+ All Categories
Home > Documents > Video Studies of Flexible Traffic Separators at Highway- Railroad Grade Crossings Florida Department...

Video Studies of Flexible Traffic Separators at Highway- Railroad Grade Crossings Florida Department...

Date post: 31-Dec-2015
Category:
Upload: duane-lee
View: 214 times
Download: 0 times
Share this document with a friend
Popular Tags:
27
Video Studies of Flexible Traffic Separators at Highway- Railroad Grade Crossings Florida Department of Transportation Rail Office
Transcript
Page 1: Video Studies of Flexible Traffic Separators at Highway- Railroad Grade Crossings Florida Department of Transportation Rail Office.

Video Studies of Flexible Traffic Separators at Highway-

Railroad Grade Crossings

Florida Department of Transportation

Rail Office

Page 2: Video Studies of Flexible Traffic Separators at Highway- Railroad Grade Crossings Florida Department of Transportation Rail Office.

Project Motivation

To enhance highway-railroad grade crossing safety by discouraging motorists from driving around gates to enter the crossing area

Page 3: Video Studies of Flexible Traffic Separators at Highway- Railroad Grade Crossings Florida Department of Transportation Rail Office.

Project Tasks

Install traffic separator devices at three highway-railroad grade crossing sites in central Florida.

Perform a field evaluation of their operation

Page 4: Video Studies of Flexible Traffic Separators at Highway- Railroad Grade Crossings Florida Department of Transportation Rail Office.

QWIK KURB ® Traffic Separators

A series of Type 3 object markers fastened to the roadway surface

Page 5: Video Studies of Flexible Traffic Separators at Highway- Railroad Grade Crossings Florida Department of Transportation Rail Office.

CSX – Park Road (Hillsborough County

Page 6: Video Studies of Flexible Traffic Separators at Highway- Railroad Grade Crossings Florida Department of Transportation Rail Office.

CSX-US 98 (Polk County)

Page 7: Video Studies of Flexible Traffic Separators at Highway- Railroad Grade Crossings Florida Department of Transportation Rail Office.

CSX – Alt 17 (Polk County)

Page 8: Video Studies of Flexible Traffic Separators at Highway- Railroad Grade Crossings Florida Department of Transportation Rail Office.

Study Methodology Time lapse video 24 hours per

tape 12V battery

power Tapes viewed by

observers to identify violations

Cabinet

Conduit

Telescoping Mast

Camera

Page 9: Video Studies of Flexible Traffic Separators at Highway- Railroad Grade Crossings Florida Department of Transportation Rail Office.

Videotapes Obtained

Site Before After

Park Rd 41 days 20 daysUS 98 31 days 22 daysAlt 27 33 days 26 days

More than 4000 hours observed

Page 10: Video Studies of Flexible Traffic Separators at Highway- Railroad Grade Crossings Florida Department of Transportation Rail Office.

Study Schedule Detail

Park Road US 98 SR 17

Before After Before After Before After

Sampling Interval 2/07/023/20/02

4/16/025/08/02

5/15/026/16/02

6/28/027/21/02

5/14/026/17/02

6/27/027/21/02

Trains (weekday) 7.9 10.5 15.2 12.2 15.5 15.1

Trains (weekend) 19.4 21.1 12.9 13.3 12.5 14.0

Total vehicles 2562 1887 614 324 461 293

Gate activations 657 410 450 328 540 403

Total trains 649 410 450 327 482 383

QWICK KURB® installation

04/16/02 06/27/02 06/27/02

Page 11: Video Studies of Flexible Traffic Separators at Highway- Railroad Grade Crossings Florida Department of Transportation Rail Office.

Results …

Page 12: Video Studies of Flexible Traffic Separators at Highway- Railroad Grade Crossings Florida Department of Transportation Rail Office.

Drive-around Violations

Site Before After

Park Rd (NB) 2 0US 98 6 1Alt 27 17 0Total 25 1

Page 13: Video Studies of Flexible Traffic Separators at Highway- Railroad Grade Crossings Florida Department of Transportation Rail Office.

Anecdotal Observations:1. Truck Interactions

A truck pushed the gate into the path of a train at night

A gate closed on top of a truckA truck blocked the crossing

forcing (slow) train to stop

Page 14: Video Studies of Flexible Traffic Separators at Highway- Railroad Grade Crossings Florida Department of Transportation Rail Office.

Anecdotal Observations:2. Damage to Traffic Separator

Several pieces of the separator were removed by a vehicle (outside of camera view) at the US 98 site

This site has a roadway width < 11 feet

Page 15: Video Studies of Flexible Traffic Separators at Highway- Railroad Grade Crossings Florida Department of Transportation Rail Office.

Anecdotal Observations:2. Damage to Traffic Separator

Page 16: Video Studies of Flexible Traffic Separators at Highway- Railroad Grade Crossings Florida Department of Transportation Rail Office.

Anecdotal Observations:3. Bicycle/ Pedestrian Violations

3 bicycle violations at Park Road

1 Pedestrian violation at US 98 and at Alt 17

All were before separator installation

Page 17: Video Studies of Flexible Traffic Separators at Highway- Railroad Grade Crossings Florida Department of Transportation Rail Office.

Anecdotal Observations:4. Platoon Violation

Seven vehicles drove around the gate in one platoon at US 98

Page 18: Video Studies of Flexible Traffic Separators at Highway- Railroad Grade Crossings Florida Department of Transportation Rail Office.

Anecdotal Observations:5. Pedestrian Trespass Fatality

A pedestrian was observed entering the track area and later reported killed.

Page 19: Video Studies of Flexible Traffic Separators at Highway- Railroad Grade Crossings Florida Department of Transportation Rail Office.

Anecdotal Observations:6. Switching delays at Park Road

Frequent switching operations caused long crossing closures

Slow trains occasionally entered the crossing before the gates had fully descended

Page 20: Video Studies of Flexible Traffic Separators at Highway- Railroad Grade Crossings Florida Department of Transportation Rail Office.

Anecdotal Observations:7. Gate violation after separators were installed

One vehicle drove around the separators and bypassed a queue of waiting vehicles The gates were down for 7 minutes before the train arrived

Page 21: Video Studies of Flexible Traffic Separators at Highway- Railroad Grade Crossings Florida Department of Transportation Rail Office.

Anecdotal Observations:7. Gate violation after separators were installed

Page 22: Video Studies of Flexible Traffic Separators at Highway- Railroad Grade Crossings Florida Department of Transportation Rail Office.

Conclusions …

Page 23: Video Studies of Flexible Traffic Separators at Highway- Railroad Grade Crossings Florida Department of Transportation Rail Office.

Effectiveness of the Separators

The reduction of drive-around violations from 25 to 1 suggests that the traffic separators were effective in discouraging motorists from driving around the gates

Page 24: Video Studies of Flexible Traffic Separators at Highway- Railroad Grade Crossings Florida Department of Transportation Rail Office.

Overall Violation Rates

Overall violation rates without separators at the study sites were lower than typically reported in the literature

Page 25: Video Studies of Flexible Traffic Separators at Highway- Railroad Grade Crossings Florida Department of Transportation Rail Office.

Park Road Configuration The extremely low violation rates

were probably the result of a configuration that discouraged violations.

Since these same conditions would make violations more hazardous than normal, the separators could improve safety at this site even with a low violation rate.

Page 26: Video Studies of Flexible Traffic Separators at Highway- Railroad Grade Crossings Florida Department of Transportation Rail Office.

Effect of Roadway Width

Roadways narrower than 11 feet may not be amenable to this treatment.

Page 27: Video Studies of Flexible Traffic Separators at Highway- Railroad Grade Crossings Florida Department of Transportation Rail Office.

Future Implementation

Each potential site should be investigated using the general methodology of this study to determine whether or not separators are justified.

It should not normally be necessary to conduct follow up evaluation studies at future sites.


Recommended