Vietnam greenhouse project
TH farm
500 Km south
to Hanoi
The farm (25 designed hectares of greenhouses to be irrigated)
Meeting of green 2000 & NDJ experts
with the local engineers
Song Sao lake – the source of the
water
• Pump station located on rhapsody
Project installation• Preparing the infrastructures and the equipment
Project installation
• building the water tank
Project installation
• Nursery irrigation installation
Project installation
• Installing the greenhouses irrigation
Project installation• Installing the system head controllers
Project installation• Finally- filling up the water tank &
operating the system