5 Mar 2010 [email protected] 1
Versatile Link
Versatile Link
F. Vasey, CERN On Behalf of the Versatile Link Project
Mini Opto Workshop, 5th March 2010
5 Mar 2010 [email protected] 2
Versatile LinkVersatile Link Project Description
● Optical Physical layer linking front- to back-end● Bidirectional, ~5Gbps● Versatile
● Multimode (850nm) and Singlemode (1310nm) versions● Point to Point and Point to Multipoint architectures
● Matching SLHC tracker environment, plus others● Joint Project (CERN, Fermilab, Oxford, SMU)
FE BE
5 Mar 2010 [email protected] 3
Versatile Link
Template TRx: SFP+ Transceiver
● Bi-directional Module with connector interface● Based upon an acknowledged standard
● Work with Industrial partner early-on
● MM 850nm & SM 1310nm versions
● Bitrate 2.5 – 10 Gbps
● Fast access to hardware
● Easy distribution to integrators
● Customization in second step
5 Mar 2010 [email protected] 4
Versatile Link
Evolution: Front End Transceiver, VTRx
● Low Mass & Volume● Minimize material, avoid metals
● Non-magnetic, capable of operating in a magnetic field
● Requires replacement of ferrite bead used in laser bias network
● Bitrate determined by ASICs: 5 – 10 Gbps
● 850nm and 1310nm flavours
TOSA
ROSA
GBLD
GBTIA
TOSA
ROSA
GBLD
TOSA
TOSA
TRx
2Tx
5 Mar 2010 [email protected] 5
Versatile Link
Evolution: Backend Transceiver
•Test Equipment Procured and Test Lab Configured•Evaluation of SFP+ 10 Gbps Transceivers @ 850 and 1310 nm (ongoing)•Evaluation of array components @850 and 1310nm (ongoing)•Partnership with Vendor for dense light engine Prototyping (ongoing)
SFP+ TRxSNAP12 4TRx or 12Rx
5 Mar 2010 [email protected] 6
Versatile LinkThe Versatile Link Project Roadmap
● Project proposal submitted to ATLAS and CMS SLHC upgrade steering groups in Nov07
● Project endorsed by ATLAS and CMS in early 2008
● Kick-off Meeting 10 Apr 2008
● 3 phases of 18 months each● phase 1 proof of concept based on tentative specifications, partial tests and early prototypes
● Apr08 – Sep 09● Phase 1 closeout meeting 20th Sept
● Phase 2: feasibility demonstration based on complete specifications and exhaustive tests on final prototypes
● Oct 09 – Apr11● Specs and procedures● Tests and Results● List of COTS components and suppliers● Test-systems and Prototype custom components
● Phase 3: specifications freeze, pre-production readiness, technico-commercial actions● Apr11 – Oct12
5 Mar 2010 [email protected] 7
Versatile LinkNext Steps (2010-2011)
● Optical Subassemblies (ROSA)
● Packages (VTRx, Light Engine)
● Specifications
● Testing (characterization, irradiation (SEU, TID, TF), comparison)
● Prototypes distribution for evaluation
FE BE
TOSA
ROSA
GBLD
GBTIA
5 Mar 2010 [email protected] 8
Versatile LinkComponents and Subassemblies
TOSA
ROSA
GBLD
GBTIA
TOSA
ROSA
ROSAGBTIA
Phase 1 (2008-09)Proof of concept
Phase 2 (2009-11)Feasibility
5 Mar 2010 [email protected] 9
Versatile LinkCredits and References
● CERN● Jan Troska, Luis Amaral, Stefanos Dris, Alberto Jimenez Pacheco, Sarah Seif el Nasr,
Christophe Sigaud, Sergio Silva, Csaba Soos, Pavel Stejskal, François Vasey
● Fermilab● Alan Prosser, Mark Bowden, John Chramowicz
● Oxford, IPAS, CERN● Todd Huffman, K. Dunn, Alex Gerardin, Cigdem Issever, S.C. Lee, Z. Liang, Z. Meng, A.
Povey, Tony Weidberg
● Southern Methodist University● Jingbo Ye, Andie Liu, Kent Liu, Annie Xiang
● The radiation tolerance of specific optical fibres exposed to 650 kGy(Si) of ionizing radiation, 2009 JINST 4 P0710, published
● The Versatile Link, A Common Project For Super-LHC, JINST_002P_0709, to be published
● https://espace.cern.ch/project-versatile-link/public/default.aspx