Page 1: · Web viewPresently EMD Diesel Loco shed, UBL is maintaining 201 locos with the staff sanction for 150 Locos. Staffs are facing difficulty to maintain. So this union requests the

Page 1 of 35

Page 2: · Web viewPresently EMD Diesel Loco shed, UBL is maintaining 201 locos with the staff sanction for 150 Locos. Staffs are facing difficulty to maintain. So this union requests the

INDEX OF 36TH PNM AGENDA ITEMS

Agenda No Pertaining to Page No Remarks1a CMS, RBA 51b CMS 51c DMM 52a Sr.DEN/E 52b Sr.DEN/E 53 Sr.DEN/E 54 Sr.DOM, Sr.DEN/E 65 Sr.DSTE 66 CMS, Sr.DEN/C or Hq 67 Sr.DPO, Sr.DSTE 68 Sr.DPO, Sr.DSTE 7

9a&b Sr.DME/C&W, Sr.DPO 79c Sr.DME/C&W, DMM 710 Sr.DME/C&W 711 Sr.DCM, DEE 712 Sr.DCM 713 DEE 814 Sr.DEN/C, Sr.DPO 815 Sr.DME/DSL, Sr.DPO 816 Sr.DME/DSL, Sr.DPO 817 Sr.DPO 818 Sr.DCM 919 Sr.DME/C&W, Sr.DEN/E 920 Sr.DOM, DEE 921 Sr.DOM, DEE 922 Sr.DEN/W, Sr.DPO 923a Sr.DME/C&W, Sr.DPO 1023b Sr.DEN/W, Sr.DPO 1024 Sr.DEN/W 1025 Sr.DEN/W 1026 Sr.DEN/W, Sr.DPO 1027 Sr.DEN/W, Sr.DPO, Sr.DSTE, DEE, DMM 10

28 Sr.DME/P, Sr.DEN/Co-ord, Sr.DPO, Sr.DSTE, DEE, DMM 11

29 Sr.DME/C&W, Sr.DEN/C 1130a Sr.DEN/W, Sr.DPO 1230b Sr.DEN/W 1230c Sr.DEN/W, Sr.DPO 1230d All BOS & Sr.DPO 12

Page 2 of 35

Page 3: · Web viewPresently EMD Diesel Loco shed, UBL is maintaining 201 locos with the staff sanction for 150 Locos. Staffs are facing difficulty to maintain. So this union requests the

INDEX for 36th PNM AGENDA Subjects

INDEX for Review Subjects No of Agenda items

No of Review items

Sl.No

Officer Concern 36th PNM Agenda subjects (Page No)

Review Item Nos & Pg Nos Pending Closed Pending Closed

1 Sr.DEN/Co-ord 28 (11), 30d (12) 6a/34(18), 2 1

2 Sr.DEN/C 6(6), 14(18), 29(11), 16/35(15), 27/35(17), 28/33(22), 28/28(31), 26/10(33),

3 5

3 Sr.DEN/E 2a(5), 2b(5), 3(5), 4(6), 19(9)

8/35, 9/35(14), 21/35(15), 22/35, 22a/35(16), 17/34(19), 18/34(20), 22/34(20), 16/33(21), 17/33(22), 12/32(25), 13/32(25), 17/32(25), 31/01(26), 30/14(28), 30a/28(29), 30c/28(29), 26/06(32), 25/19(34)

5 19

4 Sr.DEN/W 22(9), 23b(10), 24, 25, 26, 27(10), 30(12), 30b(12), 30c(12), 30d(12)

1/35, 2/35, 4/35, 5/35(13), 28/35(17), 29/35(17), 5/34(18), 11/33(19), 1/32(23), 31/28(27), 28//13(31), 26/28(34), 23/12(34)

10 13

5 DEN/HQ 6(6) 10/35(14), 8/34(18), 18/32(26), 26/09(32) 1 4

6 Sr.DME/P 28(11) 1/34(17), 20/34(20), 20/33(22), 9/32(24), 1 4

7 Sr.DME/DSL 15, 16 (8), 13/35(15), 31/07(27), 2 2

8 Sr.DME/C&W 9 a b c (7), 10(7), 19(9), 23a(10) 29(11)

11/35(14), 3b/32(24), 30a/28(29), 28/07(30),

7 4

9 Sr. DSTE 5(6), 7(6), 8(7), 27(10), 28(11)

12/35(15), 5/34(18), 6a/34(18), 27/32(26), 30/14(28),

5 5

10 DEE 11(7), 13(8), 20(9), 21(9), 27(10), 28(11)

1/35(13), 22/35, 22a/35(16), 13/34(19), 7/32(24), 14/32(25), 18/32(26), 17/02(35)

6 8

11 DMM 1c(5), 9c(7), 27(10) 3 0

12 Sr.DOM 4(6), 20(9), 21(9) 3/35(13), 26a/35(17), 1/34(17), 2/34(18), 6b/34(18), 11/34(19), 13/34(19), 18/34(20), 12/33(21), 17/33(21), 13/32(25), 31/01(26),

3 12

13 Sr.DCM 11(7), 12(7), 18(9) 10/35(14), 20/35(15), 29/35(17), 29/33(23), 28/28(31),

3 5

14 DSC/RPF 21/35(15), 0 1

15 CMS 1a(5), 1b(5), 6(6) 30/09(28), 28/04(29), 3 216 Sr.DFM 0 0

17 Sr.DPO 7(6), 8, 9ab(7), 14, 15, 16, 17(8), 22(9), 23a, 23b, 26, 27(10), 28(11), 30a, 30c, 30d(12)

12/35, 13/35(15), 23/35(16), 26a/35(17), 28/35(17), 2/34(18), 11/34(19), 12/33(21), 17/33(21), 13/32(25), 28/17(30), 26/04(31), 26/09(32),

17 13

19 RBA 1a(5) 1 0

No of Agenda Items - 30No of Review items - 70

Page 3 of 35

Page 4: · Web viewPresently EMD Diesel Loco shed, UBL is maintaining 201 locos with the staff sanction for 150 Locos. Staffs are facing difficulty to maintain. So this union requests the

INDEX for 35TH PNM Review Items Sl.N

o Review Sub No Pertaining to Page No Remarks

1 1/35 Sr.DEN/West , DEE 132 2/35 Sr.DEN/West 133 3/35 Sr.DOM 134 4/35 Sr.DEN/West 135 5/35 Sr.DEN/West 136 8/35 Sr.DEN/East 147 9/35 Sr.DEN/East 148 10/35 Sr.DCM, DEN/HQ 149 11/35 Sr.DME/C&W 14

10 12/35 Sr. DSTE, Sr.DPO (E) 1511 13/35 Sr.DME/DSL, Sr.DPO (M) 1512 16/35 Sr.DEN/C 1513 20/35 Sr.DCM 1514 21/35 Sr.DEN/East, DSC/RPF 1515 22/35 Sr.DEN/East, DEE 1616 22a/35 Sr.DEN/East, DEE 1617 23/35 Sr.DPO (E) 1618 26a/35 Sr.DOM, Sr.DPO 1719 27/35 Sr.DEN/C 1720 28/35 Sr.DEN/West, Sr.DPO (T) 1721 29/35 Sr.DCM, Sr.DEN/W 1722 1/34 Sr.DOM, Sr.DME/P 1723 2/34 Sr. DOM, Sr.DPO 1824 5/34 Sr.DEN/W, Sr. DSTE/M 1825 6a/34 Sr. DSTE, Sr.DEN/Co-ord 18

6b/34 Sr.DOM 1826 8/34 DEN/HQ 1827 11/34 Sr.DEN/W, Sr.DOM, Sr.DPO 1928 13/34 DEE, Sr.DOM 1929 17/34 Sr.DEN/E 1930 18/34 Sr.DEN/E, Sr.DOM 2031 20/34 Sr.DME/P 2032 22/34 Sr.DEN/E, Sr.DPO 2034 12/33 Sr.DOM, Sr. DPO (APO/T) 2135 16/33 Sr.DEN/E 2136 17/33 Sr.DOM, Sr. DPO (APO/T) 2137 19/33 Sr.DEN/E 2238 20/33 Sr.DME/P 2239 28/33 Sr.DEN/C 2240 29/33 Sr.DCM 2341 1/32 Sr.DEN/W 2342 3/32 Sr.DME/C&W (3b/32) 2443 7/32 DEE 2444 9/32 Sr.DME/P 2445 12/32 Sr.DEN/E 2546 13/32 Sr.DOM, Sr.DPO 2547 14/32 DEE 2548 17/32 Sr.DEN/E 2549 18/32 DEN/HQ, DEE 2650 27/32 Sr. DSTE 2651 31/01 Sr.DEN/E, Sr.DOM 2652 31/07 Sr.DME/DSL 2754 31/28 Sr.DEN/W 2755 30/09 CMS 2856 30/14 Sr. DSTE, Sr.DEN/E 2857 30a/28 Sr.DME/C&W, Sr.DEN/E 29

30c/28 Sr.DEN/E 2958 28/04 CMS 2959 28/07 Sr.DME/C&W 3060 28/17 Sr.DPO 3061 28/13 Sr.DEN/W 3162 28/28 Sr.DCM, Sr.DEN/C 3163 26/04 Sr.DPO 3164 26/06 Sr.DEN/E 3265 26/09 DEN/HQ, Sr.DPO 3266 26/10 Sr.DEN/C 3367 26/28 Sr.DEN/W 3468 25/19 Sr.DEN/E 3469 23/12 Sr.DEN/W 3470 17/02 DEE 35

Page 4 of 35

Page 5: · Web viewPresently EMD Diesel Loco shed, UBL is maintaining 201 locos with the staff sanction for 150 Locos. Staffs are facing difficulty to maintain. So this union requests the

AGENDA FOR 36 th DIVISIONAL PNM MEETING TO BE HELD WITH DRM/ADRM/UBL

Subject No 1a/36 CMS, RBA

Inconvenience faced by employees at BAY Section.

a) At Ballari, when Rajbhasha (Hindi) meeting is conducted ADMO/BAY being the Chairperson has to attend the meeting which will be lasting for three hours and more Patients with various health problems are made to suffer in the absence of Doctors, Therefore, this Union urges the administration to make alternative arrangements by ADMO/BAY.

Subject No 1b/36 CMS

b) The staff of BAY who attend PME at HPT are put into untold hardship due to irregular visit of Sr.DMO/GDG, staff are reaching HPT at 07:00 hours , it is informed that Doctor will be coming train No.57273 Passenger. There were many occasions when doctor doesn’t turn up by the said train and his visit to HPT becomes uncertain. Therefore the staff has to return to their HQrs and will attend in next week. Hence, this Union demands to take remedial action by posting Sr.DMO at HPT who can conduct PME.

Subject No 1c/36 DMM

c) Uniform was supplied in the year 2015, now, it is learnt that, instructions were given to all Supervisors to submit the size of pant & shirt of each employee. In the past,it was seen uniforms (readymade) which were received were unsize. Therefore, this Union demands to continue the existing practice of supplying cloth with stitching charges.

Subject No 2a/36 Sr.DEN/E

Problems of Engineering Staff at Ballari.

a) At BAY Trackman, while working, they will be plunged with dust which is health hazardous, also soap to be supplied and at present an amount of Rs.450/- paid for purchase of shoes for trackman. The amount paid is not sufficient to purchase good quality shoes. Hence, this Union demands to supply masks, soap and good & branded shoe which will protect the employees from health hazards.

Subject No 2b/36 Sr.DEN/E

b) At BAY the trackman are made to carry Jack which is weighing around 25 kgs to a length of 6 kms daily which is very difficult to carry. Hence, this Union demands to provide hydraulic jack which is less in weight or with some remedy.

Subject No 3/36 Sr.DEN/E

Insufficient Water Supply at Ballari Railway Colony.The water supply at BAY Railway Colony from Municipal Corporation is not sufficient and they are supplying water once in 15 days. With this supplied water they are not in a position to meet minimum requirement and this problem became perennial. Hence, this union demands the administration to pursue this issue with concerned authorities of Municipal Corporation to enhance the quantity of water to avoid the crisis faced by the colony people until alternative arrangements.

Page 5 of 35

Page 6: · Web viewPresently EMD Diesel Loco shed, UBL is maintaining 201 locos with the staff sanction for 150 Locos. Staffs are facing difficulty to maintain. So this union requests the

Subject No 4/36 Sr.DOM, Sr.DEN/E

Problems faced by staffs at Nandihalli Station.On the demand of JSWT separate siding was provided and also a station was built namely Nandihalli station for want of take off to facilitate the loading of iron ore from Nandihalli JSWT siding (NJWS). Safety and safe working condition of employees is not taken care.

There is no approach road to station; staffs are facing untold hardship to reach the station to attend their duties. This area is plunged into thick forest and hills, known for wild animals moving in & around the station. In recent past, it also appeared in print & electronic media that Cheetah (Leopard) menace has created unrest & alarm in this location. The Bheemanagundi tunnel is attached to the station, staffs are required to pass through the tunnel to discharge their duties which is unsafe to work in this place since there is no minimum facilities provided even lighting is not provided in the tunnel, staffs working at station are put into untold difficulties specially during summer season due to erratic power supply since power supply is available only 8 hrs in a day.

Hence, this Union demands immediately to discuss with JSWT and arrange one four wheeler to the station staff so that they can be protected from any untoward incidents. An approach road has to be provided, lighting has to be provided in the tunnel and also get express feeder/Niranthara Jyothi immediately.

Subject No 5/36 Sr.DSTE

Problems of S&T Staff at Ballari.

Staffs are deployed for attending failures after duty hours in emergency and even in night times they are forced to attend. Hence, this Union demands to pay Over Time (O.T) allowance when they are working beyond duty hours.

Subject No 6/36 CMS, Sr.DEN/Hq

Sub No 6: Earmarking/Construction of Toilet particularly for Pharmacists at CH/UBL.

At CH/UBL, the causality is functioning round the clock and providing service/treatment to patients. The Pharmacists who are performing duty are supposed to use common toilets of CH/UBL. Therefore, this Union requests the administration to earmark any one of the toilet particularly for Pharmacists/Causality or a separate toilet may be constructed.

Subject No 7/36 Sr.DPO, Sr.DSTE

Sub No 7: Posting of Clerical Staff at SSE/Sig/M/O/UBL and Sr.DSTE Office.

Shri.Puttaraju, Jr.Clerk who is presently working in SSE/Sig/M/O/UBL and Shri.Iranna Kashiappa, Jr.Clerk working at Sr.DSTE/M/O/UBL has been posted to SSE/Sig/M/O/UBL. Shri.Iranna Kashiappa is physically handicapped & partially blind and is unable cross the rails in old loco shed area, Therefore, this Union requests to post some other clerical staff in place of Shri.Iranna Kashiappa and he may be shifted to Sr.DSTE/M/O/UBL to avoid inconvenience to this physically handicapped employee.

Page 6 of 35

Page 7: · Web viewPresently EMD Diesel Loco shed, UBL is maintaining 201 locos with the staff sanction for 150 Locos. Staffs are facing difficulty to maintain. So this union requests the

Subject No 8/36 Sr.DPO, Sr.DSTE

Increasing of Staff Strength of S&T Dept due to doubling of assets.

Due to doubling, the assets of S&T department have increased but till date staff strength remains the same by which it has become difficult for the existing staff to perform duties without availing proper rest. Therefore, this Union urges the administration to post additional staff as per the increased workload.

Subject No 9a&b/36 Sr.DME/C&W, Sr.DPO

Increasing of Staff Strength of C&W/UBL & Supply of Shoes & Raincoats.a) No of trains are increasing day by day and the staff strength is not increased, the existing staff are finding

difficulty to manage the workload i.e. maintaining, watering, under-gear and rolling examination with the platform. Therefore, this Union urges to increase/sanction additional staff of 25 staff per batch for safe and smooth running of trains.

b) In order to check through under gear and other check in coaching yard since no of trains are increased it is very difficult to maintain the train with existing staff. Therefore, this union urges to increase the strength of staff to 20/22 staff to carry out safe through check & smooth running of trains.

Subject No 9c/36 Sr.DME/C&W, DMM

c) Supply of Shoes & Raincoats to C&W Staff of Coaching Yard & Station: Since rainy season is approaching very fast, this Union urges the administration to supply shoes and rain coats to C&W Staff of coaching yard and station to ensure proper safety of staff during rainy season.

Subject No 10/36 Sr.DME/C&W

Regular supply of Aluminium Tower Bolts to C&W/UBL.

On arrival of Tr.No.16591/16592 (Hampi Exp), it was noticed that Aluminium Tower Bolts were found missing and staff are facing lot of problems in replacing the same due to shortage of stock/no supply from GSD/UBL. Passengers are complaining frequently regarding this problem. Therefore, this Union urges the administration to supply Aluminium Tower Bolts regularly to avoid complaints from passengers and embarrassment to the Railways.

Subject No 11/36 Sr.DCM, DEE

Sub No.11: Shifting of Generator attached to Parcel Office/BAY.

At BAY, Staff working in Parcel office are facing problems due to generator sound when it is on it generates huge sound by which staff are not able to receive any phone calls and also not able to interact on phone even with customers who come for booking/delivery of parcels. Hence, this Union urges the administration to shift the generator which is attached with Parcel office/BAY to avoid problems faced by the parcel office staff.

Subject No 12/36 Sr.DCM

Sub No.12: Provision of Aluminium Ladder for Parcel Office/BAY.

At BAY Parcel Office luggage porters are put into untold hardships while sealing brake van almost every train whether it is loading & unloading they have to seal the brake van specially while, sealing at off side they are put into high risk of life. Hence, this Union demands to provide Aluminium ladder which will be convenient & safe while sealing the brake van.

Page 7 of 35

Page 8: · Web viewPresently EMD Diesel Loco shed, UBL is maintaining 201 locos with the staff sanction for 150 Locos. Staffs are facing difficulty to maintain. So this union requests the

Subject No 13/36 DEE

Sub No.13: Separate Ladies Room for Electrical (TL) Staff at Coaching Yard.

At SSE/E/TLD/UBL, there are 16 no. of ladies staff working in yard for train lighting maintenance, but they don’t have any separate ladies rest room for changing and keeping their required belongings at the time of their duty. Therefore, this Union urges the administration to allot separate ladies room for Electrical (TL) staff at coaching yard.

Subject No 14/36 Sr.DEN/C, Sr.DPO Sub No.14: Wrong Booking of Keyman in Civil Engineering Department in UBL Division.

In UBL Division Civil Engineering department there is a post of Keyman GP.4200/- whereas GP.1800/- Gangman are utilized as Keyman and they are being punished. But there are GP.2400/- Gangman are available in all the units but they are booked as Keyman and GP.1800/- Gangman are booked as Keyman and punished for any fault and they are going to the next grade which is highly irregular.

For example Shri.Salim Bellary, GP.1800/- Gangman is booked as Keyman and suspended for a small mistake happened in his absence and suspended and called for enquiry and waiting for promotion. Being a sincere employee carried out the Supervisors order and worked as Keyman and no fault of him he is placed under suspension and his promotion is held up. Hence, this Union urges to set right this irregularity in Civil Engineering department.

Subject No 15/36 Sr.DME/Dsl, Sr.DPO

Sub No.15: Allotment of Railway Quarters for staff of EMD Diesel Shed.

There is a continuous demand for Railway Quarters of Type-I, Type-II, Type-III & Type-IV, since a number of employees are appointed in EMD Diesel Shed are from RRB & Compassionate Grounds, most of them are from distant places.EMD Shed staff are struggling to get Rly.Qtrs. though the employees have been waiting for years together.Hence, this urges the administration to allot some quarters of all types from upcoming Railway qtrs. from almost all the areas i.e, Brook Road, New Vinobhanagar,Rail Nagar.

Subject No 16/36 Sr.DME/Dsl, Sr.DPO

Sub No.16: Filling up vacancies of Tech-III at EMD Shed through PQ & LDCE quota.

There are 10 vacancies in Tech-III (Mech Wing) including the 19 sliding vacancy, totally 29 vacancies in Tech-III (Mech Wing). There are approximately 134 staff in Helper grade in EMD Shed without any promotion, about 23 staff have completed more than 10 years service in the same bottom grade itself. Hence, this Union urges the administration to fill all the vacancies of Tech-III immediately through PQ & LDCE.

Subject No 17/36 Sr.DPO

Sub No.17: Provision of Office accommodation for branches of SWRMU/UBL Division. Following branches of SWRMU - UBL Division is functioning without branch office accommodation.

1. EMD Diesel Shed Branch. 2. Loco & Traffic Running Staff (LTRS) Branch.3. Station Branch. 4. Medical Branch.5. VSG Branch ( Room besides existing office which is vacant may be allotted to SWRMU/VSG branch)

Page 8 of 35

Page 9: · Web viewPresently EMD Diesel Loco shed, UBL is maintaining 201 locos with the staff sanction for 150 Locos. Staffs are facing difficulty to maintain. So this union requests the

Till date, there is no proper accommodation provided by the administration for conducting branch level meetings and to conduct other union activities. This Union being single union in this Railway has to attended staff grievances at workspot/depots etc., it is very essential to provide office for this Union. Therefore, this Union urges to provide office accommodation to the above said branches of SWRMU/UBL division immediately.

Subject No 18/36 Sr.DCM

Sub No.18: Provision of Office accommodation for Comml.Staff at BMM/Siding/MBIV/VC

Presently there is no proper office accommodation at BMM siding for Commercial staff. In the existing weighbridge the staffs are accommodated. There is no proper place for sitting two on duty persons in the present office. As the weigh bridge is being shared by BMM weighbridge staff and railway commercial staff. There is no security for FOIS equipment, books and records. There is no toilet and drinking water facility at the existing office only a can of 20 ltrs water is supplied by BMM Company for drinking and other all purposes. Hence this Union urges the administration to kindly arrange to provide Commercial office and toilets at the BMM siding.

Subject No 19/36 Sr.DME/C&W, Sr.DEN/E

Sub No.19: Provision of Pathway in the HPT Yard.

At HPT yard as there is no proper way to attend for C&W Staff This Union urges the administration to provide a pathway between the Road No.8-9, 9-10, 10-11 and 11-12.

Subject No 20/36 Sr.DOM, DEE

Sub No.20: Provision of High Mast light in the TNGL yard towards BAY end.

Whenever the formations are kept waiting in the yard for LC etc., for long duration the Brake Van is left at very far end when there is no light and pitch dark. Hence, this Union urges the administration to provide a high mast light at the BAY end of TNGL yard.

Subject No 21/36 Sr.DOM, DEE

Sub No.21: Provision of Air Coolers, Revolving Chairs for SS/HPT, Dy.SS/PF/HPT, Yard Master & 4 Cabins.

Due to increasing temperature it is very hot and inconvenient for staffs to work at SS/O/HPT, Dy.SS/O/PF/HPT, Yard Master Office and 4 Cabins. Therefore, this Union urges the administration to provide Air coolers & Revolving Chairs for all the above said operating offices of HPT.

Subject No 22/36 Sr.DEN/W, Sr.DPO

Sub No.22: LC Gate No.25 between CSM - MJU.

Traffic LC Gate 25 situated near CSM (Cansaulim) Station between CSM-MJU, staffs are working 72 hrs roster. This Union urges to immediately conduct job analysis since road vehicle traffic has increased in many folds.

Page 9 of 35

Page 10: · Web viewPresently EMD Diesel Loco shed, UBL is maintaining 201 locos with the staff sanction for 150 Locos. Staffs are facing difficulty to maintain. So this union requests the

Subject No 23a/36 Sr.DME/C&W, Sr.DPO

a) Filling up of vacancies in CDO/C&W/VSG.

a) Carpenter: 2 Carpenters transferred to UBL on 4.4.2013.b) Trimmer : Retired on 30.11.2013.c) Painter : transferred to UBL on 22.01.2015.d) Welder : 1 vacancy.

Till date, the above said vacancies are not filled by the administration. This Union urges to fill up the vacancies immediately.

Subject No 23b/36 Sr.DEN/W, Sr.DPO

b) Filling up vacancies of SSE/W/VSG.

Since one year the post of SSE/W post is vacant at VSG, only a single JE is managing VSG-QLM, which is a major section and in addition CLR depot also and often visiting Colva Holiday Home. Due to heavy workload lots of work like Qtrs. repairs etc. is pending. This Union urges to fill the vacancy of SSE/W/VSG immediately.

Subject No 24/36 Sr.DEN/W Sub No.24: Roof Leakage at Block No.66/VSG.

Rook Leakage of block No.66/VSG 1st Floor E to H (4 Qtrs) leaking very badly during monsoon season. This Union urges the administration to provide water proofing or AC sheets immediately.

Subject No 25/36 Sr.DEN/W

Sub No.25: QLM natural source water problem.

From QLM Station to natural source river distance is 4.5 kms and from river 1.5 km there is no pipe connection due to this always staffs from VSG are attending to clean the dry leaves and mud which always blocks the water flowing path. This Union urges to provide 1.5kms 4 inch GI pipe to solve the water problem QLM station, Rly Qtrs & Running Room.

Subject No 26/36 Sr.DEN/W, Sr.DPO

Sub No.26: New Roster for Points man of Kulem (KM) Station.

On 14.11.2011, ADEN/CLR, SSE/W/VSG conducted joint inspection and declared that all Qtrs are in damaged condition and beyond repairs limit and also unfit for human occupation, due to this all the Pointsman are without Qtrs. Hence, this Union urges the administration for new roster with WR & R for all Pointsman.

Subject No 27/36 Sr.DEN/W, Sr.DPO, Sr.DSTE, DEE, DMM

Sub No.27: Staff Grievances and Basic Amenities to staff of CLR/LD Section.a) LD Electrical Pump house building and river bed buildings are totally damaged and needs urgent repairs.b) Pathway from HU/LD to Electrical Substation LD is required.c) At CLR, Loco Shed area, Rly Qtrs. No.123/A to 123/H block Doors and Windows are in decayed

condition and some toilet rooms, walls are in cracked condition, to be repaired immediately.

Page 10 of 35

Page 11: · Web viewPresently EMD Diesel Loco shed, UBL is maintaining 201 locos with the staff sanction for 150 Locos. Staffs are facing difficulty to maintain. So this union requests the

d) At HU/CLR, doors & windows are in decayed condition. This Union urges to replace with new ones and painting done at HU/CLR some eight years ago needs painting.

e) Behind the station at CLR, two wheeler parking is required for the staff vehicles parking.f) Requirement of posting of additional staff in Ghat section at S&T department and request for formulation

transfer policies like other department in Ghat section.g) Allotment of additional Rly.Qtrs for S&T pool at CLR.h) Provision of Rest Room at Doodhsagar Station for ESM Staff who attend night failures.i) R.O Drinking water system in CLR Section for staff.j) Shoes to CLR/LD Electrical Staff to be provided immediately.Hence This Union urges the administration to take action on the above said grievances immediately.

Subject No 28/36 Sr.DME/P, Sr.DEN/Co-ord, Sr.DPO, Sr.DSTE, DEE, DMM

Sub No.28: Problems of Running Staff over UBL Division.

k) Provide a rest room with auto phone in platform & yard for SHR’s, so that they can take rest whenever there is no shunting and they can keep their belongings safely and loco reversers with them and the YM can easily contact the SHR’s through auto phone instead of VHF and instruct the shunting movements.

l) At UBL yard towards GDG end there is no proper pathway and lighting arrangements to walk from platform to marshalling yard. The staffs has to cross the rails and go to take over charge of train/loco’s which is very unsafe particularly in rainy season. The Union urges to take necessary action to provide the same.

m) Taking over and handing over of Walkie Talkies in UBL lobby, is leading to damaging the sets which was already damaged and removing and replacing of battery after every trip makes the contact tips in handsets slack and broken. Hence, this Union urges the administration to procure sufficient number of Walkie Talkies sets/spare batteries and issue to individual LP’s/SHR’s, as it was earlier to avoid unsafe working.

n) Provision of rest room at DWR: The existing rest room at DWR is far way from station and it is maintained very poorly and it is unsafe to walk so far in the dark. Hence, the Union urges the administration to provide rest room in the DWR platform itself as it is in LD and change the linens regularly.

o) Provision of Drinking water at HPT/Lobby & CPRC/O/UBL: It is noticed that there is no drinking water provision at HPT/Lobby and CPRC/O/UBL, staffs are working round the clock and it is very much essential. The Union urges to take necessary action to provide the same.

p) Sending of Crew Pilot to LD by Tr.No.56921 instead of Tr.No.17305: Nowadays, mail/express crew are sending pilot to LD by Tr.No.17305 to work Tr.No.12780 This Union urges to take necessary action to send the crew pilot to LD by Tr.No.56921 to work the above said train, so that crew can avail extra rest at HQ.

q) Mileage not granted for BJP crew for attending PME.r) Shunting mileage/short trip duty mileage/through working mileage not generating while signing off

through CRIS.

Subject No 29/36 Sr.DME/C&W, Sr.DEN/C

Ladies Toilet at SSE/C&W/O/UBL.The toilet which was available behind SSE/C&W/O/UBL was recently demolished. The ladies are finding difficulty without toilet facilities. Therefore, this Union urges to provide toilet at SSE/C&W/O/UBL immediately.

Page 11 of 35

Page 12: · Web viewPresently EMD Diesel Loco shed, UBL is maintaining 201 locos with the staff sanction for 150 Locos. Staffs are facing difficulty to maintain. So this union requests the

Subject No 30a/36 Sr.DEN/W, Sr.DPO

Problems of Staff faced of BGM Section.a) All way side station quarters of BGM section meant for station staff are older than 50 years and are in a

condemned state and some quarters have already been abandoned. At present all the traffic staff (Gr. D) are eligible for Type-II quarters. This Union urges to build new quarters or introduce RLT roster in these stations.

Subject No 30b/36 Sr.DEN/W

Water Filtration Plant for big stations in BGM sectionb) The following stations are having heavy passenger traffic and staff strength in this section without any

proper and hygienic drinking water supply. BGM Railway colonies consist of 197 units, GPB & KUD with 30 plus units. At BGM, the present system of potable water supply is being done by pumping water from an open well which is not even covered are walled. This water is directly pumped into an overhead tank and being supplied to all the quarters without purification. This is totally unhygienic and leads to communicable diseases spreading among the residents. At GPB, canal water is directly being pumped to OH tank and being supplied to all the quarters. At KUD, Krishna river water is being directly pumped to OH tank without any sort of purification to all the quarters. This Union urges to provide one water purification plant (RO plant) in each of the stations to provide purified water to all the quarters.

Subject No 30c/36 Sr.DEN/W, Sr.DPO

Filling up of vacancy of OS/Stores at KUDc) One post of OS/Stores in SSE/P.Way/KUD is vacant for the last 2 years and not filled up. OS/Stores post

being an important and sensitive one, This Union urges the administration to fill up the vacant post immediately. In ADEN/BGM’s office, the sanctioned post of OS is 1 only. But, there are 3 OS’s working there, 2 OS’s are excess. One willing OS can be shifted to KUD.

Subject No 30d/36 All Branch Officers & Sr.DPO

d) Relieving of Helpers selected against 40%-10% from UBL Division to join UBLS. This subject was discussed with DRM/UBL on several meetings to relieve the employees selected against 40%-10% lateral intake to join UBLS from Engg, C&W and EMD Diesel Shed etc. Till date, after months passed after the order was passed the employees are not relieved. Hence, this Union urges to relieve the selected from various departments of UBL division to join UBLS immediately, with no further delay.

*********

Page 12 of 35

Page 13: · Web viewPresently EMD Diesel Loco shed, UBL is maintaining 201 locos with the staff sanction for 150 Locos. Staffs are facing difficulty to maintain. So this union requests the

MINUTES OF 35 th - DIVISIONAL PNM MEETING WITH SWRMU HELD ON 19 th & 20 th JANUARY-2017

Subject No 1/35 Sr.DEN/W, DEE

Roof leakage at CLR section:Due to leakage problems at CRZ, DDS and LIM and health unit/CLR the old broken roofs should be replaced with new roofs at earliest35th PNM Minutes (19 & 20.01.2017) (a) Mangalore tiles Quarters in good condition, resetting of the mangalore tiles along with the repair of rafter

to be taken up after detailed survey. Survey to be completed by 1.2.2017 and estimate to be processed immediately.

(b) Electrical work side also to be taken up along with the above work.

Subject No 2/35 Sr.DEN/W

Provision of Rly Qtrs Type-II & Type-III and improvement to existing Rly Qtrs:As of now, more than 30 staff are working in SMR/O/LD; none of them are having Railway Qtrs. Hence sufficient number of Rly Qtrs should be constructed and also the existing Rly Qtrs are in bad shape, the street lights are not sufficient and not functioning, the approach road for entire colony should be redone as they are in bad condition. 35th PNM Minutes (19 & 20.01.2017) (a) Size of the rooms constructed by RVNL at LD is very small.(b) Quality for laying of the concrete block is not upto the standard, to be checked. Reference to be made to

RVNL on the above.(c) A small shed near pump house to be made.

Subject No 3/35 Sr.DOM

Rest room to be provided for the Guards and Loco pilots at UGR:Guards and Loco Pilots are staying at platform at Ugar station till loading get over. Hence they required rest room to take rest at UGAR station.35th PNM Minutes (19 & 20.01.2017): Sr.DOM will decide on allotting the vacant room available in the station for utilizing the same by Guards and Loco Pilots at UGR.

Subject No 4/35 Sr.DEN/W

Maintenance of Multistoried Rly Qtrs building and roof leakage at Kudachi:Grills are not provided for the verandah of some Qtrs of multistoried buildings in view of safety of the residents grills to be provided. And in rainy season almost all occupants of Rly Qtrs are facing roof leakage problem. Hence leakage should be arrested before rainy season35th PNM Minutes (19 & 20.01.2017) Inspection will be conducted by SSE/Works/BGM and ADEN/BGM and tender for repairs to roof leakage and provision of grill and any other required item will be called by 15th February 2017.

Subject No 5/35 Sr.DEN/W

Construction of new drainages at Belagavi colonies:The drainage systems provided in colonies at BGM are not in good condition and not having concrete bed so water is stagnated. In approach road of running room there is no way to flow rain water and it is very difficult for

Page 13 of 35

Page 14: · Web viewPresently EMD Diesel Loco shed, UBL is maintaining 201 locos with the staff sanction for 150 Locos. Staffs are facing difficulty to maintain. So this union requests the

the staff of running room and the employees those who are coming to Hospital for treatment. Hence proper drainage systems are to be provided for all sides of colonies at BGM.35th PNM Minutes (19 & 20.01.2017) Tender for repairs to above drain is scheduled to open on 17th February 2017. Work will be taken up after finalization of the tender.

Subject No 8/35 Sr.DEN/E

Poor maintenance of road & drainage and Tools for Track Maintainers at GDG: At Gadag North and South colony roads are damaged and required the attention. North and South Rly Colony drainages are fully damaged immediate attention is required.Remarks: In GDG colony for Type-1 Qtrs. Of 112 units and open drains are constructed with sufficient gradient and width by special agreement in 2015-16. At present for these quarters there is no problem regarding drainage system, for remaining quarters tender has been called.

At GDG, Due to insufficient of tools the track maintainers facing lot of problems to maintain main line and branch line. This union requests the administration to provide the new tools to SSE/P Way/GDG.

35th PNM Minutes (19 & 20.01.2017): P.Way materials such as guage level, etc., has been supplied but shovels are still expected from GSD.

Subject No 9/35 Sr.DEN/E

Provide new RCC roof to Branch office/ SWRMU at GDG: At GDG branch office ACC sheets roof to be replaced with RCC roof. This union requests the administration to provide new RCC roof to Branch office of Mazdoor union at GDG. Since roof is leaking and also looks shabby.35th PNM Minutes (19 & 20.01.2017) Joint inspection will be done by Sr.DEN/East and Representative of SWRMU, before deciding future course of action.

Subject No 10/35 Sr.DCM, DEN/HQ

Providing permanent roofing for courier room in Commercial branch at UBL:In Commercial branch Courier room, leaking badly and it is not safe. During monsoon it is heavily leaking and all the records and furniture is likely to destroy. And in summer staff facing more problems to sit inside the room. This union requests the administration to provide permanent roofing for courier room in Commercial branch.35th PNM Minutes (19 & 20.01.2017) Matter referred to Sr.DEN/C/UBL vide letter No. H/C.694/PNM/SWRMU/36/16 dated 10.10.2016.

Subject No 11/35 Sr.DME/C&W

Problems of Mechanical C&W Branch:At IOH shed of Hubli, there is no proper lighting arrangements and staff are facing lot of problem &At IOH/Box N R shed sufficient staff is not posted causing much problem for the deployed staff and Separate dressing and wash room for ladies to be provided.35th PNM Minutes (19 & 20.01.2017) (a) LED strips are indented for proper lighting arrangements. (b) Once Laundry work is outsourced staff at present in laundry will be shifted to IOH shed.(c) Bio toilet for staff has been commissioned in CLR. After observing its performance, similar toilet can be

introduced especially for ladies staff at UBL also.

Page 14 of 35

Page 15: · Web viewPresently EMD Diesel Loco shed, UBL is maintaining 201 locos with the staff sanction for 150 Locos. Staffs are facing difficulty to maintain. So this union requests the

Subject No 12/35 Sr.DSTE, Sr.DPO

Problems of S&T-Branch:In S&T department all the Ancillary staffs to be merged into one cadre for the staff to get benefit of promotion further implication of yard stick in S&T dept as per SEM and periodical rest for Supervisors also filling up of vacancies, due to increase of assets of S&T dept and doubling work.

35th PNM Minutes (19 & 20.01.2017) A joint meeting with SWRMU representatives shall be convened to arrive at a JPO in order to examine the proposal for merger of Ancillary staff to safety category (ESMs).

Subject No 13/35 Sr.DME/Dsl, Sr.DPO

Sanction of staff for EMD Dsl shed:Presently EMD Diesel Loco shed, UBL is maintaining 201 locos with the staff sanction for 150 Locos. Staffs are facing difficulty to maintain. So this union requests the administration to sanction staff for EMD Dsl Shed.35th PNM Minutes (19 & 20.01.2017) Few ancillary posts will be identified for merger with Artizan posts, thereby increasing the sanction strength.

Subject No 16/35 Sr.DEN/C

At BJP there is no water facility at manual LC gates from BGK to HG: In Tadval Engg Qtrs are not having drainage, toilet facilities and staff are facing difficulties. Hence this union requests to provide water facility to the staff and arrange drainage, toilet facilities.35th PNM Minutes (19 & 20.01.2017) Tender opened on 22.11.2016 and the same will be finalized by 19th February 2017, which will facilitate supply of water through tanker to all LCs where water is not available.

Subject No 20/35 Sr.DCM

At BALLARI HTE facing lot of difficulties in washing the bed sheets and pillow covers etc, which are used for AC, Non AC retiring rooms and dormitory. Since Feb-2016 washing amount to laundry has not paid and they are refusing to wash this will invite public complaints. HTE/BAY complaints that washing amount to be paid by CCI/BAY by number of requests to CCI/BAY but no action is taken. Hence this Union urges to make arrangements for early payment of washing of bed sheets etc.Remarks: Instructed to Sectional Commercial Inspector/BAY to submit the vouchers for recoupment from CCIs imprest35th PNM Minutes (19 & 20.01.2017) A proposal for splitting / additional imprest to be maintained by HTC, at BAY and BJP stations, will be sent to Accounts and the same will be followed up.

Subject No 21/35 Sr.DEN/E, DSC/RPF

At BALLARI staffs staying in Railway colony are facing untold hardships while entering into the colony & going out from the colony due to unauthorized parking of Lorries in very hazard manner and blocking the entrance. This problem was discussed in 30th PNM and the decision was taken to remove the unauthorized parking of Lorries immediately and this exercise was continued for few days to the utter disappointment of the staff staying in colony, but still unauthorized parking of Lorries is continued. This union requests to provide a gate at the entrance and also depute RPF staff to avoid entering of unauthorized Lorries into the Railway colony and also it is requested to provide CCTV Cameras in this area.35th PNM Minutes (19 & 20.01.2017) As done earlier, RPF will ensure proper policing and try to prevent unauthorized parking in the area.

Page 15 of 35

Page 16: · Web viewPresently EMD Diesel Loco shed, UBL is maintaining 201 locos with the staff sanction for 150 Locos. Staffs are facing difficulty to maintain. So this union requests the

Subject No 22/35 Sr.DEN/E, DEE

At LC Gate No.12 between BAY-OBM: there is no light provided in gate lodge, a solar system is provided to cater the lighting outside for the operation of the gate. The solar which was provided will work for only two hours and also there is no proper winch shelter is provided. This union urges to provide light at gate lodge and improve lighting by drawing supply from APSEB which is nearer to the gate and to provide winch shelter at the earliest to avoid sufferings of the staff.35th PNM Minutes (19 & 20.01.2017) No nearby LT supply available (2KM away). Estimate collected from GESCOM for 7.5 Lakhs. Work will be proposed in 2017-18. Meanwhile 640Wp Solar power pack for Goomty & Road Approach lighting will be provided by March 2017.

Subject No 22a/35 Sr.DEN/E, DEE

At OBM Station a bore well is provided to cater the water supply to the entire colony, which is away by 1Km from the OBM station. At present to operate the bore we need to depend on power supply which is very erratic, due to this we are not able to pump the water to over head tank which will be feeding to the Railway colony and station and staff staying in Railway colony are put to suffer. This Union requests to get connected switch to the station supply which is having express feeder, to solve the problem.Remarks of Sr.DEN/E: Remarks: Sr.DEN/E: Proposal regarding water supply to railway station and colony has been sent to PDO Obulapuram for willingness for permanent solution. However, DEE may take necessary action to ensure water supply for water available in railway premises.35th PNM Minutes (19 & 20.01.2017) Low voltage problem due to rural feeder connection. TC was installed 200 Mtrs, away. Once energized, voltage profile will be good. However, it is not a continuous problem.

Subject No 23/35 Sr.DPO

Appointment on Compassionate Ground:a) Smt. K. Vijayamma, w/o. late. Sri. K. Mohan Rao, LP/Goods/CCC/O/UBL.As her husband expired on

18.06.2006 leaving behind her two daughters. Thereafter she has requested for appointment on compassionate ground in favour of elder daughter Ms. K. Mahima vide her letter dated 23.07.2009, as she is not in a position to opt for CG appointment due to her health reasons. Mean while settlement of ex-employee has been completed and family pension orders have been issued in favour of Smt. K. Vijayamma, widow of ex-employee. The family is not having any other source of income. Hence this union urges to look into the above genuine case sympathetically on humanitarian grounds and arrange to issue necessary orders for appointment on compassionate grounds, early, since the family is suffering financially facing lot of difficulties.

b) Sri. Mudakappa Adiveppa who was working as Track Maintainer-IV under SSE/P.Way/GDG ( ML) expired on 13.01.2015 while in service due to run over ( off duty). Sri Adiveppa Shivasangappa Karugal, father of ex-employee in his representation to administration dated 05.04.2015 and 31.07.2015 has requested for appointment on compassionate grounds to his younger son Sri. Gavisiddappa Adiveppa Karugal who has completed SSLC (Xth Std). The family was totally dependent on the salary of the ex-employee as he was sole bread winner. After the demise of the employee the family is suffering without any source of income. The ex-employee has registered the names of his father and brother in his family composition and nominees under National Pension System. This union requests the administration to consider the above case sympathetically on humanitarian grounds and offer an appointment on compassionate ground to brother of ex-employee since the employee was unmarried ( bachelor).

c) Late Sri. Poora Satheesh, Helper/C&W/HPT expired on 09/10/2013 in Central hospital at Hubli. His widowed mother Smt. Subadra has requested for appointment on compassionate grounds in favour of her married daughter Smt. Swapna Poora vide application dated 15/09/2014. In his case, the widowed mother of who is aged about 50 years with minimum pension of Rs. 6000/- is facing lot of financial difficulties and depending on her married daughter who is having a child and husband is not having any job. She has to take care of her mother and her family. This case is genuine and needy for considering appointment on compassionate grounds.

Page 16 of 35

Page 17: · Web viewPresently EMD Diesel Loco shed, UBL is maintaining 201 locos with the staff sanction for 150 Locos. Staffs are facing difficulty to maintain. So this union requests the

As per Board’s instructions married daughters can be considered for appointment on compassionate grounds. Rightly, the administration has made enquiries of the daughter and her husband and confirmed that he is not having any job. But so far no appointment is given. Hence, it is requested to please consider this genuine case for an appointment on compassionate grounds on humanitarian grounds.35th PNM Minutes (19 & 20.01.2017) Cases are being dealt as per extant Rules.

Subject No 26a/35 Sr.DOM, Sr.DPO

And in LC gate No: 282 , C class gate situated at Kilometer at 465.835 between HBQ and South Hubli. Staffs are working 72 hour Roster. This union urges to immediate job analysis to be conducted since road vehicle traffic has been increased in many folds and provide supply of shoes, rain coats, gloves for Points men at Hubli Yard/ station.35th PNM Minutes (19 & 20.01.2017)Recensus of the LC 282 to be carried out in order to decide the revised roster.

Subject No 27/35 Sr.DEN/Central

Bore well to be repaired at AGL LC gate no: 287: At AGL LC gate no: 287 bore well is not working condition and hence this union requests the administration to repair the bore well immediately and Replacement of syntax at AGL LC gate no: At present the previous syntax is damaged and this union urges the administration to replace the syntax at the earliest. It was agreed in 34th PNM of Preamble subjects but no action is taken.

35th PNM Minutes (19 & 20.01.2017) Bore well will be repaired and Sintex tank will be provided.

Subject No 28/35 Sr.DEN/W, Sr.DPO

Filling up of vacancies in SSE/P/E/VSG:In SSE/P/VSG as per the scale check statement is showing 07 vacancies. Total sanction is 17 existing staff is 10 including 01 Supervisor, 01 Sr.Tech and 04 staff utilizing for pump, operation in three shifts, daily available staff is only 04 in that 01 or 02 staff having weekly rest. It is observed that daily 02 staff’s are available Vasco to QLM sanction is a big section and 141 Qtrs and 08 stations building and 01 Colva holiday home at Madgaon to be managed by this staff. It is very difficult to maintenance with 02 or 03 staff and staffs are unable to take weekly rest. Hence, this union urges to fill up the vacancies in SSE/P/VSG.35th PNM Minutes (19 & 20.01.2017)The process for filling up of the vacancies in Artisans/Gr.III from Kh/Helper to be processed by Sr.DPO on priority for entire UBL Division.

Subject No 29/35 Sr.DCM, Sr.DEN/West

New TTE rest room required at Vasco:Existing TTE rest room is in bad condition particularly in midnight passing the goods train. Total building is under vibration. TTE checking staffs unable to sleep during night time, and also due to heavy roof leakage all the beds are becoming wet and smelling badly. Hence this union urges to construct new TTE rest room at VSG.35th PNM Minutes (19 & 20.01.2017)New linen and mattress will be supplied to the TTE rest room by 26.1.2017.

Subject No 1/34 Sr.DOM, Sr.DME/P

Out station detention of GDR to be minimized to 36 hrs especially in GDG-BJP section.34th PNM Minutes (29 & 30.03.2016) Sr.DOM: Instructions have been issued to CHC/UBL to bring the guards who have been detained at Out stations to HQrs by pilot without affecting the train movements. These instructions have been implemented and on an average 2-3 guards have been brought pilot to UBL resulting in the reduction of detention to guards at out station. This process is being monitored continuously.

Page 17 of 35

Page 18: · Web viewPresently EMD Diesel Loco shed, UBL is maintaining 201 locos with the staff sanction for 150 Locos. Staffs are facing difficulty to maintain. So this union requests the

35th PNM Minutes (19 & 20.01.2017)Sr.DME/P: As per Railway Board guidelines 72 hrs. is permitted for out station detention. However all out efforts are being taken to bring running staff within 36 hrs. to Hqrs.

Subject No 2/34 Sr.DOM, Sr.DPO

Separate Guards Monitoring Controller to be required as par with Loco Pilots Controller.34th PNM Minutes (29 & 30.03.2016) Sr.DOM: As on date there are 64 vacancies in Guards cadre and there are 91 vacancies in SM’s cadre. When the position improves, the proposal of posting a separate guards monitoring controller will be consideredSr.DPO: Exam to fill up Guards vacancy to be conducted on 05.04.16, 16 posts SM’s created 16 SM’s have completed training and are to be posted.35th PNM Minutes (19 & 20.01.2017)10 papers from GDCE guards are expected by the end of January, 2017. After completion of their training, they will be posted.

Subject No 5/34 Sr.DEN/W, Sr.DSTE

Material room for S&T departmental: There is no room in section station to keep the S& T material since it is not allowed to keep material in battery/Relay room. Kindly make arrangements in every station to keep the material.34th PNM Minutes (29 & 30.03.2016) Sr.DEN/W Remarks: S&T Department to submit the requirement details like size of store room, location etc., to propose the work.Sr.DSTE: Presently room is being provided in LWR. In the proposed doubling work, the S&T accommodation as per the approved plan is being constructed which is having the facility of one room for ESM Maintainers cum Data logger Diagnostic room where ESMs can keep the very urgent needy materials of day-to-day maintenance.35th PNM Minutes (19 & 20.01.2017)Wherever vacant rooms are available in existing station building, Sr.DSTE shall put the proposal for approval of competent authority. In doubling works, this aspect is being taken care.

Subject No 6/34 Sr.DSTE, Sr.DEN/Co-Ord

a) Provision of room at S&T office, DWR: It is demanded to construct an additional room for office at S&T office, DWR for convenient working34th PNM Minutes (29 & 30.03.2016) Proposal sent to Sr.DEN/Co-ord/UBL for extension of SSE/Sig/DWR office

35th PNM Minutes (19 & 20.01.2017) Sr.DEN/Co-Ord: The work will be taken up under revenue shortly.

Subject No 6/34 Sr.DOM

b) Stoppage of T.No: 56921/56922 at SVTN: This union requests to make stoppage of T.no: 56921/56922 UBL-BGM & BGM-UBL pass at SVTN station for the convenient of employees.34th PNM Minutes (29 & 30.03.2016) For stoppage of above trains, proposal will be sent to HQrs.

35th PNM Minutes (19 & 20.01.2017)Proposal sent to Headquarters Vide letter No.H/T.458/Stoppages/16-17 dated 03.05.2016.

Subject No 8/34 DEN/HQ

In Administration branch of SWRMU office heavy roof leakage is there during rainy season most of places fall ceiling is broken and there is no proper electrical fittings.34th PNM Minutes (29 & 30.03.2016)

Page 18 of 35

Page 19: · Web viewPresently EMD Diesel Loco shed, UBL is maintaining 201 locos with the staff sanction for 150 Locos. Staffs are facing difficulty to maintain. So this union requests the

Remarks: Proposal has been made ready. Work will be completed by 15.5.2016.35th PNM Minutes (19 & 20.01.2017): Fall ceiling to be provided as discussed.

Subject No 11/34 Sr.DEN/W, Sr.DOM, Sr.DPO

a) One Room for Union at SVM station: At SVM in SSE/P.Way/SVM office nearly 205 Track maintainers and other station staff are working. Now the staffs are demanding to open a small room for union activities. And whatever problems are receiving from staff at SVM station it can be solved by local level.34th PNM Minutes (29 & 30.03.2016) Remarks of Sr.DEN/W: Pertains to Personnel Branch.

35th PNM Minutes (19 & 20.01.2017) Joint inspection to be carried out to hunt the available space and proposal to be submitted to Sr.DPO

b) One TNC post is required in SKVL: Previously one TNC was working at SKVL the same employee was transfer to VSG. Now, approximately 30 to 35 fertilizers rakes are moving from SKVL station. Presently there is no TNC, station Master is looking after the TNC work. Now they are complaining to this union it is not possible to look after two works that is train movements and fertilizers rakes. This union requests the administration kindly post one TNC at SKVL.34th PNM Minutes (29 & 30.03.2016) Sr.DOM: 21 posts of TNCs were surrendered during SM/TNC’s posts restructuring. Also on date there are 7 vacancies in TNC’s cadre, however posting of One TNC at SKVL will be examined.Sr.DPO: Reference has been made to CPO/SWR to provide 17 RRB papers.

35th PNM Minutes (19 & 20.01.2017) Sr.DOM: 21 posts of TNCs were surrendered during SM/TNC’s posts restructuring. Also, on date there are 04 vacancies in TNC’s Cadre. However, posting of One TNC at SKVL will be examined.Sr.DPO: Sanction Strength of TNC

Sanction Actual Vacancy73 69 04

c) Drainage to be provided near Union Office at VSG: One drainage near union office it is not connected outside drainage. In rainy season rain water is stagnated in front of 33 block railway quarters near health unit, Union office, SC/ST office, OBC Office. Water is entering in the railway quarters 33 blocks nearly two feet water stagnated inside the quarters and office. This union requests the administration to construct one big drainage in this location.

34th PNM Minutes (29 & 30.03.2016) [This subject could not be discussed in the meeting due to paucity of time].

Subject No 13/34 DEE, Sr.DOM

a) Ballari is known to be very hot place, especially during summer it is unbearable, and staffs are put into untold suffering with severe dehydration. Hence, this union demands to provide desert air coolers to all offices immediately.

34th PNM Minutes (29 & 30.03.2016) Sr.DEE: Indent has already prepared and will be sent to accounts for vetting.Sr.DOM: Matter pertains to Sr.DEE/UBL. Sr.DEE has been requested to provide vide this office letter No.H/T.154/ Divn./ PNM/ 15 dated 11.11.2015.35th PNM Minutes (19 & 20.01.2017) Already indented for 15 Nos. and sent to DMM/UBL on 13.12.2016, material is expected to arrive by Feb-17.

Subject No 17/34 Sr.DEN/E

The gate lodge of LC Gate-8 at BNHT station, which was newly built, is not to the standard, a window doesn’t have shutters and it is built in such a way where in a ceiling fan cannot be provided. this area is prone to have wild (animals) poisonous and harmful creatures. This union demands to provide a standard gate lodge with fencing which covers winch and also a Winch shelter and steps to be provided before any untoward incident take place.

Page 19 of 35

Page 20: · Web viewPresently EMD Diesel Loco shed, UBL is maintaining 201 locos with the staff sanction for 150 Locos. Staffs are facing difficulty to maintain. So this union requests the

34th PNM Minutes (29 & 30.03.2016) : Remarks: Window shutter work will be attended by 07.12.2015. Winch shelter will be provided by 07.12.2015.35th PNM Minutes (19 & 20.01.2017) New gate lodge will be provided as per the HQrs approved plan. TDC: 1/7/2017.

Subject No 18/34 Sr.DEN/E, Sr.DOM

At BYC station existing building is old, a new building to be constructed with elevated view to enable SM on duty to exchange all right signals for train movements, as it has been done at PKL & KGW. Especially when rakes are stabled on road one, SMs are finding very difficult to exchange the all right signals. Hence, this union demands to address the problem at the earliest.34th PNM Minutes (29 & 30.03.2016) Remarks of Sr.DEN/E: Present building is in sound condition; however, Sr.DOM/UBL can propose the same if there is operational difficulties. Sr.DOM: Proposal will be sent to Engineering dept35th PNM Minutes (19 & 20.01.2017) Work to be proposed by Sr.DOM/UBL, under traffic facility (LAW 2017-18) as the existing building is at low lying area having problem of water logging and exchanging of all right signals.

Subject No 19/34 Sr.DEN/E, Sr.DOM

b. At BYC station on duty points men are facing untold hardships while exchanging all right signals on off side in between Road 2 & 3, especially in rainy season and summer. Hence, this union urges to provide temporary shelter near Road-4.

Remarks of Sr.DEN/E: Presently there is no shelter available in exchange point in many years. Operating department can propose work for online diversion.Remarks of Sr.DOM: Proposal will be sent to Engineering dept35th PNM Minutes (19 & 20.01.2017) Proposal will be sent by Sr.DOM/UBL to Engg Dept.

Subject No 20/34 Sr.DME/PProvision of Accommodation for CLIs/HPT : There are 4 CLIs posted at Hospet and required to work round the clock and as and when required by the administration they conducting enquiry and other day to day work in connection with the monitoring of the Loco’s. At present they are place to work without any accommodation with necessary furniture and computers. Hence this union urges for accommodation with necessary furniture and computers.34th PNM Minutes (29 &30.03.2016):(a) A room will be earmarked for Loco Inspectors to discharge their duties at their H.Q. (b) Laptops are being procured and provided for their usage.35th PNM Minutes (19 & 20.01.2017) A Room has already been provided; necessary procurement of furniture and computer will be processed.

Subject No 22/34 Sr.DEN/E

Provision of proper facilities at Railway Institute A.S.Gudi Colony at Hospet: The Railway Institute for functioning well with some limited facilities and fetching revenue to railways by way of renting it to marriage and other non-communal purposes, but of late the Institute completely damaged for want of maintenance and provision of facilities. At present following facilities are required to repair the earlier splendor:

34th PNM Minutes (29 &30.03.2016):Minutes: As this requires major repairs, work will be proposed under revenue to attend it.[This subject could not be discussed in the meeting due to paucity of time].Remarks Sr.DEN/E: Same as 34th PNM Minutes.

a) Floors to be provided with tiles, Wall to be distempered neatly, proper electricity facility to be provided at dining hall as well as main hall with frames, fans and tube lights, Marriage hall to be provided with false ceiling. The worn-out AC sheets should be replaced with new sheets (Fiber), Doors and windows to be replaced, Water taps to be replaced.

Page 20 of 35

Page 21: · Web viewPresently EMD Diesel Loco shed, UBL is maintaining 201 locos with the staff sanction for 150 Locos. Staffs are facing difficulty to maintain. So this union requests the

34th PNM Minutes (29 &30.03.2016):35th PNM Minutes (19 & 20.01.2017) Flooring work in dining hall area, pipeline work done. For other repairs, proposal is under process.

Subject No12/33 Sr.DOM, Sr.DPO

Posting of additional ASM to assist the Dy.SS at VSG: The workload of SMs at VSG has increased multi- fold in the last few years due to the doubling of loading/unloading operation and increase in passenger and express trains. Due to the limited infrastructure, this has also resulted in hectic shunting activity too. As per extant Railway Board Orders, an additional ASM should be posted at such stations.33rd PNM Minutes (22 &23.12.2015)Proposal for creation of 20 Revenue posts and 44 Work Charged posts have already been sent to Accounts.34th PNM Minutes (29 & 30.03.2016) 16 posts have already been created because of which vacancies increased to 93, waiting for filling up of vacancies. 35th PNM Minutes (19 & 20.01.2017) Sr.DOM: To provide additional SMs work study has to be conducted. As on date there are 92 vacancies of SM’s cadre. Based on work study report, SMs posts have to be created. Personnel Branch requested to conduct Work Study vide this office letter No.H/T.154/Divn./PNM/15 dated 11.11.2015.Sr.DPO: Action will be taken to post the SMs after reporting of the fresh candidates (GDCE) who are under initial training at MDRTI/DWR. Training is likely to complete by the end of Jan.2017.

Subject No 16/33 Sr.DEN/E

At BNHT station is situated in jungle, staffs are facing untold hardship to reach their work place since there is no approach road to BNHT station. This union requests the administration to provide approach road and save the employees by any untoward incident.33rd PNM Minutes (22 &23.12.2015)Feasibility for approach road will be examined, as land adjustment to Railway boundary and up to main road does not belong to Railway.34th PNM Minutes (29 & 30.03.2016)35th PNM Minutes (19 & 20.01.2017) A road will be made parallel to the track from the LC gate to the station, duly providing barricading.

Subject No 17/33 Sr.DOM, Sr.DPO

At BNHT and RNJP SMs are working without rest for the past two years since Rg vacancy is not filled up & they are put into untold hardship since they are not able to avail weekly rest. This union urges to address the problem immediately.33rd PNM Minutes (22 &23.12.2015)15 Pro ASM’s are under training, proposal for creation of additional posts has already been sent to Accounts34th PNM Minutes (29 & 30.03.2016) 15 Pro ASM’s are still under training. New ASMs will be posted to BNHT & RNJP.35th PNM Minutes (19 & 20.01.2017) Sr.DOM: Due to 92 vacancies in SM’s Cadre and commissioning of VC-KTY-AVC section, RG SM could not be posted. SMs are availing weekly rest on managing duties. Section TI also arranges RG SM from other station. Personnel Branch has been requested to fill up all the vacancies of SMs/CHCs/Guards/P.Man/TNCs etc., vide letter No. H/T.263/Vacancy/ Optg. Dept./16 dated 04.05.2016 and letter No. H/T.263/staff/vacancy/16 dated 13.06.2016.Sr.DPO: Action will be taken to post the SMs after reporting of the fresh candidates (GDCE) who are under initial training at MDRTI/DWR. Training is likely to complete by the end of Jan.2017.

Page 21 of 35

Page 22: · Web viewPresently EMD Diesel Loco shed, UBL is maintaining 201 locos with the staff sanction for 150 Locos. Staffs are facing difficulty to maintain. So this union requests the

Subject No 19/33 Sr.DEN/E

At TNGL by pass cabin, the staff is facing untold hard ship for handing over caution order and PLCT, since surrounding area is pruned for poisonous snakes. This union requests to provide compound and connectivity to the Bypass line from the SMs office.

33rd PNM Minutes (22 &23.12.2015)Pathway provided. Compound wall necessity will be examined.34th PNM Minutes (29 & 30.03.2016)35th PNM Minutes (19 & 20.01.2017) Road provision is done. Boundary wall provision will be made.

Subject No 20/33 Sr.DME/P

Opening of Crew Booking Lobby at BAY:The Running staff of Hospet i.e, LPs ,ALPs and Guards have given representation to this union for opening of Crew booking Lobby at Bellari for smooth operating of GDR for the following reasons:-

1. Operating of Goods train towards KPTCL for placement and pulling out of empty rakes, ACC siding for placement and pulling out of empty rakes, loads at KDN stations for which the crew changing at BAY.

2. Trains coming from JRU going towards JVSL, MBIV for which crew changing at BYC.3. Trains coming from JRU going towards GTL for which crew changing at BAY.4. Trains coming from JVSL going towards JRU for which crew changing at BYC.5. Trains to BYC ( FCI siding) for placement and pulling out of rakes.

At present for the above the operations Goods crew are moved to and fro Pilot from HPT, where an average of 8*30=240 No. of crews per month involving 480 of hours for pilot movement and to avoid detention of crew at running room BAY. Hence it is requested to open a crew depot at BAY. And moreover a number of Loco Pilots Goods, Asst. Loco Pilots, Guards are prepared to work from BAY and have applied for request transfer for the better education of their children and medical facilities at BAY. On opening a crew depot at BAY, BAY based GDR can be utilized for extended crew working trains up to Gooty (BAY-GY) and Raichur ( BAY-RC). Bay based crew can be utilized on BAY-JVSL-RNJP-HPT-BAY sections efficiently.33rd PNM Minutes (22 &23.12.2015)Requirement for Lobby at BAY at present not required. However, a review will be made.34th PNM Minutes (29 & 30.03.2016) SWRM Union made the suggestion in the PNM forum for opening of the crew booking lobby at BAY and has given many points to the administration on the table. So the administration agreed to examine the feasibility. 35th PNM Minutes (19 & 20.01.2017) A proposal has been sent to HQrs for reconsideration, after opening of RDG-Kalyandurga line and introduction of passenger train.

Subject No 28/33 Sr.DEN/C

Community Hall to be constructed at Bijapur : Community Hall to be constructed at BJP HQ for employees benefit for the purpose of marriage and other functions for celebration.33rd PNM Minutes (22 &23.12.2015)Sr.DEN/C: Work proposed in work programme 2016-17 (DRM approved for shortlist proposal sent to HQ).34th PNM Minutes (29 & 30.03.2016)35th PNM Minutes (19 & 20.01.2017): New work to be proposed for construction of community hall, by Sr.DPO.

Page 22 of 35

Page 23: · Web viewPresently EMD Diesel Loco shed, UBL is maintaining 201 locos with the staff sanction for 150 Locos. Staffs are facing difficulty to maintain. So this union requests the

Subject No 29/33 Sr.DCM

Less man power of group ‘D’ employees: At BJP MG (Meter – Gauge) period there were 53 luggage porters posted with lesser trains and small platforms. Now train services are increased about ½ km about 90 trains ( daily and non-daily trains) will have to attend with only 16 Luggage porters is round the clock in 3 links ie, 8 hrs shift hardly 2 or 3 luggage porters are working per shift.33rd PNM Minutes (22 & 23.12.2015)An imprest cash of Rs.10,000/- will be made available with the CPSR initially for engaging coolie porters for unloading parcels. This amount can be increased/decreased based on review.34th PNM Minutes (29 & 30.03.2016) Imprest cash of Rs 5000/- was provided with CPSR/UBL (Ref: H/C.321/CPSR/Imprest/07 dated 21.09.2007) for engaging private laborers in case of exigencies upto 2015. As there was no regular utilization of imprest cash Sr.DFM/UBL has advised to surrender the same. The engaging private laborers for loading/unloading work have been stopped from March-2013. Hence surrendered the imprest cash of Rs 5000/- vide MR No 181349 dated: 28.12.2015Once again this will be reviewed and imprest cash will again be provided on need basis, after taking sanction from competent authority. Remarks: CPSR/UBL & CCI/UBL (E) reported that there is no necessity of imprest cash to parcel office/UBL and BJP for engaging private porters. Hence there is no justification for creation of imprest cash at Parcel Office BJP & UBL.35th PNM Minutes (19 & 20.01.2017) Provision of imprest cash will be revived.

Subject No 1/32 Sr.DEN/W

a) Providing tiles to kitchen room, Bath room, and toilet room at Rly Qtrs VSG station & section. At VSG station and section nearly 313 Quarters available. But last four years back some Quarters are provided with tiles at VSG. Some Quarters not provided, this creates discrimination .hence kindly provide tiles for the left over Quarters at VSG and VSG section.

32nd PNM Minutes (17&18.6.2015)32 quarters at Divers hill under 4 blocks will be completed by 15.8.2015 through zonal contract. Balance quarters, survey will be conducted and proposal will be processed under revenue.33rd PNM Minutes (22 & 23.12.2015)Work order already approved. Revised target date of completion: 29.2.2016 (Ist block will be completed by 10.1.2016.)34th PNM Minutes (29 & 30.03.2016)Remarks: Total 11 Type-II quarters provided with tiles in driver hill colony and total 08 Nos. Type-II quarters provided with tiles in station building colony at VSG.35th PNM Minutes (19 & 20.01.2017) Proposal for provision of tiles in bathroom, kitchen and other required place in multi storied quarters at VSG to be processed in an organized way, after inspection by SSE/Works / ADEN. Survey to be completed by 1.2.2017 and estimate to be processed.

b) Permanent Drinking water supply at VSG. At VSG, nearly 141 Qtrs are situated. There is no proper drinking water supply to Railway Qtrs. And Railway water is not fit for drinking purpose. At driver Hill one HL Tank is provided with capacity of 1 lack litre. For drinking water purpose, can approach MMC VSG.

32nd PNM Minutes (17 & 18.6.2015)(a) Works was proposed to provide GLR along with pumping arrangement for station side and driver hill colony. The same is sanctioned in LAW 2015-2016, will be taken-up shortly.(b) The work consists of GLR, pipeline and water tank with one water tap connection in each kitchen as per sanction. Estimate is under preparation and tender will be invited by 10.7.2015. This will solve drinking water problem at VSG. TDC: 06 months after opening of the tender.

33rd PNM Minutes (22 & 23.12.2015)

Page 23 of 35

Page 24: · Web viewPresently EMD Diesel Loco shed, UBL is maintaining 201 locos with the staff sanction for 150 Locos. Staffs are facing difficulty to maintain. So this union requests the

Calling of tender for taking up of the work is under process and revised TDC: 31.5.2016.34th PNM Minutes (29 & 30.03.2016)35th PNM Minutes (19 & 20.01.2017) Tender awarded. Work will be completed by 30.05.2017.

Subject No 3/32 Sr.DME/C&W

B. At present BVZI brake vans are undertaking IOH schedule at NVU shed. These brake vans are fitted with ICF trolleys. To carryout IOH schedule for these Brake vans pit line is necessarily required for proper fitment of centre pivot and other safety fittings. Hence it is required to provide pit line at NVU shed to undertake IOH schedule.32nd PNM Minutes (17 & 18.6.2015)Work to be proposed for construction of pit line under revenue by Engineering Department. Till such time pit line is not there, IOH work will not be carried out.33rd PNM Minutes (22 & 23.12.2015)Proposal uploaded in IRPSM Portal.34th PNM Minutes (29 &30.03.2016)Remarks: Sr.DME/C&W: Proposal uploaded in IRPSM portal. 35th PNM Minutes (19 & 20.01.2017) (a) Contract is being awarded by Electrical Department and the work is under process and the same will be

completed in due course.(b) Work has been proposed for construction of pit line under revenue by Engineering Department. The work

shall be executed in co-ordination with Engineering at the earliest possible time. Till such time pit line is not there, IOH work will not be carried out

Subject No 7/32 DEE

LC Gate No: 463 between Vijaynagar – Miraj: LC Gate 463 between Vijaynagar – Miraj staff are suffering for water and electricity and no bore is connected. This union urges to provide Bore and electricity to the LC Gate No.463.32nd PNM Minutes (17 & 18.6.2015)(a) DEE: Rly board’s sanction will be obtained for 66 gates. Tender to be opened on 23.6.2015. 33rd PNM Minutes (22 & 23.12.2015)Earlier tender called has been discharged. New tender will be called immediately. 35th PNM Minutes (19 & 20.01.2017) No nearby LT supply available. Hence 640Wp Solar power pack for Goomty & Road Approach lighting will be provided by March-2017.

Subject No 9/32 Sr.DME/P

a) Torch cell’s allowance to be increased to LocoPilots as per the board instructions, already guards are getting revised rates.

32nd PNM Minutes (17 & 18.6.2015)Will be processed.33rd PNM Minutes (22 & 23.12.2015)A reminder will be written to HQrs for enhancing the Torch cell allowance in line with traffic branch.34th PNM Minutes (29 & 30.03.2016) Proposal sent to Division finance for initial concurrence. Afterwards the same will be sent to HQrs. 35th PNM Minutes (19 & 20.01.2017) The enhancement of reimbursement to loco running staff was sent to divisional finance for concurrence after which will be forwarded to HQ.

Page 24 of 35

Page 25: · Web viewPresently EMD Diesel Loco shed, UBL is maintaining 201 locos with the staff sanction for 150 Locos. Staffs are facing difficulty to maintain. So this union requests the

Subject No 12/32 Sr.DEN/E

Trackmen working at BAY section are put into lot of risk while performing their duties while train passes they are confused and shocked since there is no respite(Trolley Refugee) to stand at the time of train passing and also there is no access it is very risky and dangerous . Hence this union demands to provide trolley refuge & access at the top priority.35th PNM Minutes (19 & 20.01.2017) In BAY-RDG section, trolley refuge will be provided by 30.8.2017.

Subject No 13/32 Sr.DOM, Sr.DPO

a) Problems of station masters working at OBM, SLM & RDG train services between BAY and RDG are increased by many folds. This union demands to conduct the Job analysis to introduce continuous roaster to bring down the stress.32nd PNM Minutes (17 & 18.6.2015)Sr.DOM: Letter has been sent to Sr.DPO/UBL for conducting job analysis to introduce continuous roster vide Letter No.H/T.263/Job Analysis/BAY/RDG/2015 dated 17.04.15.Sr.DPO: Proposal for conducting job analysis received from Sr.DOM on 20.05.2015 has been registered. The same will be conducted after monsoon.33rd PNM Minutes (22 & 23.12.2015)Date for job analysis will be given by DS/SWRMU.34th PNM Minutes (29 & 30.03.2016) Sr.DOM: Job analysis to introduce continuous roster for SM’s working between BAY-RDG sections was conducted on 8th, 9th and 10th February-2016Sr.DPO: Job analysis completed and Case file is pending with Sr.DOM.35th PNM Minutes (19 & 20.01.2017) (a) Job analysis to introduce continuous roster for SM’s working between BAY-RDG sections was conducted

on 8th, 9th and 10th February 2016. (b) The decision will be taken by 31.3.2017.

Subject No 14/32 DEE

160 KVA (Kilo Volt Ampere): At Toranagallu station earlier 160 KVA was provided which used to feed all most essential units like Running Room, Station building, PRS ,UTS and signal department’s equipment rooms, work was carried on without any hassles. Now for the best reasons known, high capacity generator .i.e.160KVA generator been shifted and replaced with least capacity generator 10 KVA ,by which untold hardships faced by the employees. Due to this there is unrest among employees. This union demands to replace the high capacity DG set.32nd PNM Minutes (17 & 18.6.2015)Repaired DG sets of 63 KVA will be provided on priority by 18.10.2015.33rd PNM Minutes (22 & 23.12.2015)Sufficient capacity DG set will be provided to TNGL station by 22.1.2016.34th PNM Minutes (29 & 30.03.2016) 35th PNM Minutes (19 & 20.01.2017) At present 30KVA DG set is catering the load Running Room & Station smoothly. Further 11KV substation is coming up, which eliminates power cuts during summer to the maximum strength. Further 63KVA DG set will be shifted to TNGL in future on need based.

Subject No 17/32 Sr.DEN/E

At Gadag, menace of dust and noise pollution plus loss of accessibility, suffered by occupants of Betgeri side Rly Colony due to plying of Lorries lined up through the Rly Colony much earlier the arrival of the train meant for unloading children are put into great risk, as they cannot venture out of their Qtrs without being escorted. As such it is urges that one old road already available for specific use of lorries, which is to be updated.32nd PNM Minutes (17 & 18.6.2015)

Page 25 of 35

Page 26: · Web viewPresently EMD Diesel Loco shed, UBL is maintaining 201 locos with the staff sanction for 150 Locos. Staffs are facing difficulty to maintain. So this union requests the

For colony, road and goods, shed work awarded on 20.10.2014.Road pattern will be studied in consultation with security & if necessary steel gate will be provided to prevent entry of heavy vehicles in colony. 33rd PNM Minutes (22 & 23.12.2015)a) Work completed.b) Representation require alternative road to be made function as per site situation it will require movement crossing some of existing lines. Function of that road will have effect on trains also. Operating and Commercial aspects also to be studies and decided.34th PNM Minutes (29 & 30.03.2016) 35th PNM Minutes (19 & 20.01.2017) Joint inspection will be done by Sr.DEN/East along with Sr.DCM, to come up with a solution.

Subject No 18/32 DEN/HQ, DEE

I) Repair work of DERD/PUMP Depot: Heavy leakage of slab at Main store room, due to this water is seeping in the wall and in Electrical switch board,

ii) Heavy leakage of cement sheet at Iron store room and welding section, many sheets can be seen in broken condition, hence necessary replacement of broken sheet is required to stop leakage.iii) Flooring of entire depot is fully damage and plastering of some walls is also damage, hence necessary repairs of flooring and wall plastering is required to be done.

32nd PNM Minutes (17 & 18.6.2015)(a) DEE will write to DEN/HQ to undertake the work at the earliest. (b) DEN/HQ: Will be examined.

33rd PNM Minutes (22 & 23.12.2015)(a) DEE: Work is in progress.(b) DEN/HQ: Site is inspected by ADEN/HQ for ascertaining the problem. Physical work not taken up will be attended and TDC is 31.12.2015. 34th PNM Minutes (29 & 30.03.2016) Work will be completed by 30.4.2016.

35th PNM Minutes (19 & 20.01.2017) Left over balance work will be completed by 28.2.2017.

Subject No 27/32 Sr. DSTE, Sr.DEN/Central

Provision of Supply of de-mineralized water for batteries:Difficulty experienced by field staff due to Non-availability of de-mineralized water for batteries. The water which is supplied for top-up to the batteries after adding the same the battery starts drawing a high current by which a rise in temperature and chances of explosion. Thus endangering the life of staff.32nd PNM Minutes (17 & 18.6.2015)Regeneration of demineralization plan will be done at UBL by 17.7.15, followed by at other locations. 33rd PNM Minutes (22 & 23.12.2015)Indent for demineralised water plant shall be placed by 31.12.2015.34th PNM Minutes (29 & 30.03.2016) Indent submitted to DMM/UBL for procurement of de mineralized water plant. Tender opening on 30.03.2016.35th PNM Minutes (19 & 20.01.2017) (a) De mineralized water plant received by SSE/Sig./M/UBL on 16.05.2016 and installed.(b) Sr.DEN/C advised to ensure adequate pipeline for proper operation.

Subject No 31/01 Sr.DEN/E, Sr.DOM

Problems at BAY Branch: Rest room at TNGL: Station masters of TNGL are put into untold inconvenience since there is no rest room for them, old reservation cum booking office is laying vacant, can be converted as rest room. 31st PNM Minutes (20& 21.1.2015)It has been stated that the building constructed for JE/PWay/TNGL has not been occupied. Since the Station building is constructed & lying vacant and hence it is suggested to allot for SM’s rest room.

Page 26 of 35

Page 27: · Web viewPresently EMD Diesel Loco shed, UBL is maintaining 201 locos with the staff sanction for 150 Locos. Staffs are facing difficulty to maintain. So this union requests the

Allotment of JE/PW/TNGL Office & Operating staff to be put up on file for the final approval of DRM.

32nd PNM Minutes (17 & 18.6.2015)As the earmarked quarters for JE/P.Way is not occupied, it is proposed to convert the quarters as JE/PWayOffice. JE/P.Way shall vacate his office from station building and come to quarters. However, this requires the approval of DRM and hence, proposal will be processed by Sr.DPO for approval. 33rd PNM Minutes (22 & 23.12.2015)A proposal for the same may be initiated by Sr.DOM, so that approval of competent authority can be obtained.34th PNM Minutes (29 & 30.03.2016) 35th PNM Minutes (19 & 20.01.2017) The room which is being utilized by SMs for taking rest at present, a formal letter will be issued to continue to utilize the same.

Subject No 31/07 Sr.DME/DSL

Problems of EMD Shed: a) Since there is no sufficient chairs at EMD canteen, staffs will stand and have breakfast. Hence it is requested to supply sufficient chairs to canteen.

31st PNM Minutes (20& 21.1.2015)One proposal for procurement of Chairs and Dining Tables under allocation 11-411-28 is initiated. Associated finance concurrence, DRM’s approval and processed for FA &CAO/SWR/UBL. However the FA & CAO/SWR/UBL has returned the proposal stating no funds are available under the concerned allocation. (Copy enclosed), funds has been projected for the year 2015-16.32nd PNM Minutes (17 & 18.6.2015)One proposal for procurement of Chairs and Dining Tables Under allocation 11-411-28 is initiated, associated finance concurrence DRM’s approval and processed for FA&CAO/SWR/UBL. However the FA&CAO/SWR/UBL, has returned the proposal stating no funds are available under the concerned allocation. (Copy enclosed). Funds have been projected for the year 2015-16. 33rd PNM Minutes (22 & 23.12.2015)One proposal for procurement of Chairs and Dining Tables under allocation No. 11-411-28 is initiated. Associated finance concurrence DRM’s approval and processed for FA&CAO/SWR/UBL, has returned the proposal stating no funds are available concerned allocation. Funds has been already asked under allocation No.11-410-28 for Rs.3,53,500/- in BE 2015-16 vide Letter No. Sr.DFM/UBL Letter No. A/FB/UBL/RE-BE/2014-15-16 dated 18.12.2014.34th PNM Minutes (29 & 30.6.2016)One proposal for procurement of chairs and dining tables under allocation 11-411-28 is initiated, associated finance concurrence DRM’s approval and processed for FA&CAO/SWR/UBL, however the FA&CAO/SWR/UBL has returned the proposal stating no funds are available concerned allocation. Finance is once again requested for accord HQ finance concurrence to the proposals of subject item sent vide Dy.CME/DSL/HQ Lr. No A/FX/HQ/MP/CME/15-16/150406043 dated: 09.06.2015 to Dy. FA&CAO/F&B dated: 01.03.2016 since the diesel shed staff are facing a lot of trouble.Remarks Sr.DME/DSL: On proposal for procurement of chairs and dining tables under allocation 11411-28 is initiated with associate finance concurrence & DRM’s approval and processed for concurrence of FA&CAO/SWR. However, FA&CAO/SWR has returned the proposal stating no funds are available under concerned allocation. HQ finance was requested again to accord concurrence vide this office letter dated 01.03.2016. At present, no funds are available under this allocation. However, requirement of funds is projected in RE for the current year.35th PNM Minutes (19 & 20.01.2017) Proposal will be made under CSBF for procurement of furniture, by Sr.DME/Dsl, within Rs.5 lakhs.

Subject No 31/28 Sr.DEN/W

Quarter’s compound wall required: In VSG Station, 60 Railway Qtrs. Are there near RailwayStation and there is no compound wall at Driver’s hill. Hence this union urges to construct compound wall at Driver’s hill. 31st PNM Minutes (20& 21.1.2015)Boundary wall will be proposed at the boundary, instead of individual blocks.

Page 27 of 35

Page 28: · Web viewPresently EMD Diesel Loco shed, UBL is maintaining 201 locos with the staff sanction for 150 Locos. Staffs are facing difficulty to maintain. So this union requests the

32nd PNM Minutes (17 & 18.6.2015)Approx length of 200M wall is required. Work will be processed under revenue. TDC for inviting tender: 01.08.2015.33rd PNM Minutes (22 & 23.12.2015)Works will be executed with DRM approval. Revised TDC: 30.06.201634th PNM Minutes (29 & 30.03.2016) 35th PNM Minutes (19 & 20.01.2017) Tender was called one time but cancelled on Administrative ground further tender will be called shortly. TDC for tender calling 31.01.2017.

Subject No 30/09 CMS

Medical facilities to TNGL staff: Staff and family members of railway men working at TNGL are finding untold hardships while they are sick and require medical treatment. Nearly about 44 staff and 60 sets of GDR movements will be there at TNGL in a day. Whenever these employees have any medical problem, they need rush to Bellary which is away by 30 kms plus due to bad roads and heavy traffic more than 1 ½ hours is required to reach BAY, to avoid suffering of the employees, this union urges to tie up with Sanjeevini Hospital, which is maintained by Jindal close to TNGL station.

30th PNM Minutes (26&27.6.2014)Tie up proposal with Sanjeevini Hospital at TNGL, will be forwarded to HQrs. 31st PNM Minutes (20& 21.1.2015)Reference has been made to Sanjeevini Hospital for accepting at CGHS rates. Reply awaited from Sanjeevini Hospital. CMS will be visiting Sanjeevini Hospital during First week of February, to pursue further.32nd PNM Minutes (17 & 18.6.2015)CMS shall visit SanjeeviniHospial personally by second week of July. 33rd PNM Minutes (22 & 23.12.2015)During the discussions, CMS has conveyed that Sanjeevini Hospital has agreed for CGHS rates and the file will be processed for finance concurrence and forwarded to HQrs within two days of receipt of finance concurrence. 34th PNM Minutes (29 & 30.3.2016)BAY Doctor will get CGHS rates quote from Sanjeevini Hospital as early as possible. In the meantime, patients will be referred to Sanjeevini Hospital itself at CGHS rates.35th PNM Minutes (19 & 20.01.2017) For staff and family member of railway men working at TNGL. ADMO/BAY will visit TNGL station for consultation and treatment once a week routinely henceforth.

Subject No 30/14 Sr.DSTE, Sr.DEN

At BAY SSE/Sig/O/ having two small rooms of the office in 40 plus and all the important electronic items are kept outside the office for want of place in any case of any damage administration will hold responsible to SSE and staff for not preserving equipments before anything bad incident could happen this union urges to extend the SSE office by constructing a spacious rooms.30th PNM Minutes (26&27.6.2014)SSE/Sig/O/BAY has been catered in the RE estimate of RVNL. Temporarily one room of the SSE/Tele/O has been handed over to keep the electronic materials of SSE/Sig. 31st PNM Minutes (20 & 21.1.2015)SSE/Sig/O/BAY has been catered in the RE estimate of RVNL. Current status shall be obtained from RVNL.Temporarily one room of the SSE/Tele/O has been handed over to keep the electronic materials of SSE/Sig.32nd PNM Minutes (17 & 18.6.2015)Status quo.33rd PNM Minutes (22 & 23.12.2015)Commitment from GGM/Elecl/RVNL shall be pursued. If no fruitful result is forthcoming by 31.1.2016, Sr.DEN/East will be advised for construction of Office place for SSE/Sig/O/BAY.34th PNM Minutes (29 & 30.03.2016)

Page 28 of 35

Page 29: · Web viewPresently EMD Diesel Loco shed, UBL is maintaining 201 locos with the staff sanction for 150 Locos. Staffs are facing difficulty to maintain. So this union requests the

For construction of store rooms at SSE/Sig/BAY, a work is proposed for the financial year 2016-17 under OSW35th PNM Minutes (19 & 20.01.2017) The work of BAY for construction of SSE/Sig/O/BAY shall be processed on priority under LAW 2017-18. Approx. cost Rs.32 lakhs.

Subject No 30a/28 Sr.DME/C&W, Sr.DEN/E

b) Construction of compound wall around stores department near ROH/HPT:Presently there is no compound wall around ROH stores dept. important material of value of more than lakhs of rupees are being dumped. Hence this union urges to construct a compound wall for the stores/ROH depot at HPT.30th PNM Minutes (26&27.6.2014)The work will be proposed under works program for construction of compound wall for the stores of ROH shed at HPT.31st PNM Minutes (20 & 21.1.2015)

(a) The work has already been proposed and estimation is under finalization. (b) Sr.DME/C&W to write a letter to Sr.DSC for arranging to conduct beats.

32nd PNM Minutes (17 & 18.6.2015)Proposal can be submitted by Sr.DME/C&W to Engineering so that the work can be taken up.33rd PNM Minutes (22 & 23.12.2015)*(a) Sr.DME/C&W: Proposal uploaded in IRPSM Portal.*(b) Sr.DEN/E:Work was proposed in PH-42 but not sanctioned, due to non availability of funds. 34th PNM Minutes (29 &30.03.2016)Work will be taken up.35th PNM Minutes (19 & 20.01.2017) Sr.DME/C&W: Work is proposed in 2015-16 and the same was not sanctioned. However, Sr.DEN/E/UBL is requested to take up the work of fencing on revenue.

Subject No 30b/28 Sr.DEN/E

Construction of compound wall to all railway quarters near railway station andA.S.Gudi colony Hospet. There is no compound wall to any quarters at railway station colony and some quarters at A.S.Gudi colony has got compound wall. Many quarters do not have. This union urges the administration to construct the compound wall to all the railway quarters at railway station colony and remaining quarters at A.S.Gudi colony Hosapet.30th PNM Minutes (26&27.6.2014)A common compound wall proposal will be processed during 2014-15 (LSWP)31st PNM Minutes (20& 21.1.2015)Construction of about 1000m wall is required and the same will be proposed under revenue.32nd PNM Minutes (17 & 18.6.2015)The proposal has been received by Divisional office and it will be processed. 33rd PNM Minutes (22 & 23.12.2015)No remarks. This subject could not be discussed due to paucity of time. 34th PNM Minutes (29 & 30.03.2016) 35th PNM Minutes (19 & 20.01.2017) Sr.DEN/E: Tender is called. Opening on 17.02.2017.

Subject No 28/04 CMS

Maintenance of Rly Qtrs at RDGAt RDG entire Rly Qtrs open drain are covered with filth and shrubs and choked. As a result sewage water is stagnated and breeding mosquitoes. 30th PNM Minutes (26&27.6.2014)Levels of water area and level of the drain at 25 m interval will be taken and matter will be decided. 31st PNM Minutes (20& 21.1.2015)

Page 29 of 35

Page 30: · Web viewPresently EMD Diesel Loco shed, UBL is maintaining 201 locos with the staff sanction for 150 Locos. Staffs are facing difficulty to maintain. So this union requests the

Debris of the drain has been removed and water is not stagnating. However regular maintenance of the open drains to be done as per the Board’s guidelines.32nd PNM Minutes (17 & 18.6.2015)Remarks will be given after consultation with CMS by 25.6.2015.33rd PNM Minutes (22 & 23.12.2015)Pertains to Medical Department.34th PNM Minutes (29 & 30.03.2016) 35th PNM Minutes (19 & 20.01.2017) Choked open drains will be cleared twice in a week by deputing Safaiwalas from BAY by Medical Department.

Subject No 28/07 Sr.DME/C&W

Provision of pit line to 140 tonne BD crane :

140 tonne Diesel Hydraulic crane of ART is stabled on ART siding and it is not having pit line. This crane is to be attended daily, weekly, monthly schedules and to attend these schedules pit line is essential. To attend these schedules crane to be moved to pit line and every movement of BD Crane DRM permission to be obtained and sometimes could not get permission due to administration reason. Hence it is very much essential to construct 16 meters pit line on BD siding itself. 30th PNM Minutes (26&27.6.2014)Sr.DME/C&W: Proposal was mooted and uploaded in IRPSM portal for inclusion in LSWP of 2013-14 under PH-42. However Hqrts has advised to include this work in LSWP-2014-15.Work to be proposed again and will be pursued with HQrs.31st PNM Minutes (20& 21.1.2015)Proposal has been resubmitted to HQrs for inclusion in LSWP 2015-16.32nd PNM Minutes (17 & 18.6.2015)Proposal for construction of pit line for 140 Tonne crane at UBL is forwarded to headquarters office for inclusion in PWP for 2015-16 under PH-42.33rd PNM Minutes (22 & 23.12.2015)Proposal uploaded in IRPSM Protal.34th PNM Minutes (29 &30.03.2016)Fresh proposal uploaded in IRPSM portal.35th PNM Minutes (19 & 20.01.2017) Work is proposed in 2015-16 and the same was not sanctioned, however the same work will be re-proposed in the year 2016-17.

Subject No 28/17 Sr.DPO/UBL

Remodeling of SWRMU Office Hospet Branch with RCC Roof: a) The existing union office building at Hospet is having Asbestos sheet roof, during heavy rain it is leaking heavily several times repairs have been attended by SSE/W/HPT. But due to heavy monkeys menace roof is getting damaged regularly. The interial thermion false ceiling roof is getting damaged frequently due to heavy leakage of rain water. Hence this branch union urges to convert the existing asbestos sheet roof to RCC roof. 30th PNM Minutes (26&27.6.2014)Proposal is prepared and it will be uploaded for approval under LSWP 2014-15.31st PNM Minutes (20& 21.1.2015)Shifting of building is proposed under remodeling of the HPT station and the proposal is submitted to Rly Board for final approval. Minor repairs will be carried out. However major repairs will be proposed after final decision of Railway Board.32nd PNM Minutes (17 & 18.6.2015)Proposal will be included in IRPSM, after receiving plinth area request from SWRM Union. 33rd PNM Minutes (22 & 23.12.2015)No Remarks.This subject could not be discussed due to paucity of time.34th PNM Minutes (29 & 30.03.2016)

Page 30 of 35

Page 31: · Web viewPresently EMD Diesel Loco shed, UBL is maintaining 201 locos with the staff sanction for 150 Locos. Staffs are facing difficulty to maintain. So this union requests the

35th PNM Minutes (19 & 20.01.2017) Work to be proposed under LAW by Sr.DPO/UBL.

Subject No 28/13 Sr.DEN/W

Problems of CLR Branch:Approach road and drainage to railway qrs no.128, 129, 130 & 131 Gang chawlApproach road and drainage to Rly Qtrs 128, 129, 130 & 131 at CLR is in very bad condition and same to be attended on top priority since occupants are suffering. 30th PNM Minutes (26&27.6.2014)Drain work tender opened on 18.6.2014. Road repair tender opened on 1.7.2014.31st PNM Minutes (20& 21.1.2015)Work has been awarded. Will be completed by 31.3.2015.32nd PNM Minutes (17 & 18.6.2015)Inspection was conducted and it was found that Pukka drain is not required since quarters are at top and ground attached to above quarters is at much lower therefore no issues of drainage. Main road concrete work is already awarded will be taken-up shortly, further small approach work will be done through zonal contract, W.O. already approved. TDC: 01.08.2015.33rd PNM Minutes (22 & 23.12.2015)Agency is already available, it was having three sub works out of which two works is over and third i.e., above road and drain work in CLR will be taken up soon.Revised TDC: 29.02.2016.34th PNM Minutes (29 & 30.03.2016) 35th PNM Minutes (19 & 20.01.2017) Work is in progress, TDC 28.02.2017.

Subject No 28/28 Sr.DCM, Sr.DEN/Central

Pathway provided towards Dharwad end to reach platform No, 2,3,4,&5 is damaged. Thereby the staff working are put to difficulties the pathway needs to be repaired immediately. 30th PNM Minutes (26&27.6.2014)Pathway to PF 4 & 5 towards GDG end is available. Pathway to PF1, 2 & 3 towards GDG end not feasible.Pathway to PF 1, 2, 3, 4 & 5 towards DWR end is available. Pathway connecting PF 4 & 5 needs to be repaired to move the parcel trollies and will be attended shortly.31st PNM Minutes (20& 21.1.2015)Joint inspection with DS/SWRMU will be organized on 24.1.2015.32nd PNM Minutes (17 & 18.6.2015)Provision of pathway for platform 2 & 3 towards GDG end is not feasible. Possibility of Motor operated trolleys to be explored by Commercial Department.33rd PNM Minutes (22 & 23.12.2015)Battery operated platform truck 2 tonne capacity is available for the use of Parcel Office at UBL, HPT, BAY & VSG stations. P.O has already been issued for procurement of 4 numbers of Batteries for the above Motor operated platform truck. (P.O.No.67.15.5019.1. 57102 dated 05.11.2015).34th PNM Minutes (29 & 30.03.2016) Sr.DCM: Provision of pathway for platform 2&3 towards GDG end is not feasible (Portion of pathway towards GDG end is discussed & closed). Possibility of Motor operated trolley has been explored. Battery for motor operated trolley has been indented. M/s. United Oxide Product Pvt Ltd, Goa (Supplier) informed the batteries will be supplied with in the time frame i.e. 14.03.201635th PNM Minutes (19 & 20.01.2017) Sr.DEN/C: Work will be attended by the end of March, 2017.Sr.DCM: Four number of Jumbo batteries has already been supplied by M/S. United Lead Oxide Products Pvt. Ltd., Goa, and the same have been sent to Dy.CWM/Carriage Repairs/UBLS on 10.06.2016 to fix into the battery operated trucks after repair work for the use at Parcel Offices at UBL, VSG, BAY & BGM. In turn Dy.CWM/Carriage Repairs/UBLS has repaired all 04 Nos of Battery operated trucks and sent to Parcel Office/UBL for the use of Parcel Luggage.

Subject No 26/04 Sr.DPOPage 31 of 35

Page 32: · Web viewPresently EMD Diesel Loco shed, UBL is maintaining 201 locos with the staff sanction for 150 Locos. Staffs are facing difficulty to maintain. So this union requests the

Problems at BNHT Station: At BNHT Station earlier only trains from RNJP and BNHT were dealt, now trains beside passing through TNGL bypass to JVSL trains from PGST,SMLI,YTG,SVSL,RDGJWT are coming from GNR and engine to be reserved and sent to Jindal. Average at the rate of 450 trains been dealt by BNHT staff, the work load to points man is increased by many folds. This union request for job analysis and introduce 8 hours roaster. 30th PNM Minutes (26&27.6.2014)Job analysis conducted from 10.07.2013 to 13.07.2013 and file has been put up for further orders. 31st PNM Minutes (20& 21.1.2015)Job analysis has been proposed to be conducted from 4.2.2015 to 7.2.2015.32nd PNM Minutes (17 & 18.6.2015)Remarks Sr.DPO: The results of Job analysis case file returned from CPO/SWR, seeking some clarifications, the same is under process.34th PNM Minutes (29 & 30.03.2016) 35th PNM Minutes (19 & 20.01.2017) The results of Job analysis case file returned from CPO/SWR, seeking some clarifications, the same is under process.

Subject No 26/06 Sr.DEN/E

c) Staff working at TNGL: Bypass are finding untold hardship while reporting for duty at bypass. Since there is no approach road to go to cabin, they have to walk in thorny bushes, especially at night times, they are finding very difficult and they have to risk their lives. This union urges to provide approach road to bypass cabin to avoid any untold hardships.30th PNM Minutes (26&27.6.2014)One Pathway of 200 M with the ramp is in progress duly connecting near starter to facilitate the movement. Work will be completed by 31.7.2014.31st PNM Minutes (20& 21.1.2015)Work awarded on 28.12.2014. Will be completed by 31.3.2015.33rd PNM Minutes (22 & 23.12.2015)No remarks. This subject could not be discussed in the meeting due to paucity of time.34th PNM Minutes (29 & 30.03.2016)

Subject No 26/09 DEN/HQ, Sr.DPO

Problems of SSE/Water works/Hubli:At Hubli Railway Qtrs and service building extended to large extent and there are five SSE/Works to maintain Qtrs and service building. To maintain Water works supply for the area covered by five SSE/works there is only one SSE/Water works is posted and there is no sufficient staff is available with SSE/Water works causing much problem to maintain the supply of water. Out of 23 sanction of skilled strength there are 16 employees are available and against sanction of 67 Helpers only 49 staff are available and there is a vacancy of 25 staff (7 Group C & 18 Group D ). Unless otherwise vacancies are filled in all the categories, it is very difficult to carry out the maintenance of water supply. Hence necessary action to be taken to supply sufficient materials with one vehicle and action to be taken to fill up the vacancies of SSE/WW to overcome the problems. It is also suggested, all the SSEs of UBL division must and should work as an SSE/WW for a period of two years on the rotation basis to understand the water supply system and to improve the water supply in the division. 30th PNM Minutes (26&27.6.2014)For hiring of vehicle initial administrative approval has been taken and sent for finance vetting to HQ on 02.01.2014. 31st PNM Minutes (20& 21.1.2015)The proposal is with Divisional Finance. 32nd PNM Minutes (17 & 18.6.2015)

(a) As the post of Mason, Carpenter &Sanitary Khalasi is required to maintain Railnagar& New Vidyaranya Nagar by SSE/Water Works in addition to his own. Hence, these 3 posts can be transferred from other works unit of Hubli to SSE/Water Works.(b) Proposal has been concurred for hiring of one lorry for the use of SSE/Works Units at Hubli.

Page 32 of 35

Page 33: · Web viewPresently EMD Diesel Loco shed, UBL is maintaining 201 locos with the staff sanction for 150 Locos. Staffs are facing difficulty to maintain. So this union requests the

33rd PNM Minutes (22 & 23.12.2015)(a) Sr.DEN/HQ: The vacancy position of Group-C & Group-D are given below:-

Category Sanction Actual VacancyGroup-C 20 11 09Group-D 64 55 09

Out of 55Nos. are being used as valve men. Based on justification hiring of lorry was cleared by division finance and approved by DRM, the matter has been referred to HQ on 07/07/2015 for the final approval.(b) Sr.DPO: Present sanction, actual are as followed.34th PNM Minutes (29 & 30.03.2016) Remarks DEN/HQ: Due to shortage of department staff with SE/W/WW/UBL for maintenances of quarters, it is proposed to have an agency for maintenance for colony through outsourcing. Proposal submitted to accounts for vetting long back in the month of July 2016, the same is not vetted. Once the proposals vetted tender will be invited for maintenance of quarters, thereby work load of JE/W/WW/UBL will come down to certain extent. With regard to shortage of staff. Remarks of Sr.DPO: Present sanction, actual are as follows

SSE/Works/WW/UBL Vacancy position

TradeMCM Grade-I Grade-II Grade-III Total

S A V E S A V E S A V E S A V E S A V E Mason 1 0 1 0 2 0 2 0 0 0 0 0 0 2 0 -2 3 2 3 -2 Carpenter 0 0 0 0 1 0 1 0 0 0 0 0 0 0 0 0 1 0 1 0 Painter 1 0 1 0 0 0 0 0 0 0 0 0 0 2 0 -2 1 2 1 -2 Fitter 2 0 2 0 5 0 5 0 3 1 2 0 2 6 0 -4 12 7 9 -4 Black Smith 0 0 0 0 1 3 0 -2 1 1 0 0 0 0 0 0 2 4 0 -2 Welder 0 0 0 0 0 0 0 0 0 1 0 -1 0 0 0 0 0 1 0 -1 Total 4 0 4 0 9 3 8 -2 4 3 2 -1 2 10 0 -8 19 16 14 -11

Group-‘D’Category Sanction Actual Vacancy Excess

Kh. Helper 51 48 3 0W/Man 2 3 0 1Care Taker 1 1 0 0Total 54 52 2 1

35th PNM Minutes (19 & 20.01.2017) The process for filling up of the vacancies in Artisans/Gr.III from Kh/Helper to be processed by Sr.DPO on priority for entire UBL Division.

Subject No 26/10 Sr.DEN/C

Problems of BJP Station :Improvement to drainage system at Bijapur Railway Colony:Railway Colony is totally open drainage system it is technically failed and having no proper slope, and sewage water of toilet and Bathrooms are mixed and left in open drainage which is overflowing in low lying old quarters which are having below ground level and stagnated in the colony by this entire colony occupants are facing in hygienic and may cause to Dengue mosquitoes are being spread. SWRMU/BJP branch urges to provide underground drainage system to avoid spreading dengue disease and spreading of mosquitoes. 30th PNM Minutes (26&27.6.2014)One septic tank will be provided under zonal work contract and work will be completed by September 2014.31st PNM Minutes (20 & 21.1.2015)

(a) Zonal agreement is not existing. Page 33 of 35

Page 34: · Web viewPresently EMD Diesel Loco shed, UBL is maintaining 201 locos with the staff sanction for 150 Locos. Staffs are facing difficulty to maintain. So this union requests the

(b) Work will be taken up under special revenue. 32nd PNM Minutes (17 & 18.6.2015)The work for UGD and construction of septic tank has been proposed and sanctioned. Tender will be invited within a week’s time. After finalization of the tender, work will be completed in 4 months after award of contract. 33rd PNM Minutes (22 & 23.12.2015)Two times tender called no offer has been received. And again recalled and will be opened on 15.12.2015.34th PNM Minutes (29 & 30.03.2016) 35th PNM Minutes (19 & 20.01.2017) Work awarded on 30.12.2016, work will be completed by 30.05.2017.

Subject No 26/28 Sr.DEN/W

Problems of CLR Branch :c) Linking of foot over bridge from Platform No.2 not provided. 30th PNM Minutes (26&27.6.2014)The matter will be decided after joint site inspection with DS/SWRMU. 31st PNM Minutes (20& 21.1.2015)Joint site inspection with DS/SWRMU will be done in the first week of February 2015.32nd PNM Minutes (17 & 18.6.2015)Joint site inspection will be done with DS/SWRMU.33rd PNM Minutes (22 & 23.12.2015)Joint site inspection with DS/SWRMU will be done on 20.01.2016.34th PNM Minutes (29 & 30.03.2016) 35th PNM Minutes (19 & 20.01.2017) Technically not feasible, site to be jointly inspected by Divisional Secretary.

Subject No 25/19 Sr.DEN/E

Repair to RNJP Yard: At RNJP station at the dead end of the station always tracks are merged with water. On duty points man and other staff faces untold problems while operating the point lever and performing shunting. Due to water logged nothing is visible this area is prone to have poisonous snakes and other harmful creatures, to avoid this problems a proper drainage to be provided and make risk free to staff. 30th PNM Minutes (26&27.6.2014)Tender opened on 24-12-2013. Tender under finalization. Work will be completed by 30.9.2014.31st PNM Minutes (20& 21.1.2015)Work awarded on 28.12.2014. Will be completed by 31.3.2015.32nd PNM Minutes (17 & 18.6.2015)Work is in progress by agency,work will be completed by 30.06.2015.33rd PNM Minutes (22 & 23.12.2015)Work is completed on 15.09.2015.34th PNM Minutes (29 & 30.03.2016) 35th PNM Minutes (19 & 20.01.2017) RNJP dead end drainage work completed on July 2015

Subject No 23/12 Sr.DEN/W

Construction of Quarters at VSG: b) 8 units of new construction of Qtrs, work is stopped. This union urges the construction to be completed immediately. Since there is acute shortage of Qtrs at VSG.30th PNM Minutes (26&27.6.2014)Clarification from HQ has been received and the tender will be invited within 7 days.31st PNM Minutes (20 & 21.1.2015)

(a) Tender cancelled on 2.1.15 for technical reasons. Calling of fresh tender is under process. (b) Tender will be invited after receiving guidelines on composite work from HQrs.

32nd PNM Minutes (17 & 18.6.2015)Composite Tender is due for opening on 30.6.2015.

Page 34 of 35

Page 35: · Web viewPresently EMD Diesel Loco shed, UBL is maintaining 201 locos with the staff sanction for 150 Locos. Staffs are facing difficulty to maintain. So this union requests the

33rd PNM Minutes (22 & 23.12.2015)Tender been opened on 03.11.2015, under finalization. Work will be taken.34th PNM Minutes (29 & 30.03.2016) 35th PNM Minutes (19 & 20.01.2017) Work in progress for 12 units. And further tender is scheduled to be open for 18 units on driver hills for completion of balance quarters.

Subject No 17/02 DEE

b) Somalapuam station: Reliability improvement of EB power supply by providing 11 KV power feeder.30th PNM Minutes (26&27.6.2014)Improvement of powersupply for express feeder is under process for registration to concerned APSEB authority.31st PNM Minutes (20& 21.1.2015)Improvement of power supply for express feeder is under process for registration to concerned APSEB authority.32nd PNM Minutes (17 & 18.6.2015)Estimate received from APSEB for SLM, it will be processed further.33rd PNM Minutes (22 & 23.12.2015)Estimate received from APSEB for SLM and proposal under process.35th PNM Minutes (19 & 20.01.2017) Power supply through separate 11KV transformer work has already been sanctioned. APCPDGL has not given estimate despite repeated requests.

* * * * * * * * THE END ********