• VALIYATHURA GODOWN PROJECT-III Administrative Sanction No. GO (Rt.) No.216/2017/ F&CSD dtd.28.06.2017 Estimated cost Rs. 3.9 crores. PMC M/s. HPL Area 24,993.80sqft Present Status The Construction work completed . Godown inaugurated on 11/09/2020.
Transcript
•
VALIYATHURA GODOWN PROJECT-III
Administrative Sanction No. GO (Rt.) No.216/2017/ F&CSD dtd.28.06.2017