35
Revised Procurement Plan for PMGSY RRP-II project Punjab as on 29 th Dec 2014 This is an indicative plan prepared for RRP-II PMGSY Punjab. The project shall update the procurement Plan annually or as needed throughout the duration of the project in agreement with the Bank to reflect the actual project implementation needs and improvements in institutional capacity. The Project shall implement the procurement plan in the manner in which it has been approved by the Bank. I. General 1. Bank’s approval date of the procurement plan - 29 th Dec 2014 2. Date of General Procurement Notice issued for Consultancies only : September 14, 2010 3. Period covered by this procurement plan: Full project period II. Goods and Works 1. Procurement Methods and Prior Review Threshold: Procurement Decisions shall be subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement. Expenditure Category Procurement Method Prior Review Threshold US $ Comments GOODS, EQUIPMENTS & MACHINERY 1. Goods and Equipments estimated to cost equivalent of US$ 3000, 000 or more per contract ICB All contracts World Bank SBD will be used and the procurement will be as per procedures described in World Bank Guidelines. 2. Goods and Equipments estimated to cost less NCB All post review All The NCB bidding document agreed will be used and 95065
Transcript

Revised Procurement Plan for PMGSY RRP-II projectPunjab as on 29 th Dec 2014

This is an indicative plan prepared for RRP-II PMGSY Punjab. The project shall update the procurement Plan annually or as needed throughout the duration of the project in agreement with the Bank to reflect the actual project implementation needs and improvements in institutional capacity. The Project shall implement the procurement plan in the manner in which it has been approved by the Bank.

I. General 1. Bank’s approval date of the procurement plan - 29 th Dec 2014 2. Date of General Procurement Notice issued for Consultancies only : September 14, 20103. Period covered by this procurement plan: Full project period

II. Goods and Works1. Procurement Methods and Prior Review Threshold: Procurement Decisions shall be subject to Prior

Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement.

Expenditure Category Procurement Method

Prior Review ThresholdUS $

Comments

GOODS, EQUIPMENTS & MACHINERY

1. Goods and Equipments estimated to cost equivalent of US$ 3000, 000 or more per

contract

ICB All contracts World Bank SBD will be used and the procurement will be as

per procedures described in World Bank Guidelines.

2. Goods and Equipments estimated to cost less than US$ 3000, 000 and greater

than US$ 100, 000 equivalent per contract

NCB All post review All post review

The NCB bidding document agreed will be used and the procurement will be as per procedures described in the Procurement and Contract

Management Manual

95065

3. Goods and Equipments estimated to cost less than US$ 100, 000 or more per

contract

Shopping procedure with at least three

quotations from qualified bidder in accordance

with the provisions of

paragraph 3.5 of procurement Guidelines.

Procurement through DGS&D rate contracts

will be considered

equivalent to shopping

procedure.

All post review

4. Goods and Equipments that meet the requirements of paragraph 3.6 and 3.7 of procurement Guidelines

Direct Contracting

DC < USD100000 Post Review and All others

prior review

CIVIL WORKS

5. Civil works contracts ,Each greater than US$ 40,000,000

or equivalent per contract

ICB* All contracts World Bank SBD will be used and the procurement will be as per procedures

described in World Bank Guidelines.

6. Civil works contracts ,Each greater than US$ 50,000 or

equivalent and less than US$ 40,000,000 per contract

NCB First contract for works for each State,

irrespective of value and all contracts estimated to

cost more than US$

The procurement will be done as per procedures described in the procurement cum Contract Management Manual and using

SBD cleared by the Bank.

15,000,000 equivalent per contract will be

subject to prior review by the Bank. All other works contracts will be subject

to post review.*As per current planning, no ICB contracts are envisaged for civil works.

2. Pre-qualification. Not applicable

3. Proposed procedures for CDD Components (as per Paragraph 3.17 of the Guidelines: Not Applicable

4. Reference to (if any) Project Operational/ Procurement Manual: A Procurement cum contract Management Manual has been prepared by NRRDA. The manual has been received by the Bank and clearance of the manual given by the Bank. All Procurement in the project will be done as per procedures described in it.

5. Any Other Special Procurement Arrangement:

The Following provisions constitute additional provisions applicable for purpose of National Competitive Bidding (NCB). NCB will be conducted in accordance with paragraph 3.3 and 3.4 of the Guidelines and the following provisions:

Only the Model Bidding Document for procurement of works through NCB agreed with the Bank (and as amended for time to time). Shall be used for bidding;

Invitations to bid shall be advertised in at least one widely circulated national daily newspaper (or on a widely used website or electronic portal with free national and international access along with an abridged version of the said advertisement published in a widely circulated national daily inter-alia giving the website/electronic portal details from which the details of the invitation to bid can be downloaded), at least 30 days prior to the deadline for the submission of bids. No special preference will be accorded to any bidder either for price or for other terms and conditions when competing with foreign bidder, State-owned enterprises, small scale enterprises or enterprises from any given State;

Except with the prior concurrence of the Bank, there shall be no negotiation of price with the bidders, even with the lowest evaluated bidder;

Extension of bid validity shall not be allowed with reference to Contracts subject to Bank prior review without the prior concurrence of the Bank (i) for the first request for extension if it is longer than four weeks; and (ii) for all subsequent requests for extension irrespective of the period (such concurrence will be considered by Bank only in cases of Force Majeure and circumstances beyond the control of the Purchaser/ Employer)Re-bidding shall not be carried out with reference to Contracts subject to Bank prior review without the prior concurrence of the Bank

The system of rejecting bids outside a pre-determined margin or “bracket” of prices shall not be used in the project;

Rate contracts entered into by Directorate General of Supplies and Disposals will not be acceptable as a substitute for NCB procedures unless agreed with the Bank on case to case basis. Such contracts will be acceptable however for any procurement under the Shopping procedures Two or three envelope system will not be used (except when using e-Procurement system assessed and agreed by the Bank)However, as exception in this project, two part bidding for NCB works (as described in the model bidding document) has been agreed by the Bank subject to appropriate fiduciary safeguards (e-procurement system and complaint handling mechanism acceptable to the Bank)

All procurement of works through NCB will be done through a standardized e-procurement system acceptable to the Bank.

As per paragraph 1.14(e) of the World Bank’s Procurement Guidelines the associations’ right to inspect the accounts and records of bidders, suppliers and contractors will be included in the bidding documents.

III. Selection of Consultants1. Selection Methods and Prior Review Threshold: Selection decisions shall be subject to Prior

Review by Bank as stated in appendix 1 to the Guidelines Selection and Employment of Consultants:

Expenditure Category

Value threshold per contract

Procurement Method Prior Review Threshold

Consultancy contracts to be awarded to consultant firms including selection of

Each contract estimated to cost US$ 1000,000 equivalent or more per contract

-Quality and Cost Based selection (QCBS)-REO: to be published in UNDB on line

All prior review.

Each contract estimated to -Quality and Cost Based All single source

training institutes by NRRDA/SRRDAs

cost less than US$ 1000,000 equivalent per contract

(QCBS) method-Quality Based (QBS) method of selection in accordance with ht provisions of paragraph 3.1 to 3.4 of consultant’s Guidelines.-Consultant’s Qualifications (CQS) method.-Least Const Method (LCS).-Fixed Budget Method-Single Source Selection

selection of consultants with estimated cost of more than US$ 100,000 equivalent per contract will be subject to prior review. All other contracts will be subject to post review but with TORs subject to prior review by the Bank.

All Individual Consultant contract

-Through comparison of qualification of at least three candidates.

-Single source Selection

All cases subject to post review but with TORs subject to prior review by the Bank. All contracts for single source /selection of individual consultant with estimated value more than USD 100 000 will be subject to prior review

2. Short List Comprising entirely of National Consultants: short list of consultants for services, estimated to cost less than US$ 500,000 equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines.

Any Other Special Selection Arrangements: NIL.

i) Procurement plan with Method & Time Schedule -- for WORKS

Phase IX

Sr No.

Reference Package

No.Contract

( Description )Lengt

h ( Km)

GOI Amount

( In Lacs)

Contract

AmountProcurement Method

Review by Bank

Expected Bid

opening date

Comments

1 2 3 4 5 6 7 8 9 10

1 PB-0138 Manj to Bachiwind 7.86 370.02 441.04 NCB Post Awarded on 17-09-2012

Work Completed

2 PB-0139 Amritsar Wagha to Amritsar Chabal Road 16.98 951.79 1031.04 NCB Post Awarded on

17-09-2012Work

Completed3 PB-0140 Amritsar Ajnala road to

Chetanpura 19.92 945.72 894.96 NCB Post Awarded on 02-11-2011

Work Completed

4 PB-0141 Gaggomahal, Chamiari to Khatrai Kalan 13.55 650.97 750.79 NCB Post Awarded on

17-09-2012Work

Completed5 PB-0142 Burj to Lahori Mal Bhakna

Road 12.16 583.14 585.68 NCB Post Awarded on 31-10-2011

Work Completed

6 PB-0144 Bandala to G.T.Road (NH-I) 24.00 1033.25 1125.31 NCB Post Awarded on 14-11-2011

Work Completed

7 PB-0145 APK road to Jandiala 9.72 464.03 447.54 NCB Post Awarded on 31-10-2010

Work Completed

8 PB-0146 Amritsar Ajnala road to APK road 15.72 726.69 767.63 NCB Post Awarded on

31-10-2011Work

Completed9 PB-0147 G.T. NH-I (Khilchian) to

Amritsar Mehta Road 15.75 671.09 540.32 NCB Post Awarded on 02-11-2011

Work Completed

10 PB-0533 Mallanwala to Fatehgarh Sabhraon 11.42 576.80 583.75 NCB Post Awarded on

02-11-2011Work

Completed11 PB-0534 Ferozepur to Maboke 15.69 783.59 785.42 NCB Post Awarded on

02-11-2011Work

Completed12 PB-0535 Mamdot to Maboke 10.70 537.74 519.70 NCB Post Awarded on

02-11-2011Work

Completed13 PB-0536 Chak Moban Hardo Dhandi to

Tahliwala 20.90 911.26 954.30 NCB Post Awarded on 02-11-2011

Work Completed

14 PB-0537 Guruharsahai to MKT- Jallalabad road via Boor Wala 22.50 1142.10 1159.24 NCB Post Awarded on

02-11-2011Work

Completed

Kuti road

15 PB-0538 MB

NH-15 (Km 168.50) to Mallanwala (Section NH-15 Km 168.50 to Fatehgarh Sabraon via Nizimudin, Wattu Bhatti

Gatta Badshah)

7.91 378.53 400.37 NCB Post Awarded on 01-11-2011

Work Completed

16 PB-0539 MB

NH-10 (Km 391.25 Ghallu) to T-06 (ODR Km 14.00) via

Ghallu, Khippan wali, Azamwala, Kheo wali Dhab

13.13 632.31 695.50 NCB Post Awarded on 01-11-2011

Work Completed

17 PB-0540 MB

NH-10 (Km 393.00) to MDR 40 (Km 34.00) via Kathera, Kamal

Wala, Islamwala15.00 722.51 732.78 NCB Post Awarded on

01-11-2011Work

Completed

18 PB-0541 MB

NH-15 (KM 170.60) to T-08 Zira-Mallanwala raod via

Sadar wala, Ghuddu wala, Behak Fattu, Islambad, Lohke Kalan, Thatha Kishan Singh

13.58 680.42 735.84 NCB Post Awarded on 01-11-2011

Work Completed

19 PB-0542 Mamdot to SH-20 Ferozepur Fazilka raod 20.13 967.39 958.67 NCB Post Awarded on

02-11-2011Work

Completed

20 PB-0543Ferozepur City to Pharymal Bhalla to ODR-20 Ferozepur

Mallanwala road24.70 1192.85 1198.80 NCB Post Awarded on

02-11-2011Work

Completed

Total 311.32 14922.20

15308.68

Phase X

Sr. No

Reference Package

No.Contract ( Description )

Length

( Km)

GOI Amount

( In Lacs)

Contract

Amount ( In

Lacs)

Procurement Method

Review by Bank

Expected Bid

opening date

Comments

1 2 3 4 5 6 7 8 9 10

1 PB-0153 Sarangdev to Abadi Sarangdev 2.20 111.34 107.13 NCB Post Awarded on 03-10-2012

Work Completed

2 PB-0154 Harsha Chinna Road to Abadi Jhander 1.95 118.02 117.67 NCB Post Awarded on

03-10-2012Work

Completed

3 PB-0214 Gidder Neor Road to Kothe Gobind Nagar 1.37 42.4 1 42.61 NCB Post Awarded on

05-11-2012Work

Completed

4 PB-0215 Poohla to Kothe Mehneke 1.80 80.86 73.72 NCB Post Awarded on 29.04.2013

Work Completed

5 PB-0216 Phul Bhadaur Road 12.96 604.51 564.79 NCB Post Awarded on 03-12-2012

Work in progress

6 PB-0315 Kotkapura - Jaitu - Chandbhan Road 19.33 922.95 989.87 NCB Post Awarded on

28-03-2013Work

Completed

7 PB-0415N.H. 95 Km 52 Ucha Pind

(Sanghol) to Khanna upto M.C. Limit

17.10 876.88 844.58 NCB Post Awarded on 12-03-2013

Work in progress

8 PB-0416 Badali Ala Singh to N.H.-1 (KM 2.52) 11.00 528.91 519.94 NCB Post Awarded on

22-10-2012Work

Completed9 PB-0417 Amloh to Khanna 10.00 476.9 478.52 NCB Post Awarded on

09-11-2012Work

Completed10 PB-0544 Sukhera Bodla Jodhey Wala

road to Dhani Amar Singh 2.00 94.39 79.94 NCB Post Awarded on 11-10-2012

Work Completed

11 PB-0545 Baghe Ke Uttar to Dhani Inder Singh 1.40 67.94 57.46 NCB Post Awarded on

11-10-2012Work

Completed12 PB-0723 Tanda to Dholwaha Bahera

upto H.P. Boundary 16.60 1086.04 1138.75 NCB Post Awarded on 25-03-2013

Work in progress

13 PB-0724 Jaijon to Garhshankar Hoshiarpur Road (Km 73) 15.94 585 547.15 NCB Post Awarded on

30-10-2012Work

Completed14 PB-0725 Mahilpur to Phagwara 14.34 625.4 574.75 NCB Post Awarded on

30-10-2012Work in progress

15 PB-0726 Hajipur to Miani (Sec. Hajipur to Dasuya) 19.19 835.15 747.50 NCB Post Awarded on

30-10-2012Work

Completed

16 PB-0727 Miani to Begowal 7.45 326.46 287.79 NCB Post Awarded on 30-10-2012

Work Completed

17 PB-0728 Jia Chak to Datarpur 17.48 802.83 765.61 NCB Post Awarded on 30-10-2012

Work in progress

18 PB-0827 Banga Phillaur Km 13.40 to Nagar 24.30 Km 10.90 510.08 499.54 NCB Post Awarded on

05-12-2012Work

Completed

19 PB-0828 Bhogpur Adampur ODR km. 0 to Behram km. 6 (ODR) 5.20 165.26 153.21 NCB Post Awarded on

30-10-2012Work

Completed

20 PB-0829 Mehatpur to Parjian Kalan (ODR 27) 9.30 411.69 385.6 NCB Post Awarded on

30-10-2012Work

Completed

21 PB-0830 Phagwara - Dosanjh (ODR Km 7.50 to Mukandpur road) 11.35 322.03 338.64 NCB Post Awarded on

30-10-2012Work

Completed

22 PB-0916 Nadala to Dhilwan 12.40 460.4 420.54 NCB Post Awarded on 30-10-2012

Work Completed

23 PB-0917 Razapur to Kular 13.97 862.44 843.23 NCB Post Awarded on 30-10-2012

Work Completed

24 PB-1025 Lakha to Burj Kularan (ODR-8) upto Block Boundary 17.64 1027.97 982.37 NCB Post Awarded on

25-10-2012Work

Completed

25 PB-1026L.F. Road upto Sugar Mill

(ODR-11) to Kokari Kalan via Galib Kalan upto Distt.

Boundary7.50 410.66 398.88 NCB Post Awarded on

25-10-2012Work

Completed

26 PB-1027 Bhundri to Swaddi Kalan upto Block Boundry via Barrowal 15.10 807.82 741.35 NCB Post Awarded on

25-10-2012Work

Completed

27 PB-1028Pohir Ahmedgarh

(Bahadargarh) to Brahmpur via Chhappar Rachine

13.70 673.53 657.75 NCB Post Awarded on 25-10-2012

Work Completed

28 PB-1029 (MB)

Chhokkar to Dhoorkot (Sec. Jodhan to Lohgarh) 8.10 445.36 NCB Post Awarded on Work

Completed

29 PB-1113Sardulgarh Mansa road to

Talwandi Sabo upto block limit (ODR-22A)

19.51 890.04 991.03 NCB Post Awarded on 05-04-2013

Work Completed

30 PB-1114 Jourkian Jagatgarh Bandran (ODR-22C) 2.83 113.27 111.09 NCB Post Awarded on

06-11-2012Work

Completed

31 PB-1115Sardulgarh Ratia Road to

Sangha upto Haryana Border (ODR-22 B)

15.88 817.93 850.81 NCB Post Awarded on 06-11-2012

Work Completed

32 PB-1116 (MB)

Mansa Khukhar Khurd Sadha Singhwala Man Bibrian upto

Block Boundary (T-08)11.10 689.08 782.64 NCB Post Awarded on

30-10-2012Work in progress

33 PB-1117 (MB)

Jhunir to Ghurkarni Fatehpur Modey Pilsian upto Block

Boundary9.00 662.67 688.70 NCB Post Awarded on

30-10-2012Work

Completed

34 PB-1118 (MB)

Mansa Khillan Chakerian Fafre Bhaike upto Block Boundary 10.57 672.81 671.25 NCB Post Awarded on

30-10-2012Work

Completed

35 PB-1210Mudki to Nihal Singh Wala

(ODR-06) (Sec. Block Boundries Bagha Purana)

32.80 1006.96 892.78 NCB Post Awarded on 25-10-2012

Work Completed

36 PB-1211 Bagha Purana Block Boundary to NH-71 via Nihal Singh Wala 17.46 696.35 633.38 NCB Post Awarded on

31-01-2013Work

Completed

37 PB-1212Moga Khosa Pando Zira road upto Block Boundary (RD 0 to

8.50 Km)8.50 260.09 225.45 NCB Post Awarded on

25-10-2012Work

Completed

38 PB-1213 Moga Khosa Pando Zira road (RD 8.50 to 23.46 Km) 14.96 479.42 441.89 NCB Post Awarded on

25-10-2012Work

Completed

39 PB-1214 Kot Ise Khan to Jagraon upto Block Boundary 16.00 504.93 469.67 NCB Post Awarded on

25-10-2012Work in progress

40 PB-1215 Kot Ise Khan to Galib Kalan (RD 16.00 to 25.20 Km) 7.80 238.37 205.30 NCB Post Awarded on

25-10-2012Work in progress

41 PB-1216Kot Ise Khan to Dharamkot to Sidhwan Bet (Sec. Dharamkot

to Sidhwan Bet upto Block Boundary)

13.70 491.35 461.40 NCB Post Awarded on 25-10-2012

Work Completed

42 PB-1327Gidderbaha to Bhalianan (Section Gidderbaha to

Kotbhai)7.47 421.02 400.64 NCB Post Awarded on

11-10-2012Work

Completed

43 PB-1328Hunsar (NH-15) to sotha

(Muktsar-Malout road) upto Bloack Bounday (Sec. Gidderbaha to Sotha)

22.30 756.62 719.07 NCB Post Awarded on 11-10-2012

Work in progress

44 PB-1329 (MB) Butter Sharih to Mallan 7.58 436.12 464.53 NCB Post Awarded on

17-10-2012Work in progress

45 PB-1330 (MB) Alamwala to Dabra 7.61 448.35 539.37 NCB Post Awarded on

18-07-2013Work in progress

46 PB-1525 Rohti Bridge to Tanda Bhada Bridge upto Distt. Boundary 21.30 962.41 985.60 NCB Post Awarded on

09-11-2012Work

Completed47 PB-1526 Nabha Thuhi Channo Road 6.22 285.18 308.00 NCB Post Awarded on

09-11-2012Work

Completed48 PB-1527 Patiala Main Swajpur Road 11.15 633.52 644.85 NCB Post Awarded on

15-11-2012Work

Completed49 PB-1528 Retgarh to Shuttrana 14.70 846.42 860.87 NCB Post Awarded on

15-11-2012Work

Completed50 PB-1529 Rajpur Chandigarh road to

Fatehgarh Sahib Landran road 9.30 465.27 561.67 NCB Post Awarded on 15-11-2012

Work Completed

51 PB-1530 Sarala Kalan to Naneola upto Haryana Border 6.00 437.96 524.40 NCB Post Awarded on

15-03-2013Work

Completed

52 PB-1620 MDR 55 Km 27.00 Nurpur Bedi to ODR 13 Distt. Boundary 11.43 653.13 679.62 NCB Post Awarded on

08-05-2014

Rebidding was done as the

previous agency did not execute the work after

allotment.

53 PB-1621RGN Road SH-22 to Sh. Naina

Devi Road upto Block Boundary

6.44 329.38 362.30 NCB Post Awarded on 15-11-2012

Work Completed

54 PB-1750 Tapa to Pakhoke Crosing 12.80 724.06 690.91 NCB Post Awarded on 04-10-2012

Work Completed

55 PB-1751 Tapa to Talwandi 30.40 1739.8 1780.88 NCB Post Awarded on 04-10-2012

Work Completed

56 PB-1752 Baloke to Abadi Baloke 2.40 123.8 116.96 NCB Post Awarded on 08-10-2012

Work Completed

57 PB-1753 (MB)

Raisar to Diwana via Naraingarh Sohian 22.13 1318.25 1482.19 NCB Post Awarded on

17-06-2013Work in progress

58 PB-1747 Sangrur (Km 3.80) to Cheema 16.00 766.29 759.64 NCB Post Awarded on 04-10-2012

Work Completed

59 PB-1748 Dhuri to Mimsa upto Block Boundary 12.40 280.17 281.32 NCB Post Awarded on

03-10-2012Work

Completed

60 PB-1749 Bagrian to Mimsa upto Block Boundary 6.45 189.1 187.08 NCB Post Awarded on

08-10-2012Work

Completed

61 PB-1754 Bhawanigarh to Bassiarkh (Sec. Bhawanigarh to Balial) 5.60 308.21 306.36 NCB Post Awarded on

04-10-2012Work

CompletedG. Total 717.06 33931.5

632901.1

7

Phase XI ( Batch – I)

Sr. No

Reference Package

No.Contract

( Description)Lengt

h ( Km)

Amount ( In Lacs)

Contract

Amount ( In

Lacs)

Procurement Method Post

Expected Bid

opening date

Comments

1 2 3 4 5 6 6 7 8 9

1 PB01-076 Amritsar Mehta road to Binjierwal 4.47 173.90

967.93

NCB Post

Awarded on 08.05.14

These works have been allotted by grouping.Work in progress

2 PB01-078 Ram Diwali To Jhamke 5.25 246.50 NCB Post3 PB01-080 Asr Majitha FGC to Burj Gosal

Zimidara 4.02 181.46 NCB Post

4 PB01-084Asr Pkt road to Abadi Abdal 1.06 54.02 NCB Post

Asr FGC Road to Daddopura 5.40 281.77 NCB Post

5 PB01-079 Majitha Fateh Garh Churrian to Bhagwan 4.49 189.96

612.97

NCB Post

Awarded on 08.05.14

 These works have been allotted by grouping.Work in progress

6 PB01-081Majitha Kathunangal via

Jalalpur Sham Nagar T-02 to Jalalpur)

5.76 220.76 NCB Post

7 PB01-085Amritsar Fateh Garh Churrian

Road to Jehunangal 2.32 105.55 NCB Post

Harrian Kaler Mangat to Dadian 0.98 57.57 NCB Post

8 PB01-093 Chaba to Mandiala 6.23 343.4 338.13 NCB Post Awarded on 05-09-2013

Work in Progress

9 PB01-109Makkowal to Sudhar 5.00 251.77

759.11NCB Post

Awarded on 08-05-14

Work in ProgressKurallian to Thoba 2.84 194.24 NCB Post

Darya Mussa to Thoba 5.00 332.56 NCB Post

10 PB01-105 Motla to Jai Ram Kot 2.60 173.75 1233.37 NCB Post Awarded on 17-12-2013

 These works have been allotted by grouping

Work in progress

Bhalot to Lopoke Ajnala 7.00 302.91 NCB Post

11 PB01-110

Ibrahimpura road to Gujjarpura, Gaggomehal 4.26 168.93 NCB Post

Abadi Puran Galib to Gaggomehal 2.75 130.98 NCB Post

Lakhuwal to Paidewal 1.60 81.24 NCB Post

12 PB01-111 Nanoke to Sudhar 1.55 73.73 NCB PostAbu Said to Chamiari 5.90 288.31 NCB Post

13 PB01-057 Tarn Taran Goindwal road to Voin Poin 4.01 187.37 176.01 NCB Post Awarded on

23-12-2013Work

Completed

14 PB01-058ATTSH Road To Walipur

Jandoke To Takthu Chak (Tarn Taran to TarnTaran Patti Road)

8.35 457.88 480.80 NCB Post Awarded on 17-12-2013

Work in progress

15 PB01-060 Chohla Sahib To Dhun Dhaiwal 5.50 289.06 297.67 NCB Post Awarded on 17-06-2013

Work Completed

16 PB01-061Sheron Dhotian Road to Abadi

Paidewali Khui (Dhotian To Naushera Pannuan)

5.30 250.49 258.14 NCB Post Awarded on 17-06-2013

Work Completed

17 PB01-062 ABK Road To Mari Kamboke 7.50 453.50 468.23 NCB Post Awarded on 04-09-2013

Work in progress

18 PB01-067T06 To Pandori Romana (ABK Road To Tarn Taran Chabal

Road)8.82 476.15 497.21 NCB Post Awarded on

04-09-2013Work in progress

19 PB01-070 Tarn Taran Patti Rd to Koharka 6.85 470.97 488.18 NCB Post Awarded on 04-09-2013

Work in progress

20 PB02-017 Upgradation of MDR 41 to Burj Mehma 1.39 59.32 47.61 NCB Post Awarded on

11-07-2013Work

Completed

21 PB03-018 Kemeana to Daggo Rormana up to Phide Kalan 9.72 506.08 532.99 NCB Post Awarded on

17-06-2013Work in progress

22 PB03-019 Kaler to Kot Sukhia to Bageana up to Panjgrain 7.72 360.77 375.93 NCB Post Awarded on

17-06-2013Work

Completed

23 PB03-020Golewala to Chugewala to

Diffence road up to Sh- Muktsar-Ferozepur road

11.96 570.83 555.38 NCB Post Awarded on 17-06-2013

Work in progress

24 PB03-023 Bageana to Panjgrain 8.55 368.60 376.51 NCB Post Awarded on 17-06-2013

Work in progress

25 PB05-050 MB Suner to Mansoorwal Kalan 5.00 244.09 242.87 NCB Post Awarded on

17-06-2013Work

Completed

26 PB05-052 MB

T-05 (Zira-Kot Ise Khan) Km 23.50 to Tindwan 8.11 426.50 412.67 NCB Post Awarded on

17-06-2013Work in progress

27 PB05-055 MB Mudki to Kabar Wacha 6.00 277.72 286.49 NCB Post Awarded on

17-06-2013Work

Completed28 PB05-057 SH-20 (Km 51) to Pire Ke

Uttar 4.98 261.15 256.49 NCB Post Awarded on 09-07-2013

Work Completed

29 PB05-058 Sukhera Bodla to Jhode Wala 6.00 435.44 426.54 NCB Post Awarded on 09-07-2013

Work Completed

30 PB05-075Banna wala to Hamad Chak 3.00 171.45

296.47NCB Post Awarded on

11-07-2013Work

CompletedArifke to Bandala (Km. 9.60 to 12.70) 3.10 159.54 NCB Post

31 PB05-061 F.F. Road to PAP Picket Noor Shah 5.98 257.37 249.54 NCB Post Awarded on

30-07-2013Work in progress

32 PB05-071 MDR-39 (Abohar-Sitoguna Dabwali) K.M 21.00 to Vishnu Datt Dhani (Sec MDR-39 K.M 21.00 to Bazidpur Bhoma)

9.22 482.89 517.17 NCB Post Awarded on 17-06-2013

Work in progress

33 PB05-072NH-10 (Malout-Fazilka) K.M

382.00 to Patti Teja to Muradwala Dal Singh to Kundal ( ODR ABH-MKS)

13.82 730.20 777.58 NCB Post Awarded on 17-06-2013

Work in progress

34 PB05-076NH 10 (Malout-Fazilka) Km

386.00 to Jand Wala Hanuwanta

1.60 86.69 91.16 NCB Post Awarded on 17-06-2013

Work Completed

35 PB05-082 MDR-40 (Km 31) to Noorpur 4.50 183.24 188.70 NCB Post Awarded on 17-06-2013

Work Completed

36 PB05-083 SH-20 (Km 70) to Ladhuka 1.70 78.54 80.76 NCB Post Awarded on 17-06-2013

Work Completed

37 PB05-087MDR-40 to Mandi Roran Wali

(Halimiwala via Aliana Nukerian)

12.75 570.47 611.09 NCB Post Awarded on 18-06-2013

Work in progress

38 PB05-088MDR-40 (KM 26.75) (Arniwala)

to Dalip Singh Dhani via Bannawala, Pakan

12.18 516.44 537.91 NCB Post Awarded on 17-06-2013

Work in progress

39 PB06-041 APK Road to Satkoha Bhoja 3.00 100.76 104.54 NCB Post Awarded on 08-05-2014

Work in progress

40 PB06-054 DBN-FGC road to Bholeke via Niko Sarai 6.20 235.19 247.88 NCB Post

Awarded on 04-09-2013.

Work in progress

41 PB06-081Nagal Ghiala Gura Mirthal to

Nalunga up to Himachal Pardesh Boundary

1.90 123.66 121.89 NCB Post Awarded on 01-07-2013

Work Completed

42 PB07-032 NH-1A (Jalandhar-Pathankot) to Behalpur 4.90 to 9.50 Km 4.60 157.40 130.94 NCB Post Awarded on

14-06-2013Work

Completed

43 PB07-042 Mukerian Naushera to Talluwal 6.30 353.03 299.61 NCB Post Awarded on 14-06-2013

Work Completed

44 PB08-032 Mehatpur to Khurlapur via Khaira Mustarka 8.50 419.06 427.67 NCB Post Awarded on

17-06-2013Work

Completed45 PB08-043 Nakodar Kapurthala road to

Shahpur 4.16 228.90 232.06 NCB Post Awarded on 17-06-2013

Work Completed

46 PB08-046 Samrai to Pandori Mustaki 2.72 123.36 131.22 NCB Post Awarded on 24-12-2013

Work Completed

47 PB08-047 Jandiala to Patti Mohanpur 5.20 274.22 271.43 NCB Post Awarded

on 17-06-2013

Work in progress

48 PB09-019 NH-1 (Jalandhar-Amritsar) to Lakhan Khurd 7.25 403.09 371.61 NCB Post Awarded on

17-06-2013Work in progress

49 PB09-021 T-03 to Pakhowal 6.90 256.47 253.05 NCB Post Awarded on 06-09-2013

Work Completed

50 PB10-035 Bhadewal Bridge to Jargari 9.56 523.09 421.91 NCB Post Awarded on 04-07-2013

Work in progress

51 PB10-036 GT Road to Payal Via Barmalipur 4.80 195.83 165.75 NCB Post Awarded on

04-07-2013Work

Completed

52 PB10-039Hadiwal to T-04 4.03 197.00

432.48NCB Post

Awarded on 04-07-2013

Work CompletedMarrewal to T-05 3.66 171.68 NCB Post

Ghumana to T-03 2.31 87.77 NCB Post53 PB10-040 Ghelewal to T-03 6.21 343.50 327.96 NCB Post Awarded on

04-07-2013Work

Completed54 PB10-041 Bholapur to T-04 6.05 255.68 240.28 NCB Post Awarded on

04-07-2013Work in progress

55 PB10-042NH-1 to Bilga 1.47 57.89

142.98NCB Post Awarded on

04-07-2013Work

CompletedSahnewal Kalan to Bhairo Munna Road 2.40 97.72 NCB Post

56 PB10-043 Boundal to Samrala 4.45 204.77 354.82 NCB Post Awarded on 22-07-2013

Work in progressDhindsa to ODR-15 3.25 140.98 NCB Post

57 PB10-046 Dangian to Kaunke kalan 7.90 455.56 444.93 NCB Post Awarded on 17-06-2013

Work in progress

58 PB10-048Sohian to N.H-95 (L.F. road) 2.38 118.28

743.67NCB Post Awarded on

22-07-2013Work in progressBarich to Dhollan. (MDR-51) 10.92 636.79 NCB Post

59 PB10-067 Aluna kalan to MDR-33 Via Aluna Tola, Nasrali. 6.65 307.55 317.39 NCB Post Awarded on

17-06-2013Work in progress

60 PB10-071 Jhugina Begga to T-03 1.60 77.18 66.23 NCB Post Awarded on 04-07-2013

Work Completed

61 PB10-077 Chak-Bhaika to Bassian 10.15 528.21 530.46 NCB Post Awarded on 22-07-2013

Work in progress

62 PB10-078 Mand Chounta to T-03 4.00 190.94 175.17 NCB Post Awarded on 04-07-2013

Work Completed

63 PB10-079 Ayali to Jhamat 1.75 94.57 78.24 NCB Post Awarded on 04-07-2013

Work Completed

64 PB10-080 Kariana Kalan to T-03 1.40 51.57 50.04 NCB Post Awarded on 04-07-2013

Work Completed

65 PB10-081 N.H-95 to Bains. 3.50 157.42 91.04 NCB Post Awarded on 04-07-2013

Work Completed

66 PB11-019 Udat Bhagat Ram to Dullowal 4.42 194.99 214.53 NCB Post Awarded on 17-06-2013

Work Completed

67 PB11-021 H.S. Road to Gehle 4.55 201.02 216.70 NCB Post Awarded on 17-06-2013

Work Completed

68 PB11-022 Khaila Malikpur (H.S. Road) to Burj Hari to Kothe Major Singh 13.50 589.45 645.70 NCB Post Awarded on

17-06-2013Work

Completed

69 PB11-023 Sahnewala to Ghudduwala 3.25 139.69 153.68 NCB Post Awarded on 17-06-2013

Work Completed

70 PB11-024 Birewala Jattan to Bhalaike 2.35 106.79 105.93 NCB Post Awarded on 17-06-2013

Work Completed

71 PB11-026 Joga to Burj Dhilwan (Joga-Burj Jhabran) 8.80 367.34 406.69 NCB Post Awarded on

17-06-2013Work

Completed72 PB11-027 Aklian to Rar 12.72 664.19 627.39 NCB Post Awarded on

17-06-2013Work in progress

73 PB11-030 Kothe Jatana to Sardulgarh Mansa Road 16.67 865.99 899.40 NCB Post Awarded on

17-06-2013Work

Completed

74 PB11-031 Hirke to Jhanduke 4.39 233.23 253.53 NCB Post Awarded on 17-06-2013

Work Completed

75 PB11-032 Sardulgarh Road to Rorki 3.04 134.98 136.61 NCB Post Awarded on 17-06-2013

Work Completed

76 PB12-017 NH-95 RD 51.00 km to Talwandi Mallian Upto B.B 8.20 480.63 422.35 NCB Post Awarded on

04-07-2013Work

Completed

77 PB12-019 N.H 95 RD76 to Salina up toBlock Boundary 7.37 434.15 361.17 NCB Post Awarded on

04-07-2013Work in progress

78 PB12-021 ODR No.08 RD 8.10 km to Lopon upto B.B 9.00 467.12 396.67 NCB Post Awarded on

04-07-2013Work

Completed

79 PB12-027Didar Singh Wala to S.H. 16A Via Raunta, Tharaj (Smadth

Bhai)12.96 772.87 791.98 NCB Post Awarded on

17-06-2013Work in progress

80 PB12-029 Baghapurana Mudki Road ODR-6 RD 0.90km to Bhaloor 6.81 333.47 344.38 NCB Post Awarded on

22-07-2013Work in progress

81 PB13-031 Modlewala to Bariwala 3.20 120.41 118.36 NCB Post Awarded on 30.07.2013

Work in progress

82 PB13-034 Marar Kalian to Chack Modlewala 2.53 103.03 97.42 NCB Post Awarded on

16.08.2013Work in progress

83 PB13-039 Doda to Kothe Surgapuri upto Rupana Husnar Road 7.56 342.66 367.13 NCB Post Awarded on

17-06-2013Work in progress

84 PB13-045Lambi to Khudian Gulab Singh 3.20 170.41

251.76NCB Post Awarded on

17-06-2013Work in progressAbul Khurana to Dhani

Balwant Singh 1.30 66.07 NCB Post

85 PB13-046

MDR 39 (KM 53.50) to Killanwali 2.32 132.98

511.45NCB Post

Awarded on 17-06-2013

Work in progressMDR 39 (KM 44.90) to Middu

Khera to Fatta Khera 5.63 357.50 NCB Post

86 PB13-048Aulakh To Dhani Sucha Singh

via Jhorar to Lakkarwala to Khane ki Dhab

10.74 608.37 613.47 NCB Post Awarded on 17-06-2013

Work in progress

87 PB13-052 Buraj Sidhwan to Dhani Burkian wali 5.26 209.42 212.45 NCB Post Awarded on

17-06-2013Work in progress

88 PB13-053

NH-10 (KM 324.15) to Bhagu 1.20 77.53

144.67

NCB PostAwarded on 17-06-2013

Work CompletedMDR-399 (Km 40.90) to

Hakuwala 0.50 31.34 NCB Post

MDR-39 (Km 49.50) to Lohana 0.60 24.43 NCB Post

89 PB13-054Arniwala - Phullu Khera to

Dhani Kanganpura 50 276.23371.07

NCB Post Awarded on 17-06-2013

Work in progress

Kangan Khera to Dabwali Rahurianwali 1.69 69.04 NCB Post

90 PB13-056 Gurrusar Jodhan to Shamkot 2.54 128.15 134.26 NCB Post Awarded on 17-06-2013

Work in progress

91 PB13-057 SH-16 (KM 12.80) to Dhani Kundan Singh 3.62 171.64 176.54 NCB Post Awarded on

17-06-2013Work in progress

92 PB14-017Behram-Mahilpur road to

Phagwara-Hoshiarpur upto Block Boundary (Via Ghuman,

Mehliana)6.35 273.88 266.39 NCB Post Awarded on

24-06-2013Work

Completed

93 PB14-019 Balachaur-Ropar road to Majara Jattan 2.29 112.92 112.01 NCB Post Awarded on

24-06-2013Work

Completed94 PB14-026 Aur Phillaur to Phambra 3.52 174.34 177.13 NCB Post Awarded on

24-06-2013Work in progress

95 PB15-036 Patiala Rajpura Road to Shahpur Afgana 5.10 213.8 184.38 NCB Post Awarded on

17-06-2013Work

Completed

96 PB15-039Massingan to Faridpur 2.34 149.19

534.94NCB Post Awarded on

18-06-2013Work

CompletedPatiala-Pehowa road to GaneshPur Plant 5.58 378.87 NCB Post

97 PB15-056 Dhanetha to Ratanheri 4.78 234.33 228.87 NCB Post Awarded on 18-06-2013

Work Completed

98 PB15-057 Dhanetha Ratanheri to marouri 3.30 127.21 137.74 NCB Post Awarded on

04-07-2013Work

Completed99 PB15-048 Lalru to Dharamgarh 3.30 201.67 199.25 NCB Post Awarded on

01-07-2013Work in progress

100 PB17-067

Sangrur Barnala road to NH-64 to Harigarh

3.10 115.72 98.49

NCB Post

Awarded on 09-07-2014

Rebidding of this package was done as the previous

agency did not execute the

work.

Tapa - Bhadaur road km 06 to Jaimal Singh Wala NCB Post

101 PB17-087 Sherwanikot to Bhudan 5.80 308.89 235.99 NCB Post Awarded on 17-06-2013

Work completed

G. Total 637.64 31921.12

31767.35

Phase XI ( Batch-II)

Sr. No

Reference Package

No.Contract

( Description)Lengt

h ( Km)

Amount ( In Lacs)

Contract

Amount ( In

Lacs)

Procurement Method Post

Expected Bid

opening date

Comments

1 2 3 4 5 6 7 8 9 10

1 PB01-114 Amritsar Wagha road to Dhand 11.00 578.63  554.09 NCB Post Awarded on

08-05-2014Work in Progress

2

PB01-056

Tarn Taran Manochal Shahbajpur Dialpur road

(Sec.Tarn Taran to Shahbajpur)

Km 0 to 16.0016.00 950.69

1353.49 NCB Post Awarded on 12-03-2014

Work in Progress

3Tarn Taran Manochal

Shahbajpur Dialpur road (Sec. Shahbajpur to Dialpur) KM 16

to 23.717.71 381.48 Work in

Progress

4 PB01-075 Tarsika to Udhonangal 14.94 899.26 887.85 NCB Post Awarded on 12-11-2013

Work in Progress

5 PB-01-102 MB

G.T. Road (Khilchian) to Asr-Mehta Road 8.40 611.63 624.97 NCB Post Awarded on

17-02-2014Work in Progress

6 PB01-059 MB Sheikh Chak to Kalha 2.90 168.34 177.61 NCB Post

Awarded on 29-10-2013

 Work Completed

7 PB01-069 MB

ATTSH Road To Khabe Rajputtan 8.18 604.51 667.89 NCB Post Awarded on

24-12-2013 Work in Progress

8 PB05-059 Abohar Hindumal to Kot Road 15.74 599.38 561.58 NCB Post Awarded

on 04-03-2014

 Work in Progress

9 PB05-060 Khuian Sarwar Panjkosi Nihal Khera road 18.85 730.09 698.26 NCB Post

Awarded on 04-03-

2014Work in Progress

10 PB05-062 Fazilka Hindumal Kot Road 13.30 483.22 484.94 NCB Post Awarded

on 04-03-2014

Work in Progress

11 PB05-077 MB

NH15 (Abohar-Sri Ganga Nagar) Km 368.00 to

Dharmpura6.77 324.74 330.93 NCB Post

Awarded on 17-02-

2014Work in Progress

12 PB06-050 Shalla Chak Sharif road to Kahnuwan upto Sekhwan Adda 19.16 1272.63 1131.38 NCB Post

Awarded on 29-10-

2013Work in Progress

13 PB06-063Dhariwal Kot Santokh Rai

Allowal Jagowal Jattan Attri Bakshi Wal Road.

4.50 204.54 212.57 NCB Post Awarded on 07-05-2014

 Work in Progress

14 PB06-058Gurdaspur Hardochhanni

Dostpur Bohar Wadala Kalanour road.

13.00 744.28 738.32 NCB Post Awarded on 08-05-2014

Work in Progress

15 PB06-062 Kalanour Qila Lal Singh Road 7.00 349.35 333.77 NCB Post Awarded on 08-05-2014

 Work in Progress

16 PB06-075 MB

Gurdaspur -Jail road to APK road 8.08 493.55 501.19 NCB Post Awarded on

17-02-2014Work in Progress

17 PB06-060NH-1 A (117 Km) Malikpur

Sahoura Taragarh Dinanagar Road

14.00 685.94 720.37 NCB Post Awarded on 07-05-2014

Work in Progress

18 PB06-076 MB

Sujanpur to Jandpur Phool Piara Panjore Kaleser 6.50 313.72 338.54 NCB Post Awarded on

17-02-2014Work in Progress

19 PB07-038Gardiwal to Hoshairpur

Dasuya Road 22.30 822.33 765.19NCB Post Awarded on

22-01-2014Work in Progressto Koi Baruhi Dholbaha

Hariana Road NCB Post

20 PB07-039 Garshankar Santokhgarh Road 16.40 725.54 669.32 NCB Post Awarded on 22-01-2014

 Work in Progress

21 PB07-040 Mahilpur to Jajjon Road 15.12 594.19 557.45 NCB Post Awarded on 22-01-2014

Work in Progress

22 PB07-035 Garhdiwal to Bullowal 10.00 510.76 490.47 NCB Post Awarded on 22-01-2014

Work in Progress

23 PB08-048 Muayi to Nurmehal via Bilga 9.27 610.98 597.83 NCB Post Awarded on 26-12-2013

 Work in Progress

24 PB09-018 Phagwara to Nakodar road upto Distt.Boundary 7.60 477.88 463.07 NCB Post

 Awarded on 26-12-2013

Work Completed

25 PB10-072 Dugri Dhandra road (R.D. 2.00 km) to Dhandra 3.90 163.99 162.37 NCB Post Awarded on

29-11-2013Work

Completed

26 PB10-074 Quaddian to NH-1 3.35 173.06 173.06 NCB Post Awarded on 06-02-2014

Work Completed

27 PB10-033 Chak Lohat to Machhiwara

ODR -17 17.75 863.3 863.30NCB Post Awarded on

06-02-14Work in Progress(Sec Machhiwara to Chak

Lohat) NCB Post

28 PB10-031 Isru to Dehru Road Via Chakohi Bhamadi 3.76 178.32 174.27 NCB Post Awarded on

22-01-2014Work in Progress

29 PB10-044 Machhiwara to NH-95 (Ludhiana Chandigarh Road) 9.25 507.14 507.02 NCB Post Awarded on

06-02-2014 Work in Progress

30 PB11-020 MB

Mansa Khurd to Kothe Mansa Khurd 3.31 203.21 200.23 NCB Post

Awarded on 28-10-

2013Work

Completed

31 PB13-051 MB Kabarwala to Sarwan Bodlan 4.05 283.87 273.49 NCB Post Awarded on

19-02-2014 Work in Progress

32 PB13-033 Mann (ODR-16) Dabwali upto Block Boundary 14.80 1001.43 965.98 NCB Post Awarded on

06-05-2014Work in Progress

33 PB13-035 Malout-Abohar road to Malout-Bathinda road (ODR Bye Pass) 4.85 284.36 276.90 NCB Post Awarded on

06-05-2014Work in Progress

34 PB13-032Muktsar-Ferozepur Road to

Lubanianwali to Marar kallan upto

Block Boundary2.58 141.92 143.88 NCB Post

Tendering under

process

 Rebidding is under process as the agency did not sign

the agreement after the

allotment of the work.

Agency has been debarred from bidding for PMGSY works for 1

year.35 PB14-015

MB Aur Phillaur road to Gunachaur 2.10 115.84 121.46 NCB Post Awarded on 28-10-2013

Work in Progress

36 PB15-055 MB Patiala Samana road to Rajla 5.50 287.01 311.99 NCB Post

Awarded on 17-02-2014

Work in Progress

37 PB16-022 Nangal SH-22 km 61.00 to Alragan 8.30 519.02 545.14 NCB Post Awarded on

09-05-2014Work in Progress

38 PB16-023 Khanpur Khuhi to Bhangal 3.50 263.63 274.09 NCB Post  Awarded on 08-05-2014

Work in Progress(RD 7.90 to 11.20) NCB Post

39 PB16-024ODR-07 KM 0.0 Bela to ODR-07 KM 8.05 District Boundary

Chak lohat8.05 599.45 595.51 NCB Post Awarded on

18-11-2013Work in Progress

40 PB17-080 Bathinda Barnala road to Tajoke 9.61 414.35 357.20 NCB Post Awarded on

20-11-2013Work

Completed

41 PB17-066 Cheema to Fatehgarh 15.76 978.49 958.51 NCB Post Awarded on 11-11-2013

Work Completed

42 PB17-082 MDR (Km 2) to Kauhrian 14.00 839.48 816.67 NCB Post Awarded

on 14-01-2014

Work Completed

43 PB17-068 Sangrur Bhalwan Road 9.95 452.94 454.27 NCB Post Awarded

on 11-11-2013

Work in Progress

44 PB17-085 Lehra to Kauhrian 9.21 732.64 719.02 NCB Post Awarded

on 14-01-2014

Work Completed

45 PB17-061 MB

SH-10 (Patran Moonak Road Km 151) to Mandvi 11.94 729.82 775.18 NCB Post Awarded on

24-12-2013Work in Progress

46 PB17-062 MB Khanouri to Mandvi Boarder 13.00 845.34 904.11 NCB Post Awarded on

24-12-2013Work in Progress

Total 455.24 24716.27

24464.73

Under World Bank Funded PMGSY RRP-II Phase XII

Sr. No

Package No. Contract (Description) Lengt

h (Km)

Amount Cleared by GoI (lacs)

Contract Award without mainten

ance cost (Rs.

Lacs)

Procurement Method

Review by Bank

Expected Bid

opening date

Comments

1 2 3 4 5 7 8 9 10 11

1 PB01-104 Ghoga to Jasrur 3.60 193.77 - NCB PostTechnical

bids opened on 12.12.2014

Rebidding is under process

2 PB01-118 Pringli to Patti Sirhali Road 5.25 247.39 - NCB Post Awarded on 24.12.14

Recently Allotted

3 PB04-019 Sirhind Morinda Road (MDR-31) to Merran 1.60 90.90 76.69 NCB Post Awarded on

10.11.2014Recently Allotted

4

PB05-064

NH-95 (Ludhiana-Ferozepur) Km.122.00 to

Basti Bhattian1.37 59.73

356.47 NCB Post Awarded on 07.11.2014

Recently Allotted

5 Dulchi ke to Kamale Wala 1.65 79.47 Recently Allotted

6 FZR City to Habibke 3.66 273.94 Recently Allotted

7PB05-068

Mamot to Saide Ke Naul 4.50 199.17255.46 NCB Post Awarded on

04.11.2014

Recently Allotted

8 Khai Mamdot Road to Tarran Wali 2.00 68.06 Recently

Allotted

9 PB07-029 Tanda Dholwaha Road (Km 3) to Harijan Abadi Jhawan 1.80 100.98 84.62 NCB Post Awarded on

07.11.2014Recently Allotted

10 PB07-034Hoshiarpur Una Road SH-22

Km No 17 to Bullanwari Road

1.66 73.79 66.94 NCB Post Awarded on 07.11.2014

Recently Allotted

11 PB07-036 Tanda Gardhiwala Road to Kotli 2.00 87.01 67.89 NCB Post Awarded on

07.11.2014Recently Allotted

12 PB07-041 Unchi Bassi to Fatehgarh 1.97 111.15 87.59 NCB Post Awarded on 07.11.2014

Recently Allotted

13 PB10-069ODR-13 (Ludhiana Pakhowal Road) to

Thakarwal1.81 99.92

88.13 NCB Post Awarded on 07.11.2014

Recently Allotted

14

PB10-084

Gopalpur to Rattangarh Mattewara Road (T-03) 4.11 215.20

435.92 NCB Post Awarded on 13.11.2014

Recently Allotted

15Kadiana Khurd to

Rattangarh Mattewara Road (T-03)

3.51 142.14Recently Allotted

16Bonkar Gujjran to

Rattangarh Mattewara Road (T-03)

2.23 116.67Recently Allotted

17 PB12-018NH-95 (Ldh.- Fzr Road) RD 58.20 Km to Kapure upto

B.B.8.10 418.00

380.18 NCB Post Awarded on 07.11.2014

Recently Allotted

18 PB15-035 Shambhu Ghanour Road to Kami Khurd 5.40 377.37 324.29 NCB Post Awarded on

12.11.2014Recently Allotted

19 PB15-060 Nabha Gobindgarh Road to Sahoi 1.40 209.41 187.95 NCB Post Awarded on

10.11.2014Recently Allotted

20 PB15-061 Nabha Malerkotla Road to Godian 7.83 527.91 383.03 NCB Post Awarded on

10.11.2014Recently Allotted

21PB15-062

Toderwal Bir Dosanj road to Tanda Bada Bridge 1.00 78.28

452.99 NCB Post Awarded on 10.11.2014

Recently Allotted

22 Saluwal to Nabha Bir Dosanj Udha Bridge 8.30 490.26

23 PB16-025 RGN Road Km 54 to Brahmpur upper and lower 2.90 152.58 151.96 NCB Post Awarded on

26.11.2014 Recently Allotted

24 PB17-071 Kauhrian to Ubhe 4.00 218.13 189.01 NCB Post Awarded on 21.11.2014

Recently Allotted

25 PB05-046 MB

T-05 (Km 25.50) to Wara Pohwindia 10.60 576.06 553.34 NCB Post Awarded on

18.11.2014Recently Allotted

26 PB06-055 MB

Shri Hargobindpur Road to Masania 1.60 78.25 61.98 NCB Post Awarded on

18.11.2014Recently Allotted

27 PB06-073 MB

Pathankot Madhopur Road to Mudhe 3.65 165.08 151.25 NCB Post Awarded on

21.11.2014Recently Allotted

28 PB06-074 MB

Mamoon Madhopur (Defence Road) Tharial 2.53 116.96 105.17 NCB Post Awarded on

21.11.2014Recently Allotted

29 PB08-045 MB Mehsampur to Mehatpur 8.01 402.87 372.67 NCB Post Awarded on

18.11.2014Recently Allotted

30 PB09-020 MB

Kartarpur-Kapurthala Kala Sanghian Road (MDR-48) to

Bishanpur2.25 116.58 98.15 NCB Post Awarded on

18.11.2014Recently Allotted

31 PB09-022 MB

Kapurthala-Jalandhar (MDR 52) to Sidh Wazir 4.50 196.61 166.39 NCB Post Awarded on

07.11.2014Recently Allotted

32 PB10-064 MB Majra Rohoun to Rahoun 2.25 114.05 111.07 NCB Post Awarded on

07.11.2014Recently Allotted

33 PB10-065 MB

Devinagar (Malakpur) to Rauni 4.70 236.95 231.89 NCB Post Awarded on

07.11.2014Recently Allotted

34 PB10-083 MB Johla to MDR-51 5.95 291.82 308.42 NCB Post Awarded on

07.11.2014Recently Allotted

35 PB11-028 MB Vare to Mandali 6.00 267.16 266.86 NCB Post Awarded on

21.11.2014Recently Allotted

36 PB12-026 MB

ODR-08 (RD 0.55 Km) to Manawan 4.89 282.07 291.64 NCB Post Awarded on

07.11.2014Recently Allotted

37 PB12-031 MB

Moga Kotkapura Road SH-16 (RD 24.50 Km) to Lande 9.10 449.09 456.77 NCB Post Awarded on

07.11.2014Recently Allotted

38 PB13-041 MB

Akalgarh to MDR-43 (MKS-JBD Road RD 11.20 Km) 4.14 195.40 186.64 NCB Post Awarded on

21.11.2014Recently Allotted

39 PB13-044 MB Singhewala to Fatuhiwala 1.40 55.99 55.88 NCB Post Awarded on

21.11.2014Recently Allotted

40 PB-14-018 MB

Mahilpur Behram Road to Cheta 4.55 180.32 164.77 NCB Post Awarded on

21.11.2014Recently Allotted

41 PB15-040 MB

Rohar Jangir Road to Mehmoodpur Roorki 3.48 207.16

314.16 NCB Post Awarded on 07.11.2014

Recently Allotted

42 Patiala Pehwoa Road to Sadiqpur Veeran 1.90 118.01 Recently

Allotted

43 PB15-044 MB

Patiala Sangrur Road to Ranbir Pura 3.00 169.31 154.82 NCB Post Awarded on

13.11.14Recently Allotted

44PB15-050

MB

Patiala Samana Gulha road to Bathoi Kalan 2.00 92.62

184.85 NCB Post Awarded on 13.11.2014

Recently Allotted

45 Patiala Samana Gulha road to Jalah Khera 1.50 61.11 Recently

Allotted

46 Patiala Samana Gulha road to Khusropur 1.01 51.12 Recently

Allotted

47 PB15-058 MB

Samana Patran Road to Kakrala 1.50 75.88 72.10 NCB Post Awarded on

13.11.2014Recently Allotted

48 PB15-046 MB

Ambala Chandigarh Road to Jawaharpur 1.30 99.74 97.37 NCB Post Awarded on

07.11.2014Recently Allotted

Total 173.46 9231.44

8209.83

Procurement plan with Method & Time Schedule -- for GOODS

Sr.No

Reference Package

No.Contract (Description)

Nos/ Quanti

ty

Estimated Cost (in ₹

million)

Procurement Metho

d

Review by

Bank (Prior/ Post)*

Expected Bid

Opening

Date

Comments

* First Contract of each State will be subject to prior review by the BankPunjab : Goods

1

Approved by NRRDA vide

its e-mail dated

13th July, 2013

Total Station 1

10.55 NCB post Oct 31, 2014

The letter of

Acceptance stands issued to

M/s Survey

Engineering &

Instruments

Factory, Ambala on Dec

26, 2014.

Auto Level 10Cone Penetrometer 10

NQBL Calibration Standard IS sieves of 45 cm dia with 10 specified sieves as per IS :460

(1985)10

NABL Calibration Standard IS sieves of 20 cm dia with 10 specified sieves as per IS :460

(1985)10

NQBL accredited Laboratory Balance Capacity 5 Kg 10

NQBL accredited Laboratory Electronic Oven Digital indicator 50 degree to 250 degree 10

Sand Pouring Cylinder Apparatus 10Compaction Test for light compaction 10Compaction Test for Heavy compaction 10

Laboratory CBR test Apparatus electronic 10Aggregate Impact tester 10

NABL digital display compression testing machine 2000 KN 10

Iron Moulds 150 MM X 150 MM 10MERLIN 10

Concrete Test Hammer 10

Bump Integrator (CRRI design)3

2

Approved by NRRDA vide its File No.

17029/1/2006/P-III dated 12th Nov,

2014

Desktops with all the necessary accessories 25

1.45 Shopping Post Jan 30,

2015Laptops 5

Printers 25

Procurement plan with Method & Time Schedule -- for SERVICES

Cont

ract

Agr

. N

o.

Cont

ract

D

escr

ipti

on

Nam

e of

the

Co

nsul

tant

Cont

ract

Pr

ice

Proc

urem

ent

Met

hod

Revi

ew b

y Ba

nk (

Yes

/ N

o)

WB

NO

to

the

awar

d of

Co

ntra

ctD

ate

of

Awar

d of

Co

ntra

ctD

ate

of S

tart

of

As

sign

men

tCo

mpl

etio

n D

ate

Com

men

ts

1 of

201

4-15

External Audit (Statutory Audit) of Program Implementing Units (PIUs) and SRRDA located in the State of Punjab for the Financial Year 2013-14 to 2015-16.

M/s R. K. Deepak & Co., Chandigarh

₹ 2,

42,1

36

QCBS Post --

23-Ju

l-14

23-Ju

l-14

31-O

ct-1

6

The Contract Agreement

with M/s R. K. Deepak & Co.,

Chandigarh has been

signed on Jul 23, 2014.

Undertaking Internal Audit on half yearly basis for the financial year 2014-15 and 2015-16 of the State Rural Roads Development Agency office at Mohali and at Seventeen (17) Program Implementing Units (PIUs) at different locations in the state of Punjab

--- ₹

300

,000

(ind

icativ

e)

QCBS Post --

31-M

ar-1

5 (in

dica

tive)

31-M

ar-1

5 (in

dica

tive)

--

The Request For Proposal

(RFP) document is

being finalized for issuance to the shortlisted

CA firms.


Recommended