OUTLINE OF PRESENTATION
Introduction Objectives Job Plan
Information Phase Speculation (Generate alternatives) Evaluation Deployment Presentation Implementation
INTRODUCTION
Electric Panel Factory at Dammam has decided to modify compact substation production line by replacing Oil Ring Main Unit (RMU) with sulphur hexafluoride insulation (SF 6).
Replaced Oil Ring Main Unit (RMU) by SF6 insulation
OBJECTIVES
1.1. Replace Old and Obsolete Oil RMUReplace Old and Obsolete Oil RMU
2.2. Use SF6 RMUUse SF6 RMU
3.3. Select the best RMU Select the best RMU
4.4. RMU should be delivered in six lots / 2 RMU should be delivered in six lots / 2 year year
5.5. The cost of oil type RMU is 15,000 SRThe cost of oil type RMU is 15,000 SR
SF6 in RMU
SF6 gas is used in electrical power equipment
It is insulation and arc quenching medium in RMU
SF6 Oil
Type of Ring Main Unit
Compact Substation
Compact substation Layout
Transformer
LV
MV
Infromartion- Requirment
1. Type- tested
2. Independent of climat
3. Maintenance - free
4. 15 KV , 630 Amp , 60 HZ ,SF6,21 KA/sec
5. Hermetically -sealed welded switchgear enclosure
6. Compact and clear design
7. Short Delivery Period
compact Easy cable instalation
Encapsulated, climate proof,Easy accessable , etc.
maintenance free
Easy cable installation
Infromartion- Requirment
Information- Data
Quotations Catalog Competitor
Information- Cost Data
No Item Q.T U.SR T.SRDimension
DeliveryL H W
1 Oil type RMU 500 17,000 8,500,000 400 900 1700 14
2 ABB 500 22,000 10,450,000 355 775 1600 12
3 SIEMENS 500 23,000 11,040,000 105 835 1400 12
4 Merlin Gerin 500 20,000 9,600,000 500 775 1600 10
5 Saudi Lucy 500 20,000 9,200,000 600 1200 1400 8
6 Alstom 500 20,000 9,600,000 1010 700 1315 16
7 Hoeco 500 19,000 8,835,000 500 700 1200 20
8 Ormazabal 500 19,500 9,360,000 370 900 1800 20
9 F & G 500 19,500 9,400,000 320 640 1400 22
WhyTo install RMU in Compact S/S
To have good market share
How
Select RMU
FunctionBuy 500 RMU Select RMU
Function Worksheet
Identify Present Function
What dose it now do Verb noun
Feed Transformer Link Load Used Oil insulation
What must it do Verb Noun
Improve marker share Reduce Maintenance Easy operation & installation Increase Customer acceptance
Analysis Phase- Ideas
The most used RMUs in KSA1. ABB
2. Siemens
3. Merlin Gerin
4. Saudi Lucy
5. Alstom
6. Hoeco
7. Ormazabal
Function Worksheet
Function : Re Design Compact substation using SF6
RMU
Why : To be competitive in the market
How Select SF6 RMU
Reliability
1 ABB 6 9 9 8 32 2
2 Siemens 6 8 9 10 33 1
3 Saudi Lucy 5 9 9 7 30 3
4 Merlin Gerin
6 8 8 6 28 4
5 Alstom 5 4 4 6 19 5
6 Hoeco 3 3 2 5 13 7
7 Ormazabal 4 2 2 4 12 8
8 F & G 4 3 4 4 15 6
Probability of
Implem
entati
on
Replacement Cost
Time of
Implem
entati
on Total
Rank
Reliability
Idea Comparison
Advantage
Disadvantage
Rank
ABB Compact Delivery +Spare parts
12
Alstom Compact Poor After Sales 5
F& G Price No Technical support
6
Holec Price After sales support 8
Merlin Gerin Price + Delivery After sales support 4
Ormazabal Price and compact
after sales support + Spare parts
7
Siemens Compact Delivery 10
Saudi Lucy Price + Delivery Dimension 3
Weight Evaluation Raw Score
Assigned Weight
A Price 11 10
B Dimension 2 2
C Delivery 3 3
D Technical Support 9 8
E Service after sales 6 5
F Number of installed units 4 4
G Installation time 7 7
Weights for Evaluation
B C D E F G
How Important A A-3 A-2 A/D A/E A-2 G-1
3-Major Preference B B-2 D-2 E-2 F-2 G-2
2- Medium Preference C D-2 C/E C-2 G-2
1- Minor Preference D D-2 D-2 D/G
E E/F E/G
F F/G
G
Low “life cycle costs“!
independent of dust, animals and climateinsensitive to failures
easy to operatesafe for people
maintenance-free
compact
low building and real estate expenses
Salvage value after 15 years
Life Cycle Analysis for 500 units
N.o ItemOriginal ABB Siemens Saudi Lucy
1 Install Cost
8,500,000 8,500,000 10,450,000 10,450,000 11,040,000 11,040,000 9,200,000 9,200,000
2 Annual operation
500x 250 125,000 500 x 120 60,000 500 x 100 50,000 500 x 150 75,000
3 Salvage cost
500 x150 75,000 500 x 1000 500,000 500 x 1200 600,000 500 x 800 400,000
4 Life years
15 15 15 15
Life Cycle Analysis I = 8% N= 15 P/A= 8.5595 P/F = 0.3152
P- Original = 9,546,298 P-ABB = 11,121,170 P- Siemens = 11,657,095 P-Saudi Lucy = 9,501,895
Choose Saudi Lucy since it is the lowest
Savings
Original : Total SR 9,546,298
Proposed Saudi Lucy Total SR 9,501,895
Saving = 44,403# 0.465 %
Value Study Summary Comprising between SF6 and Oil RMU
Reduce the cost of compact substation Easy to install Increase customer acceptance of co S/S Increase the Factory market share RMU`s manufacturer will provided technical
support for changing implement the new design
Reduce maintenance cost Increase breakdown The difference in price between oil and SF6 is
slightly very small
Implement Plan 1- How Should it be implemented?
The propped RMU from Saudi Lucy will be discussed with factory , purchasing and engineering managers to overcome any road blocks prior to management presentation
2- What should be changed and in what sequence?Within approval the purchasing department should finalize the price and delivery time. Then , the designer shall revise the drawings to meet new approved SF6 RMU.
3- Who should do it?Engineering department and do necessary changes prior compact substation submittal to procurement department
Implement Plan 4- How long should it take? Two weeks
5- Any deadline requiredAs per management report forcast
6- Implementation cost , internal house30 hours for engineering 20 procurement 50. Total cost SR 3000
THANK YOU