Annex 3 Soil Erosion Control Plan
1. Overall Arrangement for Soil Erosion Control
The overall erosion control measures shall be determined for each protection zone according to the principles of the arrangement of erosion control. The overall layout of erosion control measures for the full line is shown in Table 1.
Table 1 Overall Layout of Soil Erosion Control Measures along the New Rapid Railway from Zhangjiakou to Hohhot
Control zones Control objects Conservation and prevention measures
Hilly area
Subgrade works
Subgrade slope Retaining wall shall be located by using frame bolt and shaller to protect the deep cutting. Frame slope protection and vegetation measures shall be combined to protect subgrade slope, with vegetation measures mainly being slope shrubs, planting shrubs and grasses within the frame, etc.; and engineering measures are frame slope protection with water cut-off and drainage channels, mortar rubble slope protection and subgrade drainage works, etc.
Both sides of subgrade
Mainly plant-based measures, with shrubs inside and trees outside, and natural recovery of both sides of the subgrade shall be paid attention to.
Subgrade stripped topsoil
Temporary protective measures shall be taken on the temporary stockpiling field of the stripped topsoil in the subgrade.
Station Station Engineering measures are mainly station slope protection and drainage works; plant measures are landscaping design combining trees, shrubs, flowers and grass to beautify the environment and improve soil and water conservation.
Stripped topsoil in the station
Temporary protective measures shall be taken on the temporary stockpiling field of stripped topsoil in the station site.
Bridge and culvert works
Bridge and culvert Mortar rubble slope shall be used for the bridge cone slope and river bank; cofferdam shall be set up and removed, and temporary protective measures shall be strengthened.
Tunnel Tunnel Mortar rubble masonry shall be used for the side invert slope and gutter in the tunnel entrance, and water cut-off and drainage measures shall be taken.
Earth-fetching field
Earth-fetching field When the construction is completed, protection measures to spread grass seed and plant shrubs shall be taken, and temporary protective measures shall be strengthened for the stripped topsoil on the earth-fetching field.
Spoil (ballast) field
Spoil (ballast) field Engineering measures and plant measures shall be combined. Retaining walls and drains shall be installed, and topsoil cover measures shall be taken; grass seed shall be spread or shrubs be planted for natural recovery of spoil (ballast) body; and temporary protective measures shall be enhanced for spoil, and stripped topsoil in the disposable ballast.
Construction sidewalk
Construction sidewalk
It shall be remained for local use or maintenance of roads according to the actual situation. The sidewalk which is not used shall be cleaned up and leveled when the construction is finished, and grass seeds shall be spread for natural recovery.
Production and living
area in construction
Construction site, camp
After the construction, the garbage site and hardening space shall be cleaned, and the surface shall be leveled; plant recovery measures shall be taken according to the actual situation.
Plain area
Subgrade works
Subgrade slope Frame slope protection and plant measures shall be combined for the slope protection of the subgrade, with plant measures being shrubs planted at the slope, shrubs planted in the frame and seeding grass, etc. and engineering measures being frame slope protection with water cut-off and drainage channels, mortar rubble slope protection and subgrade drainage works.
Both sides of subgrade
Mainly plant-based measures, with shrubs inside and trees outside, and natural recovery of both sides of the subgrade shall be paid attention to.
Subgrade stripped topsoil
Temporary protective measures shall be taken on the temporary stockpiling field of the stripped topsoil in the subgrade.
Station Station Engineering measures are mainly station slope protection and drainage works; plant measures are landscaping design combining trees, shrubs, flowers and grass to beautify the environment and improve soil and water conservation.
Stripped topsoil in the station
Temporary protective measures shall be taken on the temporary stockpiling field of stripped topsoil in the station site.
Bridge and culvert works
Bridge and culvert Mortar rubble slope shall be used for the bridge cone slope and river bank; cofferdam shall be set up and removed, and temporary protective measures shall be strengthened.
Tunnel Tunnel Mortar rubble masonry shall be used for the side invert slope and gutter in the tunnel entrance, and water cut-off and drainage measures shall be taken.
Earth-fetching field
Earth-fetching field When the construction is completed, protection measures to spread grass seed and plant shrubs shall be taken, and temporary protective measures shall be strengthened for the stripped topsoil on the earth-fetching field.
Spoil (ballast) field
Spoil (ballast) field Engineering measures and plant measures shall be combined. Retaining walls and drains shall be installed, and topsoil cover measures shall be taken; grass seed shall be spread or shrubs be planted for natural recovery of spoil (ballast) body; and temporary protective measures shall be enhanced for spoil, and stripped topsoil in the disposable ballast.
Construction sidewalk
Construction sidewalk
It shall be remained for local use or maintenance of roads according to the actual situation. The sidewalk which is not used shall be cleaned up and leveled when the construction is finished, and grass seeds shall be spread for natural recovery.
Production and living
area in construction
Production and living area in construction
After the construction, the garbage site and hardening space shall be cleaned, and the surface shall be leveled; plant recovery measures shall be taken according to the actual situation.
Frame slope protection and plant measures shall be combined for the slope protection of the subgrade, with plant measures being shrubs planted at the slope, shrubs planted in the frame and seeding grass, etc. and engineering measures being frame slope protection with water cut-off and drainage channels, mortar rubble slope protection and subgrade drainage works.
2. Subgrade Protection Measures
2.1 Subgrade Protection
To reduce soil erosion resulted from subgrade filling and excavation and to ensure the safety of the subgrade project, the line of subgrade has been reinforced and appropriate
measures such as retaining wall protection, slope protection by framework or mortar rubble revetment, arched or square slope, planted tank, and new soil grass have been take based on the characteristics of subgrade in different segments. In addition, appropriate drainage system has been designed.
(1) General subgrade slope protection
If the height of the subgrade slope <3.0m, hollow bricks with new soil grass and planted shrubs shall be used; if the height of the slope≥ 3.0m, a layer of two-way geogrid with a limit tensile strength of not less than 25.0kN/m shall be laid every a filling of 0.6m within the width of 3.0m at the outer section of the slope, C25 concrete hollow brick with new soil grass + planted shrubs in water disconnection framework shall be used for slope protection. The main frame shall be 0.6m thick, and C25 concrete masonry shall be used for the water disconnection tank. The interface between the subgrade surface drainage and slope drainage shall be paid attention to. Three-dimensional ecological bags may be considered for the protection of city road segments, scenic areas and ecologically sensitive areas. If the slope of the subgrade height is greater than 8.0m, a different slope rate shall be taken according to the filling height. It is 1:1.5 for the slope of 0 ~ 8.0m, 1:1.75 for the slope of 8.0 ~ 12.0m, and 1:2.0 for the slope below 12 m; and a 2.0m wide platform will be located at 12.0m for the slope. New soil grass and planted shrubs in the hollow bricks in C25 concrete arch water disconnection frame will be used for the slope of 0 ~ 12.0m under the shaller, and dry stone revetment or prefabricated solid block revetment will be used for the side slope below 12.0m.
(2) High subgrade slope protection
If the slope height exceeds 12m, the slope rate is 1:1.5 for 0 ~ 8.0m, 1:1.75 for 8.0 ~12.0m, 1:2.0 for the height below 12 m. A 2.0m-wide platform will be located at 12.0m for the slope. New soil grass and planted shrubs in the hollow bricks in C25 concrete arch water disconnection frame will be used for the slope of 0 ~ 12.0m under the shaller, and dry stone revetment or prefabricated solid block revetment will be used for the side slope below 12.0m. C25 concrete or rubble foot wall of concrete will be positioned at the slope. Gravity retaining wall may be located at some high-fill subgrades with less arable land to reduce the use of farmland.
(3) General graben slope protection
1) For the cutting slope of general clay and all-weathered layer, if the height of the slope is less than 3.0m, hollow bricks with new soil grass and planted shrubs shall be used for protection; if the height is equal to or greater than 3.0m, hollow bricks with new soil grass and planted shrubs in C25 concrete water disconnection frame shall be used for protection.
2) For gravel soil, sandy soil cutting slope, hollow bricks with new soil grass and planted shrubs in C25 concrete arched or square grass window shall be used for protection.
3) For strong-weak weathered soft rock cutting slope whose height is less than 8.0m, hollow bricks with new soil grass and planted shrubs in C25 concrete water disconnection frame shall be used for protection; if the height is greater than 8.0m, hollow bricks with new soil grass and planted shrubs in C25 concrete arch or square grass window shall be used for the lower side slope for protection, hollow bricks with new soil grass and planted shrubs in C25 concrete water disconnection frame shall be used for the most upper side slope for protection.
4) For strong-weak weathered hard rock cutting slope, if the slope height is less than 8.0m,
hollow bricks with new soil grass and planted shrubs in C25 concrete arch or square grass window shall be used for protection; if the height is greater than 8.0m, hollow bricks with new soil grass and planted shrubs in the retaining wall of C25 concrete hollow window shall be used at the bottom, while hollow bricks with new soil grass + planted shrubs in C25 concrete arched or square grass window shall be used at the upper slope for protection.
Weakly- sligthly hard rock cutting: in general, the height of the slope is controlled within 30.0m, and M10 mortar rubbles will be embedded for the slope. Hollow bricks with new soil grass will be used for the protection in the concrete grass window or anchor rod and cable within the framework.
5) In the lots with absence of A, B group packing, if the cutting soil is sand gravel, hard rock, large platform shall be reserved for the foot and side slope of cutting slope, with one level every 8.0 ~ 10.0m, and the slope rate shall be reduced accordingly. C25 concrete grass window shall be used for the slope protection.
6) The types of water disconnection frame slope protection are arch, herringbone and box types. They shall be used based on the soil quality of the slope and the requirement for erosion prevention combined with landscape demand. The spacing between the main frame and the arch shall be 3.0m. For the general soil and soft rock cutting, the main frame is 0.65m thick, and the supporting frame is 0.4m thick; for very soft rock, red clay, swelling (rock) soil cutting, the main frame is 0.8m thick, and the supporting frame is 0.6m thick.
7) Planting tanks in which japanesecreepers and evergreen low shrubs are planted shall be located at the platform of the side trenches in the cutting where retaining wall, pile wall and protection wall are located and the platform from the flooding closed slope lot to the drainage.
(4) Deep cutting slope protection
If the height of soil and soft rock cutting slope exceeds 12.0m, and of hard rock slope exceeds 20.0m, the deep cutting shall be designed, and reinforced protection works shall be set.
1) Gravity retaining wall shall be used in the close of the slope for soil and completely weathered rock cutting, and the height of the retaining wall shall not exceed 4.0m. The measures of slope protection refer to slope subgrade. If the slope height is greater than 15.0m, stratified excavation shall be considered for hierarchical reinforcement or pre- strengthening of the lowest part of the slope.
2) In the lots where the slope height of soft rock cutting and hard weathered rock cutting is not more than 18.0m and there is no adverse impact on the structure surface, retaining wall, concrete window grass slope and framework anchored rod shall be used for protection. The height of the retaining wall shall not be greater than 6.0m. In the lots where the slope height is greater than 18.0m or there is adverse impact of the structure surface or broken lithology, stratified excavation shall be considered for hierarchy reinforcement or pre- reinforcement of the lowest part of the slope, such as prestressed cables, pre-reinforced piles and sheet pile walls. In general, the height of the slope shall be controlled within 25.0m. As the strata of the hard rock along this line is old, the joints are developed and the rocks are crushing, grass window wall shall be used for the slope or the slope shall be closed.
3) The slope rate for excavation of the cutting slope of weakly–slightly weathered hard rock shall be determined based on rock lithology, degree of weathering, level, geological
structure, groundwater and required allocation of earth and stone. If the slope height is not greater than 24.0m and there are no lots with adverse impact on the structure surface, retaining wall, concrete grass window slope, wall and frame anchored rod shall be used for protection, with the height of the retaining wall not greater than 8.0m. If the height of the wall exceeds 6.0m, temporary shotcrete shall be taken for the excavated slope of the back of the wall. If the slope height is greater than 24.0m or there are lots with adverse side effects of structure and broken lithology, stratified excavation shall be considered for hierarchical reinforcement or pre-strengthening of the foot of the slope. The slope height of weak–slight weathered hard rock cutting shall, in general, be controlled within 30.0m. Finishing or pre-split blasting shall be used for the slope within the thickness of 3.0m, and M10 mortar rubbles shall be embedded. Hollow bricks with new soil grass shall be used inside the concrete grass windows or frame anchored rods and cables.
4) Planting tanks in which japanesecreepers and evergreen low shrubs are planted shall be located at the platform of the side trenches in the cutting where retaining wall, pile wall and protection wall are located and the platform from the foot of the flooding closed slope lot to the drainage.
5) In the lots with absence of A, B group packing, if the cutting soil is sand gravel or hard rock, depressed road's extension shall be designed and large platform shall be reserved for the foot and side slope of cutting slope, with one level every 8.0 ~ 10.0m, and the slope rate shall be reduced accordingly. C25 concrete grass window shall be used for the slope protection.
(5) Expansion rock (soil) cutting slope protection
1) The slope design of expansion rock (soil) excavation shall follow the principle of "reduced slope rate, wide platform, reinforced toe, enhanced drainage and appropriate slope protection". The excavation height shall be generally controlled within 15.0m. The rating of the slope height shall not be more than 6.0m. If the slope height of the cutting is less than 10.0m, the slope rate is generally 1:1.75 for weak swelling rock (soil), 1:2.0 for moderate swelling rock (soil), and 1:2.25 - 1:2.5 for strong expansion rock (soil). The width of the slope platform shall not be less than 2.0m for weak expansion rock (soil), and not less than 3.0m for medium and strong expansion rock (soil).
2) If the slope height of the cutting is less than 3.0m, the use of hollow bricks with new soil grass + planted shrubs shall be made for protection; if the slope height is greater than 3.0m but less than 10.0m, the use of hollow bricks with new soil grass and planted shrubs in C25 concrete water disconnection frame (expansion soil) or C25 concrete grass window (expansion rock) shall be made for protection; if the slope height is equal to or greater than 10.0m, a platform in a width of 3.0 ~ 6.0m shall be located at the slope of expansive soil cutting, hollow bricks with new soil grass and planted shrubs in C25 concrete water disconnection frame combined with supporting sewer shall be used for protection; if the slope is equal to or greater than 10.0m, hollow bricks with new soil grass and planted shrubs in framework anchoring rod (or anchoring cable) combined with supporting sewer shall be used for the protection of the slope of expansion rock. The thickness of the main frame of the C25 concrete water disconnection framework shall not be less than 0.8m, and that of the supporting frame shall be 0.6m. The main frame spacing and the spacing between arches is 3.0m.
(6) Loess cutting slope protection
The excavation height of loess cutting slope is commonly controlled within 20.0m. Side-ditch platform in a width of 2.0 ~ 3.0m shall be located at the loess cuttings along the line. M10 cement mortar rubble or concrete solid block masonry shall be used for the platform.
If the cutting slope height H is ≤ 5.0m, concrete hollow bricks with new soil grass and planted shrubs inside shall be used for the slope protection. If the slope height is: 5.0m <H ≤ 16.0m, a small platform in a width of 2.0~3.0m shall be located every a height of 8.0m, and platform drainage ditches shall be located; the slope of the upper Pleistocene strata shall be protected using hollow bricks with new soil grass + planted shrubs in C25 concrete water disconnection framework; in mid Pleistocene strata, the slope shall be protected using C25 concrete space wall (mixed vegetation within). If the slope height exceeds 16.0m, the width of the slope platform shall be 4.0 ~ 6.0m, and drainage ditches shall be located at the platform; the slope shall be protected with hollow bricks with new soil grass and planted shrubs in frame anchoring rod in a length of 8.0m.
(7) Cutting of groundwater development
The slope rate shall be reduced by level 1~2 compared with the groundwater undeveloped section. C25 concrete grassed window or C25 concrete arched water disconnection frame + three-dimensional vegetation network solid soil grass + planted shrubs shall be used. The net frame spacing shall be 2.5m and the main frame shall be 0.8m thick. Water disconnection tank shall be reserved at the top, and supporting sewer in a width of 2.0m and a depth of 2.0~2.5m shall be located every 10.0~15.0m. At the junction of permeable and impermeable sections, a slope platform in a width of 3.0 ~ 5.0m shall be located with drainage ditches in it.
(8) Subgrade drainage works
1) Surface drainage design
① Side ditches, gutters, drains or drainage ditches shall be designed by the slope rate of 1/50, and the top shall be 0.2m higher than the designed water level. The longitudinal slope rate shall not be less than 2‰. The cross-section dimension of water surpassing for drainage facilities shall be calculated based on water flow. The connection with subgrade surface drainage, slope drainage and sub drainage systems shall be paid attention to.
② If the subgrade slope is protected with water disconnection framework, the slope water disconnection tanks on both sides will be the lateral gutters along the subgrade slope. Lateral gutters along the slope shall be located in the lots where C25 precast concrete hollow brick grassed pavement in a depth of 0.2m and a spacing of 10.0m is used.
③ In the lots where cross slope is significant on the subgrade ground, drainage ditches may be located in the top side. If the ground cross slope is not obvious, drainage ditches shall be located on both sides of the subgrade. Drainage plane shall be straight; if a turn is required, its radius shall not be less than 10.0~20.0m, and the length of the gutter shall be determined according to the actual needs. Drains are generally trapezoidal ditches in a bottom width of 0.4m and a depth of 0.6m with a slope rate of 1:1. Cast-in-site C30 reinforced concrete in a thickness of 0.2m shall be used for drainage ditches. The location of drains shall ensure that the water will be led outside the subgrade to prevent it from erosion.
④ C30 reinforced concrete rectangular cover trench shall be used for side ditches in a
bottom width of 0.6m, a height of 0.8m, and a thickness of 0.25m. The drains between the lines in a standard spacing shall have a width of 0.4m, a depth of 0.8m, and a thickness of 0.20m in C30 reinforced concrete masonry. Precast C30 reinforced concrete shall be used for the cover of the side ditch. Trapezoidal side ditch shall be used for non easily weathered hard rock cutting, in a bottom width of 0.4m, a depth of not less than 0.6m and a slope rate of 1:1. M10 cement mortar in a thickness of 0.08m shall be used for the surface, and C25 concrete may be used for embedment at local sections.
⑤ In the lots where cross slope is significant on the subgrade ground, gutters may be located in the top side. If the ground cross slope is not obvious, gutters shall be located on both sides of the subgrade. 0.2m thick in-situ C30 reinforced concrete may be used for the gutters, and M10 mortar rubble shall be used to close the sections from expansive rock (soil), collapsible loess, the top of the bed cutting to the gutter. For the gutter which has the steep slope of the cutting top, rectangular gutter shall be used.
⑥ 0.40m × 0.40m rectangular groove shall be used for the water disconnection ditch at the slope platform for the cutting, and C25 concrete which is used in the slope shall be poured.
⑦ The anti-slope drainage of the tunnel entrance is based on the rigid transition section of the tunnel road, with the cross section of the ditch at the starting position being 0.4m deep. In the deep cutting and the lot with problems of anti-slope drainage(if the depth
of the side ditch is more than 1.50m, and the width more than 0.80m), and in the valley cutting lots, the addition of culverts and the use of 0.2m thick C30 reinforced concrete drains shall be made to lead the side ditch water out of the subgrade as soon as possible.
2) Base-bed waterproofing and drainage
Collecting well shall be located in the middle of the subgrade for the drainage between the tracks of slab track sections of straight lines and curves lines. The inside diameter of the drainage well is 0.6m, the depth 0.8m, and 0.3m thick cast-in-site C30 reinforced concrete is used. Precast C30 reinforced concrete is used for the cover spaced 50m or so, which are embedded into the drainage channels or side trenches for the slope of subgrade.
3) Groundwater waterproofing and drainage facilities
Drainage facilities such as open ditches, slope support sewers and porous drains shall be located where underground water brings hazards to the subgrade according to its nature and characteristics. Drainage shall be particularly designed for swelling rock (soil) cutting and underground water development cutting.
4) Connection between drainage system and natural system
The drainage system of subgrade main project uses its drains with devices such as wells and settling ponds by being connected to the existing ditches or channels around.
The subgrade slope protection, slope greening measures, drainage works, protective area, quantity and investments of protection, etc taken in the design shall meet water security requirements, and be included in this program investment. For the quantities of soil stripped and corresponding temporary protective measures excluded in the main project list, design will be added to them in the program. Special design of green channel is made for the both sides of the line in the main works, and costs are listed to meet water conservation requirements, but detailed design has not been made in the main engineering. Therefore it is not very targeted and operable, and may not be implemented specifically in the construction process. This soil and water conservation program has detailed design for
the greening sections on both sides of the line, and quantities and investment costs of protection works based on sections have been included.
Table 2 Subgrade slope protection measures
NoLandfo
rmMilestone Administration
Slope protection
3-d ecological slope
protection
TGSG25
Fence
Greening protection
Concrete bloc
k
Planting pool
Grass SoilsRiver locust tree
Creepers
C25Concrete
block
C25 concrete
Planting
soil
Fertiliezer
Water outlet 3-d
slope protectio
n
M type bag
PVC pip
e( 0.0φ5m)
m2 m2 m3 Nr / m3 m3 m3 m3 m m2 Nr
1 PlainCK000+000~CK0
02+570Zhangjiakou 640 170 17 1595 7
2Plain CK002+570~CK0
11+260Wangquan 26749 5208 521 48879 235
3Plain CK011+260~CK0
68+300Huai’an
488848
49703
497247157
21027
322005 935 3931 393 1868
4 HillsCK068+300~CK0
73+310Shangyi
5Hills CK073+310~CK0
74+560Xinghe
6Hills CK074+560~CK0
76+900Shangyi 36 4 342 2
7Hills CK076+900~CK1
24+215Xinghe
139051
110007
14512
1075442
37444
4789 830 2382 237 16591944
31361
01
8Hills CK124+215~CK1
51+080Chanyouqianqi 24209
20306
418620045
51755 1017 106 309 31 213
9 PlainCK151+080~CK1
52+303Jining
10 PainCK152+303~CK1
60+796Chayouqianqi 20711 4466 447 41918 177
28292
198044
11 PainCK160+796~CK1
63+498Jining 7700 2648 265 24855 379 102 47 139 14 95
12Hills CK163+498~CK1
79+317Chayouqianqi 4673
12000
120112020
85000 459 109 347 34 218
13Hills CK179+317~CK2
55+248Zhuozi
111646
117330
13246
1114323
36806
4794 657 2007 202 13101613
91142
33
14Hills CK255+248~CK2
69+500Hohhot 55511
27715
377326227
78665 1199 166 476 47 336
15 PlainCK269+500~CK2
91+000
Hohhot 181362
35064
350432909
54742
31358 429 1810 182 861
16 HillsSections by
Second Jibaoline
Hohhot1053 2407 241 22599 1108
17 PlainSection by
Jingbao line(double line)
Hohhot57012
16711
167215685
14877
9
Total11191
654037
714856
138704
112402
046603
1327
91140
11140 6560
64054
448378
(Continued)
NoLandfor
mMilestone
Administration
Slope protectionReinfo
rce
Interception structure slope protection Concrete(window type)wall
Geotextile,etc
s
Grooving
C25 Concr
ete
M10concrete struct
ure
Wall body
Filter
layer
Water outlet
Expansion joint
Soil Stone M10
C25
concrecte
block
Sand/gra
bble
PVC管(
0.1mφ)
Alphalt
linen(0.02m)
m3 m3 m3 m3 m3 m3 m3 m m2 m2
1 PlainCK000+000~CK002+5
70Zhangjiakou 48 49 394
2Plain CK002+570~CK011+2
60Wangquan 282 283 15242
3Plain CK011+260~CK068+3
00Huai’an 15871 63 16005
266199
4 HillsCK068+300~CK073+3
10Shangyi
5Hills CK073+310~CK074+5
60Xinghe
6Hills CK074+560~CK076+9
00Shangyi 176
7Hills CK076+900~CK124+2
15Xinghe 26662 5481 32272
363902
8 HillsCK124+215~CK151+0
80Chanyouqian
qi 4831 668 5520 68226
9Plain CK151+080~CK152+3
03Jining
10Plain CK152+303~CK160+7
96Chayouqianq
i 1627 1634 7238
11Plain CK160+796~CK163+4
98Jining 627 630 16712
12Hills CK163+498~CK179+3
17Chayouqianq
i 923 2171 3108 41764
13Hills CK179+317~CK255+2
48Zhuozi 30473 2215 32835 8578 45 299 2589 897
381687
14Hills CK255+248~CK269+5
00Hohhot 9331 35 9409 79156
15 PlainCK269+500~CK291+0
00Hohhot
22796 2392124417
3
16 Hills Sections by Second Jibaoline
Hohhot1228 2998
17 Plain Section by Jingbao line(double line)
Hohhot6043 10389
Total12011
511260
125666
13387 8578 45 299 2589 89714848
69
Table 3 Subgrade Drainage Protection Measures`
NoLandform
MilestoneAdministration
Ground drainage ditchWater
collection well
Side ditchSide ditch platform
drainage ditch Gutter JointWell bod
y
Cover
C30
Concret
e
M10 ceme
nt surfacing(0.05m)
M10
M10 ceme
nt surfacing
(0.05m)
M10
C30 Concret
e
Soils
M10C30 concrete
SoilsSoil
sM10
C30Concret
e
C30Concret
e
(m3
)(
m2)(m3
)(
m2)(m3
)(m3
)(m3
)(m3
)(m3
)(m3
)(m3
)(m3
)(m3
)(m3
)1 Plain
CK000+000-
CK002+570
Zhangjiakou 17 12 12 27
2
PlainCK002+570
-CK011+260
Wangquan 938
2095
9 1
3
PlainCK011+260
-CK068+300
Huai’an
4949
9313
3479
12327
18884
408279
1635
5809
3149
1158 19
4 Hills CK068+300-
Shangyi
CK073+310
5
HillsCK073+310
-CK074+560
Xinghe
6
HillsCK074+560
-CK076+900
Shangyi 15 10 6 13
7
HillsCK076+900
-CK124+215
Xinghe
23246
16864
71461
3664
310643
23952
2847
30 209 22
8
HillsCK124+215
-CK151+080
Chanyouqia
nqi
4432
2457321
11489 355 541
2361
5228
232 39 5
9 PlainCK151+080
-CK152+303
Jining
10 PainCK152+303
-CK160+796
Chayouqian
qi445 696 298 4
11 PainCK160+796
-CK163+498
Jining121
8341 297 465 411
1972
199 10 1
12
HillsCK163+498
-CK179+317
Chayouqian
qi
2999
3090171
52504 113 333 399
1357
3055
170 48 23 2
13
HillsCK179+317
-CK255+248
Zhuozi
25114
13720
3477 201854
4945
3272
12214
234839
4051
100 220 18
14
HillsCK255+248
-CK269+500
Hohhot
4220
2398
1100
737235
3214
2332
2100
8550 45 6
15 PlainCK269+500
-CK291+000
Hohhot 550
3408
410941
15480
723160
4663
3102 11
16 HillsSections by
Second Jibaoline
Hohhot 574 66 99 96 460 653 41
17 Plain
Section by Jingbao
line(double line)
Hohhot 116
8119
7717
610531
42 74451
5307
5
Total73455
554752931
747016335
39545
91699
72233108
281067
4038
1099
819 85
2.2 Plant protection measures for both sides of the subgrade
In order to improve the environmental quality of the project area, reduce soil erosion caused by railway construction, while achieving the purposes of soil and water conservation, afforestation and beautification as well as the protection of railway operational safety, protection of plant measures shall be made for the both sides of the subgrade. Based on the site conditions in climate, soil, and water, the available lots on both sides of the subgrade within the land in the project may be greened under the principle of "trees and shrubs integrated", and green protective measures may not be taken for the lots without the space for green.
Green protective measures shall be taken for the available lots within the boundary of the land on both sides of the line with the total length of the green lots being 99.23km. A combination of planted bushes and trees will be taken for Hebei section, and shrubs will be planted in the Inner Mongolia section. Specific green measures for the Hebei section will be the following: one row of trees and two rows of shrubs will be planted at either side of the subgrade lot; three rows of shrubs planted on both sides of the cutting lot; the tree spacing will be 3.0×1.0m, shrub spacing 1.0m×1.0m; for the Inner Mongolia, the specific measures will be the following: three rows of shrubs will be planted on either sides of the subgrade lot in a spacing of 1.0m×1.0m. A total of 10,696 trees and 1,747,256 shrubs will be planted on both sides of the subgrade areas along the whole line.
Table 4 Greening along subgrade
No
Landform
MilestoneAdministr
ationSubgrade
length(km)
Greening quantity
Trees Bushes
1 PlainCK000+000~CK002+
570Zhangjiako
u 0.02 15 268
2Plain
CK002+570~CK011+260
Wangquan 0.87 577 10392
3Plain
CK011+260~CK068+300
Huai’an 15.16 10104 181867
4 HillsCK068+300~CK073+
310Shangyi 0.00 0 0
5Hills
CK073+310~CK074+560
Xinghe 0.00 0 0
6Hills
CK074+560~CK076+900
Shangyi 0.01 0 180
7Hills
CK076+900~CK124+215
Xinghe 22.27 0 400775
8 HillsCK124+215~CK151+
080Chanyouqi
anqi 3.88 0 69777
9Plain
CK151+080~CK152+303
Jining 0.00 0 0
1Plain
CK152+303~CK160+ Chayouqia 2.61 0 47003
0 796 nqi
11
PlainCK160+796~CK163+
498Jining 0.95 0 17092
12
HillsCK163+498~CK179+
317Chayouqia
nqi 2.37 0 42713
13
HillsCK179+317~CK255+
248Zhuozi 23.39 0 420965
14
HillsCK255+248~CK269+
500Hohhot 4.50 0 80953
15
PlainCK269+500~CK291+
000
Hohhot16.77 0 301831
16
Hills Sections by Second Jibaoline
Hohhot0.65 0 11653
17
Plain Section by Jingbao line(double line)
Hohhot8.99 0 161787
Total 102.42 10696174725
6
(1) Temporary block and drainage measures for the subgrade stripped topsoil
During the filling works of the railway subgrade, as the surface soil fails to meet the requirements of subgrade filling in the engineering design, the topsoil must be stripped. The thickness of this surface soil is generally about 30cm. It has high content of humus, featuring good soil fertility, structure and texture. It is suitable for vegetation growth and may be used in the topsoil transformation for the subgrade slope green of grid, station and ballast along the railway.
According to the state of the environment in the project area, combined with the engineering characteristics, the land, woodland and grassland occupied by the subgrade are designed to have topsoil stripping in a strip thickness of 0~30cm, and a temporary stockpiling field is designed every 500~1000m in the land, where the stripped topsoil will be piled up and compacted. Retaining wall made of straw bags will be used as temporary protection at the foot of the outside slope surrounding the stockpiled soil, and other exposed surfaces will be covered with tarpaulin to prevent wind transport. Temporary drains will be dug at the border of the stockpile soil, temporary settling basin will be constructed at the outlet, and connected with the surrounding drainage system, so that the rainfall runoff may be discharged through the outlet and the simple settling basin to prevent soil erosion in the temporary stockpiling field.
The stockpiling height of the temporary stockpiling filed shall not be higher than 3.0m, and the stacked slope rate shall be controlled within 1:1.5. The straw bag retaining wall section shall be a rectangular trapezoidal cross-section in height × top width ×bottom width = 1.0m × 0.5m × 1.5m. When piling, the bags shall be engaged and lapped in a lap length not less than 1/3 of the length of the straw bag. The temporary drains shall be soil drains with a trapezoidal cross-section, whose design specifications are base width of 0.3m, top width of 0.9m, ditch depth of 0.3m and slope rate of 1:1. The ditch base and wall shall be compacted.
The simple settling basin shall have a length of 2.0m, a width of 1.0m, and a depth of 1.5m, with its bottom compacted. A total of 89.57 × 104m3 topsoil used in the new soil grass of subgrade slope are stripped for the subgrade across the line.
Table 5 Temporary protection and drainage design for top soil from subgrade area
No
Landform
Milestone Administration
Topsoils(m3
)Soil cove
r(m3
)Length(m
)Soil bag
s(m3
)Pauli
n(m2
)
Temporary drainage(m
3)Temporary
settling tank
1 Plain CK000+000~CK002+570 Zhangjiakou 0 0 0 0 0 0 0
2Plain
CK002+570~CK011+260 Wangquan 10060 10060 409 409 4024 0 0
3Plain
CK011+260~CK068+300 Huai’an18242
018242
06960 6960 72968 0 0
4Hills CK068+300~CK073+310 Shangyi
14980 14980 610 610 5992 434 3HillsCK074+560~CK076+900 Xinghe
5
HillsCK073+310~CK074+560 Shangyi
Xinghe
282560
282560
10901
1090111302
47048 47Hills
CK076+900~CK124+215
6 Hills CK124+215~CK151+080 Chanyouqianqi
Jining55376 55376 2054 2054 22150 1366 9
7Plain
CK152+303~CK160+796
8Plain
CK151+080~CK152+303 Chayouqianqi
Jining0 0 0 0 0 0 0
9Plain
CK160+796~CK163+498
10
HillsCK163+498~CK179+317 Chayouqianqi 13844 13844 469 469 5538 334 2
11
HillsCK179+317~CK255+248 Zhuozi
228200
228200
8629 8629 91280 5661 38
12
HillsCK255+248~CK269+500 Hohhot 43320 43320 1600 1600 17328 1068 7
13
Plain CK269+500~CK291+000Hohhot
64980 64980 8664 8664 25992 0 0
14
HillsSections by Second
Jibaoline
Hohhot0 0 0 0 0 0 0
15
PlainSection by Jingbao line(double line)
Hohhot0 0 0 0 0 0 0
Total89574
089574
04029
640296
358296
15911 107
3. Protective measures for Station
3.1 Station subgrade protection
The water and soil conservation measures for the station in this project is mainly aimed at
the station subgrade, which are roughly the same as the soil and water conservation
measures for the subgrade. Slope protection of arched frame pavement, hollow bricks with
new soil grass and mortar rubble drainage ditch and porous drain are used for the subgrade.
If the subgrade slope height is less than 3.0m, six-diamond hollow bricks with planted grass
and Amorpha will be used for protection, and a precast concrete drainage tank will located
at both sides of the slope at intervals of 10.0m to connect the horizontal drainage channels
between the tracks; if the slope height is greater than 3.0m, 3×3m C25 concrete arch
framework with water disconnection tank will be used in the slope protection of the
subgrade, and in the framework, six-diamond hollow bricks will be paved with planted grass
and Amorpha. A layer of two-way stretch plastic geogrid (TGSG30-30) will be laid every
0.6m of the vertical height from the foot of the slope to the surface level of the base bed
within the lateral width of 3.0m on both sides of the slope; if the subgrade is filled with weak
weathered and slightly weathered broken rocks, the quantity of new soil shall be added into
the block.
The cutting slope rate shall be 1:1.25~1:1.5 for silty clay, 1:1.25 for gravel soil, and 1:1.25 for loess cutting. For the slope whose height is less than 3.0m, six-diamond hollow bricks with planted grass and Amorpha inside shall be used for protection; for the slope whose height is greater than 3.0m, C25 concrete arch frame paved with six-diamond hollow bricks with planted grass and Amorpha inside shall be used for protection. The stations are open-train layout, and the new sites are ground stations except that Huai An Station is an elevated one. The average earthwork height in plains is h≤ 3m (Huan An Station), 3m <h ≤ 5m (Ulanchabu Station), and in hilly area is 5m <h ≤ 7m (Xingheibei Station). Full sloping dry stone revetment is used for the slope protection of Xinghe Station and Ulanchabu Station, which is not included in the soil and water conservation engineering measures.
3.2 Greening measures in the station area
There are three new stations across the line, with Trunk of treesozi Station and Trunk of treesozi East Station under the construction being integrated for locations. In order to maintain soil and water and beautify the station area environment, to improve ecological environment quality of the station area, and to meet the production and operating conditions, 20% of the new permanent site in the station are greened in line with the principle of multiple green. They are mainly located at the surrounding of the new buildings at each station and other open space available for concentrated green. Trees, shrubs, flowering shrubs and grass are integrated, in a green ratio of 30% by trees, shrubs 30%, flowering shrub 20%, and grass 20%, laid according to the principle of 3×3m for trees and 1 × 1m for shrubs. In the new stations, as Huai An Station is an elevated one, green design is considered for its areas available for green at the roads in the stops. The proportion of shrubs, flowering shrubs and lawns is 30%, 30% and 40% respectively. The shrubs are laid in 1× 1m. A total of 3,523 trees, 34,898 shrubs, 9,532 flowers and 4,958m2 paved turf are planted in the stations across the line.
Table 6 Greening measures in the station area
No
Landform
StationMilestone (center)
Greening are
a(m2
)
Greening
Trees BushGras
s(m2) Flowers(m2)
1 PlainHuai’an Station
CK043+075
10633 0 3190 4253 3190
2 HillsXinghe North
Station
CK099+400
30560 1019 9168 204 1834
3 PlainsUlanchabu
StationCK159+27
054933 1831 16480 366 3296
4 HillsZhuozi
East Station
CK207+200
20200 673 6060 135 1212
Total11632
73523 34898 4958 9532
3.3 Temporary block protection and temporary drainage measures for stripped topsoil in the station area22.25 × 104m3 stripped topsoil in the new stations across the line is used for the latter stage
green in the station. The stripped topsoil will be designed to be piled in the temporary
stockpiling site in the station area, and they will be compacted. Retaining wall made of straw
bags will be used as temporary protection at the foot of the outside slope surrounding the
stockpiled soil, and other exposed surfaces will be covered with tarpaulin. Temporary drains
will be dug at the border of the stockpile soil, temporary settling basin will be constructed at
the outlet of the drains, and connected with the surrounding drainage system.
The stockpiling height of the temporary stockpiling filed shall not be higher than 3.0m, and
the stacked slope rate shall be controlled within 1:1.5. The straw bag retaining wall section
shall be a rectangular trapezoidal cross-section in height × top width ×bottom width = 1.0m
× 0.5m × 1.5m. When piling, the bags shall be engaged and lapped in a lap length not less
than 1/3 of the length of the straw bag. The temporary drains shall be soil drains with a
trapezoidal cross-section, whose design specifications are bottom width of 0.3m, top width
of 0.9m, ditch depth of 0.3m and slope rate of 1:1. The ditch base and wall shall be
compacted. The simple settling basin shall have a length of 2.0m, a width of 1.0m, and a
depth of 1.5m, with its bottom compacted. The stripped topsoil is used in the surface soil
transformation of green area in the station.
Table 7 Temporary protection and drainage design for stations
No
Landform
StationMileston
e
Toposoils(m3
)
Soil cover(m
3)Length(m
)Soil bag
s(m3)
Paulin(m
2)
Temp.
drainage(m3
)
Temp.
Settling
tank
1 PlainHuai’an Station
CK043+075
29500
29500
1118 11181180
00 0
2 HillsXinghe North
Station
CK099+400
45840
45840
1801 18011833
61012 4
3 PlainUlanchabu
StationCK159+2
703825
23825
21496 1496
15301
0 0
4 HillsZhuozi Station
CK207+200
27840
27840
1301 13011113
6652 2
5Plain
s
Hohhot Statio
n(yard)CK289+2
732700
02700
01064 1064
10800
0 0
6 Plains
Hohhot Statio
n(Utility
CK291+000
54100
54100
2044 2044 21640
0 0
Yard)Total
222532
222532
8824 88248901
31664 6
Table 8 Main Protection Measures for Stations
Station
Station subgrade reinforce
Geotextile
GrassingRiver locust tree
SoilsConcrete structure shoulder
M10 cement
surfacing
C25 Concrete
M7.5 Concrete
C30 Concrete
Units m2 m2 / m3 m3 m2 m3 m3 m3
Huai’an Station
Xinghe North Station 34269 1073 18
Ulanchabu Station 54308 1518 26
Zhuozi East Station 37972 1190 20
Hohhot Station(yard) 140463 11866 76284 1187 3044 9202 1268
Hohhot Station(Utility Yard) 10382 67085 1229 1000 3023 2493 2784
Station
Station drainage system
Side ditch of sugrade Drainage Drainage or gutter Joint
Earth work
quantity
Side ditch
length
C30 Concret
e
Side ditch
platform M10
concrete
Length
M7.5 Concret
e
Drainage length
C30 Concret
e
Foundation earth work
Earth work
quantity
M10 Concret
e
Units m3 m m3 m3 m m3 m m3 m3 m3 m3
Huai’an Station
Xinghe North Station 1925 4015 955 440 470 846 2915 1437 7288 825 220
Ulanchabu Station 1732 800 955 440 1165 1049 3600 1952 9900 743 220
Zhuozi East Station 1745 700 865 419 543 489 1875 1371 6953 748 179
Hohhot Station(yard) 11802 6744 5852 2833 2070 1863 5212 2570 13030 5058 1213
Hohhot Station(Utility
Yard) 3490 3141
4. Control Measures in the Bridge and Culvert Works Area
4.1 Bridges and culverts set-up and design requirementsThe flood frequency of bridges and culverts is designed to be 1/100 for bridges, and 1/100
for culverts. In principle, one bridge (culvert) is set up for one river (ditch), and the river
channel shall not be compressed, so that the water may go through the bridge in a natural
state; where roads are crossing, interchange may be used; in the farming-intensive areas,
farmland channel shall be located; vertical drains shall be located within the bridge, and
connected with the drainage system in the subgrade so as to lead to the water in the side
ditches of the subgrade to the natural ditches under the bridge. M10 mortar rubble paving
protection shall be adopted.
Permeable soil shall be used to fill the cone packing of the bridge ancillary works and be
compacted, and 35cm thick M20 mortar rubble shall be used in the protection of slope with
a 10cm thick gravel layer located below.
For individual lots where river erosion may be increased due to the set-up of piers,
reinforced subgrade and mortar rubble revetment measures shall be taken to avoid the
river, flood erosion. The bridge foundation excavation shall be made full use of; if it is unable
to use, spoil field shall be selected for concentrated spoil to reduce soil erosion.
The foundation of the main pier crossing the river shall use island or cofferdam construction
and shall avoid flood. Complete cleanup shall be considered after the construction to ensure
the smooth water flow.
4.2 Bridge and culvert protective measures
(1) The flood frequency of 1/100 is used in the design of the bridge and culvert to
maintain the appropriate technical requirements; for the check calculation of extra large
bridge (or large bridge) which is technically complex, difficult to repair or very important,
the flood frequency is 1/300; for the bridge close to the upstream reservoir, check
calculation will be made according to the reservoir dam break flow.
(2) Natural river channel shall be avoided from compress and ditches from change when
crossing the river channel for flood discharge so as to maintain the natural run-off state and
to ensure smooth flow of flood discharge. Streamlined piers shall preferably be used in the
river channel to reduce the water-blocking area of the pier, and avoid increased erosion, as
well as to reduce the impact on the upstream and downstream slopes of the bridge site and
to avoid soil erosion.
(3) Flood discharging capacity is fully considered in the design of the diameter of the
culvert to avoid the water restrain of the culvert caused by the small aperture, resulting in
soil erosion caused by increased downstream erosion.
(4) For the pier located in the ditch or in the water, cofferdam made of straw bags filled
with soil or steel sheet pile cofferdam is used based on the water depth in the construction
and geological conditions, and the protection of the sections where the water level is high
and the foundation layer is strongly permeable shall be paid attention to in the construction.
(5) During the construction, the spoil generated in the bridge foundation construction
shall be knocked into the pile foundation if permitted by conditions; abutment cone slope
shall be protected by M20 cement mortar rubble.
Table 9 Bridge and viaduct protection measures
No
Landform
Milestone Administration
Cone protectionConstruction
protection
M20 Concrete(m3)
M10 Concrete(m3)
Soil wei
r(m3)
Steel wei
r(Number)
1 PlainCK000+000~CK
002+570Zhangjiakou 125 1413
2
Plai
nCK002+570~CK
011+260Wangquan 110 0 0
3
Plai
nCK011+260~CK
068+300Huai’an 1178
10375
200
No
Landform
Milestone Administration
Cone protectionConstruction
protection
M20 Concrete(m3)
M10 Concrete(m3)
Soil wei
r(m3)
Steel wei
r(Number)
4 HillsCK068+300~CK
073+310Shangyi
5Hills CK073+310~CK
074+560Xinghe
6Hills CK074+560~CK
076+900Shangyi
7Hills CK076+900~CK
124+215Xinghe 2099 8181 14
8Hills CK124+215~CK
151+080Chanyouqianqi 545
35300
0
9 PlainCK151+080~CK
152+303Jining
10
PainCK152+303~CK
160+796Chayouqianqi 137 0 0
11
PainCK160+796~CK
163+498Jining 95 0 0
12
Hills CK163+498~CK179+317
Chayouqianqi 404 0 0
13
Hills CK179+317~CK255+248
Zhuozi 3803 5267 8
14
Hills CK255+248~CK269+500
Hohhot 862 0 9
15
PlainCK269+500~CK
291+000Hohhot
480 273 0 0
16
HillsSections by
Second Jibaoline
Hohhot
17
PlainSection by Jingbao line(double line)
Hohhot195
Total 10032 2736053
6231
4.3 Temporary protection measures for bridge and viaduct
(1) Temporary measures to deal with bored pile foundation mud for the bridge
To minimize the pollution of the water quality of the rivers along the line by the bridge
drilling mud, bored pile foundation of the bridge crossing river is usually constructed during
the dry season, and mud pump is installed in steel casing barrel to raise the drilling mud to
the land TWA at both ends. The slurry generated during the bored pile foundation
construction shall be temporarily processed to reduce soil erosion during construction.
There are a total of two bridges which cross a river and possess piers in the water in this
project. They are the extra large Yanghe Bridge and extra large No. 4 Daheihe Bridge. Before
the drilling of the piers, one mud pool (seepage control shall be done to the mud pond, and
multiple drilling can be shared) and two settling tanks are built in the temporary
construction site. They are used in series to make the wall protection mud separate from the
ballast. The mud precipitated shall be recycled, and the surface dust and ballast of the
sedimentation tanks shall be dehydrated at the dumping ground. The effluent of the
sedimentation tank discharges into natural rivers through the nearby agricultural irrigation
ditches. During the drilling and the hole cleaning in the pier foundation construction process,
mud cars are used to transport the mud to the designated location. The excavation earth
from mud pools and the sedimentation pond is piled near the pier and compacted. It will be
used in the pier foundation and the backfill of the mud pools and the sedimentation tanks
after the construction.
The volume of each mud pool is designed to be 8m3, and the length, width and depth to be
2m. The volume of each sedimentation tank is designed to be 6m3, the length and width 2m,
and the depth 1.5m.
Table 10 Bridge slurry pond and sedimentation tank
No
Landform Milestone AdministrationSlurry tank
Settling tank
1 Plain CK000+000~CK002+570 Zhangjiakou 2 4
2Plain
CK002+570~CK011+260 Wangquan 0 0
3Plain
CK011+260~CK068+300 Huai’an 4 8
4 Hills CK068+300~CK073+310 Shangyi 0 0
5Hills
CK073+310~CK074+560 Xinghe 0 0
6Hills
CK074+560~CK076+900 Shangyi 0 0
7Hills
CK076+900~CK124+215 Xinghe 2 4
8Hills
CK124+215~CK151+080 Chanyouqianqi 2 4
9 Plain CK151+080~CK152+303 Jining 0 0
10 Pain CK152+303~CK160+796 Chayouqianqi 0 0
11 Pain CK160+796~CK163+498 Jining 0 0
12Hills
CK163+498~CK179+317 Chayouqianqi 0 0
13Hills
CK179+317~CK255+248 Zhuozi 1 2
14Hills
CK255+248~CK269+500 Hohhot 1 2
15 Plain CK269+500~CK291+000Hohhot
0 0
16 Hills Sections by Second JibaolineHohhot
0 0
17 Plain Section by Jingbao line(double line)Hohhot
0 0
Total 12 24
(2) Temporary block and protection measures for excavation stone earth of the
foundation for bridges and culverts
Soil erosion is likely to occur for the excavation earth of the bridge foundation in the rainy or
windy season. Temporary block and protection measures shall be taken to prevent soil
erosion in the construction process.
After the balance of the excavation earthwork in the bridge foundation along the line in the
project, abandoned earth of 79.00 × 104m3 are resulted. Temporary stockpiling field shall be
set up in the land of the bridge. The temporary stockpiling height shall not be higher than
3.0m, and the pile slope rate shall be controlled within 1:1.5. The straw retaining wall
section shall be set in the form of a rectangular trapezoidal cross-section with height ×top
width× bottom width = 1.0m × 0.5m × 1.5m, and during the piling, the straws shall engage
and lap each other, with the lap length not less than the length of 1/3 of the straw.
Temporary stockpiling soil shall be centralized and piled in straw block protection. After the
construction, timely backfill and clean up shall be made, and extra earth shall be abandoned
in time in the earth fetching field nearby so as to avoid new soil erosion caused by rainfall
runoff or wind erosion.
Table 11 Temporary measures for foundation building for bridge and viaduct
NoLandform
Milestone Administration
Disposal
soils(m3
)
Fencing & retaining work
Soil bag
s(m3
)Grass bags
Geotextile(m2
)1 Plain
CK000+000~CK002+570
Zhangjiakou 15347 630 8820 6139
2Plain CK002+570~CK
011+260Wangquan 108965 4109 57526 43586
3Plain CK011+260~CK
068+300Huai’an 81116 3338 46732 32446
4 HillsCK068+300~CK
073+310Shangyi 0 0 0 0
5Hills CK073+310~CK
074+560Xinghe 0 0 0 0
6Hills CK074+560~CK
076+900Shangyi 0 0 0 0
7Hills CK076+900~CK
124+215Xinghe 140464 5371 75194 56186
8Hills CK124+215~CK
151+080Chanyouqianqi 32915 1291 18074 13166
9 PlainCK151+080~CK
152+303Jining 0 0 0 0
10 PainCK152+303~CK
160+796Chayouqianqi 72139 2726 38164 28856
11 PainCK160+796~CK
163+498Jining 51758 2010 28140 20703
12Hills CK163+498~CK
179+317Chayouqianqi 16691 656 9184 6676
13Hills CK179+317~CK
255+248Zhuozi 154210 5871 82194 61684
14Hills CK255+248~CK
269+500Hohhot 70955 2703 37842 28382
15 PlainCK269+500~CK
291+000Hohhot
43035 13906 194684 17214
16 HillsSections by
Second Jibaoline
Hohhot0 0 0 0
17 PlainSection by
Jingbao line(double line)
Hohhot2483 136 1904 993
Total 790078 42747 598458 316031
(3) Protection measures in the construction of water piers
According to the actual situation of the project, water piers shall be set up in the river for the
new bridge across the river. Cofferdam measures shall be taken accordingly for the
foundation in the water according to the river channel, water depth, flow rate and venues.
Straw cofferdam and steel sheet pile cofferdam shall be mainly used to build island in the
construction for the project, and the construction period shall be as far as possible in the dry
season. After the cofferdam is used to build an island in the river, the construction shall be
made in the island, and all waste ballast and waste water generated in the foundation
excavation shall be transported to shore through the island. They will not be leaked into the
river, and will not have a big impact on the water quality. When the construction is complete,
timely removal of the cofferdam shall be made, and all cofferdam facilities shall be
transported to the nearest designated spoil site for storage. They shall neither be dumped in
the river, nor flowed into the river downstream.
Table 12 Protection measures for bridge and viaduct
No
Landform
MilestoneAdministratio
n
Cone protectionConstruction
protection
M20 Concrete(m3)
M10 Concrete(m3)
M20 Concrete(m3)
M10 Concrete(m3
)1 Plain
CK000+000~CK002+570
Zhangjiakou 125 1413
2
Plai
nCK002+570~CK011
+260Wangquan 110 0 0
3
Plai
nCK011+260~CK068
+300Huai’an 1178
10375
200
4 HillsCK068+300~CK073
+310Shangyi
5Hills CK073+310~CK074
+560Xinghe
6Hills CK074+560~CK076
+900Shangyi
No
Landform
MilestoneAdministratio
n
Cone protectionConstruction
protection
M20 Concrete(m3)
M10 Concrete(m3)
M20 Concrete(m3)
M10 Concrete(m3
)7
Hills CK076+900~CK124+215
Xinghe 2099 8181 14
8Hills CK124+215~CK151
+080Chanyouqianqi 545
35300
0
9 PlainCK151+080~CK152
+303Jining
10
PainCK152+303~CK160
+796Chayouqianqi 137 0 0
11
PainCK160+796~CK163
+498Jining 95 0 0
12
Hills CK163+498~CK179+317
Chayouqianqi 404 0 0
13
Hills CK179+317~CK255+248
Zhuozi 3803 5267 8
14
Hills CK255+248~CK269+500
Hohhot 862 0 9
15
PlainCK269+500~CK291
+000Hohhot
480 273 0 0
16
HillsSections by Second
Jibaoline
Hohhot
17
PlainSection by Jingbao line(double line)
Hohhot195
Total 10032 2736053
6231
5. Control Measures in Tunnel Works Area
There are 25 new tunnels in a length of 59.66km built in this project. The new tunnels are
concentrated in the lots of mountainous and hilly areas. The longest tunnel is Dajianshan
Tunnel in a length of 15,390m. The excavation of these new tunnels seeks early hole, and to
avoid deep cutting or high slope so as to minimize the destruction of the mountain and to
prevent soil erosion.
If the tunnel is longer than 500m, dual-port tunneling will be generally used; if the tunnel
length is less than 500m, single-port tunneling will be generally used. For Grade Ⅳ swelling
rock lots, if the expansion of the rock is medium to strong and the rock is shallow buried, the
method of "temporary invert of three steps " will be used; if the expansion is medium to
strong, the method of " temporary lateral bracket of three steps" will be used; weak
expansion lots shall as far as possible use the "three-step method" to strengthen the lock pin
bolt, and to strengthen the monitoring of measurement, so as to reduce the temporary
support works. For the lots of GradeⅤexpansion rock, the shallow buried section shall adopt
the method of "temporary invert of three steps"; and the deep buried segment may adopt the
method of " temporary lateral bracket of three steps" to reduce the temporary support
works. The ultra-shallow, or seriously pressured lots or sections which have to go through
buildings that require protection shall adopt the method of "CRD"; collapsible loess sections
shall try to use open-cut method, and the lots which require covered tunneling shall use the
method of "CRD".
5.1 Tunnel body protection
Tunnel entrance shall be chosen to minimize the excavation height of the side invert slope to
reduce the excavation, and the destruction of land and vegetation. Top-down stratified
excavation and layered protection shall be taken during the hole earthwork construction. In
case of poor geological conditions, measures to stabilize the side slope and the invert slope
shall be taken. The tunnel waterproofing and drainage shall follow the principle of "the
combination of prevention, disconnection, discharge and block for local conditions and in
comprehensive management", if necessary, the principle of "block-based, limited discharge"
shall be taken. Appropriate control measures shall be taken according to the tunnel length,
weather conditions, the nature and degree of development of groundwater to protect the
ecological environment. Fully enclosed lining of tunnel entrances of soil, swelling rock (soil),
and schist formation is adopted for the protection of side invert slopes at the entrance; the
rest of the stone tunnels shall be protected at the entrances and within 2m of the foot of the
slope. 30cm thick M15 mortar rubble lining shall be used.
Drainage ditches shall be located at the tunnel roof, with the distance of the drainage ditches
from the stone at the top of the slop excavation line not less than 5m. The soil shall not be
less than 10m so as to intercept surface water so that it may be imported into the subgrade
drainage system, thus avoiding the formation of new erosion.
5.2 Tunnel spoil protection
The spoil of the new tunnels totals 958.12×104m3. The spoil field shall be selected to heap
the abandoned spoil based on the factors like topographical conditions near the tunnel along
the line and transport distance.
Retaining wall shall be located at the foot of the slope for the spoil field, and protected by
mortar rubble for the foundation. After the disposable ballast is carried out, reclamation and
afforestation shall be conducted, and waterproofing and drainage facilities shall be equipped
to prevent soil erosion, and reduce the impact from drop ballast on the surrounding
environment.
Table 13 Tunnel portal protection and drainage measures
No
Landform
MilestoneAdministratio
n
Tunnel
length(m
)
Tunnel numbe
r
Tunnel portal, gutter and greening
Interception gutter Dike Greening
C25 Concrete(m3)
M10 Concrete(m3)
Soil stone refil
l(m3
)
Planting
soil(m3)
Bushes
1 Plain CK000+000~CK002+570 Zhangjiakou
2Plain
CK002+570~CK011+260 Wangquan
3Plain
CK011+260~CK068+300 Huai’an
15390 1 1482 1421 969 4335 4335
4 Hills CK068+300~CK073+310 Shangyi
5Hills
CK073+310~CK074+560 Xinghe
6Hills
CK074+560~CK076+900 Shangyi
7Hills
CK076+900~CK124+215 Xinghe 5529 3 532 510 348 1558 1558
8Hills
CK124+215~CK151+080 Chanyouqianqi 3470 2 334 320 219 978 978
9 Plain CK151+080~CK152+303 Jining
10 Pain CK152+303~CK160+796 Chayouqianqi
11 Pain CK160+796~CK163+498 Jining
12Hills
CK163+498~CK179+317 Chayouqianqi 6602 4 636 609 416 1860 1860
13Hills
CK179+317~CK255+248 Zhuozi 27328 14 2631 2523 1721 7698 7698
14Hills
CK255+248~CK269+500 Hohhot 1337 1 129 123 84 377 377
15 Plain CK269+500~CK291+000Hohhot
16 Hills Sections by Second JibaolineHohhot
17 Plain Section by Jingbao line(double line)Hohhot
Total 59655 25 5743 5507 3757 16805 16805
6. Control Measures in Earth-fetching Area
6.1 Earth-fetching field set-up and optimizations
The earth-fetching fields set up along the line are mainly for the earth fetching of subgrade
and station, and the main type of land is unused land. In the earth excavation works, in the
spirit of the principle of concentrated earth fetching, the construction shall be made in
accordance with the position of earth-fetching field designed. The expansion of the
excavation area is not allowed, and flayer earth is strictly prohibited. The 0~30cm surface of
the earth-fetching field is prohibited to be used as fill. The surface layer shall be cleared and
stacked before earth fetching, and when the earthwork is completed, then they shall be
backfilled to the earth pit. Excavator with a dump truck is used to fetch the earth layer by
layer. It is proposed that if the excavation of soil complies with the requirements of packing,
the slope rate shall be slowed down, and the earth excavation depth may be enhanced to
reduce the project disturbance area. After the completion of the earth fetching, the slope of
the earth field shall be cut in a gradient of 1:1.5, and the slope shall be slowed down to
facilitate construction operations in an economic and safe way in preventing collapse and
soil erosion. Clean, flatting, green and other necessary measures shall be taken. In the next
stage of design, each earth field is required to sign an agreement on fetching and abandoning
of soil with the local Land and Resources Bureau.
6.2 Earth fetching and protection principles
1) The centralized and close earth fetching shall be carried out, and the priority in the
use of the existing earth field shall be made.
2) The selection of the earth field location shall obtain the coordination of the local
government and the soil and water conservation authority. The locacation shall be
determined through the consultation in the unified planning of the soil and water
conservation department based on the local water resources, agricultural
development planning, and environmental construction plan.
3) For the sloping earth field, after earth fetching, the slope of the excavation area shall
be adjusted, the bottom shall be cleaned and leveled, and green measures of shrub
planting shall be taken.
4) For the earth field ready to restore planting, before earth fetching, the surface
mellow soil shall be pushed aside, and leveled back after earth fetching. Reasonable
temporary protective measures shall be taken according to the terrain of the
temporary dump.
6.3 Earth field slope cutting and drainage design
In the excavation and earth fetching, the expansion of the disturbance area shall be avoided,
and the lane in a width of 10m and a longitudinal slope rate of 1:5 shall be reserved for the
access of the earth fetching pit. The lane shall stay in the side facing the construction area,
and the slope rate shall take 1: 1.5. The slope shall be cut by half-dug and half-fill to the limit
of 1/ 2 of the excavation depth. The upper earth of cut slope shall be used to fill the lower
slope, and the fill slope shall be backfilled and compacted layer by layer. To intercept the
slope runoff, and protect the overhead slope formed during earth fetching from directly
impact of wind and water erosion, a retaining ridge in a height of 80cm and a top width of
50cm shall be built beyond the upper sloping shoulder of the earth field, and intercepting
drains shall be located at the outside close to the retaining ridge so that the runoff above the
top of the slope will be channeled to both sides, then discharged to the close ditches. The
intercepting ditch has a bottom width of 0.5m, a top width of 1.5m, and a depth of 0.6m. The
soil ditches of semi-filled and semi- dug section shall be adopted and interior wall shall be
compacted. Base gutters in a bottom width of 50cm, a depth of 50cm, and a top width of 1m
shall be located at 1m outside the foot of the slope. Soil ditches shall be used, and interior
wall shall be compacted. If the slope has two platforms, the platform shall be an invert slop
directing toward interior side, namely, the side of the second slope, so as to create
conditions for the casing and the drainage in the future. Meanwhile, drains shall be located in
the middle platform and the foot of the secondary slope to discharge the slope runoff. The
water in the drains in the middle platform will flow down to lead the rainfall runoff into
natural ditches or the existing drainage ditch system. The drains in the foot of the secondary
slope shall adopt the same design standard with drains at the bottom of the slope.
6.4 Plant protection measures in the earth field
After the fetching in the earth field is completed, and when the engineering measures such as
slope adjustment of excavation area, leveling and cleaning of the underside, casing (casing
source is the topsoil stripped before earth fetching, and the casing thickness is about 30cm),
appropriate plant protection measures shall be taken on the bottom of the fetching pit, side
slope and platform. Through the green initiatives of sowing grass seed, planting shrubs, and
conservation and management measures of watering, fertilizing, and soil moisture to ensure
seedling survival rate, the purposes of soil and water conservation and the erosion control
may be achieved. The shrub spacing is 1 × 1m.
A total of 121.00hm2 rehabilitation area will be adopted for the earth fields across the line,
270,000 shrubs will be planted, and 88.60hm2 grass seed will be spread.
6.5 Temporary protection measures of stripped topsoil in the earth field
Before the fetching in the earth field, the 0~30cm surface layer of mellow soil shall be
scooped and stacked within the earth field. No new temporary area shall be used. The
bottom of the stockpiled soil shall be protected with temporary straw. The surface of the
temporary stockpiling shall be smooth and compacted and covered with a tarp to prevent
the erosion of rain runoff. Temporary soil drains shall be set up around the foot of the
stockpiling slope, so that the water collected may be discharged into the existing drainage
system around to prevent the new soil erosion. After completion of the earth fetching, the
topsoil shall be backfilled and leveled to facilitate the reclamation and revegetation.
A total of 32.40×104m3 topsoil is stripped in the earth fields across the line, with the
temporary block retaining length of 12, 585m, the stripping topsoil covering tarpaulin of
129,600m2, temporary drains of 4401m3, and temporary settling basins of 33.
Table 14 Protection Measures for Borrow pits
No Administration Location
Area(hm2
)Soils
amount(m3)
Re-vegetation and planting protection
Temporary measures for stripping tops soils
Leveling
(hm2)Bushes
Grassing(m2)
Top soil
s(m3)Temp
retaining lengt
h(m)
Soils in bag
s(m3
)Grass
bag(Nr)
Paulin(m2)
Temp drainage(m3)
Temp settling
tank(Nr)
1 Wanquan, Taishizhuang CK5+000 left 5000m 2.00 64212 2.00 0 20000 0 0 0 0 0 0 0
2 Huai’an Chunfa Company CK25+000 right 2000m 4.00 185330 4.00 0 40000 0 0 0 0 0 0 0
3 Huai’an Nanxingtun CK35+500 left 2500m 6.67 293970 6.67 16667 46667 20000 727 727 10178 8000 0 0
4 Huai’an Lijiayao CK37+300 left 3000m 4.67 164408 4.67 11667 32667 14000 584 584 8176 5600 0 0
5 Huai’an Dukoupu, Caijiantan CK51+000 left 60m 4.00 180000 4.00 10000 28000 12000 454 454 6356 4800 0 0
6 Huai’an Dukoupu, Manzhoupo CK57+000 right 1000m 2.00 81177 2.00 5000 14000 6000 227 227 3178 2400 0 0
7 Xinghe, Chengguan, Gaomiaozi CK80+600left1500m 2.67 95967 2.67 6667 18667 8000 357 357 4998 3200 184 1
8 Xinghe, Chengguan, Qijia CK91+000 right 300m 1.00 83527 1.00 2500 7000 3000 156 156 2184 1200 73 1
9 Xinghe, Chengguan, Mqiaocun CK93+400 right 200m 1.00 12481 1.00 2500 7000 3000 156 156 2184 1200 73 1
10 Xinghe, Chengguan, Haoqiancun CK99+200 right 800m 4.00 110410 4.00 10000 28000 12000 454 454 6356 4800 262 2
11 Xinghe, Chengguan, Dongshihao CK103+000 left 2000m 4.00 86408 4.00 10000 28000 12000 454 454 6356 4800 262 2
12Xinghe, Minzutuanjiexiang,
SihihaocunCK110+400 left 1000m 2.00 45025 2.00 0 20000 0 0 0 0 0 0 0
13 Xinghe, e’erdong, Dianzicun CK112+000 left 200m 1.00 21570 1.00 2500 7000 3000 156 156 2184 1200 73 1
14Xinghe, e’erdong,
DianzicunCK114+000 right 200m 1.67 29456 1.67 4167 11667 5000 192 192 2688 2000 110 1
15Xinghe, e’erdong,
DianzicunCK117+000~+300 left hill 3.33 46570 3.33 8333 23333 10000 409 409 5726 4000 224 2
16Chayouqianqi, Pingdiquanzhen,
LaijiadicunCK166+100~+500 right hill 13.33 105476 13.33 33333 93333 40000 1544 1544 21616 16000 878 7
17Zhuozi, Shibataizhen,
YushugoucunCK188+000~+600 right hill 3.33 96669 3.33 8333 23333 10000 409 409 5726 4000 224 2
18Zhuozi,
Shibataizhen,hafengjingcunCK190+000~CK195+000left hill 6.67 53345 6.67 16667 46667 20000 727 727 10178 8000 431 3
19 Zhuozi, Zhuozishan, Dongtan CK205+100~CK206+600 right hill 6.67 54583 6.67 16667 46667 20000 727 727 10178 8000 431 3
20 Zhuozi, Lihuazhen, Sidaogou CK247+050left2000m 4.00 173341 4.00 10000 28000 12000 454 454 6356 4800 262 2
21Hohhot, Saihan, Yulin,
ShimengouCK261+350left3500m 14.00 155089 14.00 35000 98000 42000 1589 1589 22246 16800 916 7
22 Hohhot, Saihan, Yulin, CK267+100 right 3200m 5.00 86160 5.00 0 50000 0 0 0 0 0 0 0
Sanyingyao
23Hohhot, Saihan,
Yulin,QiannaimobancunCK274+200left2200m 12.67 182043 12.67 31667 88667 38000 1492 1492 20888 15200 0 0
24Hohhot, Saihan, Bayan,
TengjiayingCK280+000left2100m 11.33 97144 11.33 28333 79333 34000 1317 1317 18438 13600 0 0
Total 121.00 2504360 121.00 270000 886000 324000 12585 12585 176190 129600 4401 33
7. Disposal Sites
7.1 Earth disposal site
There are 18 earth disposal sites, total earth disposed will be 4320700m3, occupying
54.8hm2.
7.2 Tunnel spoils disposal site
There will be 52 spoil disposal sites, total spoils disposed will be 10726400m3, occupying
121.21hm2.
7.3 Design of retaining wall
On the principle of “Firstly retaining and then discarding and retaining by grading”, adopt
mortar flag stone gravity type retaining wall protection for spoil ground.
To decrease active earth pressure, inclined type is adopted for gravity type retaining wall
this time. When designed, height of retaining wall is 4 to 8m. When change occurs on height
of wall, rectigradation transition is adopted for size of wall body; slope ratio of wall back is
1:0.25; wall surface is paralleled with wall back. Retaining wall is adopted for retaining base
of ballast slope. Embedded depth of foundation is not lower than 2.0m. The part below
ground of wall body is made into step-form, to increase stability of wall body; basement is
made into reverse slope, to increase resisting overturning ability of wall body.
100 PVC pipe is embedded for retaining wall body and is used as escape hole, distance is φ
2m×2m. Intercepting ditch and drainage ditch is set at ballast top. Bottom part of ditch must
be backfilled densely. Set one settlement joint each 10m longitudinally for the ditch; width of
joint is 2~3cm. For earthy spoil, filtration bed of crushed stone with width of about 500mm
needs to be set behind wall to facilitate drainage and avoid elapse of fine soil in earth filling.
Set blind drain in the middle of wall body with bigger height.
7.4 Drainage design
Drainage shall be provided at the top and foot of the disposal sites in order to timely discharge
runoff to avoid soil erosion and threats to the retaining wall.
7.5 Design of spoil grounds leveling and earth backing
After spoil is completed, top part of spoil ballast should be leveled. To facilitate recovery of
vegetation, mature soil of certain thickness should be covered onto soil body and buffer top
after leveled; earth backing comes from stripped surface soil of spoil grounds.
7.6 Reclamation and greening design for spoil grounds
After site leveling and earth backing work is completed for spoil, through combining local
actual situation, adopt reclamation measure for spoil grounds occupying fallow land for the
project and adopt protection measure of grass planting and shrub planting for spoil grounds
occupying timberland and not using land.
7.7 Design of temporary retaining measure for stripped surface soil for
spoil grounds
For spoil grounds where vegetation recovery is to be made, before spoil, shovel mature soil
by about 0~30cm of surface and stack them within the scope of spoil grounds without newly
increasing occupied area. Temporary straw bag is adopted for retaining bottom part of
stacked soil. Level and compact surface of temporary stacked soil, use fabric for covering and
build drainage ditch for temporary soil and make rainfall runoff influx before make it be
successfully discharged into surrounding trench and other existing drainage system, to avoid
causing new soil and water erosion. After spoil project is completed, level soil body and
buffer, cover stripped surface soil, to facilitate land reclamation and greening.
Table 15 Site specific management of soil disposal sites
No
Administration Location
Area(hm
2)
Disposal
quantity(m3
)
Disposal
depth(m)
Clearance and
leveling (hm2)
Retaining and fencing
Greening Temporary measures for stripping tops soils
C25 Retainin
g wal
l(m3)
C25 Concret
e drainage(m3
)
Top soil
s(m3
)
Top soil
s(m3
)
Top soil
s(m3
)
Top soil
s(m3
)
Top soil
s(m3
)
Top soil
s(m3
)
Top soil
s(m3
)
Temp. drainage(m3
)
Temp settlin
g tan
k(Nr
)1 Huai’an, Dukoubao, Caijiantan CK52+100left60m 2.00 150223 7.51 2.00 257 172 5000 14000 6000 227 227 3178 2400 0 0
2 Xinghe, Chengguan, Qinjiaaocun CK77+750left400m 5.33 306181 5.74 5.33 606 404 13333 37333 16000 650 650 9100 6400 357 3
3 Xinghe, Chengguan, Qinjiaaocun CK82+200left1500m 2.00 153091 7.65 2.00 262 175 5000 14000 6000 227 227 3178 2400 131 1
4 Xinghe, Chengguan, Qinjiaaocun CK83+100left100m 2.00 102060 5.10 2.00 198 132 5000 14000 6000 227 227 3178 2400 131 1
5 Xinghe, Chengguan, yangpocun CK85+300 right 300m 2.00 153091 7.65 2.00 262 175 5000 14000 6000 227 227 3178 2400 131 1
6 Xinghe, Chengguan, yangpocun CK88+600 right 300m 6.67 408241 6.12 6.67 1140 760 16667 46667 20000 811 8111135
48000 446 3
7 Xinghe, Chengguan, Qijiacun CK91+000 right 300m 4.67 255151 5.47 4.67 495 330 11667 32667 14000 584 584 8176 5600 315 2
8 Xinghe, Chengguan, Maqiaocun CK93+400 right 200m 2.00 159700 7.99 2.00 237 158 5000 14000 6000 227 227 3178 2400 131 1
9 Xinghe, Chengguan, Haoqiancun CK99+200 right 800m 5.33 425601 7.98 5.33 724 483 13333 37333 16000 636 636 8904 6400 354 3
10
Xinghe, Chengguan, Dongshihaocun
CK103+400 right 200m 6.67 532600 7.99 6.67 257 172 16667 46667 20000 811 8111135
48000 446 3
11
Xinghe, Chengguan, Dongshihaocun
CK107+500left1500m 2.00 159700 7.99 2.00 267 178 5000 14000 6000 227 227 3178 2400 131 1
12
Zhuozi, Shibatai, HuangqitancunCK183+000~CK184+000 right
240m4.00 316693 7.92 4.00 627 418 10000 28000 12000 454 454 6356 4800 262 2
13
Zhuozi, bayinxile, Dahaicun CK197+000~CK198+000left山沟 4.00 334780 8.37 4.00 663 442 10000 28000 12000 454 454 6356 4800 262 2
14
Zhuozi, Lihuazhen, Tuchengzi CK233+500left50m 1.13 53345 4.71 1.13 103 69 2833 7933 3400 176 176 2464 1360 83 1
15
Zhuozi, Qixiaying, Lvmeiping CK252+750 2.00 247022 12.35 2.00 479 320 5000 14000 6000 227 227 3178 2400 131 1
16
Zhuozi, Qixiaying, Lvmeiping CK254+330 0.67 197618 29.64 0.67 0 0 1667 4667 2000 130 130 1820 800 53 0
17
Sihanqu, Yulinzhen, Shihaoyao CK256+400 1.67 247022 14.82 1.67 479 320 4167 11667 5000 220 220 3080 2000 115 1
18
Sihanqu, Yulinzhen,Sanhaoyao CK257+120 0.67 118571 17.79 0.67 0 0 1667 4667 2000 130 130 1820 800 53 0
Total 54.80432068
854.8 7060 4707
137000
383600
164400
6645 66459303
06576
03531 26
Table 16 Mitigation measures for spoils disposal sites
No
Spoils disposal site and location
Area(hm2)
Disposal quantity(m3
)Disposal
depth(m)
Clearance and
leveling (hm2)
Greening measures Retaining and fencing Temporary measures for stripping tops soils
Re-vegetation(hm2)
BushesGrassing(m2)
M10 retaining wall(m3)
M10 interception and drainage
(m3)
Top soil
s(m3
)
Top soil
s(m3
)
Top soil
s(m3
)
Top soil
s(m3
)
Top soil
s(m3
)Temp.
drainage(m3)
Temp settling
tank(Nr
)1 Dajianshan Portal entrance 393931 4.18 9.43 4.18 3.84 833 2333 3652 4173 12532 459 459 6426 5013 0 0
2 Dajianshan #1shaft 366082 4.00 9.16 4.00 3.86 333 933 3393 3878 11986 454 454 6356 4795 0 0
3 Dajianshan #2 shaft 488109 5.40 9.04 5.40 5.26 333 933 4525 5171 16190 668 668 9352 6476 217 3
4 Dajianshan #3 shaft 488109 5.32 9.17 5.32 5.19 333 933 4525 5171 15970 651 651 9114 6388 213 3
5 Dajianshan4 shaft 390487 4.60 8.50 4.60 4.46 333 933 3620 4137 13789 461 461 6454 5516 166 2
6 Dajianshan exit 341676 4.14 8.25 4.14 3.81 833 2333 3167 3620 12421 458 458 6412 4968 157 2
7 Xishihao entrance 102493 1.23 8.31 1.23 0.90 833 2333 950 1086 3701 154 154 2156 1481 50 1
8 Xishihao exist 108662 1.30 8.39 1.30 0.96 833 2333 1007 1151 3886 155 155 2170 1555 51 1
9 Dalianggou entrance 95274 1.29 7.41 1.29 0.95 833 2333 883 1009 3857 155 155 2170 1543 51 1
10 Dalianggou exit 95274 1.29 7.41 1.29 0.95 833 2333 883 1009 3857 155 155 2170 1543 51 1
11 Jiabazi entrance 270393 3.04 8.91 3.04 2.70 833 2333 2506 2864 9108 373 373 5222 3643 122 2
12 Jiabazi exit 270393 3.04 8.91 3.04 2.70 833 2333 2506 2864 9108 373 373 5222 3643 122 2
13 Xiying Entrance 125758 1.43 8.81 1.43 1.09 833 2333 1166 1332 4282 170 170 2380 1713 56 1
14 Xiying exit 125758 1.43 8.81 1.43 1.09 833 2333 1166 1332 4282 170 170 2380 1713 56 1
15 Liujiagou entrance 205184 2.21 9.27 2.21 1.88 833 2333 1902 2174 6642 232 232 3248 2657 82 1
16 Liujiagou exit 205184 2.21 9.27 2.21 1.88 833 2333 1902 2174 6642 232 232 3248 2657 82 1
17 Dongtukan entrance 291957 3.40 8.59 3.40 3.06 833 2333 2706 3093 10194 411 411 5754 4078 135 2
18 Dongtukan 1 shaft 208541 2.47 8.43 2.47 2.14 833 2333 1933 2209 7420 252 252 3528 2968 90 1
19 Dongtukan exit 250249 2.98 8.40 2.98 2.65 833 2333 2320 2651 8939 407 407 5698 3576 127 1
20 Yiyuanxing entrance 83416 1.24 6.75 1.24 0.90 833 2333 773 884 3709 155 155 2170 1484 50 1
21 Xituken entrance 47974 0.81 5.90 0.81 0.48 833 2333 445 508 2439 152 152 2128 975 63 1
22 Xituken exit 47974 0.81 5.90 0.81 0.48 833 2333 445 508 2439 152 152 2128 975 63 1
23 Lujiabuzi entrance 55967 0.89 6.27 0.89 0.56 833 2333 519 593 2678 154 154 2156 1071 64 1
No
Spoils disposal site and location
Area(hm2)
Disposal quantity(m3
)Disposal
depth(m)
Clearance and
leveling (hm2)
Greening measures Retaining and fencing Temporary measures for stripping tops soils
Re-vegetation(hm2)
BushesGrassing(m2)
M10 retaining wall(m3)
M10 interception and drainage
(m3)
Top soil
s(m3
)
Top soil
s(m3
)
Top soil
s(m3
)
Top soil
s(m3
)
Top soil
s(m3
)Temp.
drainage(m3)
Temp settling
tank(Nr
)24 Lujiabuzi exit 55967 0.89 6.27 0.89 0.56 833 2333 519 593 2678 154 154 2156 1071 64 1
25 Dabaiying entrance 77703 1.11 7.00 1.11 0.78 833 2333 720 823 3330 190 190 2660 1332 54 1
26 Dabaiying exit 77703 1.11 7.00 1.11 0.78 833 2333 720 823 3330 190 190 2660 1332 54 1
27 Gonghudong entrance 134163 1.47 9.10 1.47 1.14 833 2333 1244 1421 4422 200 200 2800 1769 63 1
28 Gonghudong exit 137385 1.54 8.91 1.54 1.21 833 2333 1274 1455 4628 202 202 2828 1851 64 1
29 Gujiapu entrance 286170 3.19 8.96 3.19 2.86 833 2333 2653 3032 9581 421 421 5894 3832 133 2
30 Gujiapu exit 279705 3.13 8.94 3.13 2.80 833 2333 2593 2963 9387 247 247 3458 3755 101 2
31 Zhangjiabu entrance 151262 1.85 8.20 1.85 1.51 833 2333 1402 1602 5536 210 210 2940 2214 71 1
32 Zhangjiabu exit 146358 1.80 8.15 1.80 1.46 833 2333 1357 1550 5389 210 210 2940 2155 70 1
33 Chengbuzi entrance 59830 0.79 7.59 0.79 0.45 833 2333 555 634 2365 150 150 2100 946 63 1
34 Chengbuzi exit 59769 0.79 7.59 0.79 0.45 833 2333 554 633 2363 150 150 2100 945 63 1
35 Baliang exit 71736 1.05 6.83 1.05 0.72 833 2333 665 760 3151 158 158 2212 1260 47 1
36 Mogaitu entrance 75452 1.09 6.94 1.09 0.75 833 2333 699 799 3262 160 160 2240 1305 48 1
37 Mogaitu exit 74991 1.08 6.93 1.08 0.75 833 2333 695 794 3249 160 160 2240 1299 48 1
38 Daxigou entrance 72639 1.06 6.86 1.06 0.73 833 2333 673 770 3178 160 160 2240 1271 48 1
39 Liangshanentrance 261510 2.95 8.87 2.95 2.61 833 2333 2424 2770 8841 381 381 5334 3537 122 1
40 Liangshan #1 shaft 345935 3.76 9.20 3.76 3.51 833 2333 3207 3665 11284 421 421 5894 4514 143 2
41 Liangshan #2 shaft 334138 3.72 8.97 3.72 3.32 833 2333 3097 3540 11174 421 421 5894 4470 143 2
42 Liangshan exit 320321 3.22 9.96 3.22 2.88 833 2333 2969 3393 9645 405 405 5670 3858 131 2
43 Naobaowan exit 176441 1.77 9.97 1.77 1.44 833 2333 1636 1869 5308 194 194 2716 2123 67 1
44 Xiaopingdingshan entrance 483905 4.85 9.97 4.85 4.52 833 2333 4486 5126 14556 606 606 8484 5822 196 2
45 Xiaopingdingshan exit 631537 6.32 9.99 6.32 5.99 833 2333 5854 6690 18970 704 704 9856 7588 241 3
46 Shanghaocun exit 76994 0.94 8.17 0.94 0.61 833 2333 714 816 2829 156 156 2184 1132 64 1
47 Duguigou entrance 181011 1.92 9.42 1.92 1.59 833 2333 1678 1918 5763 227 227 3178 2305 75 1
48 Duguigou exit 181011 1.92 9.42 1.92 1.59 833 2333 1678 1918 5763 227 227 3178 2305 75 1
No
Spoils disposal site and location
Area(hm2)
Disposal quantity(m3
)Disposal
depth(m)
Clearance and
leveling (hm2)
Greening measures Retaining and fencing Temporary measures for stripping tops soils
Re-vegetation(hm2)
BushesGrassing(m2)
M10 retaining wall(m3)
M10 interception and drainage
(m3)
Top soil
s(m3
)
Top soil
s(m3
)
Top soil
s(m3
)
Top soil
s(m3
)
Top soil
s(m3
)Temp.
drainage(m3)
Temp settling
tank(Nr
)49 Xiaobaiyangou entrance 286937 2.89 9.92 2.89 2.56 833 2333 2660 3040 8681 379 379 5306 3472 120 1
50 Xiaobaiyangou exit 288168 2.89 9.96 2.89 2.56 833 2333 2671 3053 8681 379 379 5306 3472 120 1
51 Quyangyaogou entrance 168070 1.71 9.83 1.71 1.38 833 2333 1558 1780 5129 206 206 2884 2052 68 1
52 Quyangyaogou exit 170705 1.71 9.98 1.71 1.38 833 2333 1582 1808 5129 206 206 2884 2052 68 1
Total 10726363 121.22 438.17 121.22 104.70 41333 115733 99429 113632 363673 14877 14877 208278 145469 4694 61
8. Access Roads
Because of construction vehicles rolling, surface of construction detour is disturbed,
vegetation is being destroyed and soil and water erosion will be easily produced. Therefore,
we put forward following prevention and treatment measure and suggestions for
construction detour soil and water erosion:
(1) Fully use existing rural road and road as transportation road, decrease quantity and
length of newly built road. For newly built construction detour, reasonably plan strike
direction, length and width of construction detour, decrease disturbance scope on surface,
control soil and water erosion.
(2) When constructing construction detour, through combining relief and existing traffic
condition, we should set it through combining construction of incoming road and rural road
as possible. Adopt road building scheme with small influence of disturbing surface. Decrease
excavation and fill on large scale. Spoil ballast produced from construction detour should be
removed and used for being filled and be allocated and used. Spoil which cannot be allocated
should be discarded into centralized earth-fetching area of main project design.
(3) During building process of road, strengthen retaining measure for excavated
earthwork and slope and avoid entrance of soil and ballast into farmland, to avoid causing
soil and water erosion .
(4) Construction detour should be set within land expropriation scope of railway as
possible. Try to avoid crossing forestry grass land with high coverage rate of vegetation.
(5) Waste earthwork produced from developing construction detour must be timely
cleaned and unitively handled. Do not freely discard because it will provide loose soil source
to soil and water erosion. Strictly regulate drive route of vehicles during construction
process.
(6) After use of construction detour is completed, we should negotiate with local relative
departments according to actual situation. Try to make construction detour used locally and
make it further used as maintenance road of railway. For road which cannot be used, adopt
site control measures of cleaning and leveling according to concrete situation and adopt
plant protection measure of planting shrubs and spreading grass seed for restoration.
After construction is ended, the area needing to be cleaned and leveled is 46.27hm2 for
prevention and treatment of construction detour; the area spreading grass seed reaches
46.27hm2.
Table 17 Management of access roads
No Landform 起讫里程 Administration Area(hm2)Length(km) Clearance
and levelin
g(hm2)Grassin
g(hm2)Single track
Double track
1 Plain CK000+000~CK002+570 Zhangjiakou 0.00 0.00 0.00 0.00 0.00
2Plain
CK002+570~CK011+260 Wangquan 0.52 0.60 0.30 0.52 0.52
3Plain
CK011+260~CK068+300 Huai’an 5.90 7.00 3.00 5.90 5.90
4 Hills CK068+300~CK073+310Shangyi
Xinghe0.57 0.60 0.40 0.57 0.57
5Hills
CK074+560~CK076+900
6Hills
CK073+310~CK074+560Shangyi
Xinghe5.90 7.00 3.00 5.90 5.90
7Hills
CK076+900~CK124+215
8Hills
CK124+215~CK151+080 Chanyouqianqi
Jining8.26 9.80 4.20 8.26 8.26
9 Plain CK163+498~CK179+317
10 Pain CK151+080~CK152+303 Chayouqianqi
Jining1.18 1.40 0.60 1.18 1.18
11 Pain CK160+796~CK163+498
12Hills
CK152+303~CK160+796 Chayouqianqi 2.36 2.80 1.20 2.36 2.36
13Hills
CK179+317~CK255+248 Zhuozi 14.38 16.80 7.70 14.38 14.38
14Hills
CK255+248~CK269+500 Hohhot 4.85 5.80 2.40 4.85 4.85
15 Plain CK269+500~CK291+000Hohhot
2.36 2.80 1.20 2.36 2.36
16 Hills Sections by Second JibaolineHohhot
0.00 0.00 0.00 0.00 0.00
17 Plain Section by Jingbao line(double line) Zhangjiakou 0.00 0.00 0.00 0.00 0.00
Total 46.27 54.60 24.00 46.27 46.27
9. Prevention and Treatment Measure for Manufacturing and Living Area for
Construction
Because of influence of artificial activities at construction site and camp site, surface
vegetation and soil structure within land use scope of site and camp site will be easily
destroyed, and it will cause losing original soil and water conservation function. Therefore,
following protection measures should be adopted:
(1) When select address for construction site, under the premise meeting principle
of proximity, try to use surrounding idle site or uncropped soil. Build of manufacturing and
living houses at construction site, tools and stone material stacking and material processing
site and arrangement of all other temporary manufacturing and living facilities should be
guaranteed reasonable, tidy and orderly. Try to more use local existing place, avoid
occupying more land caused by casualness of temporary project building and avoid
damaging soil and water conservation function.
(2) Definitely set position and scope of construction site and camp site. Do not freely
expand scope during construction process and not freely change address. Avoid occupying
more land caused by fluidity of engineering construction and clarify environmental
protection responsibility of construction site.
(3) After construction is ended, temporary facilities built during construction
process should be handed to local government through combining opinion from local
government. Clean waste from construction site and camp site surface and carry out
necessary leveling. Adopt vegetation measure of spreading grass for ground which can be
greened and recover its soil and water conservation function.
After construction is ended, adopt cleaning and leveling measure for temporarily occupied
construction site and camp site for the project and involved area reaches 147.99hm2, the
area spreading grass seed is147.99hm2.
Table 18 Management of Construction field`
NoLandfor
mMilestone Admnistration
Are
a(hm2
)
Clearance and levelin
g(hm2
)
Grassin
g(hm2
)
1Plain
CK000+000~CK002+570Zhangjiakou
0 0 0
2 Plain CK002+570~CK011+260Wangquan
1.19 1.19 1.19
3 Plain CK011+260~CK068+300Huai’an
38.15 38.15 38.15
4Hills
CK068+300~CK073+310
Shangyi
Xinghe
2.37 2.37 2.375 Hills CK074+560~CK076+900
6 Hills CK073+310~CK074+560
Shangyi
Xinghe
17.56 17.56 17.56
7 Hills CK076+900~CK124+215
8 Hills CK124+215~CK151+080Chanyouqianqi
Jining
36.68 36.68 36.68
9Plain
CK163+498~CK179+317
10Pain
CK151+080~CK152+303Chayouqianqi
Jining
1.19 1.19 1.1911
PainCK160+796~CK163+498
12 Hills CK152+303~CK160+796Chayouqianqi
1.47 1.47 1.47
13 Hills CK179+317~CK255+248Zhuozi
30.36 30.36 30.36
14 Hills CK255+248~CK269+500Hohhot
16.37 16.37 16.37
15Plain
CK269+500~CK291+000 Hohhot 2.65 2.65 2.65
16Hills Sections by Second Jibaoline
Hohhot 0 0 0
17Plain
Section by Jingbao line(double line)
Hohhot 0 0 0
Total 147.99 147.99 147.99