+ All Categories
Home > Documents > VALIYATHURA GODOWN PROJECT-III

VALIYATHURA GODOWN PROJECT-III

Date post: 28-Jan-2022
Category:
Upload: others
View: 3 times
Download: 0 times
Share this document with a friend
5
VALIYATHURA GODOWN PROJECT-III Administrative Sanction No. GO (Rt.) No.216/2017/ F&CSD dtd.28.06.2017 Estimated cost Rs. 3.9 crores. PMC M/s. HPL Area 24,993.80sqft Present Status The Construction work completed . Godown inaugurated on 11/09/2020.
Transcript

VALIYATHURA GODOWN PROJECT-III

Administrative Sanction No. GO (Rt.) No.216/2017/ F&CSD dtd.28.06.2017

Estimated cost Rs. 3.9 crores.

PMC M/s. HPL

Area

24,993.80sqft

Present Status The Construction work completed .

Godown inaugurated on 11/09/2020.

OUTSIDE VIEW

INSIDE VIEW


Recommended