Paint storage
[ ] Abrasive storage
[ ] …………………………………………….
4. Equipment Condition [ ] Folk lift(s) [ ] Accept
[ ] Compressor(s) [ ] Reject
[ ] Blasting tank(s) & hose ass'y
[ ] Airless spray(s) & hose ass'y
[ ] Paint Mixer(s)
[ ] Generator Set(s)
5. Inspection Tool [ ] Inspection Tool(s) & List [ ] Accept
[ ] Calibration Certificate(s) & List [ ] Reject
FINAL JUDGEMENT [ ] Accept[ ] Reject
Prepared by, Approved by, Approved by,PT DPS JGC DS
________________Date : Date : Date :
FORM NO. DPS-QCPF-TFEC
TEMPORARY FACILITIES AND EQUIPMENT CHECK LIST
Remarks
Appendix-4
INDRA17-SEP-2012
Donggi Senoro LNG ProjectPT Dharma Pratama Sejati
Job. No. :
Date :
Ref. No. :
System No. :
PCWBS :
FWBS :
NO QTY IDENTIFICATION CAPACITY CONDITION
PREPARED BY CHECKED BY APPROVED BYPT DPS JGC JGC
Date : Date : Date :
EQUIPMENT INSPECTION REPORT
FORM NO. DPS-QCPF-EQIR
EQUIPMENT NAME REMARKS
Appendix-5
INDRA17-SEP-2012
Donggi Senoro LNG Project Job. No. :
PT Dharma Pratama Sejati Report No. :Report Date :Sheet No. :System No. :PCWBS :
FWBS :
No Equipt. No. Location Frequency Calibration Date
Calibration Bureau
Tolerance
Prepared by Verified byPT DPS PT DPS
Date : Date :
Brand Name Remarks
Appendix-6FORM NO. DPS-QCPF-MLCA
MASTER LIST CALIBRATION
Calibration Method
INDRA17-SEP-2012
Donggi Senoro LNG Project Report Date :
PT Dharma Pratama Sejati Record No. :
System No. :
PCWBS :
FWBS :
1. Test Date :
2. Location :
3. ITP No. :
4. Painting System No. :
5. Application by :
6. Adhesion Test Standard :
7. Inspection Tools :
8. Method :
9. Weather Condition : Dew Point :Air Temperature : Relatif Humidity :Substrate Temperature :
10. Classification Required :
11. Test Result : Accept Reject Not Applicable
psi
Note : Calibration of Certificate for Inspection Equipment see attached
12. Remarks :
Test Carried out by, Checked by, Approved by,PT DPS/PMF's JGC DS
Name : Name : ________________ Name : Date : Date : Date
Classification Result
Percentage of DFT
DFT Before adhesion pull off test
Appendix-7
Average
ISO DRAWING AREA Dolly Test No.
Form No . DPS-QCPF-ADTC
ADHESION TEST CERTIFICATE
DFT After adhesion pull off test
INDRA17-SEP-2012
Job. No. :Donggi Senoro LNG Project Report Date :PT Dharma Pratama Sejati DN No. :
Delivery Date :System No. :PCWBS :FWBS :
Sheet No. of
Abrasive Type
Brand Name Supplier Size Unit Qty Packing Contaminant Size Unit QtyTotal Qty
Received by Verified by, Approved by Approved byPT DPS PT DPS JGC DS
Material Control QA/QC Officer QC Manager QC ManagerDate Date : Date : Date :
Appendix-8FORM NO. DPS-QCPF-MTIA-1
No.DESCRIPTION VERIFICATION
Remark
(ABRASIVE MATERIAL)MATERIAL INSPECTION ACCEPTANCE
INDRA17-SEP-2012
Job. No. : Donggi Senoro LNG Project MATERIAL INSPECTION ACCEPTANCE Report Date : PT Dharma Pratama Sejati (PAINT MATERIAL) DN No. :
Delivery Date : System No. : PCWBS : FWBS : Sheet No. :
PMF's Packing Color Self Life Unit Qty
Received by Verified by, Approved by Approved byPT DPS PT DPS JGC DS
........................................... ........................................... ........................................... ...........................................Date : Date : Date : Date :
Curing Agent
VERIFICATIONTotal Qty
DESCRIPTION
Generic Type Brand Name
Appendix-9
Batch No.No.
FORM NO. DPS-QCPF-MTIA-2
RemarkBase Paint
INDRA17-SEP-2012
Donggi Senoro LNG Project Job. No. :
PT Dharma Pratama Sejati Report Date :
Record No. :
System No. :
PCWBS :
FWBS :
1. Test Date :
2. ITP No. :
3. Location :
4. Item Test
5. Inspection Tools :
6. Method :
7. Tested Area : m2 Used Distilled Water: ml
Measured Value : µS /㎝ (microsiemens) per centimetre
Zero reference : µS /㎝ (microsiemens) per centimetre
8. Test Result : mg/m2 ppm
Acceptance Criteria: Less than 30 ppm chloride for authentic stainless steel
Accept Reject Not Applicable
* All salts are considered as NaCl or Sodium Chloride
* The total surface density of soluble salts (S) in mg/m2 is:(S) in mg/m2 = 6 x (Measured Value - Zero Reference)
9. Remarks
Test Carried out by: Checked by, Approved by,PT DPS JGC DS
………………………… ……………………….. ……………………………..Date : Date : Date
SURFACE CHLORIDE TEST CERTIFICATE
FORM NO. DPS-QCPF-SCTCAppendix-10
INDRA17-SEP-2012
Donggi Senoro LNG Project Job. No. :
PT Dharma Pratama Sejati Report Date :
Record No. :
System No. :
PCWBS :
FWBS :
1. Test Date :
3. Location :
4. Item Test
5. Inspection Tools :
6. Method :
8. Test Result : No oil discoloration on the collector; no water contaminant on the collector
Acceptance Criteria:No oil discoloration on the collector; no water contaminant on the collector
Accept Reject Not Applicable
9. Remarks
Test Carried out by:QC
…………………………Date :
FORM NO. DPS-QCPF-BLTC
BLOTTER TEST
Appendix-11
INDRA17-SEP-2012