Valmet Automotive Quality Management March 2015
Transcript
  • Valmet AutomotiveQuality Management

    March 2015

  • Valmet Automotive March 20152

    INTERNAL

  • Valmet Automotive

    Management system approvals

    Based on the company policies Fulfill the relevant quality,

    environmental and safety standards as well as the specific requirements of customer

    Process-oriented Core processes

    - Product launch - Serial production

    The quality system fulfils the following standards

    - ISO/TS 16949:2009 (Quality) - ISO 14001:2004 (Environment) - OHSAS 18001:2007 (Safety)

    The quality, environmental and safety systems are certified by a third party

    March 2015

    INTERNAL

    3

  • Valmet Automotive

    Management system approvals

    March 20154

    Quality:1995 ISO 90011999 QS-90002003 ISO/TS 16949

    Environment:2001 ISO 14001

    Safety:2012 OHSAS 18001

    INTERNAL

  • Valmet Automotive

    Quality objectives

    The key targets are set and reviewed together with customer

    Internal targets are set by the management based on the key targets

    Action plans to achieve the targets Management monitors the achievement of the

    targets and improvement plans Company management sets and reviews company-

    level improvement projects Process owners set and review process-related

    improvement projects

    March 20155

    INTERNAL

  • Valmet Automotive

    Main process KPIs

    FTOK (first time OK rate-%) Product audit (index, defect/car) Delivery accuracy (%) Productivity (h/car)

    These main KPIs are base for our bonus-system.

    March 20156

    INTERNAL

  • Valmet Automotive

    Quality audits System audits (internal)

    - Effectiveness of the management system is systematically reviewed

    - Management sets the plan and reviews the results and corrective actions

    Process audits - To evaluate the effectiveness of the production process

    and sub-processes - Based on an audit plan and done by experts from the

    production departments - Reviews of audit findings and preventive and corrective

    actions are managed by the production departments

    Product audits - Performed by the quality department according to the

    procedure of customer.- Performance of the product audit is secured with

    monitoring audit.

    COP audits- Done by authorities from different markets (China, Japan, ...)

    March 20157

    INTERNAL

  • Valmet Automotive

    Management reviews Quality issues

    March 2015

    VA Management reviews

    Management team - Target setting (goals and objectives)

    Production management team

    - Customer satisfaction- Follow-up of the target fulfillment- Steering of development projects

    - Steering and reviewing the business line's/plant's operations

    - Steering of the management system

    Local department meetings

    - Steering of the plant operations- Steering of continuous improvement projects

    - Customer service- Follow-up of the target fulfillment

    Production meetings

    - Steering of the plant operations - Production conditions

    - Customer service- Short term action

    8

    INTERNAL

  • Quality assurance in production

  • Valmet Automotive

    Quality management

    Quality control plan is the basis for the process control supported by work and inspection instructions

    Team members on the line are responsible for the assembly and the quality of their work

    Separate inspection stations after major production steps Final approval of the cars is performed according to the

    standards and procedures

    Quality reporting system provides immediate feedback of the quality for corrective actions

    March 201510

    Serial production control

    INTERNAL

  • Valmet Automotive

    Product audit Quality control points End of line tests Material laboratory analysis Online/offline (3D) mesurings Control of process parameters

    Quality assurance plan Quality control plans FMEA Internal quality targets Operational & work instructions Preventive maintenance Production and material planning

    Customer quality targets Product specifications Supplier part specifications The standards / Regulations

    Management reviews Process audits System audits Quality cost report Quality-committee Quality improvement meetings

    Action plans Problem solving process Improvement projects (8D, Six sigma) Change management Market feedback process Control of non-conforming products

    Quality assurance during serial production

    March 2015

    Customer requirements

    Process definitions

    Quality control &

    measurements

    Continuous improvement

    Quality management

    11

    INTERNAL

  • Valmet Automotive

    Quality control stations

    The purpose of the control activities is to prevent defects from advancing in the process and to ensure that the quality of the product is acceptable for the next process phase.

    The inspections and tests which are carried out during the manufacturing process are documented in the quality control plans. With these inspections and tests the compliance of the product with customer requirements is verified.

    After every main process phase agreed product characteristics are inspected in separate internal quality control stations to ensure that these conform to stated specifications

    Feedback to production line according to the feedback process

    March 2015

    INTERNAL

    12

  • Valmet Automotive

    Process follow-up / analysis

    Q-targets for each process (body, paint, assembly, material, design) Q-costs are reported at management meetings Problem analysis are done acc. 8D-method Weekly Q-improvement meetings, reporting with 8D Continuous improvement process SixSigma method in use (3 BB at Valmet) Q-Committee monthly meetings 3D measurements (off-line)

    - 3 measuring units (DEA and Johansson)- 2 portable measuring units (Faro-arm)

    On-line measurements at production line (body)

    March 201513

    INTERNAL

  • Valmet Automotive

    Reaction priority1. Design change2. Process change3. Control

    Production quality assurancePreventive & corrective actions in production phase

    14

    PFMEA- New product- Process change

    Flow chart- New product- Process change

    Control plan- New product- Process change- New control methods

    Results/feedback- Production- Final audit- Customers

    Operator instructions- New product- Process change- New control methods

    Failure ranking list

    March 2015

    INTERNAL

  • Valmet Automotive

    OnlineMeasuring

    Station

    Quality AuditBody

    Metal & BodyappearanceInspection

    ECInspection

    PrimerInspection

    Top coatInspection

    Cpk-Values / Offline Measuring Station

    Body shop Paint shop

    ECOSLM 2InspectionECOS

    PaintInspection

    LM 3Inspection

    Watertest

    Wheel &Light

    alignment

    DeliverycheckDiagnosisECOSTest drive

    UnderbodycheckDiagnosis

    Roller test

    Assembly shop

    Product Audit

    offline

    LM 1Inspection

    Final Insp.Paint

    Production quality assurance

    March 201515

    INTERNAL

  • Valmet Automotive

    Body shop / Quality conceptMercedes A-class manufacturing

    16

    ALUSTALINJA

    InLine Mittaaminen OffLine Mittaaminen Adaptiivinen hitsausvalvonta Ultrani hitsauslaaduntarkastus OnLine liimakamerajrjestelm

    ETUPLINJA

    OffLine mittaus Adaptiivinen hitsausvalvonta Ultrani hitsauslaaduntarkastus OnLine liimakamerajrjestelm Liimauksen visuaalinen tarkastus

    TAKAPLINJA

    OffLine mittaus Adaptiivinen hitsausvalvonta Ultrani hitsauslaaduntarkastus OnLine liimakamerajrjestelm Liimauksen visuaalinen tarkastus Lyhytkaarihitsaus visuaalinen tarkastus Lyhytkaarihitsausmomenttitarkastus

    SIS- JA ULKOSIVULINJAT

    OffLine Mittaaminen Adaptiivinen hitsausvalvonta Ultrani hitsauslaaduntarkastusLiimauksen visuaalinen tarkastus Visuaalinen pintalaatutarkastus

    VIIMEISTELYLINJA

    Visuaalinen pintalaatutarkastus Ovien pulttien momenttitarkastus Luukkujen sovitemittaus Hitsaamon laadunmittaus (LM)

    OVILINJA

    OffLine Mittaaminen Adaptiivinen hitsausvalvonta Ultrani hitsauslaaduntarkastus Liimauksen visuaalinen tarkastus Visuaalinen pintalaatutarkastus Laserhitsaus - VISIR

    KORILINJA

    InLine Mittaaminen OffLine Mittaaminen Adaptiivinen hitsausvalvonta Ultrani hitsauslaaduntarkastus OnLine liimakamerajrjestelm

    KESKILATTIALINJA

    OffLine Mittaaminen Adaptiivinen hitsausvalvonta Ultrani hitsauslaaduntarkastus OnLine liimakamerajrjestelm Ksnhitsaus visuaalinen tarkastusKsnhitsaus momenttitarkastus

    LUUKKULINJA

    Valssauksen visuaalinen tarkastus OffLine Mittaaminen Adaptiivinen hitsausvalvonta Ultrani hitsauslaaduntarkastus Liimauksen visuaalinen tarkastus Visuaalinen pintalaatutarkastus Laserjuottamisen visuaalinen tarkastus

    March 2015

    INTERNAL

  • Valmet Automotive

    Body shop / QualityGeometry measuring concept

    ZB Heckboden

    ZB Vorbau

    ZB Hauptboden

    ZB Unterbau

    ZB Seitenwand IN RE

    ZB Seitenwand IN LI ZB Seitenwand AU VST LI

    ZB Seitenwand AU VST RE

    ZB Fahrertr RE

    ZB Fahrertr LI ZB Fondtr LI

    ZB Fondtr RE

    ZB Rckwandtr

    ZB Z2.3ZB Z2.1

    ZB Radeinbau VST RE ZB Stirnwand ZB Radeinbau VST LIZB Radeinbau LI

    ZB Lngstrger VST HI LI

    Quertrger LI

    Quertrger RE

    ZB Lngstrger VST HI RE

    ZB Radeinbau RE

    ZB Seitenwand AU LI

    ZB Seitenwand AU RE

    010A01005A01L 005A01R

    025

    305A01L

    305A01R

    570

    630

    245

    340

    320A

    320A

    325A

    325A

    425L 435L410R

    410L 425R

    435R

    790745

    530

    530

    530

    530

    ZB Radeinbau VO LI ZB Lngstrger LI

    Lngstrger IN OB VO LI Lngstrger IN OB VO RE

    ZB Radeinbau VO RE ZB Lngstrger RE002R01002L01001L01 001R01

    003R01 003L01

    = OffLine measuring= InLine measuring= Fit&flush measuring

    March 2015

    560

    ZB Motorhaube

    17

    INTERNAL

  • Valmet Automotive

    Paint shop process description and Quality controlsCONFIDENTIAL

    Degreasingspray

    Degreasingspray

    Degreasingdip

    Degreasingdip

    RinsesprayRinsespray

    Activationdip

    Activationdip

    Phosphatedip

    Phosphatedip

    Rinsedip

    Rinsedip

    RinsesprayRinsespray

    Passivationspray

    Passivationspray

    Rinsedip

    Rinsedip

    RinsesprayRinsespray

    EC ovenEC oven

    DIW Rinsespray

    DIW Rinsespray

    UF Rinsedip

    UF Rinsedip

    UF Rinsedip

    UF Rinsedip

    UF Rinsespray

    UF Rinsespray

    CathodicimmersionCathodic

    immersionRobot sealing/

    SAMRobot sealing/

    SAMManualsealingManualsealing

    Sealing oven

    Sealing oven

    EC touch-up (dry)

    EC touch-up (dry)

    Off-linerepair

    Off-linerepair

    ManualwipingManualwiping

    ManualsprayingManualspraying

    ESTAapplication

    ESTAapplication Back-upBack-up Flash-offFlash-off

    Primeroven

    Primeroven

    Primer touch-up(Moist)

    Primer touch-up(Moist)

    Top coatoven

    Top coatoven Flash-offFlash-off Back-upBack-up

    Robotclear coat

    Robotclear coat

    Heatedflash-offHeatedflash-off

    Recip.base coat

    Recip.base coat

    ESTAbase coat

    ESTAbase coat

    Manualbase coatManual

    base coatManualwipingManualwiping

    FinishingFinishing RatingOK / NOK

    RatingOK / NOK

    NOK lineNOK line

    OK lineOK line

    Spot repairSpot repair

    SandingrerunnersSandingrerunners

    To generalassembly

    Frombodyshop

    Audit2

    Audit4

    Audit1

    Audit3

    Pre-treatment

    ECSealing

    Base coat (WB)

    Primer surfacer (WB)

    Cavitytreatment

    CavitytreatmentControlControl

    Masking station

    Masking station

    Phosphatespray

    Phosphatespray

    RobotsealingRobotsealing

    Sealing touch-upSealing touch-up

    Clear coat

    Off-linerepair

    Off-linerepair

    BS surface touch-up

    BS surface touch-up

    Cavity treatment

    oven

    Cavity treatment

    oven

    INTERNAL

    March 201518

  • Valmet Automotive19

    Quality concept Paint ShopPRETREATMENT

    Random sample min 1 body/shift

    Phosphate surface quality Phosphate coating weight EC surface quality EC layer thickness EC roughness

    SEALING & SAM

    Line check - All vehicles

    Robot seams position Robot seams completeness

    Quality Audit 1 (Random sample min 1 body/shift ) Body shop surface quality EC surface quality (body & paint) Seam sealant positioning Seam sealant completeness Seam sealant leak tightness Seam sealant optical appearance SAM positioning SAM completeness SAM film thickness

    EC TOUCH-UP

    Line check - All vehicles

    EC surface quality SAM completeness Visible area seam sealant

    KPIs-FTOK % EC-Quality Audit 1

    PRIMER

    Line check - All vehicles

    Masking tape completeness Primer coat surface quality

    Quality Audit 2(Random sample min 1 body/shift ) EC touch up quality Visible area seam sealant appearance Primer coat surface quality (body & paint) Masking tape positioning Masking tape completeness

    KPIs-FTOK % Primer- Quality Audit 2

    TOP COAT

    Line check- All vehicles

    Top coat surface quality Top coat appearance

    Quality Audit 3 (Random sample min 1 body/shift)

    Primer touch up quality Top coat surface quality (body & paint) Visual color assessment Colorimetry Film thickness (EC, primer coat, base coat and clear coat)

    KPIs-FTOK % Top coat-- Quality Audit 3

    PAINT SHOP FINISH

    Line check - All vehicles

    Top coat finishing quality

    Quality Audit 4(Random sample min 1 body/shift)

    Orange peel (LW, SW, DOI) Cavity wax completeness Optical appearance of the seam sealant in the visible area SAM completeness Paint surface defects Body shop surface quality

    KPIs-FTOK % Paint Shop Finish-Quality Audit 4

    March 2015

    INTERNAL

  • Valmet Automotive

    OS

    TSE

    NSOR

    CAB

    INET R.C.

    UNIT 2

    R .C .UN IT 1

    ELEC

    TRIC

    CAB

    INETS

    HUOLT O

    R. C.

    U NI T 1EL EC TR IC C AB INE TS

    Quality conceptAssembly shop

    20

    All vehicles

    5 cars a day

    defect/car

    Quality audit

    Check:- All cars- CPA-focus points, feedback from previous days/weeks

    defect/car

    line 7 Q-check

    Audit 1

    All vehicles

    Check:-Line 1 and IP-preassys most important and safety-relevant assemblies

    KPIsFTOK % & QC

    Audit 2

    All vehicles

    Check:-Line 2 and Chassis-preassys most important and safety-relevants assemblies

    KPIsFTOK % & QC

    Audit 3

    All vehicles

    Check:-Line 3 and doors-preassys most important and safety-relevants assemblies

    KPIsFTOK % & QC

    Water test

    All vehicles

    Check:--Leaks- optical and manually

    KPIsFTOK %

    Roller test

    All vehicles

    Check:-drivability, functions, noises

    KPIsFTOK %

    Paint surface

    All vehicles

    Check:-damages, scratches, assembly marks

    KPIsFTOK %

    Test Drive

    5% test track100% cobblestone drive

    Check:-drivability, functions, noises

    KPIsFTOK %

    Line 8

    All vehicles

    Final inspectionCheck:-deliverable-chassis card OK-vehicle corresponds the order-delivery condition and cleanliness-final diagnose

    KPIsFTOK %

    Process flow

    Process flow

    Process flow

    Process flow

    All vehicles

    All vehicles

    Rework

    All vehicles

    5 % of cars

    defect/car

    High pressure water test

    March 2015

    INTERNAL

  • Valmet Automotive

    Quality Assurance Plan Assembly shop

    March 201521

    Line 1 Quality Check 100%

    Line 2 Quality Check 100%

    Line 3 Quality Check 100%

    Line 7Q-check defined points (CPA etc.)100%

    Water Test 100%

    Wheel alignment & Roller Test 100%

    Paint surface inspection 100%

    Test Drive (test track 5%, cobblestone 100%)

    Extra Quality Check 5 cars

    High pressure water test 5%Product Audit

    2 cars/dayLine 8 100%

    INTERNAL

  • Valmet Automotive

    Measuring center

    March 2015

    INTERNAL

    22

  • Valmet Automotive

    Measuring center equipment

    Coordinate measuring machines (CMM)- Dual arm machine with four movable measuring pallets

    Measuring range X=6000 mm, Y=2797 mm, Z=2400 mm- Portal machines

    Measuring range X=1500 mm, Y=1500 mm, Z=800 mm Measuring range X=700 mm, Y=450 mm, Z=350 mm

    Other equipment- Spring testing gauges- Dial indicator gauge- Block gauges- Pressure calibrators- Length measuring machines

    March 2015

    INTERNAL

    23

  • Valmet Automotive

    Material laboratoryProvides services to all VAs departments. It gives support for monitoring processes of the paint shop and it helps introducing new materials into production. The laboratory also provides its expertise to different VAs projects as required. The main activities of the material laboratories can be divided following categories

    - Surface treatment laboratory Alignment test programs for the new materials Acceptance tests for all base coats and clear coat batches (including e.g. color, mechanical properties) Climate and corrosion tests (e.g. according to VDA-standards)

    - Chemical laboratory Process baths and sewage water analysis / monitoring Chemical managements (e.g. VAs MSDS register)

    - Metal laboratory / Rubber and plastic laboratory Tensile strength tests, compression stress test (including textiles and plastics) Hardness measurements (Vickers, Brinell, Rockwell, Shore A, Shore D)

    - Cooperation together Authorities Material suppliers - SQ activities, analysis / testing services Universities and research centers - e.g.

    o Outotec , Research Center material technology and analytical laboratoryo VTT Technical Research Center analytical service (e.g. metal analysis and other problem solving)

    March 2015

    INTERNAL

    24

  • Product quality

  • Valmet Automotive

    Product quality improvement meetings

    Product audit- Review of each car daily

    Weekly product quality improvement meetings with management- Prio-issues from product audit- Task force teams for selected issues- Problem analysis are done acc. to 8D-method- Reporting with 8D-form

    Weekly QM-meeting with all quality managers- Review of the results vs. internal targets and corrective actions

    March 201526

    INTERNAL

  • Valmet Automotive

    Product audit process

    27 March 2015

    AuditR&D Prod.Prod. DeliveryDelivery

    P

    DC

    A P

    DC

    A

    Customersaudit process

    Monitoring

    Results

    A/B/C-faults

    Improvementpotential

    Final audit

    Ran

    dom

    sam

    ple

    1 %

    Legal req., functions

    Optical

    Independent activity

    Corrective actionsCorrective actions operationsCustomerInternal operationsSuppliers

    Audit

    INTERNAL

  • Valmet Automotive

    Product audit action plan

    March 2015

    Perhaps Next WS visit Immediate

    Disturbance Walk home failureComplaint

    Optical Functional

    Depends on the repair costs

    Customerreaction

    Type of defect

    Delivery BlockDefect Analysis / Immediate Actions

    ReworkStatistical

    Actions

    Quality Improvement

    PotentialDefects

    (Audit, Quality Measuring)Defect

    weighting

    Lega

    lTe

    st d

    rive

    inte

    rrup

    tion

    Safe

    ty

    INTERNAL

    28

  • Valmet Automotive

    Handling of major and systematic defects

    1. Defect added to body, paint or chassis card and issue reported verbally and in written format to the defect source.

    2. Defect stopped and inspections & repair activities started. Sampling inspection of 25+25 cars. Delivery stop if defect found from already approved cars.

    3. Root cause analysis and corrective actions to prevent the issue happening again. Analysis and actions reported to stakeholders.

    4. Solution approval and additional actions if needed. Defect creator informed.

    March 201529

    Defect

    1. Defect added to body, paint or chassis card

    Defect founder

    Area where the defect was caused

    2. Defect stopped, inspection & repair

    3. Analysis + corrective & preventive actions

    Quality Manager 4. Approval and additional actions if needed

    INTERNAL

  • Valmet Automotive

    Market feedback

    30 March 2015

    Car owners Dealers OEM-customers

    Warranty info Leasing cars Test reports Dealer reports JD Power Suppliers Audits

    Researchcompanies

    Press

    Receive, summarise and inform

    (contact person)

    Define priority(task force)

    Define root causeand responsibility

    (task force)

    Plan and implementcorrective actions

    (responsible)

    Verify and approvecorrective actions

    (task force)

    Reporting Reporting Customer satisfaction

    INTERNAL

  • Valmet Automotive

    Delivery stop process

    This process is used, if there would be found a critical defect in the product audit, in the production or in case the legal requirement is not met.

    Cars are blocked and deliveries to the harbour and further will be stopped until the corrective actions are done.

    The decision for a delivery stop is done by QM / product quality.

    By using this process it will be secured that all the possibly affected cars will be checked and reworked before delivery to the customer.

    March 2015

    INTERNAL

    31

  • Valmet Automotive

    Daily Information Flow at VA Production Depts

    32

    Production management

    morning round

    Production morning walk

    Info

    rmat

    ion/

    Supp

    ort

    Repo

    rtin

    g/Es

    cala

    tion

    Daily at: 09:20-10:00 Participants: PRD-VP, PRD-D, QS, LOG,

    FIN, PRD-C, MThemes: Volume, Quality, Productivity,

    Availability of parts/materials,Escalation

    Communication

    Daily at: 07:00-08:50 Themes: Volume, Quality,

    Productivity, Availability of parts/materials, Escalation

    TL+ OPS: 07:10 - 07:40

    TL+ SV, ENG: 07:40 - 08:10

    SV+ PRD-D, LOG, SQ, M, QS, ENG: 08:20 - 08:50

    AbbreviationsPRD-VP Director of Production PRD-D Department Director QS Quality representant LOG Logistics SQ Representant of Supplier Quality FIN Representant of FinanceENG Representant of Process EngrgPRD-C Representant of Prodn ControlM Representant of maintenanceSV Supervisor of a Prodn area TL TeamleaderOPS Operator on a station

    OPS: 07:00 - 07:05

    March 2015